CN218786484U - High stability building site tower crane installation base station - Google Patents
High stability building site tower crane installation base station Download PDFInfo
- Publication number
- CN218786484U CN218786484U CN202222060624.5U CN202222060624U CN218786484U CN 218786484 U CN218786484 U CN 218786484U CN 202222060624 U CN202222060624 U CN 202222060624U CN 218786484 U CN218786484 U CN 218786484U
- Authority
- CN
- China
- Prior art keywords
- spacing pipe
- tower crane
- bottom plate
- installation base
- high stability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a high stability building site tower crane installation base station, including bracing piece, bottom plate, first stopper, stake and stabilizing assembly, stabilizing assembly locates the bottom plate top, the stake inserts in stabilizing assembly, the bracing piece encircles and runs through the bottom plate setting, first stopper cup joints in upper end of the support bar. The utility model belongs to the technical field of the tower crane installation, specifically indicate high stability building site tower crane installation base station.
Description
Technical Field
The utility model belongs to the technical field of the tower crane installation, specifically indicate high stability building site tower crane installation base station.
Background
Tower crane refers to a rotating crane with a movable arm mounted at the upper part of a high tower body, and originates from western europe. The movable arm type hydraulic lifting device is divided into a horizontal type and a press rod type according to the movable arm form, has large operation space, and is mainly used for vertical and horizontal conveying of materials and installation of building components in building construction. The device mainly comprises a metal structure, a working mechanism and an electric system. The metal structure comprises a tower body, a movable arm, a base, an attachment rod and the like. The working mechanism has four parts of lifting, amplitude changing, rotating and walking. The electric system comprises a motor, a controller, a power distribution frame, a connecting line, a signal, a lighting device and the like, and the installation mode of the existing building site tower crane installation base station is relatively single, and the installation stability is not high enough.
SUMMERY OF THE UTILITY MODEL
In order to solve the difficult problem, the utility model provides a high stability building site tower crane installation base station.
In order to realize the above functions, the utility model discloses the technical scheme who takes as follows: the high-stability construction site tower crane installation base station comprises a support rod, a bottom plate, a first limiting block, a pile and a stabilizing assembly, wherein the stabilizing assembly is arranged at the top of the bottom plate, the pile is inserted into the stabilizing assembly, the support rod is arranged around the bottom plate, and the first limiting block is sleeved at the upper end of the support rod; the machine stabilizes the subassembly and includes spacing pipe, links up spacing pipe, lower spacing pipe, inserted bar, fixed plate, second stopper and fixing bolt, the fixed plate is located the bottom plate top and is located under the stake, the inserted bar encircles and runs through fixed plate and bottom plate and encircles the setting of the stake outside, the second stopper cup joints in the inserted bar upper end and locates the fixed plate top, spacing pipe is located the bottom plate top and cup joints in the stake lower extreme down, it is inboard to locate the inserted bar down spacing pipe, link up spacing pipe and locate lower spacing pipe top and cup joint on the stake, it locates to link up spacing pipe top and cup joint in the stake to go up spacing pipe, fixing bolt encircles and runs through between spacing pipe and the spacing pipe, through setting up spacing pipe, linking up spacing pipe and lower spacing pipe, increases the contact surface of bottom plate and stake, and then improves the stability of tower crane.
Furthermore, the lower end of the outer side face of the pile column is provided with a fixing block in a surrounding mode, the side face of the fixing block is hinged with a fixing rod, and one end, far away from the fixing block, of the fixing rod is hinged to the top of the bottom plate.
Preferably, the fixing block is provided with a screw, and the screw penetrates through the fixing block and is inserted into the pile.
Wherein, the bracing piece is the J type structure.
In order to improve the contact area and the stability, a cross rod is arranged on the lower end arc structure of the supporting rod.
Preferably, the fixing rods and the fixing blocks are provided with 4 groups.
The second limiting blocks and the inserting rods are arranged in a one-to-one correspondence mode.
The utility model adopts the above structure to gain beneficial effect as follows: the utility model provides a high stability building site tower crane installation base station easy operation, the mechanism is compact, and reasonable in design through setting up spacing pipe, linking spacing pipe and lower spacing pipe, increases the contact surface of bottom plate and stake, and then improves the stability of tower crane to set up bracing piece and horizontal pole and insert, increase the stability of bottom plate, add dead lever and fixed block, further improved the stability of stake.
Drawings
FIG. 1 is an overall structure diagram of the high-stability construction site tower crane installation base station provided by the utility model;
fig. 2 is the utility model provides a overlook structure chart of high stability building site tower crane installation base station.
The fixing device comprises a support rod 1, a support rod 2, a bottom plate 3, a first limiting block 4, a pile column 5, a stabilizing assembly 6, an upper limiting pipe 7, a connecting limiting pipe 8, a lower limiting pipe 9, an insertion rod 10, a fixing plate 11, a second limiting block 12, a fixing bolt 13, a fixing rod 14, a screw 15, a cross rod 16 and a fixing block.
Detailed Description
The technical solutions of the present invention will be described more clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, the high-stability construction site tower crane installation base station provided by the utility model comprises a support rod 1, a bottom plate 2, a first limiting block 3, a pile 4 and a stabilizing component 5, wherein the stabilizing component 5 is arranged at the top of the bottom plate 2, the pile 4 is inserted into the stabilizing component 5, the support rod 1 is arranged around the bottom plate 2, and the first limiting block 3 is sleeved at the upper end of the support rod 1; machine stable assembly 5 includes spacing pipe 6, link up spacing pipe 7, spacing pipe 8 down, insert pole 9, fixed plate 10, second stopper 11 and fixing bolt 12, fixed plate 10 locates 2 tops of bottom plate and locates under the stake 4, insert pole 9 encircles and runs through fixed plate 10 and bottom plate 2 and encircles the setting of the 4 outsides of stake, second stopper 11 cup joints in insert pole 9 upper end and locates fixed plate 10 tops, lower limit pipe 8 locates 2 tops of bottom plate and cup joints in stake 4 lower extreme, lower limit pipe 8 locates and inserts the pole 9 inboardly, link up spacing pipe 7 and locate down spacing pipe 8 tops and cup joint on stake 4, it links up spacing pipe 7 tops and cup joint in stake 4 to go up spacing pipe 6 and locate and link up spacing pipe 7, fixing bolt 12 encircles and runs through between spacing pipe 6 and the linking spacing pipe 7, through setting up spacing pipe 6, link up spacing pipe 7 and lower limit pipe 8, increase bottom plate 2 and the contact surface of stake 4, and then improve the stability of tower crane.
Further, the lower end of the outer side face of the pile 4 is provided with a fixing block 16 in a surrounding mode, the side face of the fixing block 16 is hinged with a fixing rod 13, and one end, far away from the fixing block 16, of the fixing rod 13 is hinged to the top of the bottom plate 2.
Preferably, the fixing block 16 is provided with a screw 14, and the screw 14 is inserted into the pile 4 through the fixing block 16.
Wherein, the support rod 1 is a J-shaped structure.
In order to improve the contact area and stability, the lower end arc structure of the support rod 1 is provided with a cross rod 15.
Preferably, the fixing bars 13 and the fixing blocks 16 are provided with 4 sets.
Wherein, the second limit blocks 11 and the insertion rods 9 are arranged in a one-to-one correspondence.
During the specific use, at first dig the hole in the position of installation tower crane, arrange the reinforcing bar and increase the wholeness, think to pour into the concrete in the hole, make inserted bar 9, bracing piece 1 and horizontal pole 15 insert in the concrete, later fix inserted bar 9 and bracing piece 1 respectively on bottom plate 2 and fixed plate 10 through first limiting plate and second limiting block 11, later through fixing bolt 12 with last spacing pipe 6 with link up spacing pipe 7 fixed connection in, insert the stake 4 of tower crane in the spacing pipe 6, later fix fixed plate 10 on the 4 sides of stake through screw 14, it is fixed to accomplish the installation.
The present invention and its embodiments have been described above, but the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, it should be understood that those skilled in the art should also understand the scope of the present invention without inventively designing the similar structure and embodiments of the present invention without departing from the spirit of the present invention.
Claims (7)
1. High stability building site tower crane installation base station, its characterized in that: the pile fixing device comprises a supporting rod, a bottom plate, a first limiting block, a pile and a stabilizing assembly, wherein the stabilizing assembly is arranged at the top of the bottom plate, the pile is inserted into the stabilizing assembly, the supporting rod is arranged around the bottom plate, and the first limiting block is sleeved at the upper end of the supporting rod; the utility model discloses a pile fixing device, including last spacing pipe, linking spacing pipe, lower spacing pipe, inserted bar, fixed plate, second stopper and fixing bolt, the fixed plate is located the bottom plate top and is located under the stake, the inserted bar encircles and runs through fixed plate and bottom plate and encircles the setting of the stake outside, the second stopper cup joints in inserted bar upper end and locates the fixed plate top, spacing pipe is located the bottom plate top and cup joints in the stake lower extreme down, it is inboard to locate the inserted bar down spacing pipe, link up spacing pipe and locate down spacing pipe top and cup joint on the stake, go up spacing pipe and locate linking spacing pipe top and cup joint in the stake, fixing bolt encircles and runs through between spacing pipe and linking spacing pipe.
2. The high stability building site tower crane installation base platform of claim 1, characterized in that: the lower end of the outer side face of the pile column is provided with a fixing block in a surrounding mode, the side face of the fixing block is hinged with a fixing rod, and one end, far away from the fixing block, of the fixing rod is hinged to the top of the bottom plate.
3. The high stability building site tower crane installation base platform of claim 2, characterized in that: and a screw is arranged on the fixed block, and the screw penetrates through the fixed block and is inserted into the pile.
4. The high stability building site tower crane installation base platform of claim 3, characterized in that: the support rod is of a J-shaped structure.
5. The high stability building site tower crane installation base platform of claim 4, characterized in that: and a cross rod is arranged on the lower end arc structure of the supporting rod.
6. The high stability building site tower crane installation base platform of claim 4, characterized in that: the fixed rod and the fixed block are provided with 4 groups.
7. The high stability building site tower crane installation base platform of claim 4, characterized in that: the second limiting blocks and the inserting rods are arranged in a one-to-one correspondence mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222060624.5U CN218786484U (en) | 2022-08-06 | 2022-08-06 | High stability building site tower crane installation base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222060624.5U CN218786484U (en) | 2022-08-06 | 2022-08-06 | High stability building site tower crane installation base station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218786484U true CN218786484U (en) | 2023-04-04 |
Family
ID=86504183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222060624.5U Active CN218786484U (en) | 2022-08-06 | 2022-08-06 | High stability building site tower crane installation base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218786484U (en) |
-
2022
- 2022-08-06 CN CN202222060624.5U patent/CN218786484U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218786484U (en) | High stability building site tower crane installation base station | |
CN111535196A (en) | Bridge building templates link for civil engineering | |
CN210289204U (en) | Anti-tilting supporting device for wall prefabricated part | |
CN211286572U (en) | Movable adjustable lead screw base | |
CN210369024U (en) | Assembled tower crane cushion cap basis festival standard height controlling means | |
CN211714006U (en) | Basement water-resistant plate and tower crane one-step forming foundation structure | |
CN219910056U (en) | Rod piece foundation error correction structure | |
CN214035014U (en) | Communication tower base structure | |
CN214657193U (en) | Splicing device of precast concrete foundation for tower crane | |
CN215797935U (en) | Frame-shaped steel structure lifting appliance with welding auxiliary function | |
CN211775764U (en) | Concrete beam formwork erecting device | |
CN215629315U (en) | Connecting structure of pier stud and steel box girder | |
CN217921176U (en) | Tower crane fixed bolster | |
CN217780597U (en) | Overlength attaches wall device to tower crane | |
CN217811182U (en) | Cast-in-place railway tunnel internal and external mold of open cut section and support | |
CN220886660U (en) | Prefabricated bent cap hoist and mount auxiliary device | |
CN217923711U (en) | Large-scale tower machine foundation conversion festival | |
CN211817429U (en) | Stool convenient for adjusting supporting height | |
CN217680517U (en) | Self-locking type cylindrical template | |
CN219865033U (en) | Improved generation lining platform truck | |
CN218665119U (en) | Tower crane jib loading boom diagonal brace correcting unit | |
CN220190354U (en) | Mounting structure of roof photovoltaic cable bridge | |
CN211283515U (en) | Regularization platform that tower crane attaches wall | |
CN214819409U (en) | Assembly type concrete structure based on SEM | |
CN217711588U (en) | A portable auxiliary device for tall and big space wall stone material vertical hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |