CN218732806U - Electromechanical pipeline installation system of hotel guest room - Google Patents

Electromechanical pipeline installation system of hotel guest room Download PDF

Info

Publication number
CN218732806U
CN218732806U CN202222732163.1U CN202222732163U CN218732806U CN 218732806 U CN218732806 U CN 218732806U CN 202222732163 U CN202222732163 U CN 202222732163U CN 218732806 U CN218732806 U CN 218732806U
Authority
CN
China
Prior art keywords
electromechanical
electromechanical pipeline
pipeline
machine tool
bearing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222732163.1U
Other languages
Chinese (zh)
Inventor
窦振涛
张鑫
栗祥
唐渝
路玉金
邵娜
李磊磊
吕彦雷
张泽堃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202222732163.1U priority Critical patent/CN218732806U/en
Application granted granted Critical
Publication of CN218732806U publication Critical patent/CN218732806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a hotel guest room electromechanical pipeline installation system, which relates to the technical field of electromechanical pipeline installation equipment, and adopts the technical proposal that the system comprises an electromechanical pipeline assembly machine tool and an electromechanical pipeline bearing plate arranged on the electromechanical pipeline assembly machine tool, wherein the electromechanical pipeline bearing plate is provided with a pipeline fixing clamp and a hoisting bolt hole; and a plurality of electromechanical pipeline assembling mechanical arms which are uniformly distributed are arranged at two ends of the electromechanical pipeline assembling machine tool. The beneficial effects of the utility model are that: the semi-automatic electromechanical pipeline installation mode is provided, the installation efficiency is improved, and meanwhile, the workload is reduced; aiming at the conditions of night, high construction difficulty and complex pipeline in hotel room scheme determination, the construction mode of machine tool assembly field hoisting is adopted, and the working efficiency can be greatly improved.

Description

Electromechanical pipeline installation system of hotel guest room
Technical Field
The utility model relates to an electromechanical pipeline installation technical field, in particular to hotel guest room electromechanical pipeline installation system.
Background
At present, in the electromechanical installation and construction stage, the electromechanical installation of hotel rooms mostly adopts a manual assembly mode, the hotel room space is narrow, the quantity of constructors capable of being accommodated is limited, and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
In order to realize the utility model discloses the purpose to above-mentioned technical problem, the utility model provides a hotel guest room electromechanical pipeline installing the system.
The technical scheme is that the mechanical-electrical pipeline assembling machine tool comprises an mechanical-electrical pipeline assembling machine tool and an mechanical-electrical pipeline bearing plate arranged on the mechanical-electrical pipeline assembling machine tool, wherein a pipeline fixing clamp is arranged on the mechanical-electrical pipeline bearing plate, and a hoisting bolt hole is reserved on the mechanical-electrical pipeline bearing plate; and a plurality of electromechanical pipeline assembling mechanical arms which are uniformly distributed are arranged at two ends of the electromechanical pipeline assembling machine tool.
And the working end of the electromechanical pipeline assembling mechanical arm corresponds to the pipeline fixing clamp and the hoisting bolt hole.
And electromechanical material conveying belts for conveying the prefabricated pipe sections are arranged on two sides of the electromechanical pipeline assembling machine tool.
And an electromechanical pipeline protective shell is arranged around the electromechanical pipeline bearing plate after the assembly is finished, and an electromechanical pipeline protective cover is arranged above the electromechanical pipeline protective shell.
The electromechanical pipeline protection method comprises the steps of carrying out deepening design and drawing on an electromechanical pipeline according to guest room drawings, then manufacturing an electromechanical pipeline supporting plate according to the deepening drawings, arranging a pipeline fixing clamp and a reserved hoisting bolt hole on the electromechanical pipeline supporting plate, then preparing materials in batches according to the deepening drawings, conveying the materials to an electromechanical pipeline assembling machine tool through an electromechanical material conveying belt, assembling the electromechanical pipeline on the electromechanical pipeline supporting plate through an electromechanical pipeline assembling mechanical arm, fixing an electromechanical pipeline protection shell and the electromechanical pipeline supporting plate after assembling is finished, arranging an electromechanical pipeline protection cover above the electromechanical pipeline protection shell, packaging, conveying to a construction site, hoisting to a top plate, dismantling the electromechanical pipeline protection shell, connecting a pipeline and a pipeline well pipeline through a flexible pipeline, and completing installation of the electromechanical pipelines of the guest rooms of the hotel.
The embodiment of the utility model provides a beneficial effect that technical scheme brought is: the semi-automatic electromechanical pipeline installation mode is provided, the installation efficiency is improved, and meanwhile, the workload is reduced; aiming at the conditions of night, high construction difficulty and complex pipeline in hotel room scheme determination, the construction mode of machine tool assembly field hoisting is adopted, and the working efficiency can be greatly improved.
Drawings
FIG. 1 is the deep construction drawing of electromechanical blueprint of the embodiment of the utility model.
Fig. 2 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 3 is a schematic structural view of an electromechanical pipeline bearing plate according to an embodiment of the present invention.
Fig. 4 is a schematic structural diagram of the electromechanical pipeline protection cover and the electromechanical pipeline protection shell according to an embodiment of the present invention.
Wherein the reference numerals are: 1. an electromechanical pipeline assembling mechanical arm; 2. an electromechanical pipeline assembly machine tool; 3. an electromechanical material conveying belt; 4. a pipeline fixing clip; 5. hoisting the bolt holes; 6. an electromechanical pipeline bearing plate; 7. an electromechanical pipeline protective cover; 8. electromechanical pipeline protective housing.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
It should be noted that the embodiments and features of the embodiments of the present invention can be combined with each other without conflict.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the creation of the present invention can be understood by those of ordinary skill in the art through specific situations.
Example 1
Referring to fig. 1 to 4, the utility model provides a hotel guest room electromechanical pipeline installation system, which comprises an electromechanical pipeline assembly machine tool 2 and an electromechanical pipeline bearing plate 6 arranged on the electromechanical pipeline assembly machine tool 2, wherein the electromechanical pipeline bearing plate 6 is provided with a pipeline fixing clamp 4 and a hoisting bolt hole 5; the two ends of the electromechanical pipeline assembling machine tool 2 are provided with a plurality of electromechanical pipeline assembling mechanical arms 1 which are uniformly distributed.
The working end of the electromechanical pipeline assembling mechanical arm 1 corresponds to the pipeline fixing clamp 4 and the hoisting bolt hole 5.
And electromechanical material conveying belts 3 for conveying the prefabricated pipe sections are arranged on two sides of the electromechanical pipeline assembling machine tool 2.
An electromechanical pipeline protection shell 8 is arranged around the assembled electromechanical pipeline bearing plate 6, and an electromechanical pipeline protection cover 7 is arranged above the electromechanical pipeline protection shell 8.
The utility model discloses during the use, carry out deepening design and go out the map to electromechanical pipeline according to the guest room drawing, according to electromechanical blueprint deepening construction drawing (attached 1) prefabricated processing pipeline section, then according to deepening drawing preparation electromechanical pipeline bearing board 6, set up pipeline fixing clip 4 and the hoist and mount bolt hole 5 of reserving on the electromechanical pipeline bearing board 6, then prepare material in batches according to deepening the drawing, prefabricated pipeline section transmits to electromechanical pipeline equipment lathe 2 through electromechanical material transmission band 3, place electromechanical pipeline bearing board 6 on electromechanical pipeline equipment lathe 2, through electromechanical pipeline equipment arm 1 with electromechanical pipeline equipment to electromechanical pipeline bearing board 6 on, the equipment is accomplished the back and is surrounded and set up electromechanical pipeline protective housing 8, the top sets up electromechanical pipeline visor 7, after the protection architecture equipment is accomplished, the packing is transported to the construction field, use fork truck to promote electromechanical pipeline bearing board 6, hoist electromechanical pipeline bearing board 6 on the roof through hoist and mount bolt hole 5, electromechanical pipeline protective housing 8, the pipeline adopts flexible pipe connection with pipeline hotel's well pipeline, accomplish electromechanical pipeline installation of guest room.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (4)

1. The electromechanical pipeline installation system for the hotel guest room is characterized by comprising an electromechanical pipeline assembly machine tool (2) and an electromechanical pipeline bearing plate (6) arranged on the electromechanical pipeline assembly machine tool (2), wherein a pipeline fixing clamp (4) is arranged on the electromechanical pipeline bearing plate (6), and a hoisting bolt hole (5) is reserved; and a plurality of electromechanical pipeline assembling mechanical arms (1) which are uniformly distributed are arranged at two ends of the electromechanical pipeline assembling machine tool (2).
2. Hotel room electromechanical pipeline installation system according to claim 1, characterised in that the working end of the electromechanical pipeline assembly robot arm (1) corresponds to the pipe fixing clip (4) and the hoisting bolt hole (5).
3. Hotel guest room electromechanical pipeline installation system according to claim 1, characterized in that the electromechanical pipeline assembly machine tool (2) is provided with electromechanical material conveyor belts (3) on both sides for conveying prefabricated pipe sections.
4. Hotel guest room electromechanical wiring installation system according to claim 1, characterized in that an electromechanical wiring protective casing (8) is arranged around the assembled electromechanical wiring bearing plate (6), and an electromechanical wiring protective cover (7) is arranged above the electromechanical wiring protective casing (8).
CN202222732163.1U 2022-10-18 2022-10-18 Electromechanical pipeline installation system of hotel guest room Active CN218732806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222732163.1U CN218732806U (en) 2022-10-18 2022-10-18 Electromechanical pipeline installation system of hotel guest room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222732163.1U CN218732806U (en) 2022-10-18 2022-10-18 Electromechanical pipeline installation system of hotel guest room

Publications (1)

Publication Number Publication Date
CN218732806U true CN218732806U (en) 2023-03-24

Family

ID=85586073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222732163.1U Active CN218732806U (en) 2022-10-18 2022-10-18 Electromechanical pipeline installation system of hotel guest room

Country Status (1)

Country Link
CN (1) CN218732806U (en)

Similar Documents

Publication Publication Date Title
CN210609724U (en) 5G movable emergency base station
CN218732806U (en) Electromechanical pipeline installation system of hotel guest room
CN212129609U (en) Curtain fossil fragments fixing support
CN210687379U (en) Heating and ventilation pipeline connecting device
CN115584750A (en) Regularsend lower base structure of wind power platform and installation method thereof
CN216952180U (en) Glass fiber reinforced plastic pipeline with improved structure
CN218344213U (en) Photovoltaic frame connection corner connector
CN216428657U (en) Assembled building component
CN215407505U (en) Large-scale round pin axle thrustor
CN112659094B (en) Intelligent inspection robot for new energy pipelines
CN212772977U (en) High-efficient type wallboard mounting structure
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN214626207U (en) Be applied to weak current cable and leaky cable sharing support in circular tunnel of subway
CN220080291U (en) Connector for dome space bracket
CN218740776U (en) Large-scale hoist and mount formula high efficiency air cleaner
CN220705716U (en) Assembly structure for railway single-line lining trolley
CN220439872U (en) Portable mounting structure of unmanned aerial vehicle hardware
CN212430168U (en) Culvert is used in existing pipeline protection
CN220078139U (en) Temporary storage rack for cables
CN216633177U (en) Positioning assembly welding tool for connecting sleeve of main chord member of standard knot of tower crane
CN219910842U (en) Tunnel dryer with automatic flexible function
CN216680806U (en) Device for manufacturing gas collecting pipe
CN216252002U (en) High-strength electric power protection sleeve
CN220522701U (en) Connecting assembly and wind power generation tower
CN212772860U (en) Wall mounting clamp for prefabricated building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant