CN218754594U - Road engineering installation is with supplementary elevating gear - Google Patents
Road engineering installation is with supplementary elevating gear Download PDFInfo
- Publication number
- CN218754594U CN218754594U CN202223269535.8U CN202223269535U CN218754594U CN 218754594 U CN218754594 U CN 218754594U CN 202223269535 U CN202223269535 U CN 202223269535U CN 218754594 U CN218754594 U CN 218754594U
- Authority
- CN
- China
- Prior art keywords
- articulated
- sets
- road engineering
- hoist
- engineering installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to road construction auxiliary fixtures field, concretely relates to road engineering installation is with supplementary elevating gear, reach the hoist of being connected with chain block lifting end including chain block, still include folding support, folding support is including two sets of articulated arms of articulated setting, the lower extreme of articulated arm is provided with two sets of scissors form articulated bracing pieces that are, the bracing piece is the pin joint setting of rectangular pyramid structure around two sets of articulated arms, be provided with the hole for hoist on the articulated arm. The utility model discloses a two sets of articulated arms respectively connect two sets of bracing pieces and form folding rectangular pyramid structure, are convenient for use at the engineering scene, and folding and expansion process are rapid, practices thrift the engineering time, and rectangular pyramid stable in structure can provide safe and reliable's hoisting point for hoist and mount lift post, guarantees that the safety of construction goes on.
Description
Technical Field
The utility model belongs to road construction auxiliary fixtures field, concretely relates to road engineering installation is with supplementary elevating gear.
Background
In road engineering, especially in the construction of high-speed toll stations, a gateway break-through prevention facility needs to be installed on a toll gate of the toll station, wherein a lifting column is the mainstream equipment at present, the installation of the lifting column is generally carried out while the tunnel pavement is constructed, the pavement is smooth after the construction and good in integrity, the installation step is to dig and install a foundation pit on the pavement, an electric pipeline and a drainage pipeline are laid in the installation foundation pit, then the lifting column is hoisted into the foundation pit, and the lifting column is adjusted to a proper height in a mode of piling and filling gravels.
Because the hoisting point is not easy to find on the spot during construction, hoisting equipment such as chain block is not easy to install, the adjustment during installation of the lifting column at present is mainly carried out in a manual carrying mode, namely, one person holds the flange at the upper end of the lifting column and heels for a certain angle, the other person fills sand and stone on one tilted side, then the lifting column is carried and heels to the other side to be filled with sand and stone, but the lifting column has larger weight, the safety of workers in a foundation pit is easily endangered after the lifting column is toppled, and larger construction safety hidden trouble exists.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the problem that exists among the above-mentioned prior art, the utility model provides a road engineering installation is with supplementary elevating gear, simple structure, convenient to use adjust the lift post position labour saving and time saving, satisfy safe construction needs.
The utility model discloses a concrete technical scheme be:
the utility model provides a road engineering installation is with supplementary elevating gear, includes chain block and the hoist of being connected with chain block lifting end, still includes folding support, folding support is including two sets of articulated arms of articulated setting, the lower extreme of articulated arm is provided with two sets of scissors form articulated bracing pieces that are, the bracing piece is the pin joint setting of rectangular pyramid structure around two sets of articulated arms, be provided with the hole for hoist on the articulated arm.
The lower ends of the support rods are provided with drawknot holes, and a hauling rope is arranged in the drawknot hole between the adjacent support rods.
The lower end of the supporting rod is provided with a conical foundation cone.
The lifting appliance is of a circular ring-shaped structure and comprises two groups of semicircular lifting pieces which are symmetrically arranged, lifting rings are arranged on the outer ring sides of the lifting pieces, and the lifting pieces are detachably connected with each other through the insertion structure.
The inserting structure comprises an inserting hook arranged at the end part of the hoisting piece on one side and an inserting cylinder arranged at the end part of the hoisting piece on the other side, and the inserting hook is of an L-shaped structure and is inserted into the inserting cylinder.
And a rubber pad is arranged on the inner ring side of the hoisting piece.
The beneficial effects of the utility model are that:
the utility model discloses a two sets of articulated arms respectively connect two sets of bracing pieces to form folding rectangular pyramid structure, are convenient for use at the engineering scene, and folding and expansion process are rapid, practices thrift the engineering time, and rectangular pyramid stable in structure can provide safe and reliable's hoisting point for hoist and mount lifting column, guarantees that the safety of construction goes on.
Drawings
Fig. 1 is a schematic structural view of the present invention when it is deployed on a mounting foundation pit;
FIG. 2 is a schematic view of FIG. 1 taken from above;
FIG. 3 is a schematic view in the left side view direction of FIG. 1;
FIG. 4 is a schematic view of the foldable stand in a folded state;
FIG. 5 is a schematic view in the left-hand direction of FIG. 4;
fig. 6 is a schematic view of a spreader in a top view;
in the attached drawing, the device comprises a chain block 1, a chain arm 2, a hinged arm 3, a support rod 4, a hoisting hole 5, a hitch hole 6, a traction rope 7, a foundation cone 8, a hoisting piece 9, a hoisting ring 10, a splicing hook 11, a splicing cylinder 12 and a rubber pad.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings and specific embodiments:
concrete embodiment is shown in fig. 1 to fig. 6, the utility model relates to a road engineering installation is with supplementary elevating gear, including chain block 1 and the hoist of being connected with chain block 1 lifting end, still include folding support, folding support is including two sets of articulated arms 2 of articulated setting, the lower extreme of articulated arm 2 is provided with two sets of scissors form articulated bracing pieces 3 that are, bracing piece 3 is the pin joint setting of rectangular pyramid structure around two sets of articulated arms 2, be provided with hole for hoist 4 on the articulated arm 2.
The utility model discloses when using, open bracing piece 3 respectively, and unscrew two sets of articulated arm 2 and be the scissors form, make folding support expand and erect on the installation foundation ditch, overlap the hoist cover on the lift post, be connected chain block 1 with the hoist, chain block 1 hangs on articulated arm 2 through hoisting hole 4, support as hoist and mount through the rectangular pyramid structure's that folding support formed support frame, pull up the lift post with the help of chain block 1, supplementary chain block 1 goes up and down the lift post, the personnel of being convenient for adjust the grit packing condition of lift bottom of the column in the foundation ditch, the security when having improved the installation of lift post in the road construction.
Further, as shown in fig. 2 and 5, the lower ends of the support rods 3 are provided with drawknot holes 5, and a hauling rope 6 is arranged in the drawknot hole 5 between the adjacent support rods 3.
After the folding support is unfolded, the support rod 3 forms a stable triangular support structure through the traction of the traction rope 6, and the safety during hoisting is ensured.
Furthermore, the installation of the lifting column belongs to a part of road engineering, and at the moment, the toll collection channel of the toll station only completes foundation compaction, and the asphalt pavement is not paved, and at the moment, the lower end of the support rod 3 is provided with a conical foundation cone 7. Insert the ground after the compaction through lower margin awl 7, can play the effect of stabilizing folding support structure to the higher bracing piece 3 of just this moment of ground intensity is the tilt state, and lower margin awl 7 is unlikely to go into ground too deeply, has guaranteed folding support's safe handling.
Further, the hoist be ring shaped structure, including two sets of semicircular ring shape hoist and mount pieces 8 that the symmetry set up, the outer loop side of hoist and mount piece 8 is provided with rings 9, form with the help of grafting structure between the hoist and mount piece 8 and can dismantle the connection.
As shown in fig. 1 and 6, the insertion structure includes an insertion hook 10 disposed at an end of the hanging piece 8 on one side, and an insertion tube 11 disposed at an end of the hanging piece 8 on the other side, and the insertion hook 10 is inserted into the insertion tube 11 in an L-shaped structure.
When the lifting appliance is used, firstly two groups of lifting pieces 8 are disassembled and sleeved on a lifting column or a columnar weight object to be lifted, such as a charging pavilion foundation pile, the lifting ring 9 is connected through the lifting hook of the chain block 1, the lifting pieces 8 which are connected into an annular shape are pulled up, when the lifting device is pulled up, because the inserting hooks 10 are in clearance fit with the inserting cylinders 11, the two groups of lifting pieces 8 have a folding trend upwards, an annular inner cavity formed by the enclosing of the lifting pieces 8 is shaped into a flat circular shape, the side wall of the lifting column is clamped, and the upper end of the lifting column is provided with a protruding circle of fixing flange, so that the clamp can be further prevented from falling off,
further, a rubber pad 12 is arranged on the inner ring side of the hanging piece 8. Cushion between hoist and mount piece 8 and lift post through rubber pad 12, avoid the hoist and mount in-process to damage lift post surface finish, prevent to rust in the later stage uses, improve the reliability of lift post installation.
Claims (6)
1. The utility model provides a road engineering installation is with supplementary elevating gear, includes chain block (1) and lifts by crane the hoist that the end is connected with chain block (1), its characterized in that: still including folding support, folding support is including articulated two sets of articulated arms (2) that set up, the lower extreme of articulated arm (2) is provided with two sets of scissors form articulated bracing pieces (3) that are, bracing piece (3) are the pin joint setting of rectangular pyramid structure around two sets of articulated arms (2), be provided with hole for hoist (4) on articulated arm (2).
2. The auxiliary lifting device for road engineering installation according to claim 1, wherein: the lower ends of the support rods (3) are provided with drawknot holes (5), and a hauling rope (6) is arranged in the drawknot hole (5) between the adjacent support rods (3).
3. The auxiliary lifting device for road engineering installation according to claim 1, wherein: the lower end of the supporting rod (3) is provided with a conical foundation cone (7).
4. The auxiliary lifting device for road engineering installation according to claim 1, wherein: the lifting appliance is of a circular ring-shaped structure and comprises two groups of semicircular lifting pieces (8) which are symmetrically arranged, lifting rings (9) are arranged on the outer ring side of each lifting piece (8), and the lifting pieces (8) are detachably connected with each other through the insertion structures.
5. The auxiliary lifting device for road engineering installation according to claim 4, wherein: the inserting structure comprises an inserting hook (10) arranged at the end part of the hoisting piece (8) at one side and an inserting cylinder (11) arranged at the end part of the hoisting piece (8) at the other side, wherein the inserting hook (10) is in an L-shaped structure and is inserted into the inserting cylinder (11).
6. The auxiliary lifting device for road engineering installation according to claim 4, wherein: a rubber pad (12) is arranged on the inner ring side of the hoisting piece (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223269535.8U CN218754594U (en) | 2022-12-07 | 2022-12-07 | Road engineering installation is with supplementary elevating gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223269535.8U CN218754594U (en) | 2022-12-07 | 2022-12-07 | Road engineering installation is with supplementary elevating gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218754594U true CN218754594U (en) | 2023-03-28 |
Family
ID=85679619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223269535.8U Active CN218754594U (en) | 2022-12-07 | 2022-12-07 | Road engineering installation is with supplementary elevating gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218754594U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116216508A (en) * | 2023-05-09 | 2023-06-06 | 成都原创人造板科学技术有限公司 | Hoisting structure of municipal pipeline equipment |
-
2022
- 2022-12-07 CN CN202223269535.8U patent/CN218754594U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116216508A (en) * | 2023-05-09 | 2023-06-06 | 成都原创人造板科学技术有限公司 | Hoisting structure of municipal pipeline equipment |
CN116216508B (en) * | 2023-05-09 | 2023-07-04 | 成都原创人造板科学技术有限公司 | Hoisting structure of municipal pipeline equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218754594U (en) | Road engineering installation is with supplementary elevating gear | |
WO2021135038A1 (en) | Method for construction of shaft lining | |
CN203835417U (en) | Tunnel supporting steel arch installation device and clamp | |
CN208563968U (en) | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus | |
CN109989333A (en) | Fashioned iron trestle work structure and its installation method for concrete horizontal support | |
CN212982286U (en) | U-shaped prefabricated ditch hoisting device | |
CN113716472A (en) | Double-arm holding pole | |
CN210597308U (en) | Steel-pipe pile extractor | |
CN108590170A (en) | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method | |
CN209038882U (en) | A kind of moveable suspended bracket for lifting pipeline in piping lane | |
CN207390874U (en) | A kind of movable type supplies installation construction device | |
CN110924723A (en) | Construction method and hoisting device for earth-covered oil tank and using method | |
JP2000327261A (en) | Gantry crane, bucket used for it and laying construction method for underground buried object | |
CN212612488U (en) | Movable underwater concrete pouring guide pipe trolley | |
CN212200101U (en) | Supporting upright post and structure for suspended casting of box girder at triangular area of hollow rigid frame bridge | |
CN210150591U (en) | Old sewage pipe suspension device | |
CN108691452B (en) | Split type electric pole operation, inspection and maintenance device and construction method | |
CN108750929B (en) | Lifting appliance special for vertical rod of excavator | |
CN108518119B (en) | Portable power transmission pole maintenance tool and construction method | |
CN208618415U (en) | A kind of pervious concrete well casing mounting device for base pit dewatering | |
CN208501499U (en) | A kind of bent cap bracket installation jacking system | |
CN219950378U (en) | Shaft annular lining pulling-out frame | |
CN212050249U (en) | Earthwork transportation equipment suitable for sinking portal construction | |
CN218291946U (en) | Bored concrete pile steel reinforcement cage installation device | |
CN218968713U (en) | Miniature prefabricated section lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |