CN218770944U - Threading construction device for building electrical engineering - Google Patents

Threading construction device for building electrical engineering Download PDF

Info

Publication number
CN218770944U
CN218770944U CN202221767081.4U CN202221767081U CN218770944U CN 218770944 U CN218770944 U CN 218770944U CN 202221767081 U CN202221767081 U CN 202221767081U CN 218770944 U CN218770944 U CN 218770944U
Authority
CN
China
Prior art keywords
threading
plate
traction
building electrical
placing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221767081.4U
Other languages
Chinese (zh)
Inventor
韦颂
马强
冯敏玲
曾强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202221767081.4U priority Critical patent/CN218770944U/en
Application granted granted Critical
Publication of CN218770944U publication Critical patent/CN218770944U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to the technical field of threading construction winding frames, in particular to a threading construction device for building electrical engineering, which comprises a placing frame, wherein the placing frame is placed on the surface of a building electrical construction site, a side plate of the placing frame is provided with a mounting hole, and a traction shaft is movably inserted in the mounting hole; the threading construction winding shaft is arranged at the end part of the traction shaft, and a cable is wound on the surface of the threading construction winding shaft; the transverse plate is arranged on the side plate of the placing frame, the surface of the transverse plate is provided with a threading opening, and a cleaning plate is movably arranged inside the threading opening; the beneficial effects are that: the utility model provides a building electrical engineering threading construction equipment installs the diaphragm additional in the place ahead of putting the frame, and when the cable passed the through wires mouth that the diaphragm surface was seted up, the inside cleaning plate of through wires mouth swept dust and the particulate matter of cable surface adhesion, avoided the particulate matter to prick the cable protective layer.

Description

Threading construction device for building electrical engineering
Technical Field
The utility model relates to a threading construction rolling frame technical field specifically is a building electrical engineering threading construction equipment.
Background
The building electrical engineering is the operation, maintenance, overhaul, debugging and management work of an electrical system of a town and country building community.
Among the prior art, building electrical engineering is in the construction of building site, and the spool often adopts pre-buried mode, and is pre-buried in wall and floor, in order to lay the wire in pre-buried pipeline, need carry out the threading construction of wire with the help of rolling axle threading device.
But traditional rolling axle lacks the clearance structure to the cable surface, leads to the particulate matter centre gripping of cable surface adhesion in the cable dish of rolling, easily leads to the protective layer of cable to be punctured, influences cable safety in utilization.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building electrical engineering threading construction equipment to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a threading construction device for building electrical engineering comprises a placing frame, wherein the placing frame is placed on the surface of a building electrical construction site, a side plate of the placing frame is provided with a mounting hole, and a traction shaft is movably inserted into the mounting hole;
the threading construction winding shaft is arranged at the end part of the traction shaft, and a cable is wound on the surface of the threading construction winding shaft; and
the transverse plate is arranged on the side plate of the placing frame, the surface of the transverse plate is provided with a threading opening, and a cleaning plate is movably arranged inside the threading opening.
Preferably, the placing frame is of a '21274', the two side plates of the placing frame are respectively provided with a mounting opening, a bearing is arranged in the mounting openings, and the bearing is sleeved on the outer side of the traction shaft.
Preferably, the traction shafts are of a T-shaped cylindrical structure, the two groups of traction shafts are symmetrically distributed about the threading construction winding shaft, and the threading construction winding shaft is of an I-shaped cylindrical structure.
Preferably, the transverse plate is a square plate, the transverse plate is fixed on the two side plates of the placing frame through screws, and the threading opening is formed in the middle of the surface of the transverse plate.
Preferably, the clearance board is square board, and the surface of clearance board is provided with the brush hair, and the clearance board is provided with two sets ofly, and two sets of clearance boards are upper and lower symmetric distribution about the center of threading mouth.
Preferably, the surface of the cleaning plate is provided with a plurality of traction handles, the traction handles penetrate through the transverse plate and are in a T-shaped cylinder structure, and springs are sleeved on the outer sides of the traction handles and fixed between the end plate body of the traction handles and the transverse plate.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a building electrical engineering threading construction equipment installs the diaphragm additional in the place ahead of putting the frame, and when the cable passed the through wires mouth that the diaphragm surface was seted up, the inside clearance board of through wires mouth swept the dust and the particulate matter of cable surface adhesion, avoided the particulate matter to prick the cable protective layer.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the transverse plate of the present invention;
fig. 3 is an enlarged schematic view of the structure at a in fig. 2.
In the figure: the cable laying frame comprises a laying frame 1, a building electrical construction site 2, a mounting port 3, a bearing 4, a traction shaft 5, a threading construction winding shaft 6, a cable 7, a transverse plate 8, a threading port 9, a cleaning plate 10, a traction handle 11 and a spring 12.
Detailed Description
In order to make the objects and technical solutions of the present invention clear and fully described, and the advantages thereof more clearly understood, the embodiments of the present invention are described in further detail below with reference to the accompanying drawings. It is to be understood that the specific embodiments described herein are merely illustrative of some, but not all, embodiments of the present invention and are not to be considered as limiting, and that all other embodiments can be made by one of ordinary skill in the art without any inventive work.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "a," "an," "first," "second," "third," "fourth," "fifth," and "sixth" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected" and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
For the purposes of simplicity and explanation, the principles of the embodiments are described by referring mainly to examples. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments. It will be apparent, however, to one skilled in the art that the embodiments may be practiced without these specific details. In some instances, well-known methods and structures have not been described in detail so as not to unnecessarily obscure the embodiments. In addition, all embodiments may be used in combination with each other.
Referring to fig. 1 to 3, the present invention provides a technical solution: a threading construction device for building electrical engineering comprises a placing frame 1, wherein the placing frame 1 is placed on the surface of a building electrical construction site 2, mounting ports 3 are formed in side plates of the placing frame 1, the placing frame 1 is of a '21274' -shaped plate structure, the mounting ports 3 are formed in two side plates of the placing frame 1, a bearing 4 is arranged in each mounting port 3, the bearing 4 is sleeved on the outer side of a traction shaft 5, and the traction shaft 5 is movably inserted in each mounting port 3;
the threading construction winding shaft 6 is arranged at the end part of the traction shaft 5, the traction shaft 5 is in a T-shaped cylindrical structure, the two groups of traction shafts 5 are symmetrically distributed about the threading construction winding shaft 6, the threading construction winding shaft 6 is in an I-shaped cylindrical structure, and a cable 7 is wound on the surface of the threading construction winding shaft 6;
diaphragm 8 is located on the curb plate of putting frame 1, threading mouth 9 has been seted up on the surface of diaphragm 8, diaphragm 8 is square board, diaphragm 8 passes through the fix with screw on two curb plates of putting frame 1, threading mouth 9 is placed in the middle on the surface of diaphragm 8, the inside activity of threading mouth 9 is provided with clearance board 10, clearance board 10 is square board, the surface of clearance board 10 is provided with the brush hair, clearance board 10 is provided with two sets ofly, two sets of clearance boards 10 are upper and lower symmetric distribution about the center of threading mouth 9, the surface of clearance board 10 is provided with a plurality of handles 11 that pull, pull handle 11 and run through diaphragm 8, it is "T" font cylinder structure to pull handle 11, and the outside cover that pulls handle 11 is equipped with spring 12, spring 12 fixes between the tip diaphragm and 8 that pull handle 11.
During the in-service use, two clearance boards 10 in the through wires mouth 9 are passed to cable conductor 7's one end, and clearance board 10 is pull handle 11 elasticity by the cooperation of spring 12 and is pushed up the support, consequently two sets of clearance boards 10 are to cable conductor 7 centre gripping, stretch-draw cable conductor 7's in-process, and the brush hair on clearance board 10 surface sweeps dust and the particulate matter of cable conductor 7 surface adhesion.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building electrical engineering threading construction device, is including putting frame (1), puts frame (1) and puts the surface at building electrical construction scene (2), its characterized in that: a mounting opening (3) is formed in a side plate of the placing frame (1), and a traction shaft (5) is movably inserted into the mounting opening (3);
the threading construction winding shaft (6) is arranged at the end part of the traction shaft (5), and a cable (7) is wound on the surface of the threading construction winding shaft (6); and
the transverse plate (8) is arranged on the side plate of the placing frame (1), the surface of the transverse plate (8) is provided with a threading opening (9), and the inside of the threading opening (9) is movably provided with a cleaning plate (10).
2. The threading construction device for the building electrical engineering according to claim 1, characterized in that: the placing frame (1) is of a '21274', the two side plates of the placing frame (1) are respectively provided with a mounting port (3), a bearing (4) is arranged in each mounting port (3), and the bearing (4) is sleeved on the outer side of the traction shaft (5).
3. The threading construction device for the building electrical engineering according to claim 1, characterized in that: the traction shafts (5) are of T-shaped cylindrical structures, the two groups of traction shafts (5) are symmetrically distributed about the threading construction winding shaft (6), and the threading construction winding shaft (6) is of an I-shaped cylindrical structure.
4. The threading construction device for the building electrical engineering according to claim 1, characterized in that: the transverse plate (8) is a square plate, the transverse plate (8) is fixed on the two side plates of the placing frame (1) through screws, and the threading opening (9) is arranged between the two sides of the transverse plate (8).
5. The threading construction device for building electrical engineering of claim 1, characterized in that: the cleaning plate (10) is a square plate, the surface of the cleaning plate (10) is provided with bristles, the cleaning plate (10) is provided with two groups, and the two groups of cleaning plates (10) are distributed in a vertically symmetrical mode about the center of the threading opening (9).
6. The threading construction device for building electrical engineering of claim 5, characterized in that: the surface of the cleaning plate (10) is provided with a plurality of traction handles (11), the traction handles (11) penetrate through the transverse plate (8), the traction handles (11) are of a T-shaped cylinder structure, a spring (12) is sleeved on the outer side of each traction handle (11), and the spring (12) is fixed between the end plate body of each traction handle (11) and the transverse plate (8).
CN202221767081.4U 2022-07-11 2022-07-11 Threading construction device for building electrical engineering Active CN218770944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221767081.4U CN218770944U (en) 2022-07-11 2022-07-11 Threading construction device for building electrical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221767081.4U CN218770944U (en) 2022-07-11 2022-07-11 Threading construction device for building electrical engineering

Publications (1)

Publication Number Publication Date
CN218770944U true CN218770944U (en) 2023-03-28

Family

ID=85688875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221767081.4U Active CN218770944U (en) 2022-07-11 2022-07-11 Threading construction device for building electrical engineering

Country Status (1)

Country Link
CN (1) CN218770944U (en)

Similar Documents

Publication Publication Date Title
CN209993409U (en) Antifouling type suspension porcelain insulator
CN218770944U (en) Threading construction device for building electrical engineering
CN210162122U (en) Water conservancy and hydropower building engineering management device
CN208508396U (en) A kind of electric power cable laying apparatu
CN215120065U (en) Stable in structure's modified polypropylene electric power buried pipe
CN211579451U (en) Communication engineering optical cable fixing device
CN211831519U (en) Agricultural irrigation water demand prediction system equipment
CN212041607U (en) Water conservancy construction pipeline is laid and is dimension foster device
CN212008771U (en) Multifunctional monitoring instrument device
CN212978286U (en) Electric power overhauls instrument hoisting device
CN220925915U (en) Automatic cable winding device
CN219567217U (en) Baffle plate for pull rod of elevator
CN212336881U (en) Electric power tower installation base
CN221074070U (en) Foot nail suitable for electric power iron tower angle steel
CN215440708U (en) Automatic tamping unit of multi-functional electrolysis trough
CN212908850U (en) Cable protection pipe convenient to installation
CN216625159U (en) Net twine winding displacement reason line ware
CN217396302U (en) Positioning and mounting structure for existing railway line contact net
CN220182394U (en) Cable take-up reel
CN214812845U (en) Cleaning device is used in production of only gluing valve
CN215934424U (en) Insulator for sampling salt ash density components of power transmission line
CN221057604U (en) Power storage module and voltage sag management device
CN218292884U (en) Surface treatment tool for concrete structural slab
CN209685020U (en) A kind of simple wrap-up of power cable
CN213460917U (en) Fixing device of server power cord

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant