CN207390874U - A kind of movable type supplies installation construction device - Google Patents
A kind of movable type supplies installation construction device Download PDFInfo
- Publication number
- CN207390874U CN207390874U CN201721459512.XU CN201721459512U CN207390874U CN 207390874 U CN207390874 U CN 207390874U CN 201721459512 U CN201721459512 U CN 201721459512U CN 207390874 U CN207390874 U CN 207390874U
- Authority
- CN
- China
- Prior art keywords
- support
- chassis
- rotating member
- stabilising arrangement
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 238000009434 installation Methods 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 230000003019 stabilising effect Effects 0.000 claims abstract description 14
- 239000007787 solid Substances 0.000 claims abstract description 5
- 238000005728 strengthening Methods 0.000 claims abstract description 3
- 239000000725 suspension Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
A kind of movable type supplies installation construction device, including hoist engine, stabilising arrangement, pulley blocks, steel wire rope, chassis, lifting support, rotating member and strengthening support, wherein lifting support is divided into two parts, lower support welds together with chassis, upper support is connected between lower support by rotating member, lower support is welded with rotating member, upper support is fixed with rotating member by jackscrew, the bottom of wherein upper support is outward extended with semicircular /V block piece, stabilising arrangement is fixed on device chassis, stabilising arrangement is included with the weight member for being arranged at intervals hollow and solid construction, the device construction efficiency is high, safety coefficient is big.
Description
Technical field
The utility model is related to mechanical building fields, and in particular to a kind of movable type supplies installation construction device.
Background technology
In the construction of building and electromechanical installation, workshop internal pipeline, suspension and support construction and its Construction of Steel Structure are numerous,
Due to construction characteristic, majority construction manpower can not be moved directly, lifted, and site environment lacks the hanging needed for auxiliary installation
Point, boom hoisting.The method that construction site uses (is such as faced after interim hanging structure is often welded on steel structure girder or embedded part
When lifting lug, interim beam etc.), then aid in installing with measures such as chain blocks.
Due to no dedicated sling point, boom hoisting, weld in interim hanging structure and chain block auxiliary construction, cloth
The arrangement that the means such as welded steel beam, hanging scaffold or floor with opening above on-station position complete suspension centre is generally required when putting suspension centre
Work.During using these methods, risk factor increases, and safety coefficient reduces, meanwhile, completed civil engineering operation finished product is destroyed
Larger and labor intensive is more.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide one kind without additionally arrange suspension centre, pass through
Device aids in steel member, the lifting of pipeline, installation in itself, and for removable frame and uses electric drive, and construction efficiency is high,
The big dynamic formula supplies installation construction device of safety coefficient.
The utility model provides a kind of portable supplies installation construction device, including hoist engine, stabilising arrangement, cunning
Wheel group, steel wire rope, chassis, lifting support, rotating member and strengthening support;
Wherein hoist engine is fixed on chassis;Steel wire rope is connected by pulley blocks with hoist engine;Lifting support is divided into two
Point, lower support welds together with chassis, and upper support is connected between lower support by rotating member, lower support and rotating member
Welding, upper support are fixed with rotating member by jackscrew, wherein the bottom of upper support is outward extended with semicircular /V block piece;
Stabilising arrangement is fixed on device chassis, and stabilising arrangement is included with the counterweight for being arranged at intervals hollow and solid construction
Component.
Further, hoist engine is bolted on chassis.
Further, the chassis has wheel, and retaining mechanism is provided on wheel.
Further, the lifting support is made of hollow steel pipe.
Further, stabilising arrangement is made of jack and steel pipe.
Further, jack is fixed on chassis afterbody.
Further, weight ratio hollow in the weight member and solid construction is 1:1.3.
The portable supplies installation construction device of the utility model can realize raising construction efficiency, save manually,
Construction cost is reduced, prevents from destroying completed civil engineering operation finished product, specifically:
(1) device ensures stabilization of the device when lifting in place by the secure stabilization device thereto of chassis afterbody, prevents from inclining
;
(2) Lift-on/Lift-off System that the device is formed is simple, easy to operate, and by the wheel of locking device, ensures construction system
The stabilization of system;
(3) device is a kind of portable adminicle formed by using I-steel, jack, pulley blocks, hoist engine
Expect installation construction device, using flexible is packaged type device, and purposes is wide, easy to use, using electric drive, compared to tradition
Manpower hangs weight, and construction efficiency is high, saves artificial;
(4) avoid breaking ring to completed civil engineering finished product;
(5) combination settings of /V block piece and anchor structure so that device can bear the external force of bigger at work,
And the position between upper support and rotating member keeps relative stability, and more stablizes during work, more efficient;
(6) special construction of stabilising arrangement is set, and not only structure is more stablized, and cost is lower, and is prevented by counterweight
When slinging weight, in jack without vertically jacking steel pipe in the floor or Liang Shangshi of upper strata workshop, anti-locking apparatus is translated into, more
Reliably.
Description of the drawings
Fig. 1 is portable supplies installation construction device structure front view
Fig. 2 is portable supplies installation construction device structural side view
Fig. 3 is understructure schematic diagram
Specific embodiment
The following detailed description of the specific implementation of the utility model, it is necessary to it is indicated herein to be, implement to be only intended to below
The further explanation of the utility model, it is impossible to be interpreted as the limitation to scope of protection of the utility model, the skilled people of the field technology
Some nonessential modifications and adaptations that member makes the utility model according to above-mentioned the utility model content, still fall within this reality
With new protection domain.
The utility model provides a kind of portable supplies installation construction device, is applicable to workshop antidetonation pipeline
With the installation of large-scale suspension and support in workshop.As shown in Figs. 1-3, mainly it is made of 8 parts, wherein hoist engine 1 is bolted
On chassis 5 (the wheel locking mechanism on chassis).Lifting support 6 points be two parts, made of hollow steel pipe, it is lower support with
Chassis welds together, and upper support is connected between lower support by rotating member 7, and lower support is welded with rotating member 7, upper branch
Support is fixed with rotating member 7 by jackscrew.Wherein, the bottom of upper support is outward extended with semicircular /V block piece, limiting block
The arc-shaped edges that the lower part of part is provided with base and /V block piece partly overlap the fixing piece of triangle that welding sets, in this neck
In domain, existing constructing device is there is no this structure, when adopting this kind of construction, since upper support is subject to outwards at work
Power, by /V block piece limitation on support rotating member 7 between position while, it is therefore prevented that dislocation when external force is excessive
And damage, while ensure that rotating member 7 can work normally, will not because of after by external force because longitudinal pressure influence work
The efficiency of work in addition, the lower part of /V block piece is provided with fixing piece, after the combination connection of the two structure, has stronger intensity,
It can bear the external force of bigger, effect is more in practical application.Steel wire rope 4 is connected by pulley blocks 3 with hoist engine 1, stablizes dress
It puts 2 to be fixed on device chassis 5, be formed using jack and steel pipe.Add in addition, being provided between lifting support 6 and chassis 5
Strong support 8.
Specifically, after portable supplies installation construction device is moved to installation site, will be moved using stabilising arrangement 2
Dynamic formula supplies installation construction device fixes, and then by wheel locked, plugs in, and starting hoist engine will use hoist cable will
Pipe laying or steel construction is needed to be hung to setting height(from bottom), the jackscrew of rotating member 7 is loosened, has ensured that hanging on support is freely rotatable,
Change position convenient for pipeline or steel construction, after pipeline or steel construction completion installation are fixed, unclamp hoist cable, deenergization, by wheel
It opens, is moved to next position and continues to construct.Wherein the fixation generally use jack of stabilising arrangement 2 and steel pipe composition, by thousand
5 afterbody of chassis is fixed on jin top, and the vertical steel pipe that jacks is on the floor or beam of upper strata workshop.
Although for illustrative purposes, it has been described that the illustrative embodiments of the utility model, the skill of this field
Art personnel will be understood that, can be in shape in the case of the scope and spirit for not departing from utility model disclosed in appended claims
The change for carrying out various modifications, adding and replacing in formula and details etc., and all these changes should all belong to the utility model institute
Attached scope of the claims, and each step in each department of product and method of the requires of the utility model protection,
Form that can be in any combination is combined.Therefore, it is not to the description of the embodiment disclosed in the utility model
In order to limit the scope of the utility model, but for describing the utility model.Correspondingly, the scope of the utility model from
The limitation of upper embodiment, but be defined by claim or its equivalent.
Claims (7)
1. a kind of movable type supplies installation construction device, it is characterised in that:Including hoist engine, stabilising arrangement, pulley blocks, steel
Cord, chassis, lifting support, rotating member and strengthening support;
Wherein hoist engine is fixed on chassis;Steel wire rope is connected by pulley blocks with hoist engine;Lifting support is divided into two parts, under
Support welds together with chassis, and upper support is connected between lower support by rotating member, and lower support is welded with rotating member,
Upper support is fixed with rotating member by jackscrew, wherein the bottom of upper support is outward extended with semicircular /V block piece;
Stabilising arrangement is fixed on device chassis, and stabilising arrangement is included with the counterweight part for being arranged at intervals hollow and solid construction
Part.
2. constructing device as described in claim 1, it is characterised in that:Hoist engine is bolted on chassis.
3. constructing device as described in claim 1, it is characterised in that:The chassis has wheel, and locking is provided on wheel
Mechanism.
4. constructing device as described in claim 1, it is characterised in that:The lifting support is made of hollow steel pipe.
5. constructing device as described in claim 1, it is characterised in that:Stabilising arrangement is made of jack and steel pipe.
6. constructing device as claimed in claim 5, it is characterised in that:Jack is fixed on chassis afterbody.
7. constructing device as described in claim 1, it is characterised in that:Hollow and solid construction counterweight in the weight member
Than for 1:1.3.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721459512.XU CN207390874U (en) | 2017-11-06 | 2017-11-06 | A kind of movable type supplies installation construction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721459512.XU CN207390874U (en) | 2017-11-06 | 2017-11-06 | A kind of movable type supplies installation construction device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207390874U true CN207390874U (en) | 2018-05-22 |
Family
ID=62324734
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721459512.XU Active CN207390874U (en) | 2017-11-06 | 2017-11-06 | A kind of movable type supplies installation construction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207390874U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107662887A (en) * | 2017-11-06 | 2018-02-06 | 山东电力建设第工程公司 | A kind of portable supplies installation construction device |
| CN110388064A (en) * | 2019-07-31 | 2019-10-29 | 重庆建筑工程职业学院 | A kind of prefabricated member location and installation equipment |
-
2017
- 2017-11-06 CN CN201721459512.XU patent/CN207390874U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107662887A (en) * | 2017-11-06 | 2018-02-06 | 山东电力建设第工程公司 | A kind of portable supplies installation construction device |
| CN110388064A (en) * | 2019-07-31 | 2019-10-29 | 重庆建筑工程职业学院 | A kind of prefabricated member location and installation equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103470093B (en) | Concrete chimney dismantling method | |
| CN102359303A (en) | Extra-high voltage common circuit iron tower assembling method | |
| CN104276514B (en) | Installation method of ground self-balancing pole | |
| CN105546278A (en) | Method for protecting underground pipeline during pipe ditch excavation | |
| CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
| CN207390874U (en) | A kind of movable type supplies installation construction device | |
| CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
| CN203289011U (en) | Tension cross arm hoisting device | |
| CN211971577U (en) | Tower crane system | |
| CN105822132A (en) | Unit type assembly and erection method of extra-high-voltage power transmission iron pylon | |
| CN205442496U (en) | High -rise building roof curtain lifting device | |
| CN113264458B (en) | Tower crane system and method for removing attachment rods thereof | |
| CN109132880B (en) | Method for disassembling portal crane | |
| CN210117149U (en) | A jacket sling platform | |
| CN207158618U (en) | Pipeline welding lift hanger | |
| CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
| CN107662887A (en) | A kind of portable supplies installation construction device | |
| CN206599363U (en) | Vertical transferring apparatus | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN205772947U (en) | Disconnecting switch hanging apparatus | |
| CN217174727U (en) | Auxiliary vibrating device | |
| CN204873628U (en) | Caterpillar crane cantilever crane is quick -release formula landing leg for system | |
| CN204198329U (en) | Anchor pole hanging device | |
| CN206940317U (en) | A kind of hanger structure for rack upper air installing | |
| CN107344698A (en) | A special high-altitude crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |