CN213444475U - A adjustable conveyer for building rubbish - Google Patents

A adjustable conveyer for building rubbish Download PDF

Info

Publication number
CN213444475U
CN213444475U CN202022588665.2U CN202022588665U CN213444475U CN 213444475 U CN213444475 U CN 213444475U CN 202022588665 U CN202022588665 U CN 202022588665U CN 213444475 U CN213444475 U CN 213444475U
Authority
CN
China
Prior art keywords
sliding
container
shaft
groove
construction waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022588665.2U
Other languages
Chinese (zh)
Inventor
包根所
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022588665.2U priority Critical patent/CN213444475U/en
Application granted granted Critical
Publication of CN213444475U publication Critical patent/CN213444475U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses an adjustable transportation device for construction waste, which comprises a first container, wherein a first sliding groove is arranged at the inner side of the first container, and a sliding frame is arranged at the inner side of the first sliding groove in a sliding manner; a sliding circular groove is formed in the sliding frame, a first sliding shaft is inserted into the sliding circular groove in a sliding mode, a push plate is arranged at the lower end of the first sliding shaft, a second sliding groove is formed in the inner side of the first container, and a first sliding rod is arranged on the sliding frame in a sliding clamping mode; the first container and the second container realize the capacity expansion, so that the second container can move back and forth along the sliding chute, and the storage of the containers for garbage with different sizes is expanded; pushing the garbage at different positions in the container by moving the push plate under the first sliding shaft, and pushing the construction garbage by sliding the first sliding rod back and forth along the second sliding groove; and rotating the rotating iron rod on the second round shaft, and clamping the clamping plate on the rotating iron rod on the first round shaft on the outer surface of the first container to ensure that the first round shaft fixes the container to shrink.

Description

A adjustable conveyer for building rubbish
Technical Field
The utility model relates to a building technical field specifically is an adjustable conveyer for building rubbish.
Background
The construction waste refers to residue soil, waste materials, residual mud and other wastes generated in the process of construction, laying or dismantling and repairing of various buildings, structures, pipe networks and the like of construction units or personal teams, how to store the waste with different sizes and expand the storage tanks, how to fix the waste after expansion and how to pour the waste out well, and therefore an adjustable transportation device for the construction waste is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an adjustable conveyer for building rubbish to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an adjustable conveying device for construction waste comprises a first container, wherein a first sliding groove is formed in the inner side of the first container, and a sliding frame is arranged on the inner side of the first sliding groove in a sliding mode; the improved sliding door is characterized in that a sliding circular groove is formed in the sliding frame, a first sliding shaft is inserted into the sliding circular groove in a sliding mode, the lower end of the first sliding shaft is provided with a push plate, a second sliding groove is formed in the inner side of a first container, a first sliding rod is arranged on the sliding frame in a sliding mode, the two ends of the first sliding rod slide along the inner side of the second sliding groove, a second container is arranged in the first container in a sliding mode, the outer surface of the second container is provided with a second fixed circular shaft, the outer surface of the second fixed circular shaft is provided with a rotating iron rod, a fourth fixed block is arranged on the lower surface of one end of the rotating iron rod, an iron chain is arranged at the lower end of the fourth fixed block, a plug bolt is fixedly arranged at one end of the iron chain, a symmetrical clamping plate is arranged at the lower end of the rotating iron.
Preferably, a group of first fixed circular shafts arranged in an array mode is arranged on the outer surface of the first container, and the first fixed circular shafts can be clamped between the adjacent clamping plates.
Preferably, a second fixed block is arranged at one end of the second container, a baffle is arranged on the outer side of the second fixed block, a third sliding shaft is arranged on the baffle, a hollow groove is formed in the outer surface of the third sliding shaft, a door plate is arranged on the outer surface of the third sliding shaft, and the door plate is clamped in the second container.
Preferably, the outer surface of the first container is provided with a second sliding block, the outer surface of the second container is provided with a sliding groove, and the second sliding block is clamped in the sliding groove.
Preferably, a set of symmetrical first wheels is arranged on the lower surface of the first container, a handle is arranged at one end of the first container, and a second wheel is arranged on the lower surface of the second container.
Preferably, one end of the second container is provided with a first fixed block, a second sliding shaft is inserted into the outer surface of the first fixed block, a third fixed block is arranged on the outer surface of the door plate, and the second sliding shaft movably penetrates through the first fixed block and the third fixed block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the first container and the second container realize the capacity expansion, so that the second container can move back and forth along the sliding chute, and the storage of the containers for garbage with different sizes is expanded;
2. pushing the garbage at different positions in the container by moving the push plate under the first sliding shaft, and pushing the construction garbage by sliding the first sliding rod back and forth along the second sliding groove;
3. and rotating the rotating iron rod on the second round shaft, and clamping the clamping plate on the rotating iron rod on the first round shaft on the outer surface of the first container to ensure that the first round shaft fixes the container to shrink.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the structure of the present invention;
FIG. 3 is a side view of the first container of the present invention;
FIG. 4 is a schematic view of a second slide shaft according to the present invention;
in the figure: 1. a first container; 11. a first wheel; 12. a first fixed circular shaft; 13. a handle; 14. a first sliding groove; 15. a carriage; 16. a first slide bar; 17. a second sliding groove; 18. a second slider; 2. a first slide shaft; 21. a sliding circular groove; 22. pushing the plate; 3. a second container; 31. a first fixed block; 32. a second slide shaft; 33. a second fixed circular shaft; 34. a chute; 35. a second fixed block; 36. a baffle plate; 37. a hollow groove; 38. a second wheel; 4. a door panel; 41. a third slide shaft; 42. a third fixed block; 5. rotating the iron rod; 51. a fourth fixed block; 52. an iron chain; 53. plugging; 54. and (4) clamping the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an adjustable conveying device for construction waste comprises a first container 1, wherein a first sliding groove 14 is formed in the inner side of the first container 1, and a sliding frame 15 is arranged in the inner side of the first sliding groove 14 in a sliding mode; a sliding circular groove 21 is formed in the sliding frame 15, a first sliding shaft 2 is inserted in the sliding circular groove 21 in a sliding mode, a push plate 22 is arranged at the lower end of the first sliding shaft 2, the position of the first sliding shaft close to the building garbage in the first container 1 is convenient to move, a second sliding groove 17 is formed in the inner side of the first container 1, a first sliding rod 16 is arranged on the sliding frame 15 in a sliding mode, two ends of the first sliding rod 16 slide along the inner side of the second sliding groove 17, a second container 3 is arranged in the first container 1 in a sliding mode, the sliding frame 15 can slide in the first container 1 and the second container 3 in a front-back mode, the garbage is pushed out of the containers, a second fixed circular shaft 33 is arranged on the outer surface of the second container 3, a rotating iron rod 5 is arranged on the outer surface of the second fixed circular shaft 33, a fourth fixed block 51 is arranged on the lower surface of one end of the rotating iron rod 5, an iron chain 52 is arranged on the lower end of the fourth, the lower end of the rotating iron rod 5 is provided with symmetrical clamping plates 54, the plug 53 can movably penetrate through the clamping plates 54, the positions of the first container 1 and the second container 3 can be conveniently fixed, and one end of the second container 3 is rotatably provided with the door plate 4, so that the door plate 4 and the second container 3 are closed to form a closed space.
As an embodiment of the present invention, the outer surface of the first container 1 is provided with a set of first fixed circular shafts 12 arranged in an array, the first fixed circular shafts 12 can be clamped between the adjacent clamping plates 54, and the first container 1 is connected with the second container 3.
As an embodiment of the utility model, 3 one end of second container is equipped with second fixed block 35, the second fixed block 35 outside is equipped with baffle 36, be equipped with third slide shaft 41 on the baffle 36, third slide shaft 41 surface is equipped with hollow groove 37, third slide shaft 41 surface is equipped with door plant 4, door plant 4 card is established in second container 3, makes second container 3 be in closely closed state, prevents that construction waste from dropping in the transportation.
As an embodiment of the present invention, the outer surface of the first container 1 is provided with the second slider 18, the outer surface of the second container 3 is provided with the sliding groove 34, the second slider 18 is clamped in the sliding groove 34, so that the first container 1 and the second container 3 can move back and forth, the second slider 18 is fixed, and the second container 3 is prevented from falling off the first container 1.
As an embodiment of the present invention, the lower surface of the first container 1 is provided with a set of symmetrical first wheels 11, the one end of the first container 1 is provided with the handle 13, the lower surface of the second container 3 is provided with the second wheels 38, the push cart with the handle 13 is advantageous, and the cooperation of the first wheels 11 and the second wheels 38 helps the transportation of the construction waste.
As an embodiment of the utility model, 3 one ends of second container are equipped with first fixed block 31, first fixed block 31 surface is inserted and is equipped with second slide shaft 32, 4 surfaces of door plant are equipped with third fixed block 42, first fixed block 31 and third fixed block 42 are run through in the activity of second slide shaft 32, and second slide shaft 32 firmly fixes door plant 4 and second container 3, does not let it make door plant 4 luffing motion at the removal in-process.
The working principle is as follows: the transport vehicle is pushed forwards by holding the handle 13, and then the transport vehicle is pushed to transport the construction waste to reach a specified stacking position, then the second container 3 slides into the first container 1 along the chute 34, and is stacked according to the size of the construction waste, and the first fixed round shaft 12 is clamped between the adjacent clamping plates 54 to fix the distance between the first container 1 and the second container 3, then the door panel 4 is closed, the second sliding shaft 32 is clamped on the first fixing block 31 and the third fixing block 42, the door panel 4 is tightly closed, finally the transport vehicle is transported to a designated place, the door panel 4 is opened, the position of the first sliding shaft 2 is adjusted according to the position of the garbage built in the vehicle, firstly, the push plate 22 at the lower end of the first sliding shaft 2 moves up and down along the sliding frame 15, when the garbage container moves to the rear side of the construction garbage, the first sliding rod 16 is pushed to slide along the inner side of the second sliding groove 17, and finally the garbage is poured out of the container.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The adjustable conveying device for the construction waste comprises a first container (1), and is characterized in that a first sliding groove (14) is formed in the inner side of the first container (1), and a sliding frame (15) is arranged in the inner side of the first sliding groove (14) in a sliding manner; a sliding circular groove (21) is formed in the sliding frame (15), a first sliding shaft (2) is inserted on the sliding circular groove (21), a push plate (22) is arranged at the lower end of the first sliding shaft (2), a second sliding groove (17) is formed in the inner side of the first container (1), a first sliding rod (16) is arranged on the sliding frame (15) in a sliding mode, the two ends of the first sliding rod (16) slide along the inner side of the second sliding groove (17), a second container (3) is arranged in the first container (1) in a sliding mode, a second fixed circular shaft (33) is arranged on the outer surface of the second container (3), a rotating iron rod (5) is arranged on the outer surface of the second fixed circular shaft (33), a fourth fixed block (51) is arranged on the lower surface of one end of the rotating iron rod (5), an iron chain (52) is arranged at the lower end of the fourth fixed block (51), and a plug (53) is fixedly arranged at one end of the iron chain (, the lower end of the rotating iron rod (5) is provided with symmetrical clamping plates (54), the plug (53) can movably penetrate through the clamping plates (54), and one end of the second container (3) is rotatably provided with a door plate (4).
2. The adjustable transport device for construction waste of claim 1, wherein: the outer surface of the first container (1) is provided with a group of first fixed circular shafts (12) which are arranged in an array mode, and the first fixed circular shafts (12) can be clamped between adjacent clamping plates (54).
3. The adjustable transport device for construction waste of claim 1, wherein: second container (3) one end is equipped with second fixed block (35), second fixed block (35) outside is equipped with baffle (36), be equipped with third sliding shaft (41) on baffle (36), third sliding shaft (41) surface is equipped with hollow groove (37), third sliding shaft (41) surface is equipped with door plant (4), door plant (4) card is established in second container (3).
4. The adjustable transport device for construction waste of claim 1, wherein: the outer surface of the first container (1) is provided with a second sliding block (18), the outer surface of the second container (3) is provided with a sliding groove (34), and the second sliding block (18) is clamped in the sliding groove (34).
5. The adjustable transport device for construction waste of claim 1, wherein: the lower surface of the first container (1) is provided with a group of symmetrical first wheels (11), one end of the first container (1) is provided with a handle (13), and the lower surface of the second container (3) is provided with second wheels (38).
6. The adjustable transport device for construction waste of claim 1, wherein: one end of the second container (3) is provided with a first fixing block (31), a second sliding shaft (32) is inserted into the outer surface of the first fixing block (31), a third fixing block (42) is arranged on the outer surface of the door plate (4), and the second sliding shaft (32) movably penetrates through the first fixing block (31) and the third fixing block (42).
CN202022588665.2U 2020-11-11 2020-11-11 A adjustable conveyer for building rubbish Expired - Fee Related CN213444475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022588665.2U CN213444475U (en) 2020-11-11 2020-11-11 A adjustable conveyer for building rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022588665.2U CN213444475U (en) 2020-11-11 2020-11-11 A adjustable conveyer for building rubbish

Publications (1)

Publication Number Publication Date
CN213444475U true CN213444475U (en) 2021-06-15

Family

ID=76299856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022588665.2U Expired - Fee Related CN213444475U (en) 2020-11-11 2020-11-11 A adjustable conveyer for building rubbish

Country Status (1)

Country Link
CN (1) CN213444475U (en)

Similar Documents

Publication Publication Date Title
CN213444475U (en) A adjustable conveyer for building rubbish
CN212197027U (en) Garbage classification cleaning and transporting vehicle
CN211392550U (en) Garbage dumping and transporting vehicle
CN214733887U (en) High-efficient handling device is used to on-vehicle container
CN212685666U (en) Handling device for municipal works
CN212829773U (en) Portable grid plastic tray that removes
CN212768507U (en) Clamping mechanism for carrying paper packaging barrel
CN210941803U (en) Aerated brick conveyor who facilitates use
CN201395148Y (en) Brick conveying trolley for construction site
CN210942916U (en) Iron box convenient to move
CN210259806U (en) Multifunctional garbage truck
CN211139411U (en) Material transporting vehicle for constructional engineering
CN210392395U (en) Building rubbish clearance transfer device
CN214298301U (en) Stacker-reclaimer for cement plant
CN215944659U (en) Building rubbish extracting equipment
CN207863482U (en) A kind of packaged type mortar storage tool
CN214931970U (en) Portable garbage collection box
CN218558867U (en) Convenient trolley for construction site
CN210192451U (en) Can fix garbage bin that piles up
CN214165025U (en) Waste material conveying device for tunnel construction
CN215159986U (en) Cable protection sleeve strorage device
CN214877486U (en) Urban building garbage treatment recycling device
CN218172275U (en) Multifunctional building handcart
CN217755156U (en) Building rubbish classification device
CN210882166U (en) Building material conveyer for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210615

Termination date: 20211111