CN218719276U - Tool type C-shaped comprehensive support hanger tool for steel structure factory building - Google Patents

Tool type C-shaped comprehensive support hanger tool for steel structure factory building Download PDF

Info

Publication number
CN218719276U
CN218719276U CN202223053442.1U CN202223053442U CN218719276U CN 218719276 U CN218719276 U CN 218719276U CN 202223053442 U CN202223053442 U CN 202223053442U CN 218719276 U CN218719276 U CN 218719276U
Authority
CN
China
Prior art keywords
shaped steel
support
shaped
steel
steel support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223053442.1U
Other languages
Chinese (zh)
Inventor
高珂
左雪艳
郭泽林
尚恩光
李思启
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No9 Metallurgical Construction Corp
Original Assignee
No9 Metallurgical Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No9 Metallurgical Construction Corp filed Critical No9 Metallurgical Construction Corp
Priority to CN202223053442.1U priority Critical patent/CN218719276U/en
Application granted granted Critical
Publication of CN218719276U publication Critical patent/CN218719276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building belongs to the technical field of steel structure electromechanical installation, and comprises a C-shaped steel support stress base formed by detachably connecting a C-shaped steel support vertical rod, a C-shaped steel support cross rod and a C-shaped steel support longitudinal rod, wherein pipe clamps with different specifications are detachably connected to the C-shaped steel support cross rod according to the pipeline arrangement requirement, and an anti-seismic inclined rod is obliquely arranged on the outer side of the C-shaped steel support vertical rod upwards; the C-shaped steel bracket stress base is fixedly connected with the steel beam in the steel structure through a slope pitch steel beam clamp; the C-shaped steel bracket stress base is fixedly connected with a wall purlin in a steel structure through a clip hoop; the C-shaped steel support stress base is fixedly connected with the steel column in the steel structure through an encircling steel hoop. The utility model discloses a can dismantle and assemble theory design instrument formula C type and synthesize a gallows, cancel traditional welded type support, have advantages such as with low costs, construction cycle is short, the environmental protection degree is high, simple to operate.

Description

Tool type C-shaped comprehensive support hanger tool for steel structure factory building
Technical Field
The utility model belongs to the technical field of steel construction electromechanical installation, concretely relates to a gallows frock is synthesized to instrument formula C type for steel construction factory building, concretely relates to is arranged in the construction of steel construction factory building electromechanical pipeline support.
Background
With the high-speed development of urban construction in China and the increasingly mature and development of technologies such as welding, hoisting and assembled upper and lower structure design, manufacturing and construction of steel structure factory buildings, the steel structure factory buildings are widely applied to the fields of electric component manufacturing, medicine production, logistics service, automobile accessories, decoration and the like, the installation of electromechanical pipelines in the construction of the steel structure factory buildings is an important link, and the professional system is complex and changeable, the pipelines are crossed and intensive, and the variability of the construction process is large. The traditional support is in a channel steel or angle steel welding mode, for example, an electric pipeline fixing device disclosed in patent CN201720059417.4, a support frame in the traditional support is a support formed by welding, and the traditional support has the defects that pipeline arrangement cannot be flexibly changed, raw materials are wasted greatly, a large amount of leftover materials are produced, a manufacturing process is complex, rust removal painting causes great environmental pollution, installation is not light, manufacturing cost is high, and the workload for removing the support after pipeline change is large. There is therefore a need for improvements.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem: the utility model provides a gallows frock is synthesized to instrument formula C type for steel construction factory building, the utility model discloses to the problem that the electric pipeline support exists in current steel construction, adopt can dismantle and assemble the theory of assembling and design out this instrument formula C type and synthesize a gallows, cancel traditional welded type support, bolted connection replaces traditional welding, has advantages such as with low costs, construction cycle is short, the environmental protection degree is high, simple to operate.
In order to solve the above problem, the utility model discloses a technical scheme:
the tool type C-shaped comprehensive support and hanger tool for the steel structure factory building comprises a C-shaped steel support stress base formed by detachably connecting a C-shaped steel support vertical rod, a C-shaped steel support cross rod and a C-shaped steel support longitudinal rod, wherein pipe clamps with different specifications are detachably connected to the C-shaped steel support cross rod according to the pipeline arrangement requirement, and an anti-seismic inclined rod is obliquely arranged on the outer side of the C-shaped steel support vertical rod upwards;
the C-shaped steel bracket stress base is fixedly connected with a steel beam in a steel structure through a slope pitch type steel beam clamp; the C-shaped steel bracket stress base is fixedly connected with a wall purlin in a steel structure through a clip hoop; and the C-shaped steel support stress base is fixedly connected with the steel column in the steel structure through an encircling steel hoop.
Further inject above-mentioned technical scheme, in C shaped steel support atress base, C shaped steel support montant is vertical to be set up, C shaped steel support horizontal pole transversely sets up and the tip passes through right angle shaped steel connecting piece combination bolt and is connected with C shaped steel support montant, C shaped steel support longitudinal rod vertically sets up on C shaped steel support montant upper portion and through returning type fastener fixed connection with C shaped steel support montant upper end.
In the technical scheme, the pipe clamps on the C-shaped steel support cross rods can adopt L-shaped pipeline clamping pieces and adjustable pipe clamps according to different types and specifications of pipelines.
To above-mentioned technical scheme's further injecture, the antidetonation down tube sets up in the slope of C shaped steel support montant outside, the antidetonation down tube lower extreme passes through Z type antidetonation connecting piece and is connected with C shaped steel support montant, antidetonation down tube upper end is connected with C shaped steel support longitudinal rod, C shaped steel support longitudinal rod passes through domatic tooth pitch shaped steel roof beam card and girder steel fixed connection.
Further inject above-mentioned technical scheme, when C shaped steel support atress base only was connected with the girder steel in the steel construction, C shaped steel support montant was equipped with two and vertical parallel each other, two C shaped steel support montant upper end all vertically is equipped with C shaped steel support longitudinal bar, through domatic tooth pitch shaped steel roof beam card fixed connection between the girder steel in C shaped steel support longitudinal bar and the steel construction.
According to the technical scheme, when one side of the C-shaped steel support stress base needs to be connected with a wall purlin in a steel structure, one end of a cross bar of the C-shaped steel support is directly fixedly connected with the wall purlin through the clip hoop.
The utility model has the advantages compared with the prior art:
1. the scheme innovates the combination mode of the support in the steel structure and the connection mode of the support and the steel structure through the tool type splicing idea, so that the support does not damage original components when meeting the requirements of clear distance, vertical and horizontal relations of various professional pipelines, and can quickly adjust the position of the pipeline according to the field conditions, thereby overcoming the defects that the conventional support cannot be flexibly adjusted, the raw materials are wasted greatly, the rust removal painting has large pollution to the environment, the installation is not light and the like, and effectively avoiding the problem that the raw materials are damaged due to the welding on the steel beam and the steel column which are installed when being changed.
2. The special connecting piece in the scheme forms a plurality of combined connecting forms, the C-shaped steel support stress base is arranged according to design and specification requirements at the place where a pipeline needs to be arranged, the steel beams are connected and fixed through slope pitch steel beam connectors, the steel columns are fixedly connected through encircling steel hoops, and the wall purlins and the roof purlins are connected through clip-type hoop fixing pieces, so that the special connecting piece has the advantage of not damaging the original materials of the plant structure;
3. compared with the traditional welding mode, the scheme adopts a tool type disassembling and assembling concept, is mainly fixed with the structural main body through a rigid fastener, a bolt and the like, can be quickly disassembled and adjusted under various complex environmental conditions, is suitable for various types of pipelines, and can flexibly adjust the fixing mode of the supports in different types of steel structure plants and the arrangement positions of the pipelines according to design requirements;
4. in the scheme, the fixing problems of dense crossing, different height differences and complex and changeable professional systems of the electromechanical pipelines on the support are solved by utilizing the multi-type, multifunctional and conveniently-adjusted pipe clamps, and compared with the traditional support and hanger welding and mounting process, the adjusting efficiency is high and the accuracy is high;
5. in the prior art, after a common bracket is installed, secondary construction is performed to install the anti-seismic bracket, and the tool type support hanger and the anti-seismic support hanger are integrated into a whole, so that construction is performed simultaneously, secondary construction is not needed, the installation efficiency is improved, and the installation cost investment is reduced;
6. maintenance cost is low in this scheme, uses a instrument formula C type to synthesize a gallows frock, can promote electromechanical installation construction impression quality, and galvanized C shaped steel is chooseed for use to support preparation log, can avoid the environmental impact that conventional support rust cleaning mopping brought, and the environmental protection is profitable.
Drawings
FIG. 1 is a schematic view of the C-shaped integrated support and hanger of the present invention connected to a steel beam;
fig. 2 is a schematic view of the C-shaped integrated support and hanger of the present invention connected to a wall purlin;
fig. 3 is the utility model discloses well C shaped steel support montant and the connection schematic diagram of C shaped steel support montant.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term "comprising", without further limitation, means that the element so defined is not excluded from the group consisting of additional identical elements in the process, method, article, or apparatus that comprises the element.
Referring to fig. 1-3, embodiments of the present invention are detailed.
A gallows frock is synthesized to steel construction factory building with instrument formula C type, it is shown with reference to figure 1, include by C type steel support montant 1, C type steel support horizontal pole 2 and C type steel support vertical pole 4 can dismantle the C type steel support atress base of connecting the constitution, it is concrete, the vertical establishment of C type steel support montant 1, C type steel support horizontal pole 2 transversely sets up and the tip passes through right angle shaped steel connecting piece 3 and combines the bolt to be connected with C type steel support montant 1, C type steel support vertical pole 4 vertically sets up on 1 upper portion of C type steel support montant and pass through back type fastener 13 fixed connection with 1 upper end of C type steel support montant, see figure 3 and show. Preferably, the bracket manufacturing raw material is galvanized C-shaped steel.
The pipe clamp on the C-shaped steel support cross rod 2 can adopt an L-shaped pipeline clamping piece 7 and an adjustable pipe clamp 8 according to different types and specifications of pipelines. The problems that electromechanical pipelines are densely crossed and have different heights and professional systems are complex and changeable are solved by utilizing the multi-type, multifunctional and conveniently-adjusted pipe clamps.
And an anti-seismic inclined rod 5 is obliquely arranged on the outer side of the C-shaped steel support vertical rod 1 upwards. Antidetonation down tube 5 inclines in the 1 outside slope setting of C shaped steel support montant, 5 lower extremes of antidetonation down tube pass through Z type antidetonation connecting piece 9 and are connected with C shaped steel support montant 1, 5 upper ends of antidetonation down tube are connected with C shaped steel support longitudinal rod 4, C shaped steel support longitudinal rod 4 is through domatic tooth pitch shaped steel roof beam card 6 and girder steel 10 fixed connection. In the prior art, after the common support is installed, secondary construction is performed to install the anti-seismic support, and the tool type C-shaped comprehensive support hanger tool integrates the tool type support hanger and the anti-seismic support hanger, and meanwhile, secondary construction is not needed, so that the installation efficiency is improved, and the installation cost is reduced.
The C-shaped steel bracket stress base is fixedly connected with the steel beam 10 in the steel structure through the slope pitch steel beam clamp 6. When C shaped steel support atress base only is connected with girder steel 10 in the steel construction, see shown in fig. 1, C shaped steel support montant 1 is equipped with two and vertical parallel each other, two 1 upper ends of C shaped steel support montant all vertically are equipped with C shaped steel support longitudinal rod 4, through domatic tooth pitch shaped steel roof beam card 6 fixed connection between C shaped steel support longitudinal rod 4 and the girder steel 10 in the steel construction.
And at the side span of the factory building, the C-shaped steel support stress base is fixedly connected with a wall purlin 11 in a steel structure through a clip-shaped hoop 12. When one side of the C-shaped steel support stress base needs to be connected with a wall purlin 11 in a steel structure, as shown in figure 2, one end of the C-shaped steel support cross bar 2 is directly fixedly connected with the wall purlin 11 through a bent hoop 12.
And the C-shaped steel support stress base is fixedly connected with the steel column in the steel structure through an encircling steel hoop. If when fire-fighting pipeline installs, the fire hose need be arranged on ground, is changeed to vertical riser by aerial horizontal fire-fighting pipeline and arranges to ground direction, according to the design requirement, and the structure steel column is hugged closely to vertical arranging, for fixed vertical fire-fighting pipeline, through embracing formula steel hoop fixed connection.
When the device is used, the stress base of the C-shaped steel support is arranged at the position where a pipeline needs to be arranged according to design and standard requirements, after the initial screwing of each connecting piece is completed, whether the support has a free load or not is checked, the deviation and the inclination condition are measured, after the errors do not exist, the bolt fastening is carried out, the stress point is firstly fastened, the connecting piece is fastened, and finally, the support installation is completed after the anti-seismic connecting piece is fastened and the qualified moment wrench is detected.
The utility model discloses a through instrument formula assemble theory to the compound mode of steel construction inner support and innovate with steel construction internal connection form, make it satisfy each professional pipeline clean distance, it is perpendicular, when the horizontal relation, do not harm original component, can be according to site conditions quick adjustment pipeline position, can solve conventional support can not adjust in a flexible way, the former material is extravagant big, the rust cleaning mopping is big to environmental pollution, the installation shortcoming such as not light, when effectually avoiding changing and the welding on the girder steel column of having installed causes the problem that the former material harms.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. A gallows frock is synthesized to steel construction factory building with instrument formula C type, its characterized in that: the device comprises a C-shaped steel support stress base formed by detachably connecting a C-shaped steel support vertical rod (1), a C-shaped steel support cross rod (2) and a C-shaped steel support longitudinal rod (4), wherein pipe clamps with different specifications are detachably connected to the C-shaped steel support cross rod (2) according to the pipeline arrangement requirement, and an anti-seismic inclined rod (5) is obliquely arranged on the outer side of the C-shaped steel support vertical rod (1) upwards;
the C-shaped steel bracket stress base is fixedly connected with a steel beam (10) in a steel structure through a slope pitch steel beam clamp (6); the C-shaped steel bracket stress base is fixedly connected with a wall purlin (11) in a steel structure through a clip hoop (12).
2. The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building according to claim 1, wherein the tool type C-shaped comprehensive support and hanger tool comprises: in C shaped steel support atress base, C shaped steel support montant (1) is vertical to be set up, C shaped steel support horizontal pole (2) transversely set up and the tip passes through right angle shaped steel connecting piece (3) combination bolt to be connected with C shaped steel support montant (1), C shaped steel support vertical pole (4) vertically set up on C shaped steel support montant (1) upper portion and with C shaped steel support montant (1) upper end through time type fastener (13) fixed connection.
3. The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building according to claim 1, wherein the tool type C-shaped comprehensive support and hanger tool comprises: the pipe clamp on the C-shaped steel support cross rod (2) can adopt an L-shaped pipeline clamping piece (7) and an adjustable pipe clamp (8) according to different types and specifications of pipelines.
4. The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building according to claim 1, wherein the tool type C-shaped comprehensive support and hanger tool comprises: antidetonation down tube (5) slope setting in C shaped steel support montant (1) outside, antidetonation down tube (5) lower extreme passes through Z type antidetonation connecting piece (9) and is connected with C shaped steel support montant (1), antidetonation down tube (5) upper end is connected with C shaped steel support longitudinal rod (4), C shaped steel support longitudinal rod (4) are through domatic tooth pitch shaped steel roof beam card (6) and girder steel (10) fixed connection.
5. The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building according to claim 2, wherein the tool type C-shaped comprehensive support and hanger tool comprises: when C shaped steel support atress base only is connected with girder steel (10) in the steel construction, C shaped steel support montant (1) is equipped with two and vertical parallel each other, two C shaped steel support montant (1) upper end all vertically is equipped with C shaped steel support longitudinal rod (4), through domatic tooth pitch shaped steel roof beam card (6) fixed connection between girder steel (10) in C shaped steel support longitudinal rod (4) and the steel construction.
6. The tool type C-shaped comprehensive support and hanger tool for the steel structure factory building according to claim 2, wherein the tool type C-shaped comprehensive support and hanger tool comprises: when one side of the C-shaped steel support stress base needs to be connected with a wall purlin (11) in a steel structure, one end of the C-shaped steel support cross rod (2) is directly fixedly connected with the wall purlin (11) through the bent hoop (12).
CN202223053442.1U 2022-11-17 2022-11-17 Tool type C-shaped comprehensive support hanger tool for steel structure factory building Active CN218719276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223053442.1U CN218719276U (en) 2022-11-17 2022-11-17 Tool type C-shaped comprehensive support hanger tool for steel structure factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223053442.1U CN218719276U (en) 2022-11-17 2022-11-17 Tool type C-shaped comprehensive support hanger tool for steel structure factory building

Publications (1)

Publication Number Publication Date
CN218719276U true CN218719276U (en) 2023-03-24

Family

ID=85620919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223053442.1U Active CN218719276U (en) 2022-11-17 2022-11-17 Tool type C-shaped comprehensive support hanger tool for steel structure factory building

Country Status (1)

Country Link
CN (1) CN218719276U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396418A (en) * 2021-12-31 2022-04-26 深圳优力可科技股份有限公司 Assembled bearing support and hanger connecting structure and support and hanger system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396418A (en) * 2021-12-31 2022-04-26 深圳优力可科技股份有限公司 Assembled bearing support and hanger connecting structure and support and hanger system

Similar Documents

Publication Publication Date Title
CN218719276U (en) Tool type C-shaped comprehensive support hanger tool for steel structure factory building
CN203640247U (en) Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN205296927U (en) Steel bar machining shed
CN210218926U (en) Adjustable electromechanical pipeline installation's a gallows device of synthesizing
CN109339480A (en) Temporarily use movable plank house radix saposhnikoviae reinforcement means
CN209748456U (en) Fixed single-upright photovoltaic support
CN200952220Y (en) Rain awning
CN105442873A (en) Lightweight steel structure awning of gas station
CN201891213U (en) Roof girder suspension bracket for plants
CN208294105U (en) A kind of architectural engineering pipe sleeve preburied positioning device
CN217843763U (en) Comprehensive supporting and hoisting device for steel beam of steel structure factory building
CN215410520U (en) Large-scale air pipe mounting structure on single steel truss or steel beam
CN219611663U (en) Photovoltaic installation support with adjustable
CN219322307U (en) Lattice formula photovoltaic support
CN216290765U (en) Convenient flexible photovoltaic support of dismantling
CN215211527U (en) Steel constructs component convenient to connect
CN215168639U (en) Tent with adjustable be convenient for dismouting height
CN204947971U (en) modular photovoltaic bracket
CN218387328U (en) Pastoral complementary photovoltaic power station bracket component mounting platform
CN111779889A (en) Large-span support hanger
CN212470445U (en) Embrace of supplementary pipeline interim displacement and push away seat
CN220521768U (en) FRP roofing adjustable installation skeleton
CN208272522U (en) Dismountable cable bearer
CN110725492B (en) Square column wrapped cylinder rooting-free construction process
CN215829991U (en) Support joint for climbing frame at hollow position

Legal Events