CN218809998U - An assembled wall panel hoisting device - Google Patents

An assembled wall panel hoisting device Download PDF

Info

Publication number
CN218809998U
CN218809998U CN202222385962.6U CN202222385962U CN218809998U CN 218809998 U CN218809998 U CN 218809998U CN 202222385962 U CN202222385962 U CN 202222385962U CN 218809998 U CN218809998 U CN 218809998U
Authority
CN
China
Prior art keywords
wall panel
wheel
traction
rotating seat
reversing wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222385962.6U
Other languages
Chinese (zh)
Inventor
张弓
杨杰
胡旭光
卢纯义
李宇泽
汪剑锋
刘锡成
施祖安
贾建明
朱烈光
吕小波
蒋睿鹏
王平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN202222385962.6U priority Critical patent/CN218809998U/en
Application granted granted Critical
Publication of CN218809998U publication Critical patent/CN218809998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种装配式墙板吊装装置,包括导轨,导轨的上侧滑动连接有底座,底座的上侧转动连接有转动座,转动座的上侧固定连接有支架,支架固定连接有两个相互平行的连接臂,连接臂的一端倾斜向上延伸并形成吊臂,吊臂的一端转动连接有第一换向轮,连接臂的中部转动连接有第二换向轮,第一换向轮的下侧设置有横梁,横梁的两端转动连接有用于吸附檩条的磁轮,横梁设置有用于连接墙板的连接装置,转动座设置有牵引装置,横梁的两端均连接有两个牵引绳,牵引绳经过第一换向轮、第二换向轮并和牵引装置连接。本实用新型为了解决现有的吊机在吊装时墙板稳定性差的缺点,提出一种装配式墙板吊装装置,吊装墙板稳定性好。

Figure 202222385962

The utility model discloses an assembled wall panel hoisting device, which comprises a guide rail, the upper side of the guide rail is slidingly connected with a base, the upper side of the base is rotatably connected with a rotating seat, the upper side of the rotating seat is fixedly connected with a bracket, and the bracket is fixedly connected with a Two connecting arms parallel to each other, one end of the connecting arm extends obliquely upwards to form a boom, one end of the boom is rotatably connected to the first reversing wheel, the middle part of the connecting arm is rotatably connected to the second reversing wheel, the first reversing wheel The lower side of the wheel is provided with a beam, the two ends of the beam are rotatably connected with a magnetic wheel for absorbing purlins, the beam is provided with a connecting device for connecting the wallboard, the rotating seat is provided with a traction device, and both ends of the beam are connected with two traction Rope, the traction rope passes through the first reversing wheel, the second reversing wheel and is connected with the traction device. The utility model proposes an assembled wall panel hoisting device in order to solve the disadvantage of poor stability of the wall panel when the existing crane is hoisting, which has good stability for hoisting the wall panel.

Figure 202222385962

Description

一种装配式墙板吊装装置An assembled wall panel hoisting device

技术领域technical field

本实用新型涉及装配式墙板吊装技术领域,尤其涉及一种装配式墙板吊装装置。The utility model relates to the technical field of hoisting assembled wallboards, in particular to a hoisting device for assembled wallboards.

背景技术Background technique

电力建筑用于放置电力设备,现有的电力建筑往往采用装配式墙板做建筑的外立面,装配时,需要搭设脚手架,人员站在脚手架上并在墙体的外侧安装型钢,然后再在型钢上安装墙板,由于墙板的体积较大和重量较重,需要采用吊机将墙板吊装至安装位置,然后人员将墙板通过连接件安装在型钢上,现有的装配方法安全隐患较大,具体的,吊机通过一根吊绳和墙板连接,墙板在下降的过程中容易产生晃动,从而使得墙板和吊绳之间的连接松动,另外,在吊装时如遇大风,大风将吹动墙板,并使得连接在吊机上的墙板晃动,严重时将与站立在脚手架上的人员发生碰撞。Power buildings are used to place power equipment. Existing power buildings often use prefabricated wall panels as the facade of the building. During assembly, scaffolding needs to be erected. Personnel stand on the scaffold and install steel profiles on the outside of the wall. Wall panels are installed on section steel. Due to the large size and heavy weight of the wall panels, it is necessary to use a crane to hoist the wall panels to the installation position, and then install the wall panels on the section steel through connectors. The existing assembly method has more safety hazards. Large, specifically, the crane is connected to the wall panel through a sling rope, and the wall panel is prone to shake during the descent process, which makes the connection between the wall panel and the sling rope loose. In addition, in case of strong wind during hoisting, The strong wind will blow the wall panel and make the wall panel connected to the crane shake, and in severe cases, it will collide with people standing on the scaffold.

实用新型内容Utility model content

本实用新型为了解决现有的吊机在吊装时墙板稳定性差的缺点,提出一种装配式墙板吊装装置,吊装墙板稳定性好。The utility model proposes an assembled wall panel hoisting device in order to solve the disadvantage of poor stability of the wall panel when the existing crane is hoisting, which has good stability for hoisting the wall panel.

为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种装配式墙板吊装装置,包括导轨,导轨的上侧滑动连接有底座,底座的上侧转动连接有转动座,转动座的上侧固定连接有支架,支架固定连接有两个相互平行的连接臂,连接臂的一端倾斜向上延伸并形成吊臂,吊臂的一端转动连接有第一换向轮,连接臂的中部转动连接有第二换向轮,第一换向轮的下侧设置有横梁,横梁的两端转动连接有用于吸附檩条的磁轮,横梁设置有用于连接墙板的连接装置,转动座设置有牵引装置,横梁的两端均连接有两个牵引绳,牵引绳经过第一换向轮、第二换向轮并和牵引装置连接。An assembled wallboard hoisting device, comprising a guide rail, the upper side of the guide rail is slidably connected with a base, the upper side of the base is rotatably connected with a rotating seat, the upper side of the rotating seat is fixedly connected with a bracket, and the bracket is fixedly connected with two mutually parallel Connecting arm, one end of the connecting arm extends obliquely upwards to form a boom, one end of the boom is rotatably connected with a first reversing wheel, the middle part of the connecting arm is rotatably connected with a second reversing wheel, and the lower side of the first reversing wheel is set There is a crossbeam, the two ends of the crossbeam are rotatably connected with magnetic wheels for absorbing the purlins, the crossbeam is provided with a connecting device for connecting the wall panels, the rotating seat is provided with a traction device, and two ends of the crossbeam are connected with two traction ropes, the traction ropes pass through The first reversing wheel and the second reversing wheel are connected with the traction device.

通过上述设置,可增加吊装的墙板的稳定性。具体的,本申请位于所要安装墙板的建筑的屋顶,建筑的一侧设置为安装面,安装面上已预先安装好檩条,檩条的材质可被磁轮吸附,檩条沿竖向延伸,吊臂背向安装面,然后将墙板放置横梁的下方,横梁通过连接装置和墙板的一侧边缘连接,然后牵引装置收紧牵引绳并将墙板吊起,然后转动座转动180度,此时墙板自由下垂,且基本位于安装面的正上方,然后牵引装置慢慢释放牵引绳,墙板下降,磁轮向下运动,当磁轮靠近檩条后,磁轮吸附在檩条上,并随着墙板的下降,磁轮沿檩条向下滚动,本申请设置有两个磁轮,磁轮的间距和檩条的间距适配,两个磁轮分别吸附在对应的檩条上,从而当遇大风时,墙板基本不会产生很大的晃动,增加了施工的安全性,另外,由于本申请中,横梁的两端均连接有牵引绳,可使得横梁的下降的过程中基本水平,进而增加墙板的稳定性。另外,当需要更换吊装的地方时,可沿导轨移动底座。Through the above arrangement, the stability of the hoisted wallboard can be increased. Specifically, this application is located on the roof of the building where the wall panels are to be installed. One side of the building is set as the installation surface. Purlins have been installed on the installation surface. The material of the purlins can be absorbed by the magnetic wheel. Back to the installation surface, then place the wallboard under the beam, the beam is connected to one side edge of the wallboard through the connecting device, then the traction device tightens the traction rope and lifts the wallboard, and then the rotating seat rotates 180 degrees, at this time The wall panel hangs freely and is basically located directly above the installation surface. Then the traction device slowly releases the traction rope, the wall panel descends, and the magnetic wheel moves downward. When the magnetic wheel is close to the purlin, the magnetic wheel is adsorbed on the purlin, and with the When the wall panel is lowered, the magnetic wheel rolls down along the purlin. This application is provided with two magnetic wheels. The distance between the magnetic wheel and the purlin is adapted. , the wallboard will basically not produce a lot of shaking, which increases the safety of the construction. In addition, because in this application, the two ends of the beam are connected with traction ropes, which can make the beam basically level during the descending process, thereby increasing the safety of the wall. board stability. In addition, when the lifting place needs to be changed, the base can be moved along the guide rail.

进一步的,第二换向轮设置在连接臂的中部的上方,连接臂的中部设置有贯穿连接臂上下两侧的过孔,牵引装置包括设置在转动座上的牵引电机,牵引电机连接有转轴,转轴固定连接有两个卷绕轮,两个卷绕轮和两个牵引绳一一对应,牵引绳远离横梁的一端经过过孔并连接在对应的卷绕轮上。Further, the second reversing wheel is arranged above the middle part of the connecting arm, and the middle part of the connecting arm is provided with via holes running through the upper and lower sides of the connecting arm. The rotating shaft is fixedly connected with two winding wheels, the two winding wheels correspond to the two traction ropes one by one, and the end of the traction rope away from the beam passes through the through hole and is connected to the corresponding winding wheel.

通过上述设置,可增加连接臂的稳定性,并可实现牵引绳的收放,具体的,通过在连接臂设置过孔,从而对牵引绳起到限位的作用。牵引电机通过驱动转动,可实现两个卷绕轮同步缠绕或释放牵引绳,从而可使得横梁始终基本水平。Through the above configuration, the stability of the connecting arm can be increased, and the retraction of the traction rope can be realized. Specifically, through holes are provided in the connecting arm, so as to limit the position of the traction rope. The traction motor can be driven to rotate to realize synchronous winding or release of the traction rope by the two winding wheels, so that the crossbeam can always be substantially horizontal.

进一步的,横梁的下侧设置有开口向下的凹槽,磁轮设置在横梁靠近转动座的一侧,底座的一侧延伸形成支撑台,支撑台位于吊臂的下方,凹槽靠近磁轮的一侧设置有第一橡胶垫,连接装置包括螺纹连接在横梁远离磁轮的一侧的螺杆,螺杆靠近磁轮的一端转动连接有挤压板,挤压板设置在凹槽内,且挤压板靠近磁轮的一侧设置有第二橡胶垫,螺杆远离磁轮的一侧固定连接有把手。Further, the underside of the crossbeam is provided with a downward opening groove, the magnetic wheel is arranged on the side of the crossbeam close to the rotating seat, one side of the base extends to form a supporting platform, the supporting platform is located under the boom, and the groove is close to the magnetic wheel A first rubber pad is provided on one side of the beam, and the connecting device includes a screw threaded on the side of the beam away from the magnetic wheel. The end of the screw close to the magnetic wheel is connected with an extruding plate in rotation, and the extruding plate is arranged in the groove, and extruded The side of the pressure plate close to the magnetic wheel is provided with a second rubber pad, and the side of the screw rod away from the magnetic wheel is fixedly connected with a handle.

通过上述设置,使得横梁和墙板之间的连接十分便捷。具体的,先将墙板水平放置在支撑台上,其中,墙板远离转动座的一侧离开支撑台并腾空,从而便于连接装置的连接,然后将墙板腾空的一侧边缘插入凹槽,通过把手转动螺杆,挤压板将墙板压紧在第一橡胶垫上,从而将墙板和横梁固定在一起,然后在牵引电机的作用下,牵引绳缠绕在卷绕轮上,在牵引绳的作用下,墙板靠近横梁的一端向上被吊起,最终墙板被吊离支撑台。当需要拆卸连接装置时,反向转动把手,第一橡胶垫和第二橡胶垫和墙板分开,墙板从凹槽中离开。Through the above arrangement, the connection between the beam and the wall panel is very convenient. Specifically, the wallboard is placed horizontally on the support platform first, wherein the side of the wallboard away from the rotating seat is away from the support platform and vacated, so as to facilitate the connection of the connecting device, and then the edge of the vacated side of the wallboard is inserted into the groove, By turning the screw with the handle, the extrusion plate presses the wall panel on the first rubber pad, thereby fixing the wall panel and the beam together, and then under the action of the traction motor, the traction rope is wound on the winding wheel, and the traction rope Under the action, the end of the wall panel close to the beam is lifted upwards, and finally the wall panel is lifted away from the supporting platform. When the connection device needs to be disassembled, the handle is reversely turned, the first rubber pad and the second rubber pad are separated from the wallboard, and the wallboard leaves the groove.

进一步的,导轨的数量为两个且相互平行。Further, there are two guide rails and they are parallel to each other.

进一步的,底座设置有用于驱动转动座转动的转动电机。Further, the base is provided with a rotating motor for driving the rotating seat to rotate.

进一步的,支撑台靠近转动座的一侧固定连接有限位块。Further, a limit block is fixedly connected to a side of the support table close to the rotating seat.

通过上述设置,使得墙板的起吊更加稳定,具体的,墙板水平放置在支撑台上时,墙板的一侧腾空,另一侧和限位块抵接,当墙板的一侧被吊起时,墙板以限位块为支点进行转动,此时,限位块可防止墙板和支撑台之间发生相对移动,进而避免墙板和转动座发生碰撞。Through the above settings, the hoisting of the wallboard is more stable. Specifically, when the wallboard is placed horizontally on the support platform, one side of the wallboard is vacated, and the other side is in contact with the limit block. When one side of the wallboard is hoisted When starting, the wall board rotates with the limit block as the fulcrum. At this time, the limit block can prevent relative movement between the wall board and the supporting platform, thereby avoiding collision between the wall board and the rotating seat.

进一步的,牵引绳的材质为钢丝绳。Further, the material of the traction rope is steel wire rope.

附图说明Description of drawings

图1为实施例的示意图。Figure 1 is a schematic diagram of the embodiment.

图2为图1的A处放大图。FIG. 2 is an enlarged view of A in FIG. 1 .

图3为实施例的俯视图。Figure 3 is a top view of the embodiment.

图4为连接装置和墙板连接的示意图。Fig. 4 is a schematic diagram of the connection between the connecting device and the wallboard.

图5为磁轮和檩条吸附在一起的示意图。Fig. 5 is a schematic diagram of magnetic wheels and purlins being adsorbed together.

具体实施方式Detailed ways

下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。The technical solutions of the present utility model will be further specifically described below through the embodiments and in conjunction with the accompanying drawings.

参见图1至图5,一种装配式墙板31吊装装置,包括导轨11,导轨11的上侧滑动连接有底座12,底座12的上侧转动连接有转动座13,转动座13的上侧固定连接有支架14,支架14固定连接有两个相互平行的连接臂15,连接臂15的一端倾斜向上延伸并形成吊臂151,吊臂151的一端转动连接有第一换向轮152,连接臂15的中部转动连接有第二换向轮153,第一换向轮152的下侧设置有横梁16,横梁16的两端转动连接有用于吸附檩条21的磁轮161,横梁16设置有用于连接墙板31的连接装置17,转动座13设置有牵引装置18,横梁16的两端均连接有两个牵引绳162,牵引绳162经过第一换向轮152、第二换向轮153并和牵引装置18连接。Referring to Fig. 1 to Fig. 5, a hoisting device for an assembled wall panel 31 includes a guide rail 11, the upper side of the guide rail 11 is slidably connected with a base 12, and the upper side of the base 12 is rotatably connected with a rotating seat 13, and the upper side of the rotating seat 13 A bracket 14 is fixedly connected, and the bracket 14 is fixedly connected with two connecting arms 15 parallel to each other. One end of the connecting arm 15 extends obliquely upwards to form a boom 151, and one end of the boom 151 is rotatably connected with a first reversing wheel 152. The middle part of the arm 15 is rotatably connected with a second reversing wheel 153, the underside of the first reversing wheel 152 is provided with a beam 16, and the two ends of the beam 16 are rotatably connected with a magnetic wheel 161 for absorbing the purlin 21, and the beam 16 is provided with a Connect the connecting device 17 of the wallboard 31, the rotating seat 13 is provided with a traction device 18, and the two ends of the beam 16 are connected with two traction ropes 162, and the traction rope 162 passes through the first reversing wheel 152, the second reversing wheel 153 and Connect with traction device 18.

通过上述设置,可增加吊装的墙板31的稳定性。参见图5,具体的,本申请位于所要安装墙板31的建筑的屋顶,建筑的一侧设置为安装面41,安装面上已预先安装好檩条21,檩条21的材质可被磁轮161吸附,檩条21沿竖向延伸,吊臂151背向安装面,然后将墙板31放置横梁16的下方,横梁16通过连接装置17和墙板31的一侧边缘连接,然后牵引装置18收紧牵引绳162并将墙板31吊起,然后转动座13转动180度,此时墙板31自由下垂,且基本位于安装面的正上方,然后牵引装置18慢慢释放牵引绳162,墙板31下降,磁轮161向下运动,当磁轮161靠近檩条21后,磁轮161吸附在檩条21上,并随着墙板31的下降,磁轮161沿檩条21向下滚动,本申请设置有两个磁轮161,磁轮161的间距和檩条21的间距适配,两个磁轮161分别吸附在对应的檩条21上,从而当遇大风时,墙板31基本不会产生很大的晃动,增加了施工的安全性,另外,由于本申请中,横梁16的两端均连接有牵引绳162,可使得横梁16的下降的过程中基本水平,进而增加墙板31的稳定性。另外,当需要更换吊装的地方时,可沿导轨11移动底座12。Through the above arrangement, the stability of the hoisted wall panel 31 can be increased. Referring to Fig. 5, specifically, the application is located on the roof of the building where the wall panel 31 is to be installed, and one side of the building is set as the installation surface 41, and the purlin 21 has been pre-installed on the installation surface, and the material of the purlin 21 can be adsorbed by the magnetic wheel 161 , the purlin 21 extends vertically, the boom 151 faces away from the installation surface, then the wall panel 31 is placed under the beam 16, the beam 16 is connected to one side edge of the wall panel 31 through the connecting device 17, and then the traction device 18 tightens the traction The rope 162 lifts the wall panel 31, and then the rotating seat 13 rotates 180 degrees. At this time, the wall panel 31 hangs down freely and is basically located directly above the installation surface. Then the traction device 18 slowly releases the traction rope 162, and the wall panel 31 descends. , the magnetic wheel 161 moves downward. When the magnetic wheel 161 is close to the purlin 21, the magnetic wheel 161 is adsorbed on the purlin 21, and as the wall panel 31 descends, the magnetic wheel 161 rolls down along the purlin 21. This application is provided with two Two magnetic wheels 161, the distance between the magnetic wheels 161 and the purlins 21 are adapted, and the two magnetic wheels 161 are respectively adsorbed on the corresponding purlins 21, so that when there is a strong wind, the wallboard 31 basically does not shake a lot. The safety of the construction is increased. In addition, because in this application, both ends of the crossbeam 16 are connected with traction ropes 162, the descending process of the crossbeam 16 can be basically horizontal, thereby increasing the stability of the wall panel 31. In addition, the base 12 can be moved along the guide rail 11 when the hoisting place needs to be replaced.

作为一种实现方式,第二换向轮153设置在连接臂15的中部的上方,连接臂15的中部设置有贯穿连接臂15上下两侧的过孔154,牵引装置18包括设置在转动座13上的牵引电机181,牵引电机181连接有转轴182,转轴182固定连接有两个卷绕轮183,两个卷绕轮183和两个牵引绳162一一对应,牵引绳162远离横梁16的一端经过过孔154并连接在对应的卷绕轮183上。As an implementation, the second reversing wheel 153 is arranged above the middle part of the connecting arm 15, and the middle part of the connecting arm 15 is provided with a via hole 154 that runs through the upper and lower sides of the connecting arm 15. The traction motor 181 on the top, the traction motor 181 is connected with a rotating shaft 182, and the rotating shaft 182 is fixedly connected with two winding wheels 183, and the two winding wheels 183 correspond to the two traction ropes 162 one by one, and the traction rope 162 is far away from the end of the beam 16 Pass through the hole 154 and connect to the corresponding winding wheel 183 .

通过上述设置,可增加连接臂15的稳定性,并可实现牵引绳162的收放,具体的,通过在连接臂15设置过孔154,从而对牵引绳162起到限位的作用。牵引电机181通过驱动转动,可实现两个卷绕轮183同步缠绕或释放牵引绳162,从而可使得横梁16始终基本水平。Through the above arrangement, the stability of the connecting arm 15 can be increased, and the pulling rope 162 can be retracted. Specifically, the through hole 154 is provided in the connecting arm 15 to limit the pulling rope 162 . The traction motor 181 can realize synchronous winding or releasing of the traction rope 162 by the two winding wheels 183 by driving the rotation, so that the crossbeam 16 can be substantially horizontal all the time.

作为一种实现方式,横梁16的下侧设置有开口向下的凹槽163,磁轮161设置在横梁16靠近转动座13的一侧,底座12的一侧延伸形成支撑台121,支撑台121位于吊臂151的下方,凹槽163靠近磁轮161的一侧设置有第一橡胶垫1631,连接装置17包括螺纹连接在横梁16远离磁轮161的一侧的螺杆171,螺杆171靠近磁轮161的一端转动连接有挤压板172,挤压板172设置在凹槽163内,且挤压板172靠近磁轮161的一侧设置有第二橡胶垫173,螺杆171远离磁轮161的一侧固定连接有把手174。As an implementation, the underside of the crossbeam 16 is provided with a groove 163 opening downward, the magnetic wheel 161 is arranged on the side of the crossbeam 16 close to the rotating base 13, and one side of the base 12 extends to form a support platform 121, and the support platform 121 Located below the boom 151, the groove 163 is provided with a first rubber pad 1631 on the side close to the magnetic wheel 161, and the connecting device 17 includes a screw 171 threaded on the side of the beam 16 away from the magnetic wheel 161, and the screw 171 is close to the magnetic wheel One end of 161 is rotatably connected with an extruding plate 172, and the extruding plate 172 is arranged in the groove 163, and the side of the extruding plate 172 near the magnetic wheel 161 is provided with a second rubber pad 173, and the screw rod 171 is far away from one side of the magnetic wheel 161. A handle 174 is fixedly connected to the side.

通过上述设置,参见图4,使得横梁16和墙板31之间的连接十分便捷。具体的,先将墙板31水平放置在支撑台121上,其中,墙板31远离转动座13的一侧离开支撑台121并腾空,从而便于连接装置17的连接,然后将墙板31腾空的一侧边缘插入凹槽163,通过把手174转动螺杆171,挤压板172将墙板31压紧在第一橡胶垫1631上,从而将墙板31和横梁16固定在一起,然后在牵引电机181的作用下,牵引绳162缠绕在卷绕轮183上,在牵引绳162的作用下,墙板31靠近横梁16的一端向上被吊起,最终墙板31被吊离支撑台121。当需要拆卸连接装置17时,反向转动把手174,第一橡胶垫1631和第二橡胶垫173和墙板31分开,墙板31从凹槽163中离开。Through the above arrangement, referring to FIG. 4 , the connection between the beam 16 and the wall panel 31 is very convenient. Specifically, the wallboard 31 is placed horizontally on the support platform 121 first, wherein the side of the wallboard 31 away from the rotating seat 13 leaves the support platform 121 and is emptied, thereby facilitating the connection of the connecting device 17, and then the wallboard 31 is vacated. One side edge is inserted into the groove 163, and the screw rod 171 is turned by the handle 174, and the pressing plate 172 presses the wallboard 31 on the first rubber pad 1631, thereby fixing the wallboard 31 and the beam 16 together, and then the traction motor 181 Under the action of the traction rope 162 is wound on the winding wheel 183, under the action of the traction rope 162, the end of the wall panel 31 close to the beam 16 is lifted upwards, and finally the wall panel 31 is lifted away from the supporting platform 121. When the connection device 17 needs to be disassembled, the handle 174 is reversely turned, the first rubber pad 1631 and the second rubber pad 173 are separated from the wallboard 31 , and the wallboard 31 leaves the groove 163 .

作为一种实现方式,导轨11的数量为两个且相互平行。As an implementation manner, the number of guide rails 11 is two and parallel to each other.

作为一种实现方式,底座12设置有用于驱动转动座13转动的转动电机122。As an implementation manner, the base 12 is provided with a rotating motor 122 for driving the rotating seat 13 to rotate.

作为一种实现方式,支撑台121靠近转动座13的一侧固定连接有限位块123。As an implementation manner, a side of the support table 121 close to the rotating base 13 is fixedly connected with a limit block 123 .

通过上述设置,使得墙板31的起吊更加稳定,具体的,墙板31水平放置在支撑台121上时,墙板31的一侧腾空,另一侧和限位块123抵接,当墙板31的一侧被吊起时,墙板31以限位块123为支点进行转动,此时,限位块123可防止墙板31和支撑台121之间发生相对移动,进而避免墙板31和转动座13发生碰撞。Through the above setting, the hoisting of the wallboard 31 is made more stable. Specifically, when the wallboard 31 is placed horizontally on the support platform 121, one side of the wallboard 31 is vacated, and the other side abuts against the limit block 123. When the wallboard 31 When one side of 31 is hoisted, wallboard 31 is rotated with stop block 123 as fulcrum, and at this moment, stop block 123 can prevent that relative movement takes place between wallboard 31 and support platform 121, and then avoids wallboard 31 and Rotary seat 13 collides.

作为一种实现方式,牵引绳162的材质为钢丝绳。As an implementation manner, the material of the traction rope 162 is a steel wire rope.

应当理解的是,对于本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本实用新型所附权利要求的保护范围。It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should belong to the protection scope of the appended claims of the present utility model.

Claims (7)

1.一种装配式墙板吊装装置,其特征在于,包括导轨,所述导轨的上侧滑动连接有底座,所述底座的上侧转动连接有转动座,所述转动座的上侧固定连接有支架,所述支架固定连接有两个相互平行的连接臂,所述连接臂的一端倾斜向上延伸并形成吊臂,所述吊臂的一端转动连接有第一换向轮,所述连接臂的中部转动连接有第二换向轮,所述第一换向轮的下侧设置有横梁,所述横梁的两端转动连接有用于吸附檩条的磁轮,所述横梁设置有用于连接墙板的连接装置,所述转动座设置有牵引装置,所述横梁的两端均连接有两个牵引绳,所述牵引绳经过第一换向轮、第二换向轮并和牵引装置连接。1. An assembled wallboard hoisting device, characterized in that it comprises a guide rail, the upper side of the guide rail is slidably connected with a base, the upper side of the base is rotatably connected with a rotating seat, and the upper side of the rotating seat is fixedly connected There is a bracket, the bracket is fixedly connected with two parallel connecting arms, one end of the connecting arm extends obliquely upwards to form a boom, one end of the boom is rotatably connected with a first reversing wheel, and the connecting arm There is a second reversing wheel connected to the middle part of the reversing wheel, and a crossbeam is arranged on the lower side of the first reversing wheel, and the two ends of the crossbeam are rotatably connected with magnetic wheels for absorbing purlins, and the crossbeam is provided with The connecting device, the rotating seat is provided with a traction device, and two traction ropes are connected to both ends of the beam, and the traction rope passes through the first reversing wheel and the second reversing wheel and is connected with the traction device. 2.根据权利要求1所述的一种装配式墙板吊装装置,其特征在于,所述第二换向轮设置在连接臂的中部的上方,所述连接臂的中部设置有贯穿所述连接臂上下两侧的过孔,所述牵引装置包括设置在所述转动座上的牵引电机,所述牵引电机连接有转轴,所述转轴固定连接有两个卷绕轮,两个卷绕轮和两个牵引绳一一对应,所述牵引绳远离所述横梁的一端经过所述过孔并连接在对应的卷绕轮上。2. A prefabricated wall panel lifting device according to claim 1, characterized in that, the second reversing wheel is arranged above the middle part of the connecting arm, and the middle part of the connecting arm is provided with a The through holes on the upper and lower sides of the arm, the traction device includes a traction motor arranged on the rotating seat, the traction motor is connected with a rotating shaft, and the rotating shaft is fixedly connected with two winding wheels, the two winding wheels and The two traction ropes correspond to each other, and the end of the traction rope away from the beam passes through the through hole and is connected to the corresponding winding wheel. 3.根据权利要求2所述的一种装配式墙板吊装装置,其特征在于,所述横梁的下侧设置有开口向下的凹槽,所述磁轮设置在横梁靠近所述转动座的一侧,所述底座的一侧延伸形成支撑台,所述支撑台位于吊臂的下方,所述凹槽靠近所述磁轮的一侧设置有第一橡胶垫,所述连接装置包括螺纹连接在所述横梁远离所述磁轮的一侧的螺杆,所述螺杆靠近所述磁轮的一端转动连接有挤压板,所述挤压板设置在所述凹槽内,且所述挤压板靠近所述磁轮的一侧设置有第二橡胶垫,所述螺杆远离所述磁轮的一侧固定连接有把手。3. A prefabricated wall panel hoisting device according to claim 2, characterized in that, the underside of the beam is provided with a groove opening downward, and the magnetic wheel is arranged on the side of the beam close to the rotating seat. One side, one side of the base extends to form a support platform, the support platform is located below the boom, the side of the groove close to the magnetic wheel is provided with a first rubber pad, and the connecting device includes a threaded connection The screw rod on the side of the beam away from the magnetic wheel, the end of the screw rod close to the magnetic wheel is rotatably connected with an extruding plate, the extruding plate is arranged in the groove, and the extruding plate The side of the plate close to the magnetic wheel is provided with a second rubber pad, and the side of the screw rod away from the magnetic wheel is fixedly connected with a handle. 4.根据权利要求3所述的一种装配式墙板吊装装置,其特征在于,所述导轨的数量为两个且相互平行。4. A prefabricated wall panel lifting device according to claim 3, characterized in that there are two guide rails parallel to each other. 5.根据权利要求1所述的一种装配式墙板吊装装置,其特征在于,所述底座设置有用于驱动所述转动座转动的转动电机。5. A prefabricated wall panel lifting device according to claim 1, characterized in that, the base is provided with a rotating motor for driving the rotating seat to rotate. 6.根据权利要求3所述的一种装配式墙板吊装装置,其特征在于,所述支撑台靠近所述转动座的一侧固定连接有限位块。6 . The assembly-type wall panel lifting device according to claim 3 , wherein a limit block is fixedly connected to a side of the support platform close to the rotating seat. 7 . 7.根据权利要求1至6中任意一项所述的一种装配式墙板吊装装置,其特征在于,所述牵引绳的材质为钢丝绳。7. A prefabricated wall panel hoisting device according to any one of claims 1 to 6, characterized in that the material of the traction rope is a steel wire rope.
CN202222385962.6U 2022-09-08 2022-09-08 An assembled wall panel hoisting device Active CN218809998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222385962.6U CN218809998U (en) 2022-09-08 2022-09-08 An assembled wall panel hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222385962.6U CN218809998U (en) 2022-09-08 2022-09-08 An assembled wall panel hoisting device

Publications (1)

Publication Number Publication Date
CN218809998U true CN218809998U (en) 2023-04-07

Family

ID=87264850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222385962.6U Active CN218809998U (en) 2022-09-08 2022-09-08 An assembled wall panel hoisting device

Country Status (1)

Country Link
CN (1) CN218809998U (en)

Similar Documents

Publication Publication Date Title
CN111980391A (en) An integral lifting platform and a construction method for a building exterior facade construction platform
CN112623976A (en) Heavy tower crane with transverse supporting and stabilizing equipment
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN205688774U (en) A kind of electric bridge scaffold
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN218375115U (en) Detachable tower crane aerial walkway
CN218809998U (en) An assembled wall panel hoisting device
CN207537025U (en) A kind of novel meet an urgent need adjusts the windproof tower crane of tower crane height
CN206784884U (en) Curved-surface building climbing device
CN219365366U (en) A mobile hanging cage for installation of steel structure roof reverse buckle plate
CN113216587A (en) High-rise building outer wall construction operation platform fixing structure and construction method thereof
CN219060835U (en) Self-elevating lighting well operation platform device
CN219730342U (en) An auxiliary lifting device
CN109110667B (en) Portable supplementary siding wall splicing apparatus
CN215479307U (en) Tower crane with safety function
CN117864944A (en) Assembled building PC board component hoist and mount anticreep frame
CN217602048U (en) An operation device for plastering construction in a well with high safety
CN221680599U (en) A large equipment hoisting device for the power distribution room in a super high-rise refuge floor
CN220131721U (en) ALC wallboard lifting device
CN221878772U (en) Building wall painting device
CN218491362U (en) Assembled building externally-hung wallboard lifting device
CN223163075U (en) Pipeline installation portal
CN219672073U (en) Template support alternately climbing operation platform in elevator well
CN217268962U (en) Panel Wall Mounter
CN220978760U (en) Elevator shaft construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant