CN217843763U - Comprehensive supporting and hoisting device for steel beam of steel structure factory building - Google Patents

Comprehensive supporting and hoisting device for steel beam of steel structure factory building Download PDF

Info

Publication number
CN217843763U
CN217843763U CN202220712046.6U CN202220712046U CN217843763U CN 217843763 U CN217843763 U CN 217843763U CN 202220712046 U CN202220712046 U CN 202220712046U CN 217843763 U CN217843763 U CN 217843763U
Authority
CN
China
Prior art keywords
steel
factory building
supporting
double
bearing assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220712046.6U
Other languages
Chinese (zh)
Inventor
汤晓猛
崔海瑞
李强
岳庆宇
索晨楠
高梓博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Original Assignee
Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd filed Critical Beijing Construction Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Priority to CN202220712046.6U priority Critical patent/CN217843763U/en
Application granted granted Critical
Publication of CN217843763U publication Critical patent/CN217843763U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a comprehensive supporting device of steel construction factory building girder steel, includes the main bearing subassembly of being connected with the girder steel, be connected with on the main bearing subassembly and be used for the fixed auxiliary bearing subassembly of treating the installed part. The utility model discloses simple structure, easily operation, save material, convenient dismantlement maintenance satisfies convenient and fast, up to standard construction requirement under the condition that the engineering volume is big, the pipeline is complicated, the time limit for a project is nervous, is effectively applicable to the overall arrangement installation that carries out lamps and lanterns, pipeline on large-scale steel construction factory building I-steel crossbeam.

Description

Comprehensive supporting and lifting device for steel beams of steel structure factory building
Technical Field
The utility model relates to a connecting device, especially a steel construction factory building girder steel synthesize a hoist and mount device belong to building engineering technical field.
Background
The steel structure factory building is because of the building is simple and easy, and construction period is short, durable, easily maintenance, advantage such as the cost is reasonable, by extensive use in buildings such as mill, warehouse, office building, gymnasium, hangar. Its main bearing member is made of steel material, including steel column, steel beam, steel structure foundation, steel roof truss and steel roof.
Along with the wide application of steel construction factory building, the factory building functional requirement is more and more, and electromechanical device pipeline just increases thereupon, for example: the lighting pipeline, the induction fan pipeline, the high-space heating pipeline, the fire-fighting pipeline and the like are arranged in advance by constructors aiming at plants containing pipelines with different functions, so that the arrangement of the supporting and hanging brackets of various pipelines, lamps and the like is reasonable, the installation and the disassembly are convenient, the material and the installation cost are saved, and the standard requirements are met.
Disclosure of Invention
In order to overcome the urgent need among the prior art, the utility model provides a comprehensive supporting and hanging of steel construction factory building girder steel is put, the device simple structure, easily operation, save material, convenient dismantlement maintenance satisfies convenient and fast, up to standard construction requirement under the intensive, the pipeline is complicated, the time limit for a project condition nervous, is effectively applicable to the overall arrangement installation that carries out lamps and lanterns, pipeline on large-scale steel construction factory building I-steel crossbeam.
The utility model provides a technical scheme that its technical problem adopted is:
a comprehensive supporting and hanging device for steel beams of a steel structure factory building comprises a main bearing assembly connected with the steel beams, wherein an auxiliary bearing assembly used for fixing a piece to be installed is connected onto the main bearing assembly; the main bearing assembly, the auxiliary bearing assembly and the to-be-installed part are detachably connected to the flange plate of the steel beam, the bearing assembly or the auxiliary bearing assembly respectively.
Optionally, the to-be-installed member comprises a threading pipe, a junction box and a lamp.
Optionally, the main bearing assembly includes a double-spliced channel steel and a beam clamp, the double-spliced channel steel is connected to the flange plate of the steel beam through the beam clamp, and the auxiliary bearing assembly is connected to the double-spliced channel steel.
Optionally, the double-spliced channel steel comprises two channel steels which are connected back to back.
Optionally, the beam clamp is U-shaped beam clamp, U-shaped beam clamp installs on the double-spliced channel steel, and its both sides still connect on the double-spliced channel steel through first fastening subassembly.
Optionally, the number of the auxiliary supporting assemblies is multiple, the first auxiliary supporting assembly comprises angle steel, the second auxiliary supporting assembly comprises channel steel and a steel pipe hanger with nuts at two ends, the channel steel is connected with the double-spliced channel steel, the junction box and the steel pipe hanger respectively, a lamp is installed at the other end of the steel pipe hanger, and the threading pipe is fixed on the angle steel.
Optionally, the system further comprises a reinforcing support member connected between the plurality of auxiliary support assemblies.
Optionally, at least one edge of the angle steel is provided with a mounting hole for connecting a wire pipe, at least one end of the angle steel is provided with a connecting plate for connecting double-spliced channel steel or a reinforcing support member, and the connecting plate is arranged between the two edges and provided with a connecting hole.
Optionally, the steel beam is an i-shaped steel beam, a U-shaped steel beam, an H-shaped steel beam or a C-shaped steel beam.
Compared with the prior art, the utility model discloses a comprehensive supporting and hanging device of steel construction factory building girder steel to the more condition of pipeline, will treat the installed part overall arrangement through main tributary bearing subassembly and auxiliary bearing subassembly and install on the girder steel of steel construction factory building, simple structure, production workable, multiple pipe box synthesizes and arranges the back can a large amount of save materials, reduces installation cost, convenient dismantlement during the maintenance.
Drawings
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is a front view of an embodiment of the present invention.
Figures 2a and 2b are front and side views of a main bearing assembly according to one embodiment of the present invention.
Fig. 3a and 3b are front and side views of a beam clamp according to an embodiment of the invention.
Fig. 4a and 4b are a perspective view and a front view of a first auxiliary support assembly according to an embodiment of the present invention.
Fig. 5 is a front view of a reinforcing support in an embodiment of the invention.
Fig. 6 is a perspective view of a second auxiliary support assembly in accordance with an embodiment of the present invention.
Fig. 7a and 7b are schematic diagrams of application structures of the embodiment of the present invention.
Description of reference numerals:
1. the device comprises a comprehensive supporting device 11, a main supporting assembly 12, a beam clamp 13, a first auxiliary supporting assembly 13-1, a first fastener 13-2, a connecting plate 14, a reinforcing supporting member 14-1, a second fastener 15, a second auxiliary supporting assembly 15-1, channel steel 15-2, a steel pipe hanging member 16, a first fastening assembly 17 and a second fastening assembly;
2. the steel beam, 3, the threading pipe, 31, the illumination threading pipe, 4, lamps and lanterns, 41, lamps and lanterns cable, 5, terminal box.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Fig. 1 to 7 show the schematic structural diagram of a preferred embodiment of the present invention, and the comprehensive supporting device 1 of a steel structural factory building steel beam in fig. 1 comprises a main supporting component 11 connected with a steel beam 2, wherein the main supporting component 11 is connected with an auxiliary supporting component for fixing a to-be-installed member. In a specific implementation, referring to fig. 7a and 7b, the main bearing assembly 11, the auxiliary bearing assembly, and the members to be installed are detachably connected to the flange plates of the steel beams 2, the bearing assemblies, or the auxiliary bearing assemblies, respectively.
In the present embodiment, the members to be installed include a conduit 3, a junction box 5, and a lamp 4. The present invention is not limited to this, and can be used as a support and hanger for various piping and lighting fixtures 4 and the like.
In an alternative embodiment of this embodiment, and referring to fig. 1 and 2a and 2b, the main bearing assembly 11 comprises a double-split channel beam and a beam clamp 12, the double-split channel beam is connected to the flange plate of the steel beam 2 via the beam clamp 12, and the auxiliary bearing assembly is connected to the double-split channel beam. More specifically, the present embodiment provides a main bearing assembly 11, which is comprised of a double-spliced channel, which may include two channels connected back to back, and two beam clamps 12; referring to fig. 1 and 3a and 3b, the beam clamp 12 may be a U-shaped beam clamp installed on the double-spliced channel steel, and both sides of the U-shaped beam clamp are wider than the steel beam 2 by one section and connected to the double-spliced channel steel through a first fastening assembly 16, and in the preferred embodiment, the first fastening assembly 16 may include a bolt, a washer, and a spring nut.
In an alternative embodiment of this embodiment, referring to fig. 1, the number of the auxiliary support assemblies is three, two first auxiliary support assemblies symmetrically arranged on two sides of the double-spliced channel steel and one second auxiliary support assembly 15 arranged in the middle of the double-spliced channel steel, the first auxiliary support assemblies comprise angle steel, optionally, at least one edge of the angle steel is provided with a mounting hole for connecting a wire pipe, and the shape of the mounting hole is preferably a long hole for adjustment; at least one end of the angle steel is provided with a connecting plate 13-2 used for connecting double-spliced channel steel or a reinforcing support member 14, the connecting plate 13-2 is arranged between two edges and is provided with a connecting hole, and the connecting hole can be a round hole. Referring to fig. 1 and 6, the second auxiliary supporting assembly 15 includes a channel steel 15-1 and a steel pipe hanging piece 15-2 with nuts at two ends, the channel steel 15-1 is respectively connected with the double-spliced channel steel, the junction box 5 and the steel pipe hanging piece 15-2, the steel pipe hanging piece 15-2 can be connected with the double-spliced channel steel by a fastening assembly, the second fastening assembly 17 includes a bolt and a spring nut, the lamp 4 is installed at the other end of the steel pipe hanging piece 15-2, and the threading pipe 3 can be fixed on the angle steel by a first fastening piece 13-1 such as a U-shaped pipe clamp.
In order to increase the stability of the integrated suspension device 1 and reduce the influence of the air flow inside the building on the stability of the lamp, as a further preferred embodiment of the present embodiment, with reference to fig. 1 and 5, said further comprises a reinforcing support 14 connected between a plurality of auxiliary support assemblies. Specifically, a reinforcing support member 14 is provided, which is made of flat steel, two ends of the reinforcing support member are respectively connected to the lower ends of two angle steels serving as a first auxiliary support assembly 13, the length of the reinforcing support member is determined according to the inner side distance between the two vertical angle steels and can be fixed with the angle steels through bolts, and a steel pipe hanger 15-2 for hoisting the lamp 4 is fixed in the middle of the reinforcing support member through a second fastener 14-1 such as a U-shaped pipe clamp.
In this embodiment, the steel beam 2 is an i-shaped steel beam, and may be a U-shaped steel beam, an H-shaped steel beam, a C-shaped steel beam, or the like, as an alternative.
In a more specific embodiment of this embodiment, a comprehensive support device 1 for steel structural plant steel beams is composed of 40 × 4 galvanized angle steel with a long hole on one side, 41 double-spliced galvanized C-shaped channel steel, 82/8U-shaped beam clamps, 10# channel steel, 40 × 4 galvanized flat steel, hexagon bolts M12 × 25, hexagon bolts M12 × 20, 41 spring nuts, two-end mantle fiber DN25 galvanized steel pipe hanger 15-2, U-shaped pipe clamps, fastening bolts and the like.
The length of the 40 x 4 galvanized angle steel is determined according to the number and spacing requirements of pipelines, one side of the angle steel is uniformly provided with a long hole with the diameter of 6.5mm and the length of 30mm, the other side of the angle steel is inwards folded by 40mm to form 90 degrees, the angle steel is welded with the side of the long hole, is brushed with anti-rust paint, and is provided with an M12 bolt hole in the center for fixing the angle steel and 41 double-spliced galvanized C-shaped channel steel; the length of the 41 double-spliced galvanized C-shaped channel steel is determined according to the width of the flange plate of the I-shaped steel beam, and the two sides of the channel steel are respectively 100mm wide; the 82/8 beam clamps on two sides are used for fixing the 41 double-spliced galvanized C-shaped channel steel and the I-shaped steel beam and bear the force of each pipeline, the pipe box and the lamp 4, and the two sides of the 82/8 beam clamps are fixed by hexagon bolts M12 and 25, 41 spring nuts and a hole flat gasket to prevent falling off;
the length of the No. 10 channel steel is 150mm, two M12 bolt holes are uniformly formed in one side of the No. 10 channel steel and used for fixing the No. 10 channel steel with 41 double-spliced galvanized C-shaped channel steel through hexagon bolts M12 x 20 and 41 spring nuts, a DN25 galvanized steel pipe round hole is formed in the other side of the channel steel, the channel steel is used for fixing a pipe hanger of a lamp 4, a DN25 round hole is formed in the middle of the inner side of the channel steel and used for allowing a lamp cable 41 to penetrate through, a 86 junction box is fixed to the back of the No. 10 channel steel, and the angle steel on the two sides of the 86 junction box can be provided with lighting threading pipes 31;
the length of the 40 × 4 galvanized flat steel is judged according to the inner side distance between the two vertical angle steels, the flat steel is fixed with the angle steels through bolts, a DN25 galvanized steel pipe of the lamp 4 is fixedly hoisted in the middle of the flat steel through a U-shaped pipe clamp, and the flat steel has the functions of increasing the stability of a comprehensive support and reducing the stability of airflow in a factory building to the lamp; the length of the DN25 galvanized steel pipe with the mantle fiber at the two ends is determined according to the elevation requirement of the lamp 4, the rear section of the mantle fiber at the two ends passes through the No. 10 channel steel, the other end passes through the mounting hole of the lamp 4 and is fixed by a special nut, and the lamp cable 41 arranged in the middle of the steel pipe passes through the middle of the steel pipe and is connected into the 86 junction box;
referring to fig. 7a and 7b, after the i-shaped steel beam and the comprehensive supporting and hanging device 1 are fixed by the 82/8 beam clamps at two sides, lamps 4, tube boxes and the like which are arranged in advance can be installed on the comprehensive supporting and hanging device 1.
Go up embodiment simple structure, production workable, can save a large amount of materials, reduce installation cost, convenient dismantlement during the maintenance effectively applies to the more condition of pipeline under the I-steel roof beam, can help the installer big in the engineering volume, under the complicated, the nervous condition of time limit for a project of pipeline, the installation work of lamps and lanterns 4, tube box under the convenient and fast completion I-steel roof beam just reaches the requirement that satisfies the standard simultaneously.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do the restriction in any form, all basis the utility model discloses a technical essence makes any simple modification and equal change to above embodiment, all falls into within the protection scope of the utility model.

Claims (9)

1. The utility model provides a comprehensive supporting and hanging device of steel structure factory building girder steel, characterized by: the device comprises a main bearing assembly (11) connected with a steel beam (2), wherein an auxiliary bearing assembly used for fixing a piece to be installed is connected to the main bearing assembly (11); the main bearing assembly (11), the auxiliary bearing assembly and the to-be-installed part are detachably connected to the flange plate of the steel beam (2), the bearing assembly or the auxiliary bearing assembly respectively.
2. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 1, is characterized in that: the piece to be installed comprises a threading pipe (3), a junction box (5) and a lamp (4).
3. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 2, which is characterized in that: the main bearing assembly (11) comprises double-spliced channel steel and a beam clamp (12), the double-spliced channel steel is connected with a flange plate of the steel beam (2) through the beam clamp (12), and the auxiliary bearing assembly is connected to the double-spliced channel steel.
4. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 3, wherein the comprehensive supporting and hanging device is characterized in that: the double-spliced channel steel comprises two channel steel which are connected back to back.
5. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 3 or 4, which is characterized in that: the beam clamp (12) is a U-shaped beam clamp, the U-shaped beam clamp is installed on the double-spliced channel steel, and the two sides of the U-shaped beam clamp are connected to the double-spliced channel steel through first fastening assemblies (16).
6. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 2, which is characterized in that: the auxiliary supporting assembly comprises a plurality of auxiliary supporting assemblies, a first auxiliary supporting assembly (13) comprises angle steel, a second auxiliary supporting assembly (15) comprises channel steel (15-1) and steel pipe hanging pieces (15-2) with nuts at two ends, the channel steel (15-1) is connected with the double-spliced channel steel, the junction box (5) and the steel pipe hanging pieces (15-2) respectively, a lamp (4) is installed at the other end of the steel pipe hanging piece (15-2), and the threading pipe (3) is fixed on the angle steel.
7. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building as claimed in claim 6, wherein: also included is a reinforcing support (14) connected between the plurality of auxiliary support assemblies.
8. The comprehensive supporting and hanging device for the steel beams of the steel structure factory building according to claim 7, which is characterized in that: at least one edge of the angle steel is provided with a mounting hole for connecting a wire pipe, at least one end part of the angle steel is provided with a connecting plate (13-2) for connecting double-spliced channel steel or a reinforcing support member (14), and the connecting plate (13-2) is arranged between the two edges and is provided with a connecting hole.
9. The integrated supporting and hanging device for the steel structural plant girder of claim 1, 2, 3, 4, 6, 7 or 8, which is characterized in that: the steel beam (2) is an I-shaped steel beam, a U-shaped steel beam, an H-shaped steel beam or a C-shaped steel beam.
CN202220712046.6U 2022-03-30 2022-03-30 Comprehensive supporting and hoisting device for steel beam of steel structure factory building Active CN217843763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220712046.6U CN217843763U (en) 2022-03-30 2022-03-30 Comprehensive supporting and hoisting device for steel beam of steel structure factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220712046.6U CN217843763U (en) 2022-03-30 2022-03-30 Comprehensive supporting and hoisting device for steel beam of steel structure factory building

Publications (1)

Publication Number Publication Date
CN217843763U true CN217843763U (en) 2022-11-18

Family

ID=84018779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220712046.6U Active CN217843763U (en) 2022-03-30 2022-03-30 Comprehensive supporting and hoisting device for steel beam of steel structure factory building

Country Status (1)

Country Link
CN (1) CN217843763U (en)

Similar Documents

Publication Publication Date Title
CN111946902A (en) Modularization combination assembled antidetonation gallows
CN217843763U (en) Comprehensive supporting and hoisting device for steel beam of steel structure factory building
CN102767644A (en) Assembly type heavy pipeline hanger
US2915275A (en) Ceiling suspension system
CN211772964U (en) Bridging suspension beam for box culvert first-aid repair
CN108149860A (en) A kind of siphonic roof storm system hangs fixing device
CN209839352U (en) Horizontal mounting bracket for heavy pipeline of steel structure building
CN218719276U (en) Tool type C-shaped comprehensive support hanger tool for steel structure factory building
CN213390229U (en) A hang in midair piping lane for laying pipeline in room
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN110848467A (en) Construction method for mounting multi-split equipment and pipeline in steel structure building
CN207919925U (en) A kind of siphonic roof storm system hanging fixing device
CN201598761U (en) Wiring device for electric system high altitude steel rope mounting
CN219366975U (en) Light H-shaped steel purline lower hanging pipeline installation support hanger device
CN217734539U (en) Adjustable assembled suspended ceiling reverse supporting device
CN220190401U (en) High-altitude electromechanical pipeline conversion bracket for steel truss system building
CN220768583U (en) Assembled conversion layer jib mounting structure
CN217711623U (en) A stand platform structure for purifying workshop
CN217683569U (en) Light-duty piece prevents weighing down support
CN216480615U (en) Hanging bracket
CN219840429U (en) Steel structure support frame for house construction
CN211973830U (en) Steel construction connecting device for construction
CN210685137U (en) Hanger rod for pipeline and ceiling fixing support
CN218828927U (en) Anti-drop's power pipeline support
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant