CN218779955U - Positioning device for ensuring fixed distance and horizontal of double holes of template - Google Patents

Positioning device for ensuring fixed distance and horizontal of double holes of template Download PDF

Info

Publication number
CN218779955U
CN218779955U CN202222877327.XU CN202222877327U CN218779955U CN 218779955 U CN218779955 U CN 218779955U CN 202222877327 U CN202222877327 U CN 202222877327U CN 218779955 U CN218779955 U CN 218779955U
Authority
CN
China
Prior art keywords
template
bar
distance
angle
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222877327.XU
Other languages
Chinese (zh)
Inventor
李帅
李洪运
张建洪
陈金辉
陈存卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Bureau Construction Development Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN202222877327.XU priority Critical patent/CN218779955U/en
Application granted granted Critical
Publication of CN218779955U publication Critical patent/CN218779955U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a guarantee that template opens diplopore distance, horizontally positioner, including angle bar, level pearl, a pair of reinforcing bar, the reinforcing bar interval welding is on angle bar right angle inner wall, and the level pearl is installed on the angle bar top surface and is located in the middle of two reinforcing bars, and angle bar one end is kept away from to the reinforcing bar and is polished into sharp pyramis. The utility model discloses simple structure, convenient for material collection, the cost of manufacture is low, and it is convenient to use.

Description

Positioning device for ensuring fixed distance and horizontal of double holes of template
Technical Field
The utility model relates to a construction field especially relates to a guarantee that template is opened diplopore distance, horizontally positioner.
Background
Along with the continuous development of building technology, the fixing mode of the cantilever I-steel in the cantilever scaffold is also continuously changed. The flower basket type overhanging scaffold has the advantages that I-shaped steel does not need to go deep into a building for anchoring, construction is convenient, and cost is reduced, so that the flower basket type overhanging scaffold is widely applied. Before the construction of the flower basket type overhanging scaffold, two screw mounting holes are reserved on a template according to the required sizes of two bolt connecting holes on an overhanging I-shaped steel anchoring plate before concrete pouring. And after the strength of the concrete reaches the design requirement, fixing the high-strength screw in the main body structure through the preformed hole, and then fixing the cantilever I-shaped steel through the high-strength screw. Because the distance between the two holes of the I-shaped steel anchoring plate is a fixed value, the distance between the reserved holes is also a fixed value, and the two reserved holes are required to be positioned on the same horizontal line, otherwise, the I-shaped steel cannot be installed or is in an inclined state after being installed.
The traditional positioning method for the front hole with the hole has the following defects:
1. the construction pitch-row draws lines through manual scale, has errors, and hardly guarantees that two holes are on same water flat line, and construction quality is difficult to guarantee.
2. Because the trompil volume is big, this kind of mode leads to overall efficiency of construction low, and the later stage is reworked a lot after the error appears, and the cost of labor is high.
Disclosure of Invention
The utility model discloses aim at solving prior art's not enough, and provide a guarantee that template is opened diplopore distance, horizontally positioner.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme: the utility model provides a guarantee that template is opened diplopore distance, horizontally positioner, includes angle bar, level pearl, a pair of reinforcing bar, and the reinforcing bar interval welding is on angle bar right angle inner wall, and the level pearl is installed on the angle bar top surface and is located two reinforcing bars in the middle of, and angle bar one end is kept away from to the reinforcing bar and is polished into the pointed cone portion.
In particular, the distance between the two reinforcing bars 3 is 100mm.
In particular, the angle 1 is 200mm in length.
In particular, the steel bar 3 is a straight smooth circular steel bar, the length of the steel bar is 200mm, and the diameter of the steel bar is 8mm.
In particular, the leveling bead is a strip-shaped leveling bead with strong magnetism.
The utility model has the advantages that:
1. the device is fixed with the diplopore interval, and the level pearl that the angle bar carried, can easily adjust two holes to same water flat line, effectively improve construction quality and efficiency.
2. The angle iron and the reinforcing steel bar are common materials in a construction site, the engineering leftover materials can meet the requirement of processing of the device, and the device can be recycled once being formed, so that the construction is rapid, the adjustment is convenient, and the time and the labor are saved.
3. The template diplopore location operation is simple and easy, diplopore level adjustment is convenient, and the construction degree of difficulty is lower.
4. The overall construction speed is high, the operation is simple and easy, the construction difficulty is low, the adjustment is convenient, the construction quality can be effectively guaranteed, and the problem of later reworking is avoided.
Drawings
Fig. 1 is a schematic structural view of the present invention;
in the figure: 1-angle iron; 2-leveling bead; 3-reinforcing steel bars; 4-a pointed cone;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in figure 1, a guarantee template and open diplopore distance, horizontally positioner, including angle bar 1, level pearl 2, a pair of reinforcing bar 3, the welding of reinforcing bar 3 interval is on 1 right angle inner wall of angle bar, and level pearl 2 is installed on 1 top surface of angle bar and is lain in the middle of two reinforcing bars 3, and 1 one end polishing taper portion 4 of angle bar is kept away from to reinforcing bar 3.
The distance between the two steel bars 3 is 100mm; the length of the angle iron 1 is 200mm; the steel bar 3 is a straight-bar smooth circular steel bar, the length is 200mm, and the diameter is 8mm; the leveling bead 2 is a strip-shaped leveling bead with strong magnetism and is fixed on the angle iron 1 in a magnetic attraction mode.
The distance between the screw connecting holes on the overhanging I-shaped steel anchoring plate is 100mm. During manufacturing, two straight lines are drawn on the angle iron 1, the distance between the two straight lines is 100mm, a reinforcing steel bar 3 and the angle iron 1 are welded at a line drawing position, the reinforcing steel bar 3 is perpendicular to the angle iron 1, one end of the pointed conical part 4 faces outwards, the second reinforcing steel bar 3 is welded at the other line, the welding method is the same as that of the first reinforcing steel bar, whether the distance between the two reinforcing steel bars 3 is 100mm or not is rechecked before welding, corresponding adjustment is carried out according to a rechecking result, and the distance between the two reinforcing steel bars 3 is ensured to be 100mm. After welding, the magnetic strip leveling bead 2 is fixed with the angle iron 1.
When the double holes of the template are reserved, the device is leveled and leveled perpendicular to the template, after the leveling is finished, the device is pressed towards the template, two pits which are 100mm apart and located on the same horizontal line are reserved on the template through the pointed conical part 4, then holes are drilled at the pits of the template through a hole drilling tool, and then the screw rod is fixed.
By adopting the device, the construction speed is high, the operation is simple, the construction difficulty is lower, the site manufacture can be carried out according to different hole distances, the manufacture is simple, the construction hole distance is ensured, meanwhile, two preformed holes are positioned on the same horizontal line, and the construction quality and the construction efficiency of the preformed holes are improved.
The utility model discloses the on-the-spot step of implementing as follows:
the first step is as follows: measuring and positioning
And according to the I-steel layout of the cantilever scaffold, measuring and positioning the template at the position where the cantilever I-steel needs to be arranged, and marking the template.
The second step is that: leveling at the mark
After the installation position of the I-shaped steel is determined, the hole opening position is centrally positioned at the mark position of the template, the device is aligned to the template at the mark position, and leveling is carried out according to the leveling bead 2 on the device until the air bubble is positioned in the middle of the leveling bead 2.
The third step: the pointed cone part 4 is inserted into the template to leave a pit
After centering the bubble in leveling bead 2, the pointed cone 4 on the rebar 3 is forcibly inserted into the form, leaving two pits at the form.
The fourth step: making holes in the form
According to the position of a pit reserved on a template by the device, drilling is carried out at the pit by a hand drill, so that the positioning and the hole opening of the template are completed, the hole opening distance of two holes is ensured, and the two holes are positioned on the same horizontal plane; the construction is convenient, the location is accurate, the time and the labor are saved, and multiple purposes are achieved.
The fifth step: fixing embedded parts according to the positions of the holes
And (3) fixing the embedded part according to the position of the hole formed in the template, vertically placing the embedded part close to the template, and then fastening the screw rod with the embedded part after penetrating the template from the outer side to finish the embedding work of the embedded part.
And a sixth step: checking
And checking the levelness of the external wire leaking rod by using a water cone ruler, and performing construction of the next group of embedded parts when the levelness meets the requirement, or adjusting until the levelness meets the requirement.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and for simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; may be mechanically coupled, may be electrically coupled or may be in communication with each other; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.

Claims (5)

1. The utility model provides a guarantee that template is opened diplopore distance, horizontally positioner, its characterized in that, includes angle bar (1), level pearl (2), a pair of reinforcing bar (3), and reinforcing bar (3) interval welding is on angle bar (1) right angle inner wall, and level pearl (2) are installed on angle bar (1) top surface and are located two reinforcing bar (3) centre, and angle bar (1) one end is polished into pointed cone portion (4) in reinforcing bar (3).
2. The positioning device for ensuring the fixed distance and the levelness of the double holes of the template according to the claim 1, characterized in that the distance between the two steel bars (3) is 100mm.
3. The positioning device for ensuring the distance and the levelness of the double holes of the template according to the claim 2, characterized in that the length of the angle iron (1) is 200mm.
4. A device for ensuring the fixed distance and the horizontal of the double holes of the template according to claim 3, characterized in that the steel bars (3) are straight smooth round steel bars with the length of 200mm and the diameter of 8mm.
5. A device for ensuring the fixed distance and the levelness of the template according to claim 4, wherein the leveling bead (2) is a strip leveling bead with strong magnetism.
CN202222877327.XU 2022-10-31 2022-10-31 Positioning device for ensuring fixed distance and horizontal of double holes of template Active CN218779955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222877327.XU CN218779955U (en) 2022-10-31 2022-10-31 Positioning device for ensuring fixed distance and horizontal of double holes of template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222877327.XU CN218779955U (en) 2022-10-31 2022-10-31 Positioning device for ensuring fixed distance and horizontal of double holes of template

Publications (1)

Publication Number Publication Date
CN218779955U true CN218779955U (en) 2023-03-31

Family

ID=85710481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222877327.XU Active CN218779955U (en) 2022-10-31 2022-10-31 Positioning device for ensuring fixed distance and horizontal of double holes of template

Country Status (1)

Country Link
CN (1) CN218779955U (en)

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN113089887A (en) Assembly type wallboard with positioning device and installation method thereof
CN110607907B (en) Quick accurate positioning tool assembly for embedded sleeve
CN212561935U (en) Drilling-free embedded part for chemically planting steel bars of constructional column
CN105604102A (en) On-site measurement method for perpendicularity of cast-in-place concrete pile body and drilling core hole
CN105953698B (en) A kind of floor plate thickness survey tool and its measurement method
CN218779955U (en) Positioning device for ensuring fixed distance and horizontal of double holes of template
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN109138450A (en) Reducer pipe space articulation mouth intersection localization method
CN107655740B (en) Device and method for manufacturing test piece capable of testing shear strength of joint surfaces of different anchoring angles
CN205503041U (en) Guider is right in drilling
CN211421198U (en) Inclinometer tube structure capable of being oriented accurately
CN213653454U (en) Positioning and elevation control device for anti-floating anchor rod
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN113529814A (en) Method for detecting wall quality of hectometer-level ultra-deep underground continuous wall by drilling and coring
CN209907967U (en) Tool for controlling main reinforcement spacing of cast-in-place pile reinforcement cage
CN111519672A (en) Cast-in-place pile sediment measuring device and measuring method thereof
CN220575089U (en) Positioning device for reinforcement cage
CN205918142U (en) Aligning device is assembled to shear force wall
CN210164265U (en) Positioning device for preformed hole of prefabricated wallboard
CN218933844U (en) A pre-buried sleeve pipe positioner for building carrier plate
CN219508284U (en) Auxiliary device for laying steel spring precast slabs
CN213645937U (en) Template is to drawing screw rod hole positioning tool
CN216737128U (en) Steel stand hoisting accessory

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant