CN218752770U - Building rubbish clearing device - Google Patents

Building rubbish clearing device Download PDF

Info

Publication number
CN218752770U
CN218752770U CN202223376816.3U CN202223376816U CN218752770U CN 218752770 U CN218752770 U CN 218752770U CN 202223376816 U CN202223376816 U CN 202223376816U CN 218752770 U CN218752770 U CN 218752770U
Authority
CN
China
Prior art keywords
skip
fixedly connected
construction waste
storehouse
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223376816.3U
Other languages
Chinese (zh)
Inventor
胡家兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xinping Construction Development Co ltd
Original Assignee
Shanghai Xinping Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xinping Construction Development Co ltd filed Critical Shanghai Xinping Construction Development Co ltd
Priority to CN202223376816.3U priority Critical patent/CN218752770U/en
Application granted granted Critical
Publication of CN218752770U publication Critical patent/CN218752770U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model relates to a construction waste clearance technical field, specific is a construction waste clearance device, the utility model discloses a rubbish clearance shallow, the top of rubbish clearance shallow is provided with the skip that is used for accomodating rubbish, fixedly connected with division board between the both sides of skip inner wall, the division board is used for dividing into first storehouse and the second storehouse of holding with the skip internal partitioning, first storehouse and the storehouse of holding is used for holding recoverable construction waste, the second holds the storehouse and is used for holding unrecoverable construction waste, can become first storehouse and the storehouse is held to the second with skip internal partitioning through the division board, be used for recoverable construction waste and unrecoverable construction waste's clearance respectively, the convenience is to the categorised clearance of rubbish, can shift up closed baffle when pulling the pull ring, hold the storehouse to first storehouse and second and release respectively, be convenient for the categorised clearance and the recovery processing of construction waste.

Description

Building rubbish clearing device
Technical Field
The utility model relates to a construction waste clearance technical field, specific is a construction waste clearance device.
Background
The construction waste refers to residue, waste soil, waste material, sludge and other wastes generated in the process of constructing, laying or dismantling and repairing various buildings, structures, pipe networks and the like by construction and construction units or individuals.
For the cleaning of construction waste, a garbage cart is often used to assist in cleaning so as to increase the cleaning speed, such as a safety type construction waste cleaning device proposed in patent application No. CN202121252029.0, which includes a skip for loading the construction waste.
In the prior art, as for the construction waste clearing device provided in patent application No. CN202121252029.0, all the waste is thrown into the same skip for clearing, but the construction waste contains not only non-recoverable materials such as muck and waste soil, but also a large amount of recyclable construction waste such as metal plastics, and the waste is cleared through the same skip, which is inconvenient for classification clearing and recycling of the construction waste.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction waste clearance device to solve the problem that proposes in the above-mentioned background art.
The purpose of the utility model can be realized by the following technical scheme:
a construction waste cleaning device comprises a waste cleaning trolley, wherein a skip bucket for containing waste is arranged at the top of the waste cleaning trolley, a partition plate is fixedly connected between two sides of the inner wall of the skip bucket and used for partitioning the interior of the skip bucket into a first containing bin and a second containing bin, the first containing bin is used for containing recoverable construction waste, the second containing bin is used for containing unrecoverable construction waste, and the bottoms of the inner walls of the first containing bin and the second containing bin are obliquely arranged;
the inside fixed surface of skip is connected with first uide bushing post, fixedly connected with second uide bushing post between one side of skip inner wall and division board to one side of skip and the outside that is located first storehouse and the second storehouse of holding all is provided with gliding closed baffle from top to bottom.
Preferably, the sliding groove is formed in the top of the clearing and transporting cart, limiting plates are fixedly connected to the two sides of the sealing baffle, and the sliding groove is in sliding connection with the limiting plates.
Preferably, one side fixedly connected with L type cardboard of blind baffle, the top of first uide bushing post and second uide bushing post has all been seted up with the positioning groove that L type cardboard cooperation was used.
Preferably, the inside of skip has seted up the arc hole, the crooked spring of one side fixedly connected with of arc downthehole wall, the one end fixedly connected with movable block of crooked spring, fixedly connected with location arc pole on the movable block.
Preferably, an arc-shaped positioning hole is formed in the L-shaped clamping plate, one end of the positioning arc rod penetrates through the arc-shaped positioning hole and extends to the outside of the L-shaped clamping plate, and the other end of the positioning arc rod penetrates through the skip and is fixedly connected with the pulling ring.
Preferably, one side fixedly connected with of skip inner wall is used for accomodating the position sleeve of column and strip building rubbish, and one side fixedly connected with threaded sleeve of skip, threaded sleeve go up threaded connection have the screw spindle, and the top of screw spindle is rotated and is connected with the lift cover.
Preferably, one side of the lifting sleeve is fixedly connected with a limiting sliding plate, and the limiting sliding plate is connected with the positioning sleeve in a sliding manner.
The utility model has the advantages that:
can become first storehouse and the second storehouse of holding with skip internal partitioning through the division board, be used for recoverable building rubbish and the clear fortune of unrecoverable building rubbish respectively, conveniently to the categorised clear fortune of rubbish, can shift up closed baffle when pulling the ring, hold the storehouse to first storehouse and second and release respectively, be convenient for clear fortune and recovery processing of building rubbish's classification.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts;
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a perspective view of the skip part of FIG. 1;
FIG. 3 is an enlarged view of FIG. 2 at skip A;
FIG. 4 is an enlarged view of FIG. 2 at skip B;
FIG. 5 is a cross-sectional view of a top portion of the first guide sleeve leg of FIG. 4;
fig. 6 is a schematic structural view of a rear view portion of the skip of fig. 2.
The reference numbers in the figures are as follows:
1. clearing and transporting trolley, 2, skip, 3, partition board, 4, first containing bin, 5, second containing bin, 6, first guide sleeve column, 7, second guide sleeve column, 8, closed baffle, 9, sliding groove, 10, limiting plate, 11, L-shaped clamping plate, 12, positioning clamping groove, 13, arc-shaped hole, 14, bending spring, 15, movable block, 16, positioning arc rod, 17, arc-shaped positioning hole, 18, pulling ring, 19, positioning sleeve, 20, threaded sleeve, 21, threaded shaft, 22, lifting sleeve, 23 and limiting sliding plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
A construction waste clearing and transporting device comprises a waste clearing and transporting cart 1, wherein a skip bucket 2 used for containing waste is arranged at the top of the waste clearing and transporting cart 1, a partition plate 3 is fixedly connected between two sides of the inner wall of the skip bucket 2, the partition plate 3 is used for partitioning the interior of the skip bucket 2 into a first containing bin 4 and a second containing bin 5, the first containing bin 4 is used for containing recoverable construction waste, the second containing bin 5 is used for containing unrecoverable construction waste, and the bottoms of the inner walls of the first containing bin 4 and the second containing bin 5 are obliquely arranged;
the internal surface fixedly connected with first uide bushing post 6 of skip 2, fixedly connected with second uide bushing post 7 between one side of skip 2 inner wall and division board 3 to one side of skip 2 and the outside that is located first storehouse 4 and the second storehouse 5 of holding all is provided with gliding closed baffle 8 from top to bottom.
Skip 2 is used for holding building rubbish, and skip 2 is fixed on transport cart 1, conveniently drives skip 2 and building rubbish and shifts and transport, can hold 5 insides in storehouse and seal first storehouse 4 and the second of holding through close baffle 8, avoids rubbish department of falling, and first storehouse 4 and the second of holding hold the storehouse 5 outside and seal through a close baffle 8 respectively.
The top of clearing and transporting shallow 1 has seted up sliding tray 9, and the equal fixedly connected with limiting plate 10 in both sides of closure flap 8, sliding tray 9 and limiting plate 10 sliding connection.
As shown in fig. 2, 3 and 4, the closing flap 8 can only move up and down by the sliding connection of the stopper plate 10 and the sliding groove 9.
One side fixedly connected with L type cardboard 11 of closure flap 8, the positioning channel 12 that uses with the cooperation of L type cardboard 11 has all been seted up at the top of first uide bushing post 6 and second uide bushing post 7.
Arc hole 13 has been seted up to skip 2's inside, one side fixedly connected with crooked spring 14 of arc hole 13 inner wall, the one end fixedly connected with movable block 15 of crooked spring 14, fixedly connected with location arc pole 16 on the movable block 15.
An arc-shaped positioning hole 17 is formed in the L-shaped clamping plate 11, one end of the positioning arc rod 16 penetrates through the arc-shaped positioning hole 17 and extends to the outside of the L-shaped clamping plate 11, and the other end of the positioning arc rod 16 penetrates through the skip 2 and is fixedly connected with a pulling ring 18.
As shown in fig. 2, 4 and 5, the positioning arc rod 16 passes through the arc positioning hole 17, so that the L-shaped clamping plate 11 and the closing baffle 8 are prevented from moving upwards.
One side fixedly connected with of skip 2 inner wall is used for accomodating column and strip construction waste's position sleeve 19, one side fixedly connected with screw sleeve 20 of skip 2, and threaded connection has screw shaft 21 on screw sleeve 20, and the top of screw shaft 21 is rotated and is connected with lift cover 22.
As shown in fig. 1 and 6, the reinforcing steel bars and the strip-shaped plates can be vertically placed into the positioning sleeve 19, so that the reinforcing steel bars and the strip-shaped plates can be conveniently driven to be cleaned together, the lifting sleeve 22 can be driven to move up and down by rotating the threaded shaft 21, the lifting sleeve 22 is sleeved outside the cleaned reinforcing steel bars and the strip-shaped plates, and the stability of the cleaned reinforcing steel bars and the strip-shaped plates is further improved.
One side of the lifting sleeve 22 is fixedly connected with a limiting sliding plate 23, and the limiting sliding plate 23 is connected with the positioning sleeve 19 in a sliding manner.
As shown in fig. 1 and 6, the lifting sleeve 22 can be prevented from rotating by the sliding connection of the limiting slide plate 23 and the positioning sleeve 19.
The utility model provides a pair of building rubbish clearance device's theory of operation as follows:
when the construction waste needs to be cleared, the recyclable construction waste is thrown into the first accommodating bin 4, the non-recyclable construction waste is thrown into the second accommodating bin 5, and then the clearing cart 1 drives the skip 2 to be transported together with the construction waste inside;
when the manual orientation pulling pull ring 18 of keeping away from skip 2, pull ring 18 drives location arc pole 16 and breaks away from in the arc locating hole 17, can upwards stimulate closure flap 8 this moment, closure flap 8 drives L type cardboard 11 and breaks away from positioning slot 12, and when moving closure flap 8 down, can make L type cardboard 11 card go into inside positioning slot 12, then loosen pull ring 18, crooked spring 14 extends promotion movable block 15 and location arc pole 16, make location arc pole 16 card go into arc locating hole 17, fix L type cardboard 11 and closure flap 8.
When the closing baffle 8 is moved upwards and opened, the construction waste inside the corresponding first containing bin 4 and second containing bin 5 slides to the outside along the inclined planes at the bottoms of the first containing bin 4 and second containing bin 5, and the cleaning and transportation of the construction waste are completed.
Compared with the prior art, the utility model provides a pair of building rubbish clearance device has following beneficial effect:
can become skip 2 internal partitioning through division board 3 and first hold storehouse 4 and the second holds storehouse 5, be used for recoverable building rubbish and the clearance of unrecoverable building rubbish respectively, conveniently hold storehouse 4 and the second and hold storehouse 5 and release respectively, be convenient for to building rubbish's categorised clearance and recovery processing to the convenient categorised clearance of rubbish, can move up closed baffle 8 during pulling pull ring 18.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (7)

1. The building garbage cleaning device comprises a garbage cleaning cart (1) and is characterized in that a skip bucket (2) used for containing garbage is arranged at the top of the garbage cleaning cart (1), a partition plate (3) is fixedly connected between two sides of the inner wall of the skip bucket (2), the partition plate (3) is used for partitioning the inside of the skip bucket (2) into a first containing bin (4) and a second containing bin (5), the first containing bin (4) is used for containing recoverable building garbage, the second containing bin (5) is used for containing non-recoverable building garbage, and the bottoms of the inner walls of the first containing bin (4) and the second containing bin (5) are obliquely arranged;
the inside fixed surface of skip (2) is connected with first uide bushing post (6), fixedly connected with second uide bushing post (7) between one side of skip (2) inner wall and division board (3) to one side of skip (2) and the outside that is located first storehouse (4) and the second storehouse (5) of holding all is provided with gliding closed baffle (8) from top to bottom.
2. The building rubbish clearing device as claimed in claim 1, characterized in that a sliding groove (9) is formed in the top of the clearing cart (1), limiting plates (10) are fixedly connected to two sides of the sealing baffle (8), and the sliding groove (9) is in sliding connection with the limiting plates (10).
3. The construction waste cleaning device according to claim 1, wherein an L-shaped clamping plate (11) is fixedly connected to one side of the closed baffle (8), and positioning clamping grooves (12) matched with the L-shaped clamping plate (11) are formed in the tops of the first guide sleeve column (6) and the second guide sleeve column (7).
4. The construction waste clearing device according to claim 3, wherein an arc-shaped hole (13) is formed in the skip (2), a bending spring (14) is fixedly connected to one side of the inner wall of the arc-shaped hole (13), a movable block (15) is fixedly connected to one end of the bending spring (14), and a positioning arc rod (16) is fixedly connected to the movable block (15).
5. The construction waste cleaning device according to claim 4, wherein the L-shaped clamping plate (11) is provided with an arc-shaped positioning hole (17), one end of the positioning arc rod (16) penetrates through the arc-shaped positioning hole (17) and extends to the outside of the L-shaped clamping plate (11), and the other end of the positioning arc rod (16) penetrates through the skip (2) and is fixedly connected with the pulling ring (18).
6. The construction waste cleaning device according to claim 1, wherein one side of the inner wall of the skip (2) is fixedly connected with a positioning sleeve (19) for containing columnar and strip-shaped construction waste, one side of the skip (2) is fixedly connected with a threaded sleeve (20), the threaded sleeve (20) is in threaded connection with a threaded shaft (21), and the top of the threaded shaft (21) is rotatably connected with a lifting sleeve (22).
7. A construction waste cleaning device according to claim 6, characterized in that a limiting slide plate (23) is fixedly connected to one side of the lifting sleeve (22), and the limiting slide plate (23) is slidably connected with the positioning sleeve (19).
CN202223376816.3U 2022-12-14 2022-12-14 Building rubbish clearing device Active CN218752770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223376816.3U CN218752770U (en) 2022-12-14 2022-12-14 Building rubbish clearing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223376816.3U CN218752770U (en) 2022-12-14 2022-12-14 Building rubbish clearing device

Publications (1)

Publication Number Publication Date
CN218752770U true CN218752770U (en) 2023-03-28

Family

ID=85684419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223376816.3U Active CN218752770U (en) 2022-12-14 2022-12-14 Building rubbish clearing device

Country Status (1)

Country Link
CN (1) CN218752770U (en)

Similar Documents

Publication Publication Date Title
JP2020195995A (en) Equipment for collection, sorting and reuse of waste metal at construction site
CN218752770U (en) Building rubbish clearing device
CN111573066A (en) Intelligent robot for garbage classification
CN106628739A (en) Sorting and conveying system for household garbage between buildings
CN212197027U (en) Garbage classification cleaning and transporting vehicle
CN211392550U (en) Garbage dumping and transporting vehicle
CN214245643U (en) Clear robot that floats of compressible rubbish in collection storehouse
CN212685666U (en) Handling device for municipal works
CN214245644U (en) Clear robot that floats of compressible and automatic row material in collection storehouse
CN212981217U (en) Novel industrial waste treatment device
CN212638690U (en) Robot moving guide rail structure in garbage station
CN213169667U (en) Garbage storage device suitable for intelligent warehouse
CN213444475U (en) A adjustable conveyer for building rubbish
CN112591346A (en) Combined type city garbage classification marking booth
CN212767866U (en) Categorised conveyer of urban management rubbish
CN216071501U (en) Environment-friendly garbage bin for building
CN218059796U (en) Multi-functional handling device of municipal works construction usefulness
CN212530931U (en) Urban garbage recycling transfer cabinet
CN213805289U (en) A collection storehouse for clear compressed rubbish that floats robot
CN214165025U (en) Waste material conveying device for tunnel construction
CN110451131A (en) Domestic combined classification garbage can
CN214297631U (en) Combined type city garbage classification marking booth
CN212952240U (en) Large-scale industrial waste temporary storage device
CN220484094U (en) Be used for abluent transport workbin of differential mechanism
CN219340541U (en) Telescopic guide rail buried dustbin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant