CN212336881U - Electric power tower installation base - Google Patents

Electric power tower installation base Download PDF

Info

Publication number
CN212336881U
CN212336881U CN201922493100.3U CN201922493100U CN212336881U CN 212336881 U CN212336881 U CN 212336881U CN 201922493100 U CN201922493100 U CN 201922493100U CN 212336881 U CN212336881 U CN 212336881U
Authority
CN
China
Prior art keywords
base
power tower
mounting
electric power
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922493100.3U
Other languages
Chinese (zh)
Inventor
李胜华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Detaiheng Iron Tower Co ltd
Original Assignee
Qingdao Detaiheng Iron Tower Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Detaiheng Iron Tower Co ltd filed Critical Qingdao Detaiheng Iron Tower Co ltd
Priority to CN201922493100.3U priority Critical patent/CN212336881U/en
Application granted granted Critical
Publication of CN212336881U publication Critical patent/CN212336881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to the technical field of electric power towers, in particular to an electric power tower mounting base, which comprises a base and an electric power tower mounting plate, wherein the top of the base is provided with the electric power tower mounting plate, partition plates are symmetrically arranged in the base, one side of the two partition plates is provided with a screw rod, the screw rod penetrates through a nut moving block and extends to the two sides of the nut moving block, the nut moving block is in threaded connection with the screw rod, the two ends of the screw rod are connected with connecting shafts, the connecting shaft of one end penetrates through the side plate of the base to be connected with a rotating shaft, one end of the rotating shaft, which is far away from the connecting shaft, is connected with a rotating handle, the top of the nut moving block is connected with a vertical first connecting rod, the first connecting rod penetrates through the top of the base to be connected with the, the power tower mounting plate is clamped, so that the power tower is stably mounted.

Description

Electric power tower installation base
Technical Field
The utility model relates to an electric power tower technical field specifically is an electric power tower installation base.
Background
The electric tower is mostly built near a power plant and a power distribution station in the field, is an important facility of an electric power department, and can be used for overhead electric wires and play a role in protection and support. The anti-overturning capacity and the bearing capacity of the electric power tower mounting base directly determine the safety of the electric power tower, and the stability, the safety and the like of the existing electric power tower mounting base are still to be improved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power tower installation base to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an electric power tower mounting base comprises a base and an electric power tower mounting plate, wherein the top of the base is provided with the electric power tower mounting plate, partition plates are symmetrically arranged in the base, screw rods are arranged on one sides of the two partition plates, the screw rods penetrate through a nut moving block and extend to the two sides of the nut moving block, the nut moving block is in threaded connection with the screw rods, the two ends of each screw rod are connected with connecting shafts, the connecting shafts at one end penetrate through side plates of the base to be connected with rotating shafts, one ends of the rotating shafts, far away from the connecting shafts, are connected with rotating handles, the top of the nut moving block is connected with vertical first connecting rods, the first connecting rods penetrate through the top of the base to be connected to the bottom of a clamping plate, the clamping plates are arranged on the two sides of the electric power, the guide rods penetrate through the sliding guide block and extend to two sides of the sliding guide block; the base bottom is provided with mounting plate, and mounting plate bottom is provided with many vertical installation stake poles.
Preferably, a sliding groove connected with the first connecting rod in a sliding manner is arranged on a top plate of the base, and the sliding groove is arranged on two sides of the power tower mounting plate.
Preferably, a buffer pad is arranged between the base and the power tower mounting plate, and a plurality of mounting holes are arranged on the power tower mounting plate.
Preferably, the bottom of the installation pile rod is connected with a chassis, and the bottom of the chassis is provided with a plurality of protrusions with sharp conical structures.
Preferably, bearing seats are arranged on the inner walls of the two ends of the base and on one side of the two partition plates, connecting shafts at the two ends of the screw rod are arranged in the bearing seats, and the connecting shaft at one end penetrates through the bearing seats to be connected with the rotating shaft.
Preferably, the inner walls of the two ends of the base and one side of each of the two partition plates are provided with mounting seats, and the mounting seats are connected with the two ends of the guide rod.
Compared with the prior art, the beneficial effects of the utility model are that: the electric power tower mounting base clamps the electric power tower mounting plate through the clamping plate, so that the electric power tower is stably mounted, the clamping plate is stabilized when moving through the guide rod and the sliding guide block, the mounting pile rod at the bottom of the base enters the soil, the bulge at the bottom of the base plate is inserted into the soil, the stability of base mounting is improved, and the stability of electric power tower mounting is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic diagram of the structure of the clamping plate of the present invention.
In the figure: 1. a base; 2. a power tower mounting plate; 21. mounting holes; 3. mounting a bottom plate; 4. installing a pile rod; 41. a chassis; 42. a protrusion; 5. a clamping plate; 6. a nut moving block; 7. a screw; 8. a guide bar; 9. a rotating shaft; 10. a partition plate; 11. a chute; 12. a first connecting rod; 13. a sliding guide block; 14. a second connecting rod; 15. a cushion pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-2, the present invention provides a technical solution: an electric power tower mounting base comprises a base 1 and an electric power tower mounting plate 2, the top of the base 1 is provided with the electric power tower mounting plate 2, partition plates 10 are symmetrically arranged in the base 1, one side of each partition plate 10 is provided with a screw 7, each screw 7 penetrates through a nut moving block 6 and extends to two sides of the nut moving block 6, the nut moving blocks 6 are in threaded connection with the screws 7, two ends of each screw 7 are connected with connecting shafts, the connecting shaft at one end penetrates through a side plate of the base 1 and is connected with a rotating shaft 9, one end, away from the connecting shaft, of the rotating shaft 9 is connected with a rotating handle, the top of each nut moving block 6 is connected with a vertical first connecting rod 12, the first connecting rods 12 penetrate through the top of the base 1 and are connected to the bottom of a clamping plate 5, the clamping plates 5 are arranged on two sides of the electric power tower mounting plate 2, the sliding guide block 13 is connected to the guide rod 8 in a sliding manner, and the guide rod 8 penetrates through the sliding guide block 13 and extends to two sides of the sliding guide block 13; the bottom of the base 1 is provided with a mounting bottom plate 3, and the bottom of the mounting bottom plate 3 is provided with a plurality of vertical mounting pile rods 4.
Be provided with on the roof of base 1 with first connecting rod 12 sliding connection's spout 11, and spout 11 sets up in the both sides of electric power tower mounting panel 2, and first connecting rod 12 slides in spout 11, conveniently drives the clamp plate 5 and removes.
Be provided with blotter 15 between base 1 and the electric power tower mounting panel 2, and be provided with a plurality of mounting holes 21 on the electric power tower mounting panel 2, through mounting hole 21, conveniently install electric power tower bottom on electric power tower mounting panel 2.
The bottom of the installation pile rod 4 is connected with a chassis 41, the bottom of the chassis 41 is provided with a plurality of protrusions 42 with a pointed conical structure, the protrusions 42 at the bottom of the chassis 41 are inserted into soil, and the installation stability of the installation pile rod 4 is improved.
Bearing seats are arranged on the inner walls of the two ends of the base 1 and one side of the two partition plates 10, connecting shafts at the two ends of the screw 7 are arranged in the bearing seats, and the connecting shaft at one end penetrates through the bearing seats to be connected with the rotating shaft 9, so that the rotating shaft 9 can drive the connecting shafts to rotate conveniently.
The inner walls of the two ends of the base 1 and one side of the two partition plates 10 are respectively provided with a mounting seat, and the mounting seats are connected with the two ends of the guide rod 8, so that the guide rod 8 is conveniently mounted between the two mounting seats.
The working principle is as follows: during the use, the electric power tower passes through mounting hole 21 and installs on electric power tower mounting panel 2, through the rotation of axis of rotation 9, drive the connecting axle and rotate, screw rod 7 begins to rotate, nut movable block 6 begins to move, slide in spout 11 through first connecting rod 12, drive clamp plate 5 and remove, press from both sides tight electric power tower mounting panel 2, the removal of nut movable block 6, drive slide guide block 13 through second connecting rod 14 and slide on guide arm 8, improve the stability of nut movable block 6, base 1 inserts in soil through installation stake pole 4 of mounting plate 3 bottom, the arch 42 of chassis 41 bottom inserts in soil, improve the stability of base 1.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electric power tower installation base, includes base (1) and electric power tower mounting panel (2), its characterized in that: the top of the base (1) is provided with an electric power tower mounting plate (2), partition plates (10) are symmetrically arranged in the base (1), screw rods (7) are arranged on one sides of the two partition plates (10), the screw rods (7) penetrate through the nut moving block (6) and extend to two sides of the nut moving block (6), the nut moving block (6) is in threaded connection with the screw rods (7), connecting shafts are connected to two ends of each screw rod (7), the connecting shaft at one end penetrates through a side plate of the base (1) to be connected with a rotating shaft (9), one end, far away from the connecting shaft, of the rotating shaft (9) is connected with a rotating handle, the top of the nut moving block (6) is connected with a vertical first connecting rod (12), the first connecting rod (12) penetrates through the top of the base (1) to be connected to the bottom of the clamping plate (5), the clamping plate (5) is arranged on two sides of the, one end of the second connecting rod (14) is connected with a sliding guide block (13), the sliding guide block (13) is connected to the guide rod (8) in a sliding mode, and the guide rod (8) penetrates through the sliding guide block (13) and extends to the two sides of the sliding guide block (13); the bottom of the base (1) is provided with a mounting bottom plate (3), and the bottom of the mounting bottom plate (3) is provided with a plurality of vertical mounting pile rods (4).
2. An electrical tower mounting base as claimed in claim 1, wherein: a top plate of the base (1) is provided with a sliding chute (11) which is connected with the first connecting rod (12) in a sliding manner, and the sliding chute (11) is arranged on two sides of the electric power tower mounting plate (2).
3. An electrical tower mounting base as claimed in claim 1, wherein: a buffer cushion (15) is arranged between the base (1) and the power tower mounting plate (2), and a plurality of mounting holes (21) are formed in the power tower mounting plate (2).
4. An electrical tower mounting base as claimed in claim 1, wherein: the bottom of the installation pile rod (4) is connected with a chassis (41), and a plurality of protrusions (42) with sharp cone structures are arranged at the bottom of the chassis (41).
5. An electrical tower mounting base as claimed in claim 1, wherein: bearing seats are arranged on the inner walls of the two ends of the base (1) and on one side of the two partition plates (10), connecting shafts at the two ends of the screw rod (7) are arranged in the bearing seats, and the connecting shaft at one end penetrates through the bearing seats to be connected with the rotating shaft (9).
6. An electrical tower mounting base as claimed in claim 1, wherein: the inner walls of the two ends of the base (1) and one side of the two partition plates (10) are respectively provided with a mounting seat, and the mounting seats are connected with the two ends of the guide rod (8).
CN201922493100.3U 2019-12-31 2019-12-31 Electric power tower installation base Active CN212336881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922493100.3U CN212336881U (en) 2019-12-31 2019-12-31 Electric power tower installation base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922493100.3U CN212336881U (en) 2019-12-31 2019-12-31 Electric power tower installation base

Publications (1)

Publication Number Publication Date
CN212336881U true CN212336881U (en) 2021-01-12

Family

ID=74064633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922493100.3U Active CN212336881U (en) 2019-12-31 2019-12-31 Electric power tower installation base

Country Status (1)

Country Link
CN (1) CN212336881U (en)

Similar Documents

Publication Publication Date Title
CN210985516U (en) Cable support convenient to altitude mixture control
CN210709437U (en) Fixing and clamping device of transformer box
CN212336881U (en) Electric power tower installation base
CN217529413U (en) Lithium cell electricity core cut device
CN113585857B (en) Anti-toppling device for transformer substation capital construction
CN210093156U (en) Photovoltaic electroplax strutting arrangement with adjustable
CN210998375U (en) Turnover sheet metal part clamp device
CN211018202U (en) Novel electric power lays support
CN211151200U (en) Outdoor portable on-spot power dispatching case
CN212134766U (en) High-voltage power grid test line fixing device
CN212251927U (en) Scalable solar energy control pole of control angularly adjustable
CN215267194U (en) Power distribution cabinet stand column clamping tool
CN216312613U (en) Cable fixing mechanism for wind generating set
CN212419957U (en) Tapping device for nut processing
CN211736264U (en) Civil engineering construction support
CN220394300U (en) Steel box girder construction pin-connected panel loading platform
CN215168319U (en) Electrified tower pole righting device
CN211860075U (en) Network communication engineering receiving arrangement
CN216948400U (en) Bearing platform template for building construction
CN215747500U (en) Low top cap assembly anchor clamps
CN220291938U (en) Photovoltaic energy source board support piece
CN214153973U (en) Lightning protection equipment for power transmission and transformation convenient to it is fixed
CN216575475U (en) Cast welding clamp for lead-acid storage battery
CN220189821U (en) Fork truck battery structure with fixed subassembly
CN214560241U (en) Leveling device for end face of rubber barbell disc

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant