CN218759201U - Building site rail of construction engineering construction usefulness - Google Patents

Building site rail of construction engineering construction usefulness Download PDF

Info

Publication number
CN218759201U
CN218759201U CN202222961740.4U CN202222961740U CN218759201U CN 218759201 U CN218759201 U CN 218759201U CN 202222961740 U CN202222961740 U CN 202222961740U CN 218759201 U CN218759201 U CN 218759201U
Authority
CN
China
Prior art keywords
fixedly connected
plate
construction
fixing
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222961740.4U
Other languages
Chinese (zh)
Inventor
解雪状
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Province Road Construction Engineering Management Co ltd
Original Assignee
Anhui Guining Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guining Construction Engineering Co ltd filed Critical Anhui Guining Construction Engineering Co ltd
Priority to CN202222961740.4U priority Critical patent/CN218759201U/en
Application granted granted Critical
Publication of CN218759201U publication Critical patent/CN218759201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building site rail that construction engineering construction was used, including the fixing base, the top fixedly connected with dead lever of fixing base, the right side fixedly connected with extension case of dead lever, the first fixed plate of left side fixedly connected with of extension incasement chamber, the first fixed block of one side fixedly connected with of first fixed plate, the equal swing joint in both ends on first fixed block surface has the movable rod, and the one end swing joint of movable rod has the second fixed plate. The utility model discloses an increase extension structure, the usable floor area of the extension rail of being convenient for to improved the availability factor of rail, also improved the practicality of rail simultaneously, solved staff's trouble, satisfied staff's demand, through increasing the dismouting structure, be convenient for carry out quick assembly disassembly to the rail, thereby improved staff's work efficiency, also saved staff's time simultaneously, through increasing reset structure, can play automatic re-setting's effect.

Description

Building site rail of construction engineering construction usefulness
Technical Field
The utility model relates to a construction engineering technical field, specifically speaking relates to a building site rail that construction engineering construction was used.
Background
The construction engineering refers to the general name of various buildings and engineering facilities which provide material and technical foundations for human life and production, and the construction engineering is an organized, purposeful and large-scale economic activity of human beings;
the utility model discloses a CN214089629U, a construction engineering construction warning rail, including the fixed column, the bottom of fixed column and the top fixed connection of bottom plate, the left and right sides of fixed column all is provided with a set of removal post, the bottom of removal post and the top fixed connection of movable plate, the bottom fixed connection of movable plate has the gyro wheel, the top and the bottom that the removal post is close to fixed column one side all rotate with the one end of a set of telescopic link and are connected, this construction engineering construction warning rail is connected through setting up lifter plate, connecting plate and accessory plate, and set up the lifter plate and drive the lifter plate decline, make lifter plate and accessory plate combined action prop up the device, in order to fix the device on ground, improved the stability of device, stimulate the interlock board through setting up the pull rod and rotate, so that the catch plate promotes the removal post and the movable plate, the device of being convenient for remove, improved the practicality of device;
although the file is convenient for the device to move, the practicability of the device is improved, the file does not have an expansion function, so that the requirement of a user cannot be met in the using process, the using efficiency of the fence is reduced, and meanwhile, the file brings troubles to workers.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
To prior art's not enough, the utility model aims to provide a building site rail of construction engineering construction usefulness has reached the function of extension.
(II) technical scheme
This for realize above-mentioned mesh, the utility model provides a following technical scheme, a building site rail that construction engineering construction was used, which comprises a fixed base, the top fixedly connected with dead lever of fixing base, the right side fixedly connected with extension case of dead lever, the first fixed plate of left side fixedly connected with of extension incasement chamber, the first fixed block of one side fixedly connected with of first fixed plate, the equal swing joint in both ends on first fixed block surface has the movable rod, the one end swing joint of movable rod has the second fixed plate, one side fixedly connected with sliding plate of second fixed plate, the first installation piece of one side fixedly connected with of sliding plate, the equal fixedly connected with mount pad in both ends of dead lever left, the top swing joint of mount pad has the bolt, the inner chamber threaded connection that runs through to the mount pad in the bottom of bolt has the nut, the bottom swing joint of bolt has the movable plate, the bottom fixedly connected with inserted block of inserted block, it has the second installation piece to peg graft in the bottom of inserted block.
As the preferred scheme, the equal fixedly connected with bracing piece in both sides of mount pad inner chamber bottom, the top fixedly connected with backup pad of bracing piece.
As the preferred scheme, the right side fixedly connected with base at backup pad top, the bottom fixedly connected with spring of base inner chamber, the top fixedly connected with of spring resets the board, the center department fixedly connected with release link at board top resets.
As an optimized scheme, the two sides of the top of the reset plate are fixedly connected with limiting plates, and limiting blocks are fixedly mounted on the inner sides of the limiting plates.
As preferred scheme, the second spout has all been seted up to the both sides of base inner chamber, the equal fixedly connected with second slider in both sides of the board that resets, and the surface sliding connection of second slider is in the inner chamber of second spout.
As the preferred scheme, first spout has all been seted up to the both sides of mount pad inner chamber, the both sides of movable plate all fixedly connected with first slider, and the surface sliding connection of first slider is in the inner chamber of first spout.
Preferably, the surface of the first mounting block is provided with a mounting opening, and the bottom of the spring is fixedly connected with a fixing pad.
(III) advantageous effects
Compared with the prior art, the utility model provides a building site rail that construction engineering construction was used possesses following beneficial effect.
1. The utility model discloses an increase the extension structure, be convenient for extend the usable floor area of rail to the availability factor of rail has been improved, the practicality of rail has also been improved simultaneously, the trouble of staff has been solved, staff's demand has been satisfied, through increasing the dismouting structure, be convenient for carry out quick assembly disassembly to the rail, thereby improved staff's work efficiency, also saved staff's time simultaneously, through increasing reset structure, can play automatic re-setting's effect.
2. The utility model discloses an increase first spout, be convenient for carry on spacingly to first slider, improved the gliding stability of movable plate, solved staff's trouble, through increasing limiting plate and stopper, can play firm effect.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a sectional view of the structure of the expansion box of the present invention;
FIG. 3 is a sectional view of the mounting base structure of the present invention;
fig. 4 is a cross-sectional view of the base structure of the present invention.
In the figure: 1. a fixed seat; 2. an expansion box; 3. a first mounting block; 4. an installation port; 5. fixing the rod; 6. a bolt; 7. a second mounting block; 8. a mounting seat; 9. a movable rod; 10. a first fixed block; 11. a first fixing plate; 12. a sliding plate; 13. a second fixing plate; 14. moving the plate; 15. a first chute; 16. a first slider; 17. inserting a block; 18. a support bar; 19. a support plate; 20. a base; 21. a reset lever; 22. a nut; 23. a reset plate; 24. a spring.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention: the utility model provides a building site rail that construction engineering construction was used, which comprises a fixed base 1, the top fixedly connected with dead lever 5 of fixing base 1, the right side fixedly connected with extension case 2 of dead lever 5, the first fixed plate 11 of the left side fixedly connected with of extension case 2 inner chamber, the first fixed block 10 of one side fixedly connected with of first fixed plate 11, the equal swing joint in both ends on first fixed block 10 surface has movable rod 9, the one end swing joint of movable rod 9 has second fixed plate 13, one side fixedly connected with sliding plate 12 of second fixed plate 13, the first installation piece 3 of one side fixedly connected with of sliding plate 12, the equal fixedly connected with mount pad 8 in both ends of dead lever 5 left, the top swing joint of mount pad 8 has bolt 6, the inner chamber threaded connection that the bottom of bolt 6 runs through to mount pad 8 has nut 22, the bottom swing joint of bolt 6 has movable plate 14, the bottom fixedly connected with inserted block 17 of movable plate 14, the bottom of inserted block 17 is pegged graft and is had second installation piece 7.
Through the technical scheme, the use area of the fence is conveniently expanded by increasing the extension structure, so that the use efficiency of the fence is improved, the practicability of the fence is improved, the trouble of workers is solved, the demands of the workers are met, and the fence can be quickly disassembled and assembled by increasing the disassembly and assembly structure, so that the work efficiency of the workers is improved, and the time of the workers is saved.
Specifically, both sides of the bottom of the inner cavity of the mounting seat 8 are fixedly connected with supporting rods 18, and the top of each supporting rod 18 is fixedly connected with a supporting plate 19.
Through the technical scheme, the supporting rod 18 and the supporting plate 19 are additionally arranged, so that the effect of supporting and stabilizing can be achieved.
Specifically, the right side fixedly connected with base 20 at backup pad 19 top, the bottom fixedly connected with spring 24 of base 20 inner chamber, the top fixedly connected with reset plate 23 of spring 24, the fixedly connected with release link 21 of center department at the top of reset plate 23.
Through above-mentioned technical scheme, through increasing reset structure, can play automatic re-setting's effect.
Specifically, the both sides at board 23 top that resets are the equal fixedly connected with limiting plate, and the inboard fixed mounting of limiting plate has the stopper.
Through above-mentioned technical scheme, through increasing limiting plate and stopper, can play firm effect.
Specifically, the second spout has all been seted up to the both sides of base 20 inner chamber, and the equal fixedly connected with second slider in both sides of board 23 that resets, and the surface sliding connection of second slider is in the inner chamber of second spout.
Through above-mentioned technical scheme, through increasing the second spout, be convenient for carry on spacingly to the second slider, improved the gliding stability of board 23 that resets.
Specifically, first chutes 15 have been all seted up to the both sides of the inner chamber of mount pad 8, and the equal fixedly connected with first slider 16 in both sides of movable plate 14, and the surface sliding connection of first slider 16 is in the inner chamber of first chute 15.
Through above-mentioned technical scheme, through increasing first spout 15, be convenient for carry on spacingly to first slider 16, improved the gliding stability of movable plate 14, solved staff's trouble.
Specifically, the surface of the first mounting block 3 is provided with a mounting opening 4, and the bottom of the spring 24 is fixedly connected with a fixing pad.
Through above-mentioned technical scheme, through increasing installing port 4, can play the effect of the installation of being convenient for.
The working principle of the utility model is as follows; firstly, a user carries a fixed rod 5 to a specified position, then pulls a first mounting block 3 to move, drives a sliding plate 12 to move through the first mounting block 3, drives a second fixing plate 13 to move through the sliding plate 12, stretches a movable rod 9 to move through the second fixing plate 13, then inserts the first mounting block 3 into a mounting mechanism of another fence, and meanwhile, when the fence needs to be dismounted, the user twists a bolt 6 to reverse through an external tool, when no limiting pressure exists, a spring 24 automatically resets, resets through the spring 24 to push a reset plate 23 to move, pushes the reset rod 21 to move through the reset plate 23, pushes a movable plate 14 to move through the reset rod 21, drives an inserting block 17 to move through the movable plate 14, and when the second mounting block 7 does not have the limiting pressure, the user takes the fence away.
It should be finally noted that the above embodiments are only intended to illustrate the technical solutions of the present invention, and not to limit the scope of the present invention, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solutions of the present invention can be modified or replaced with equivalents without departing from the spirit and scope of the technical solutions of the present invention.

Claims (7)

1. The utility model provides a building site rail that construction engineering construction was used, includes fixing base (1), its characterized in that: the fixing device is characterized in that a fixing rod (5) is fixedly connected to the top of the fixing seat (1), an expansion box (2) is fixedly connected to the right side of the fixing rod (5), a first fixing plate (11) is fixedly connected to the left side of an inner cavity of the expansion box (2), a first fixing block (10) is fixedly connected to one side of the first fixing plate (11), movable rods (9) are movably connected to the two ends of the surface of the first fixing block (10), a second fixing plate (13) is movably connected to one end of each movable rod (9), a sliding plate (12) is fixedly connected to one side of the second fixing plate (13), a first mounting block (3) is fixedly connected to one side of the sliding plate (12), a mounting seat (8) is fixedly connected to the two ends of the left side of the fixing rod (5), a bolt (6) is movably connected to the top of the mounting seat (8), a nut (22) is connected to the bottom of the bolt (6) through the inner cavity of the mounting seat (8), a moving plate (14) is movably connected to the bottom of the bolt (6), an insert block (17) is fixedly connected to the bottom of the moving plate (14), and a second mounting block (7) is inserted and inserted in the bottom of the insert.
2. A worksite fence for construction of construction works as claimed in claim 1, wherein: the support rod (18) is fixedly connected to the two sides of the bottom of the inner cavity of the mounting seat (8), and the support plate (19) is fixedly connected to the top of the support rod (18).
3. A worksite fence for construction of construction works as claimed in claim 2, wherein: the right side fixedly connected with base (20) at backup pad (19) top, the bottom fixedly connected with spring (24) of base (20) inner chamber, the top fixedly connected with reset plate (23) of spring (24), fixedly connected with release link (21) is located at the center at reset plate (23) top.
4. A worksite fence for construction of construction works as claimed in claim 3, wherein: the equal fixedly connected with limiting plate in both sides at board (23) top that resets, and the inboard fixed mounting of limiting plate has the stopper.
5. A worksite fence for construction of construction works as claimed in claim 3, wherein: the second spout has all been seted up to the both sides of base (20) inner chamber, the equal fixedly connected with second slider in both sides of board (23) that resets, and the surface sliding connection of second slider is in the inner chamber of second spout.
6. A worksite fence for construction of construction works as claimed in claim 1, wherein: first spout (15) have all been seted up to the both sides of mount pad (8) inner chamber, the equal fixedly connected with first slider (16) in both sides of movable plate (14), and the surperficial sliding connection of first slider (16) is in the inner chamber of first spout (15).
7. A worksite fence for construction of construction works as claimed in claim 3, wherein: the surface of the first mounting block (3) is provided with a mounting opening (4), and the bottom of the spring (24) is fixedly connected with a fixing pad.
CN202222961740.4U 2022-11-07 2022-11-07 Building site rail of construction engineering construction usefulness Active CN218759201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222961740.4U CN218759201U (en) 2022-11-07 2022-11-07 Building site rail of construction engineering construction usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222961740.4U CN218759201U (en) 2022-11-07 2022-11-07 Building site rail of construction engineering construction usefulness

Publications (1)

Publication Number Publication Date
CN218759201U true CN218759201U (en) 2023-03-28

Family

ID=85646757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222961740.4U Active CN218759201U (en) 2022-11-07 2022-11-07 Building site rail of construction engineering construction usefulness

Country Status (1)

Country Link
CN (1) CN218759201U (en)

Similar Documents

Publication Publication Date Title
CN212927138U (en) Steel construction strutting arrangement that stability is strong for building engineering
CN218759201U (en) Building site rail of construction engineering construction usefulness
CN114215354A (en) Concrete formwork connecting mechanism capable of being quickly butted and locked
CN216840604U (en) Plane supporting unit for beam formwork and formwork supporting system
CN217053903U (en) Stone curtain wall steel frame keel structure convenient to install
CN214272835U (en) Wheel buckle type scaffold supporting system
CN217602079U (en) Beam slab supporting frame structure and system convenient to adjust and early tear open
CN216587632U (en) Scaffold frame protection network
CN217325813U (en) Energy-saving building convenient to build dismouting temporarily
CN219411215U (en) Integrated assembly type steel structure building
CN213015482U (en) Shear force wall installation strutting arrangement
CN214994662U (en) Stable form prefabricated construction house convenient to connect
CN219396771U (en) Suspension bedstead
CN216866065U (en) Interim escape way of architectural design construction
CN220768929U (en) Multidirectional house assembly support piece and support structure thereof
CN212912457U (en) Skeleton frame for bed
CN218758809U (en) Noise reduction device for construction
CN218375757U (en) Electric power civil engineering building guardrail
CN218346731U (en) Scaffold frame that can quick detach
CN216446606U (en) Prefabricated formula structure of control room external frame
CN219954466U (en) Auxiliary installation structure for connecting pipeline with filter
CN215905762U (en) Combined tower body and base structure thereof
CN217001042U (en) Temporary support for building construction
CN220389264U (en) Tool for mounting bridge boom
CN219327290U (en) Face limit operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230705

Address after: 334700 Imperial International Hotel, Renmin North Road West, Bingxi Town, Yushan County, Shangrao City, Jiangxi Province

Patentee after: Jiangxi feishun Construction Co.,Ltd.

Address before: 230000 East corner of the intersection of Meichonghu Road and Wenming Road, Shuangfeng Economic Development Zone, Changfeng County, Hefei City, Anhui Province, 5-5224, Floor 5, Science and Technology Innovation Experimental Building, Shuangfeng Zhigu Innovation and Entrepreneurship Science Park

Patentee before: Anhui Guining Construction Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240410

Address after: No.21, Xiatao Group, Zhanglaoying Village, Sanjie Town, Mingguang City, Chuzhou City, Anhui Province, 239000

Patentee after: Anhui Province Road Construction Engineering Management Co.,Ltd.

Country or region after: China

Address before: 334700 Imperial International Hotel, Renmin North Road West, Bingxi Town, Yushan County, Shangrao City, Jiangxi Province

Patentee before: Jiangxi feishun Construction Co.,Ltd.

Country or region before: China