CN218834622U - Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process - Google Patents

Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process Download PDF

Info

Publication number
CN218834622U
CN218834622U CN202222396341.8U CN202222396341U CN218834622U CN 218834622 U CN218834622 U CN 218834622U CN 202222396341 U CN202222396341 U CN 202222396341U CN 218834622 U CN218834622 U CN 218834622U
Authority
CN
China
Prior art keywords
frame
wall
fixedly connected
gear
outer frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222396341.8U
Other languages
Chinese (zh)
Inventor
吴岸松
钟仁华
李威
彭诗阳
朱娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xinheng Ecological Environment Research Institute Co ltd
Original Assignee
Hunan Xinheng Ecological Environment Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xinheng Ecological Environment Research Institute Co ltd filed Critical Hunan Xinheng Ecological Environment Research Institute Co ltd
Priority to CN202222396341.8U priority Critical patent/CN218834622U/en
Application granted granted Critical
Publication of CN218834622U publication Critical patent/CN218834622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a fall and make an uproar clearance water spray dust removal integration processing line among building rubbish disposal process belongs to building rubbish processing line technical field, which comprises a frame, the broken storehouse of inner wall fixedly connected with of frame, the inner wall in broken storehouse rotates and is connected with two sets of broken wheels, and is two sets of the one end of broken wheel extends to the outside of frame, and two sets of broken wheels extend the outside one end of frame a set of gear of fixedly connected with respectively, a motor is installed to the outer wall of frame, and the output fixed mounting of a motor has drive gear, the outer wall of frame rotates and is connected with No. two gears, no. two gears with lean on a left gear engagement, and drive gear respectively with No. two gears and lean on a gear engagement on the right side, the inner wall of frame is provided with the crushed aggregates conveyer belt. The beneficial effects of the utility model are that can fetch the water economy resource of water of circling, can sort out the metals such as reinforcing bar in the building rubbish and be convenient for retrieve.

Description

Cleaning of making an uproar water spray dust removal integration processing line falls in construction waste treatment process
Technical Field
The utility model relates to a building rubbish handles the line field, specifically says so a clearance of making an uproar is fallen in building rubbish processing procedure and water spray dust removal integration handles line.
Background
In the high-speed development of urbanization, a lot of old housing construction are demolishd and are rebuilt, make the city seem more beautiful and magnificent, but produced a lot of building rubbish equally, these building rubbish are handled very trouble, people can choose to look for these building rubbish to bury by individual place mostly at first, but along with the development of science and technology, fall the birth of the clearance water spray dust removal integration processing line of making an uproar in the building rubbish processing procedure, make building material with the building rubbish breakage then once more, the processing problem of a part of building rubbish of solution.
The existing construction waste disposal line removes dust through spraying water in the using process, a large amount of water is evaporated after being sprayed out, great waste is caused to water resources, and the existing construction waste disposal line cannot separate out metal objects such as reinforcing steel bars mixed in construction waste, so that the recycling of resources is not convenient.
The above prior art has the following problems:
(1) Some construction waste treatment lines remove dust by spraying water in the using process, a large amount of water is evaporated after being sprayed out, and thus, water resources are greatly wasted;
(2) The existing construction waste treatment line cannot separate the reinforcing steel bars mixed in the construction waste, and is inconvenient to recycle.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a make an uproar clearance water spray dust removal integration processing line falls in building rubbish disposal process to solve the problem that proposes in the above-mentioned background art.
The technical scheme of the utility model is that: including the frame, the broken storehouse of inner wall fixedly connected with of frame, the inner wall in broken storehouse rotates and is connected with two sets of broken wheels, and is two sets of the one end of broken wheel extends to the outside of frame, and two sets of broken wheels extend the outside one end of frame a set of gear of fixedly connected with respectively, the outer wall of frame is installed a motor, and the output fixed mounting of a motor has drive gear, the outer wall of frame rotates and is connected with No. two gears, no. two gears with lean on a left gear engagement, and drive gear respectively with No. two gears and lean on a gear engagement on the right side, the inner wall of frame rotates and is connected with the crushed aggregates conveyer belt, the crushed aggregates conveyer belt is located the below in broken storehouse, the inner wall fixedly connected with of frame is located the electro-magnet that the crushed aggregates conveyer belt leaned on right side one end top, the outer wall sliding connection of electro-magnet has the push pedal, the lateral wall sliding connection of frame has the rack, the spout has been seted up with rack contact position, the one end fixed connection of rack is on the top of push pedal, no. two motors are installed to the lateral wall of frame, the output of No. two motors extends to inside, the baffle is connected with the multiunit filter media baffle, and the baffle of the filter media baffle is equipped with the multiunit cotton top of the baffle.
Furthermore, the inner wall of the outer frame is provided with a metal conveyor belt, the metal conveyor belt is positioned under one end, close to the right side, of the electromagnet, and one end, positioned above the metal conveyor belt, of the electromagnet is not magnetic.
Furthermore, soundproof cotton is fixedly connected inside the side wall of the outer frame.
Furthermore, the top end of the outer frame is provided with one end of a feeding conveyor belt, and the other end of the feeding conveyor belt is arranged on the ground.
Further, the water pump is installed to header tank inner wall bottom, the lateral wall fixedly connected with water pipe of frame, the one end of water pipe and the output intercommunication of water pump, the top fixedly connected with stay tube of frame, the other end intercommunication of water pipe communicates to the stay tube, the lateral wall intercommunication of stay tube has the nozzle to the group.
Further, the crushed aggregates conveyer belt is equipped with the inside collecting box that is located the frame by the below of right side one end, the metal conveyer belt is equipped with another group by the below of right side and is located the inside collecting box of frame, the multiunit universal wheel is installed to the bottom of collecting box, and the lateral wall of frame sets up the opening of two sets of confession collecting box roll-offs.
The utility model discloses an improve and provide a it makes an uproar clearance water spray dust removal integration processing line to fall in the building rubbish treatment process here, compare with prior art, have following improvement and advantage:
one is as follows: the utility model discloses water after spouting from the nozzle, fall on building rubbish, drench building rubbish to reach the purpose of dust removal, unnecessary water falls to flow into the header tank, then gets into the header tank bottom through the filtration of filter pulp and filter media, then is taken out by the water pump and is recycled thereby reaching the purpose of using water wisely;
and the second step is as follows: the utility model discloses building rubbish after by the breakage falls into on the crushed aggregates conveyer belt from broken storehouse bottom, then along with the operation of crushed aggregates conveyer belt move right, the reinforcing bar among the building rubbish is adsorbed by the electro-magnet after moving to the electro-magnet below, no. two motors rotate and drive the rack through No. three gears and slide, the rack drives the push pedal and moves right, thereby promote the reinforcing bar and slide in the electro-magnet bottom, because this section of electro-magnet right side one end is located metal conveyor belt top does not have magnetism after the reinforcing bar slides to the electro-magnet right-hand member, so the reinforcing bar falls into metal conveyor belt, then in the collecting box that leans on the right side is gone into in metal conveyor belt's drive whereabouts, thereby reach the purpose of sorting out from building rubbish with this kind of metal object of reinforcing bar.
Drawings
The invention is further explained below with reference to the figures and examples:
fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
fig. 3 is a schematic rear view of the present invention;
FIG. 4 is a schematic view of the three-dimensional structure of the crushing bin of the present invention;
fig. 5 is a schematic view of a three-dimensional structure of the support tube of the present invention.
Description of reference numerals: 1. an outer frame; 2. a crushing bin; 3. a crushing wheel; 4. a first gear; 5. a first motor; 6. a second gear; 7. a scrap conveyor belt; 8. an electromagnet; 9. pushing the plate; 10. a rack; 11. a second motor; 12. a third gear; 13. a metal conveyor belt; 14. a water collection tank; 15. a partition plate; 16. a collection box; 17. a water pump; 18. a feeding conveyor belt; 19. a water pipe; 20. supporting a pipe; 21. and (4) a nozzle.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 5, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a noise reduction, cleaning, water spraying and dust removal integrated treatment line in a construction waste treatment process through improvement, as shown in figures 1-5, the line comprises an outer frame 1, a crushing bin 2 is fixedly connected to the inner wall of the outer frame 1, two groups of crushing wheels 3 are rotatably connected to the inner wall of the crushing bin 2, one ends of the two groups of crushing wheels 3 extend to the outside of the outer frame 1, one ends of the two groups of crushing wheels 3 extending to the outside of the outer frame 1 are respectively and fixedly connected with a group of first gears 4, a first motor 5 is installed on the outer wall of the outer frame 1, a driving gear is fixedly installed at the output end of the first motor 5, a second gear 6 is rotatably connected to the outer wall of the outer frame 1, the second gear 6 is meshed with the first gear 4 close to the left side, the driving gear is respectively meshed with the second gear 6 and the first gear 4 close to the right side, a crushed material conveying belt 7 is arranged on the inner wall of the outer frame 1, the crushed aggregates conveyor belt 7 is positioned below the crushing bin 2, the inner wall of the outer frame 1 is fixedly connected with an electromagnet 8 positioned above one end of the crushed aggregates conveyor belt 7 close to the right side, the outer wall of the electromagnet 8 is connected with a push plate 9 in a sliding manner, the side wall of the outer frame 1 is connected with a rack 10 in a sliding manner, the outer frame 1 is provided with a sliding groove at the position contacting with the rack 10, one end of the rack 10 is fixedly connected with the top end of the push plate 9, the side wall of the outer frame 1 is provided with a second motor 11, the output end of the second motor 11 extends into the outer frame 1, the output end of the second motor 11 is fixedly connected with a third gear 12 positioned in the outer frame 1, the third gear 12 is meshed with the rack 10, the inner wall of the outer frame 1 is fixedly connected with a water collecting tank 14, the inner wall of the water collecting tank 14 is fixedly connected with a partition plate 15, the top end of the partition plate 15 is provided with a plurality of holes, a plurality of groups of filter materials are placed above the partition plate 15, and filter cotton is laid above the plurality of groups of filter materials, the metal such as reinforcing bar is convenient for be separated from the building rubbish to thereby can carry out reuse to water economy resource.
The inner wall setting of frame 1 has connect metal conveyor 13, and metal conveyor 13 is located electro-magnet 8 and leans on right side one end under, and the one end that electro-magnet 8 is located metal conveyor 13 top does not have magnetism, is convenient for collect the reinforcing bar.
The inside fixedly connected with soundproof cotton of lateral wall of frame 1 has increased the sound-proof performance of device.
The top of frame 1 is provided with the one end of material loading conveyer belt 18, and the other end setting of material loading conveyer belt 18 is on ground, is convenient for transport the construction waste to in broken storehouse 2.
Water pump 17 is installed to header tank 14 inner wall bottom, and the lateral wall fixedly connected with water pipe 19 of frame 1, the one end of water pipe 19 and the output intercommunication of water pump 17, the top fixedly connected with stay tube 20 of frame 1, the other end intercommunication of water pipe 19 communicates to stay tube 20, and the lateral wall intercommunication of stay tube 20 has to the group nozzle 21, is convenient for reach the purpose of removing dust in the broken in-process of building rubbish.
The crushed aggregates conveyer belt 7 is equipped with below by right side one end and is located frame 1 inside collecting box 16, and metal conveyer belt 13 is equipped with another group by right side below and is located frame 1 inside collecting box 16, and the multiunit universal wheel is installed to the bottom of collecting box 16, and the opening of two sets of confession collecting box 16 roll-offs is seted up to the lateral wall of frame 1, is convenient for take out collecting box 16 to can add water in the header tank 14 through the opening when there is not water in the header tank 14.
The working principle is as follows: starting the device, then putting the construction waste on a feeding conveyor belt 18, driving the construction waste by the operation of the feeding conveyor belt 18, enabling the construction waste to fall into a crushing bin 2, driving a first gear 4 and a second gear 6 to rotate respectively by a first motor 5 through a driving gear, thereby enabling two groups of crushing wheels 3 to rotate oppositely, enabling the two groups of crushing wheels 3 to crush the construction waste, pumping water into a supporting tube 20 by a water pump 17 through a water pipe 19 in the process, spraying the water out through a nozzle 21, spraying the water into the crushing bin 2 to wet the construction waste, preventing dust from being generated in the process of treating the construction waste, enabling the crushed construction waste to fall onto a crushed material conveyor belt 7 from the bottom end of the crushing bin 2, enabling the crushed construction waste to be driven by the crushed material conveyor belt 7 to move towards the upper right, and when the construction waste moves below an electromagnet 8, metals such as reinforcing steel bars in the construction waste are adsorbed by the electromagnet 8, the second motor 11 is driven to rotate, the third gear 12 rotates to drive the rack 10 to slide rightwards, the rack 10 drives the push plate 9 to slide rightwards on the surface of the electromagnet 8, so as to push the metal adsorbed by the electromagnet 8 to slide rightwards, when the metal adsorbed by the electromagnet 8 slides to the upper part of the metal conveyor belt 13, the metal loses the magnetic adsorption of the electromagnet 8 and falls onto the metal conveyor belt 13, then the metal is driven by the metal conveyor belt 13 to move rightwards and finally falls into the collection box 16 close to the right, then the second motor 11 rotates reversely to push the push plate 9 to reset, and the residual crushed construction waste on the crushed material conveyor belt 7 falls into the collection box 16 close to the left, part of water sprayed into the crushed material conveyor 2 is attached to the construction waste, and part of water flows downwards and falls onto the crushed material conveyor belt 7 and finally flows into the crushed material box 14 under the crushed material conveyor belt 7, the water is filtered by the filter cotton, then flows onto the partition plate 15 after secondary filtration of filter materials, and then flows into the bottom of the inner wall of the water collecting tank 14 through the holes of the partition plate 15, so as to be pumped out by the water pump 17 for use again, when the two groups of collecting tanks 16 are filled, the collecting tanks are pulled out from the outer frame 1 and pushed into the empty collecting tanks 16 again, and if the water in the water collecting tank 14 does not exist, the water can be added into the water collecting tank 14 through the openings on the side wall of the outer frame 1.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a line is handled in integration of making an uproar clearance water spray dust removal that falls among construction waste disposal process which characterized in that: comprises an outer frame (1), wherein a crushing bin (2) is fixedly connected to the inner wall of the outer frame (1), two groups of crushing wheels (3) are rotatably connected to the inner wall of the crushing bin (2), one ends of the two groups of crushing wheels (3) extend to the outside of the outer frame (1), one ends of the two groups of crushing wheels (3) extending out of the outside of the outer frame (1) are respectively fixedly connected with a group of first gears (4), a first motor (5) is installed on the outer wall of the outer frame (1), a driving gear is fixedly installed at the output end of the first motor (5), a second gear (6) is rotatably connected to the outer wall of the outer frame (1), the second gear (6) is meshed with the first gear (4) close to the left side, the driving gear is respectively meshed with the second gear (6) and the first gear (4) close to the right side, a crushed aggregate conveyor belt (7) is arranged on the inner wall of the outer frame (1), the crushed aggregate conveyor belt (7) is arranged below the crushing bin (2), a sliding rack sliding chute (10) is connected with an electromagnet (8) which is arranged above one end of the outer wall of the outer frame (1), the utility model discloses a multi-unit filter material, including frame (1), rack (10), output fixedly connected with frame (1), inner wall fixedly connected with baffle (15), the one end fixed connection of rack (10) is on the top of push pedal (9), no. two motor (11) are installed to the lateral wall of frame (1), the output of No. two motor (11) extends to inside frame (1), the output fixedly connected with of No. two motor (11) is located No. three gear (12) of frame (1) inside, no. three gear (12) and rack (10) meshing, the inner wall fixedly connected with header tank (14) of frame (1), the inner wall fixedly connected with baffle (15) of header tank (14), and the top of baffle (15) has seted up the multiunit trompil, the multiunit filter media has been placed to the top of baffle (15), and the filter pulp has been laid to the top of multiunit filter media.
2. The integrated treatment line for noise reduction, cleaning, water spraying and dust removal in the construction waste treatment process according to claim 1, characterized in that: the inner wall of frame (1) is provided with metal conveyer belt (13), metal conveyer belt (13) are located electro-magnet (8) and lean on under right side one end, electro-magnet (8) are located the one end of metal conveyer belt (13) top and do not have magnetism.
3. The integrated treatment line for noise reduction, cleaning, water spraying and dust removal in the construction waste treatment process according to claim 1, characterized in that: and soundproof cotton is fixedly connected inside the side wall of the outer frame (1).
4. The integrated processing line for noise reduction, cleaning, water spraying and dust removal in the construction waste processing procedure according to claim 1, which is characterized in that: the top end of the outer frame (1) is provided with one end of a feeding conveyor belt (18), and the other end of the feeding conveyor belt (18) is arranged on the ground.
5. The integrated treatment line for noise reduction, cleaning, water spraying and dust removal in the construction waste treatment process according to claim 1, characterized in that: the water pump (17) is installed to header tank (14) inner wall bottom, the lateral wall fixedly connected with water pipe (19) of frame (1), the one end of water pipe (19) and the output intercommunication of water pump (17), the top fixedly connected with stay tube (20) of frame (1), the other end intercommunication of water pipe (19) communicates to stay tube (20), the lateral wall intercommunication of stay tube (20) has to organize nozzle (21).
6. The integrated treatment line for noise reduction, cleaning, water spraying and dust removal in the construction waste treatment process according to claim 2, characterized in that: crushed aggregates conveyer belt (7) are equipped with below by right side one end and are located frame (1) internal collection box (16), metal conveyer belt (13) are equipped with another a set of frame (1) internal collection box (16) that is located by the right side below, the multiunit universal wheel is installed to the bottom of collection box (16), and the lateral wall of frame (1) sets up the opening of two sets of confession collecting box (16) roll-off.
CN202222396341.8U 2022-09-09 2022-09-09 Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process Active CN218834622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222396341.8U CN218834622U (en) 2022-09-09 2022-09-09 Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222396341.8U CN218834622U (en) 2022-09-09 2022-09-09 Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process

Publications (1)

Publication Number Publication Date
CN218834622U true CN218834622U (en) 2023-04-11

Family

ID=87306870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222396341.8U Active CN218834622U (en) 2022-09-09 2022-09-09 Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process

Country Status (1)

Country Link
CN (1) CN218834622U (en)

Similar Documents

Publication Publication Date Title
CN107310186A (en) A kind of house refuse sewage extrudes processing unit (plant)
CN207142986U (en) A kind of integrated complexes of deep treatment of domestic sewage
CN215591613U (en) Municipal refuse strorage device with solid-liquid separation function
CN218834622U (en) Noise reduction, cleaning, water spraying and dust removal integrated treatment line in construction waste treatment process
CN211568997U (en) Sanitation car is transported in refuse handling
CN216703562U (en) Highway service area domestic sewage integration treatment device
CN206382319U (en) Clean rubbish and centrally dispose system
CN205913303U (en) Domestic unimog
CN112169889B (en) Recovery unit is smashed to building rubbish
CN213409783U (en) Solid garbage treatment equipment
CN212681107U (en) Building engineering refuse treatment device
CN212607276U (en) Compression type garbage transport vehicle
CN211247712U (en) Energy-saving environment-friendly in-situ advanced treatment equipment for building wastes
CN210230107U (en) Building rubbish collecting and treating pool
CN109606978B (en) Road garbage environment-friendly treatment device and construction method thereof
CN211226415U (en) Refuse dump leachate collection device
CN217141406U (en) Waste metal recovery device
CN207954778U (en) A kind of organic waste screw press feed device
CN210065392U (en) Environment-friendly resource recovery sewage treatment device
CN212468360U (en) Construction waste treatment device
CN217526460U (en) Oil-water separation device with sundry cleaning function
CN217595479U (en) Industry is useless processing apparatus admittedly with dust removal mechanism
CN213833180U (en) Domestic waste minimizing and clearing device
CN216879780U (en) Dust removal and noise reduction building rubbish stone crushing equipment
CN215324774U (en) Garbage house convenient to put in and clear transport

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant