CN218714974U - Horizontal truss of scaffold board of attached lifting scaffold - Google Patents

Horizontal truss of scaffold board of attached lifting scaffold Download PDF

Info

Publication number
CN218714974U
CN218714974U CN202221654166.1U CN202221654166U CN218714974U CN 218714974 U CN218714974 U CN 218714974U CN 202221654166 U CN202221654166 U CN 202221654166U CN 218714974 U CN218714974 U CN 218714974U
Authority
CN
China
Prior art keywords
mainboard
horizontal truss
bracing piece
equipment
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221654166.1U
Other languages
Chinese (zh)
Inventor
曹南南
陆绍南
蓝江涛
姚仁旺
杨素娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Luban Construction Equipment Manufacturing Co ltd
Original Assignee
Guangxi Luban Construction Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Luban Construction Equipment Manufacturing Co ltd filed Critical Guangxi Luban Construction Equipment Manufacturing Co ltd
Priority to CN202221654166.1U priority Critical patent/CN218714974U/en
Application granted granted Critical
Publication of CN218714974U publication Critical patent/CN218714974U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses an inserted lift scaffold board horizontal truss, including first mainboard and second mainboard, the second mainboard is located the bottom of first mainboard, the both sides of first mainboard are all pegged graft and are had the bracing piece, the top of bracing piece and the equal fixedly connected with positioning mechanism in bottom. The utility model discloses a set up positioning mechanism, can advance line location equipment when making first mainboard and second mainboard assemble with the bracing piece, the stability of equipment has been guaranteed, the condition of slope is avoided appearing, thereby the effect of advancing line location equipment when assembling the horizontal truss of assembly has been reached, it needs more pole to assemble when the horizontal truss is assembled to have solved, thereby assemble the horizontal truss and use, because the pole of equipment is more, because do not possess the structure of location when assembling, can lead to the condition that the slope appears in the pole when assembling, thereby influence the problem of equipment progress, the effect of advancing line location equipment when assembling the horizontal truss of assembly has been reached.

Description

Horizontal truss of scaffold board of attached lifting scaffold
Technical Field
The utility model relates to a scaffold technical field specifically is an inserted lift scaffold board horizontal truss.
Background
Attached lift scaffold equipment is the novel scaffold technique that this century early rapidly developed, it has important influence to china's construction technology progress, it becomes the low place operation with the eminence operation, become the inside operation of support body with unsettled operation, low carbon nature that has showing, high-tech content and more economy, safer, characteristics such as more convenient, attached lift scaffold indicates to set up the take the altitude and adhere to on the engineering structure, rely on the jacking equipment and the device of self, can climb or descend along with the engineering structure successive layer, the advantage of truss is that the member mainly bears pulling force or pressure, the effect that can the full play material, save material, alleviate structure weight, but the problem that present horizontal truss exists is: need more pole when the horizontal truss assembles to assemble the horizontal truss and use, because the pole of equipment is more, owing to do not possess the structure of location when the equipment, can lead to the condition that the pole appears inclining when the equipment, and then leads to the pole to appear bending, thereby influence the equipment progress, and still there is certain potential safety hazard after the equipment.
SUMMERY OF THE UTILITY MODEL
For solving the problem that provides in the above-mentioned background art, the utility model aims to provide an attached lifting scaffold board horizontal truss has possessed the advantage of carrying out the location equipment when assembling horizontal truss, has solved and has required more pole to assemble when horizontal truss assembles to assemble the horizontal truss and use, because the pole of equipment is more, owing to do not possess the structure of location when the equipment, can lead to the condition that the pole appears inclining when the equipment, thereby influence the problem of equipment progress.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an inserted lift scaffold board horizontal truss, includes first mainboard and second mainboard, the second mainboard is located the bottom of first mainboard, the bracing piece has all been pegged graft to the both sides of first mainboard, the top and the equal fixedly connected with positioning mechanism in bottom of bracing piece, peg graft at the top of first mainboard has the mobile jib, the mobile jib runs through first mainboard and second mainboard from last to down in proper order and extends to the inside of second mainboard.
As the utility model discloses it is preferred, positioning mechanism includes the mounting groove, the inside at first mainboard and second mainboard is seted up to the mounting groove, the top and the equal fixedly connected with locating piece in bottom of bracing piece, the equal fixedly connected with location strip in both sides of locating piece inboard, the inside intercommunication of mounting groove has the constant head tank that the cooperation location strip used, location strip and constant head tank sliding connection.
As the utility model discloses it is preferred, the top fixedly connected with location section of thick bamboo of second mainboard, the mobile jib runs through to the inside of a location section of thick bamboo.
As the utility model discloses it is preferred, the surperficial cover of bracing piece is equipped with the antiskid cover, the fixed surface of antiskid cover is connected with anti-skidding granule, anti-skidding granule is provided with a plurality of and is the equidistance and distributes.
As the utility model discloses it is preferred, the equal threaded connection in top and the bottom of bracing piece has the bolt, the bolt runs through first mainboard, second mainboard and locating piece and extends to the inside of first mainboard and second mainboard after to in the past in proper order.
As the utility model discloses preferred, the positive threaded connection of a location section of thick bamboo has the reinforcing to tie, the reinforcing is tied and runs through a location section of thick bamboo and mobile jib and extend to the inside of a location section of thick bamboo after to in the past in proper order.
As the utility model discloses preferred, the front threaded connection of first mainboard has the gim peg, the gim peg runs through first mainboard and mobile jib and extends to the inside of first mainboard after to in the past in proper order.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up positioning mechanism, can advance line location equipment when making first mainboard and second mainboard assemble with the bracing piece, the stability of equipment has been guaranteed, the condition of slope is avoided appearing, thereby the effect of advancing line location equipment when assembling the horizontal truss of assembly has been reached, it needs more pole to assemble when the horizontal truss is assembled to have solved, thereby assemble the horizontal truss and use, because the pole of equipment is more, because do not possess the structure of location when assembling, can lead to the condition that the slope appears in the pole when assembling, thereby influence the problem of equipment progress, the effect of advancing line location equipment when assembling the horizontal truss of assembly has been reached.
2. The utility model discloses a set up positioning mechanism, make the mounting groove carry on spacingly to the locating piece, make the locating piece drive the location strip again and carry out sliding connection with the constant head tank to make the location strip can play the positioning action with the constant head tank to the bracing piece, avoid the bracing piece the condition that the slope appears when the equipment, thereby reached the effect of carrying out the location equipment when assembling the horizontal truss.
3. The utility model discloses a set up a location section of thick bamboo, make a location section of thick bamboo play the positioning action to the mobile jib, avoid the mobile jib to appear the dead condition of slope card, guaranteed the stability of mobile jib equipment.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the front view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a first main board; 2. a second main board; 3. a support bar; 4. a positioning mechanism; 41. mounting grooves; 42. positioning blocks; 43. a positioning bar; 44. positioning a groove; 5. a main rod; 6. a positioning cylinder; 7. an anti-slip sleeve; 8. Anti-skid particles; 9. a bolt; 10. reinforcing the bolt; 11. and (4) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 3, the utility model provides a pair of inserted lift scaffold board horizontal truss, including first mainboard 1 and second mainboard 2, second mainboard 2 is located the bottom of first mainboard 1, and the both sides of first mainboard 1 are all pegged graft and are had bracing piece 3, and the top of bracing piece 3 and the equal fixedly connected with positioning mechanism 4 in bottom have peg graft at the top of first mainboard 1 and have mobile jib 5, and mobile jib 5 runs through first mainboard 1 and second mainboard 2 from last to down in proper order and extends to the inside of second mainboard 2.
Referring to fig. 3, the positioning mechanism 4 includes a mounting groove 41, the mounting groove 41 is opened in the inside of the first main board 1 and the second main board 2, the top and the bottom of the supporting rod 3 are fixedly connected with a positioning block 42, two sides of the inner side of the positioning block 42 are fixedly connected with positioning strips 43, the inside of the mounting groove 41 is communicated with a positioning groove 44 used by matching the positioning strips 43, and the positioning strips 43 and the positioning groove 44 are slidably connected.
As the utility model discloses a technical optimization scheme, through setting up positioning mechanism 4, make mounting groove 41 carry on spacingly to locating piece 42, make locating piece 42 drive location strip 43 and constant head tank 44 again and carry out sliding connection to make location strip 43 can play the positioning action to bracing piece 3 with constant head tank 44, avoid bracing piece 3 the condition that the slope appears when the equipment, thereby reached and carried out the effect of location equipment when assembling the horizontal truss.
Referring to fig. 1, a positioning cylinder 6 is fixedly connected to the top of the second main plate 2, and the main rod 5 penetrates into the positioning cylinder 6.
As a technical optimization scheme of the utility model, through setting up a location section of thick bamboo 6, make a location section of thick bamboo 6 play the positioning action to mobile jib 5, avoid mobile jib 5 the dead condition of slope card to appear, guaranteed the stability of mobile jib 5 equipment.
Referring to fig. 1, the surface of the supporting rod 3 is sleeved with an anti-slip sleeve 7, the surface of the anti-slip sleeve 7 is fixedly connected with anti-slip particles 8, and the anti-slip particles 8 are provided with a plurality of particles and distributed equidistantly.
As the utility model discloses a technical optimization scheme, through setting up antiskid cover 7, the non-skid stability has been guaranteed to the condition that the landing appears because the surface of bracing piece 3 is more smooth when the bracing piece 3 is taken to the person of being convenient for use, and anti-skidding granule 8 can increase the antiskid degree.
Referring to fig. 1, the top and the bottom of the supporting rod 3 are both connected with a bolt 9 in a threaded manner, and the bolt 9 sequentially penetrates through the first main board 1, the second main board 2 and the positioning block 42 from front to back and extends to the inside of the first main board 1 and the second main board 2.
As a technical optimization scheme of the utility model, through setting up bolt 9, make bolt 9 fix bracing piece 3, avoid bracing piece 3 and first mainboard 1 and second mainboard 2 the condition of landing to appear.
Referring to fig. 1, a reinforcing bolt 10 is screwed to the front surface of the positioning cylinder 6, and the reinforcing bolt 10 sequentially penetrates through the positioning cylinder 6 and the main rod 5 from front to back and extends into the positioning cylinder 6.
As a technical optimization scheme of the utility model, through setting up reinforcing bolt 10, make reinforcing bolt 10 fix the bottom of mobile jib 5, guaranteed the stability of mobile jib 5 installation.
Referring to fig. 1, a fixing bolt 11 is screwed to the front surface of the first main plate 1, and the fixing bolt 11 sequentially penetrates through the first main plate 1 and the main rod 5 from front to back and extends to the inside of the first main plate 1.
As a technical optimization scheme of the utility model, through setting up gim peg 11, make gim peg 11 fix the top of mobile jib 5, avoid the mobile jib 5 the condition that the slope appears, guaranteed the stability of mobile jib 5 installation.
The utility model discloses a theory of operation and use flow: make mounting groove 41 earlier carry on spacingly to locating piece 42 when needs assemble the horizontal truss when using, make locating piece 42 drive location strip 43 and constant head tank 44 carry out sliding connection again, thereby make location strip 43 can play the positioning action to bracing piece 3 with constant head tank 44, avoid bracing piece 3 the condition that the slope appears when the equipment, insert mobile jib 5 again and fix a position in a location section of thick bamboo 6, then in proper order with bolt 9 again, consolidate bolt 10 and gim peg 11 and screw in and fix bracing piece 3 and mobile jib 5, thereby reached and carried out the effect of location equipment when assembling the horizontal truss.
In summary, the following steps: this kind of adhesion type lift scaffold board horizontal truss, through setting up positioning mechanism 4, can fix a position the equipment when making first mainboard 1 and second mainboard 2 assemble with bracing piece 3, the stability of equipment has been guaranteed, the condition of slope is avoided appearing, thereby the effect of carrying out the location equipment when assembling horizontal truss has been reached, it needs more pole to assemble when horizontal truss assembles to have solved, thereby it uses to assemble the horizontal truss, because the pole of equipment is more, because the structure of location does not possess when the equipment, can lead to the condition that the slope appears in the pole when the equipment, thereby influence the problem of equipment progress.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an inserted lift scaffold board horizontal truss, includes first mainboard (1) and second mainboard (2), its characterized in that: second mainboard (2) are located the bottom of first mainboard (1), the both sides of first mainboard (1) are all pegged graft and are had bracing piece (3), the top and the equal fixedly connected with positioning mechanism (4) in bottom of bracing piece (3), peg graft at the top of first mainboard (1) has mobile jib (5), mobile jib (5) are from last to running through first mainboard (1) and second mainboard (2) down in proper order and extend to the inside of second mainboard (2).
2. The attached lifting scaffold board horizontal truss of claim 1, wherein: positioning mechanism (4) include mounting groove (41), the inside at first mainboard (1) and second mainboard (2) is seted up in mounting groove (41), the top and the equal fixedly connected with locating piece (42) in bottom of bracing piece (3), the equal fixedly connected with location strip (43) in both sides of locating piece (42) inboard, the inside intercommunication of mounting groove (41) has constant head tank (44) that cooperation location strip (43) used, location strip (43) and constant head tank (44) sliding connection.
3. The attached lifting scaffold board horizontal truss of claim 1, wherein: the top fixedly connected with location section of thick bamboo (6) of second mainboard (2), mobile jib (5) run through to the inside of a location section of thick bamboo (6).
4. The attached lifting scaffold board horizontal truss of claim 1, wherein: the anti-skidding support rod is characterized in that an anti-skidding sleeve (7) is sleeved on the surface of the support rod (3), anti-skidding particles (8) are fixedly connected to the surface of the anti-skidding sleeve (7), and the anti-skidding particles (8) are arranged in a plurality of and distributed equidistantly.
5. The attached lifting scaffold board horizontal truss of claim 1, wherein: the top and the bottom of bracing piece (3) all have bolt (9) threaded connection, bolt (9) run through first mainboard (1), second mainboard (2) and locating piece (42) and extend to the inside of first mainboard (1) and second mainboard (2) after to in the past in proper order.
6. An attached lifting scaffold board horizontal truss of claim 3 wherein: the front surface of the positioning cylinder (6) is in threaded connection with a reinforcing bolt (10), and the reinforcing bolt (10) sequentially penetrates through the positioning cylinder (6) and the main rod (5) from front to back and extends to the inside of the positioning cylinder (6).
7. The attached lifting scaffold board horizontal truss of claim 1, wherein: the front face threaded connection of first mainboard (1) has gim peg (11), gim peg (11) run through first mainboard (1) and mobile jib (5) and extend to the inside of first mainboard (1) in proper order after to in the past.
CN202221654166.1U 2022-06-30 2022-06-30 Horizontal truss of scaffold board of attached lifting scaffold Active CN218714974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221654166.1U CN218714974U (en) 2022-06-30 2022-06-30 Horizontal truss of scaffold board of attached lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221654166.1U CN218714974U (en) 2022-06-30 2022-06-30 Horizontal truss of scaffold board of attached lifting scaffold

Publications (1)

Publication Number Publication Date
CN218714974U true CN218714974U (en) 2023-03-24

Family

ID=85605899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221654166.1U Active CN218714974U (en) 2022-06-30 2022-06-30 Horizontal truss of scaffold board of attached lifting scaffold

Country Status (1)

Country Link
CN (1) CN218714974U (en)

Similar Documents

Publication Publication Date Title
CN218714974U (en) Horizontal truss of scaffold board of attached lifting scaffold
CN207988561U (en) A kind of pin-connected panel aluminium alloy stair
CN205532243U (en) Electric power overhauls with support of ascending a height
CN215518412U (en) A walking string basket for construction of overpass roof beam
CN206412980U (en) Photovoltaic component frame mounting structure
CN214942223U (en) Full-steel climbing frame with good splicing firmness
CN210369824U (en) Multifunctional scaffold
CN210369632U (en) Assembled stair for building
CN209483205U (en) Aluminium section material for ladder
CN209352400U (en) A kind of construction elevator cable coaster
CN209369205U (en) A kind of stair convenient for assembling
CN208884948U (en) A kind of operating platform
CN207829427U (en) A kind of template is climbed constructing device
CN205857668U (en) The attachment type raise scaffold guide rail attachment device of plate building of wafing for plane
CN216740676U (en) Novel building composite formwork
CN207330091U (en) Escalator glass clamping device
CN210313081U (en) Combined sill support
CN209799410U (en) A bed-jig sliding shoe structure that slides for speed skating pavilion
CN206360631U (en) A kind of multifunctional ladder
CN201484664U (en) Deck of roof overhead helistop
CN205369758U (en) Stair tread
CN215631638U (en) Building site building plank sheathing auxiliary device
CN218176768U (en) Cat ladder is used in high slope construction
CN217496554U (en) Unmanned aerial vehicle retrieves platform ground nail laying device
CN220051657U (en) Sealed installation frock of frame apron on hydroelectric generating set generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant