CN214942223U - Full-steel climbing frame with good splicing firmness - Google Patents

Full-steel climbing frame with good splicing firmness Download PDF

Info

Publication number
CN214942223U
CN214942223U CN202120377216.5U CN202120377216U CN214942223U CN 214942223 U CN214942223 U CN 214942223U CN 202120377216 U CN202120377216 U CN 202120377216U CN 214942223 U CN214942223 U CN 214942223U
Authority
CN
China
Prior art keywords
fixedly connected
material receiving
receiving box
good
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120377216.5U
Other languages
Chinese (zh)
Inventor
孙栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shujie Construction Technology Co ltd
Original Assignee
Shanghai Shujie Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shujie Construction Technology Co ltd filed Critical Shanghai Shujie Construction Technology Co ltd
Priority to CN202120377216.5U priority Critical patent/CN214942223U/en
Application granted granted Critical
Publication of CN214942223U publication Critical patent/CN214942223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model discloses a frame is climbed to full steel that concatenation fastness is good, which comprises a supporting column, the rear side fixedly connected with of support column is dull and stereotyped, the through-hole has been seted up at dull and stereotyped top, dull and stereotyped bottom fixedly connected with connecting plate, the equal fixedly connected with connecting axle in both sides around the connecting plate, the surperficial movable sleeve of connecting axle is equipped with material receiving box, the constant head tank has been seted up on material receiving box's right side, dull and stereotyped bottom fixedly connected with location structure, location structure includes the casing, the inner chamber swing joint of casing has the slide. The utility model discloses a cooperation that sets up support column, flat board, material receiving box, stiffener, through-hole, location structure, constant head tank, connecting axle and connecting plate is used, has solved the lower problem of the full steel of current concatenation fastness good and has climbed the frame security, and this full steel that concatenation fastness is good climbs the frame, possesses the high advantage of security, is worth promoting.

Description

Full-steel climbing frame with good splicing firmness
Technical Field
The utility model relates to a climb frame technical field, specifically be a frame is climbed to full steel that concatenation fastness is good.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, the scaffold is not limited by the height of a building, and manpower and materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The application of full steel creeper in the aspect of building use is more extensive, and current full steel creeper is strong in stability, but its dull and stereotyped surface that is used for the walking deposits silt easily, and after silt and water contact, it is comparatively wet smooth to cause the dull and stereotyped surface that the creeper is used for the walking, and the user is careless slightly, the phenomenon that falls down has probably appeared to the security that has reduced full steel creeper.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a frame is climbed to full steel that concatenation fastness is good possesses the high advantage of security, has solved the lower problem of frame security is climbed to full steel that current concatenation fastness is good.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a frame is climbed to full steel that concatenation fastness is good, includes the support column, the rear side fixedly connected with of support column is dull and stereotyped, the through-hole has been seted up at dull and stereotyped top, dull and stereotyped bottom fixedly connected with connecting plate, the equal fixedly connected with connecting axle in both sides around the connecting plate, the surperficial movable sleeve of connecting axle is equipped with material receiving box, the constant head tank has been seted up on material receiving box's right side, dull and stereotyped bottom fixedly connected with location structure, location structure includes the casing, the inner chamber swing joint of casing has the slide, the right side fixedly connected with slide bar of slide, the surperficial cover of slide bar is equipped with the spring, the right-hand member of slide bar runs through to the right side and the fixedly connected with handle of casing, the left side fixedly connected with locating lever of slide.
Preferably, the number of the support columns is a plurality, and the support columns are uniformly arranged left and right.
Preferably, the surface of the locating rod is matched with the locating groove, and two sides of the spring are respectively contacted with the inner walls of the sliding plate and the shell.
Preferably, the front side and the rear side of the connecting plate are both contacted with the material receiving box, and the through holes are matched with the material receiving box for use.
Preferably, the front surface of the supporting column is fixedly connected with a plurality of reinforcing rods which are distributed in a crossed manner.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation that sets up support column, flat board, material receiving box, stiffener, through-hole, location structure, constant head tank, connecting axle and connecting plate is used, has solved the lower problem of the full steel of current concatenation fastness good and has climbed the frame security, and this full steel that concatenation fastness is good climbs the frame, possesses the high advantage of security, is worth promoting.
2. The utility model increases the stability of the climbing frame during installation by arranging the reinforcing rod;
through setting up connecting plate and connecting axle, the material receiving box of being convenient for is in the same place with dull and stereotyped installation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front sectional view of the present invention;
FIG. 3 is a front sectional view of the material receiving box of the present invention;
fig. 4 is a front sectional view of the positioning structure of the present invention;
fig. 5 is a left partial sectional view of the partial structure of the present invention.
In the figure: the device comprises a support column 1, a flat plate 2, a material receiving box 3, a reinforcing rod 4, a through hole 5, a positioning structure 6, a positioning groove 7, a handle 8, a sliding rod 9, a shell 10, a spring 11, a sliding plate 12, a positioning rod 13, a connecting shaft 14 and a connecting plate 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a support column 1, flat board 2, material receiving box 3, stiffener 4, through-hole 5, location structure 6, constant head tank 7, handle 8, slide bar 9, casing 10, spring 11, slide 12, locating lever 13, connecting axle 14 and connecting plate 15 etc. parts are general standard or the part that technical staff in the field knows, and its structure and principle all can learn through the technical manual or learn through conventional experimental method for technical staff in the field.
Referring to fig. 1-5, an all-steel climbing frame with good splicing firmness comprises a support column 1, a flat plate 2 is fixedly connected to the rear side of the support column 1, a through hole 5 is formed in the top of the flat plate 2, a connecting plate 15 is fixedly connected to the bottom of the flat plate 2, connecting shafts 14 are fixedly connected to the front side and the rear side of the connecting plate 15, a material receiving box 3 is movably sleeved on the surface of the connecting shaft 14, a positioning groove 7 is formed in the right side of the material receiving box 3, a positioning structure 6 is fixedly connected to the bottom of the flat plate 2, the positioning structure 6 comprises a shell 10, a sliding plate 12 is movably connected to the inner cavity of the shell 10, a sliding rod 9 is fixedly connected to the right side of the sliding plate 12, a spring 11 is sleeved on the surface of the sliding rod 9, the right end of the sliding rod 9 penetrates through the right side of the shell 10 and is fixedly connected with a handle 8, and a positioning rod 13 is fixedly connected to the left side of the sliding plate 12;
the number of the support columns 1 is a plurality, and the support columns are uniformly arranged left and right;
the surface of the positioning rod 13 is matched with the positioning groove 7 for use, and two sides of the spring 11 are respectively contacted with the sliding plate 12 and the inner wall of the shell 10;
the front side and the rear side of the connecting plate 15 are both contacted with the material receiving box 3, and the through hole 5 is matched with the material receiving box 3 for use;
the front surface of the support column 1 is fixedly connected with a plurality of reinforcing rods 4, and the reinforcing rods 4 are distributed in a crossed manner;
the reinforcing rod 4 is arranged, so that the stability of the climbing frame during installation is improved;
the connecting plate 15 and the connecting shaft 14 are arranged, so that the material receiving box 3 and the flat plate 2 can be conveniently installed together.
During the use, with this all steel frame of climbing normally install the back, can carry out normal use, when silt or rainwater are stored up at dull and stereotyped 2 top, most silt or rainwater can be saved through the inner chamber that through-hole 5 got into material receiving box 3, avoid dull and stereotyped 2 top to store up more silt rainwater, the emergence of the slippery phenomenon of having reduced, when the silt rainwater in the material receiving box 3 of needs clearance, user stimulates handle 8 right, handle 8 drives slide 12 through slide bar 9 and removes, slide 12 drives the inner chamber of locating lever 13 from constant head tank 7 and breaks away from, user's right-hand member of material receiving box 3 moves down afterwards, convenient to use person takes out inside silt and rainwater, the clearance finishes the back, the position of material receiving box 3 resets, utilize 6 butt joint material box 3 location of location structure.
In summary, the following steps: this frame is climbed to full steel that concatenation fastness is good uses through the cooperation that sets up support column 1, flat board 2, material receiving box 3, stiffener 4, through-hole 5, location structure 6, constant head tank 7, connecting axle 14 and connecting plate 15, has solved the lower problem of the frame security is climbed to full steel that current concatenation fastness is good.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a frame is climbed to full steel that concatenation fastness is good, includes support column (1), its characterized in that: the rear side fixedly connected with flat board (2) of support column (1), through-hole (5) have been seted up at the top of flat board (2), the bottom fixedly connected with connecting plate (15) of flat board (2), both sides are all fixedly connected with connecting axle (14) around connecting plate (15), the surface activity cover of connecting axle (14) is equipped with material receiving box (3), constant head tank (7) have been seted up on the right side of material receiving box (3), the bottom fixedly connected with location structure (6) of flat board (2), location structure (6) include casing (10), the inner chamber swing joint of casing (10) has slide (12), the right side fixedly connected with slide bar (9) of slide (12), the surface cover of slide bar (9) is equipped with spring (11), the right-hand member of slide bar (9) runs through to the right side and the fixedly connected with handle (8) of casing (10), and a positioning rod (13) is fixedly connected to the left side of the sliding plate (12).
2. The all-steel climbing frame with good splicing firmness according to claim 1, is characterized in that: the number of the support columns (1) is a plurality of, and the support columns are uniformly arranged left and right.
3. The all-steel climbing frame with good splicing firmness according to claim 1, is characterized in that: the surface of the positioning rod (13) is matched with the positioning groove (7) for use, and two sides of the spring (11) are respectively contacted with the sliding plate (12) and the inner wall of the shell (10).
4. The all-steel climbing frame with good splicing firmness according to claim 1, is characterized in that: the front side and the rear side of the connecting plate (15) are both contacted with the material receiving box (3), and the through holes (5) are matched with the material receiving box (3) for use.
5. The all-steel climbing frame with good splicing firmness according to claim 1, is characterized in that: the front surface of the supporting column (1) is fixedly connected with reinforcing rods (4), and the number of the reinforcing rods (4) is a plurality of and is in cross distribution.
CN202120377216.5U 2021-02-19 2021-02-19 Full-steel climbing frame with good splicing firmness Active CN214942223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120377216.5U CN214942223U (en) 2021-02-19 2021-02-19 Full-steel climbing frame with good splicing firmness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120377216.5U CN214942223U (en) 2021-02-19 2021-02-19 Full-steel climbing frame with good splicing firmness

Publications (1)

Publication Number Publication Date
CN214942223U true CN214942223U (en) 2021-11-30

Family

ID=79096900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120377216.5U Active CN214942223U (en) 2021-02-19 2021-02-19 Full-steel climbing frame with good splicing firmness

Country Status (1)

Country Link
CN (1) CN214942223U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961310A (en) * 2021-02-20 2022-08-30 上海率捷建筑科技有限公司 All-steel climbing frame convenient to install

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961310A (en) * 2021-02-20 2022-08-30 上海率捷建筑科技有限公司 All-steel climbing frame convenient to install
CN114961310B (en) * 2021-02-20 2024-06-14 上海率捷建筑科技有限公司 All-steel climbing frame convenient to installation

Similar Documents

Publication Publication Date Title
CN214942223U (en) Full-steel climbing frame with good splicing firmness
CN212507262U (en) Scaffold for building with buckle joint structure
CN201439639U (en) multifunctional scaffold
CN210659537U (en) Chemical iron tower basal portion protector
CN218815114U (en) Novel building scaffold
CN213297627U (en) Fireproof rectangular window fixing structure
CN210798231U (en) Combined scaffold convenient for stable climbing
CN212079184U (en) A combination formula safety ladder cage for construction
CN210439951U (en) Intelligent furniture safety ladder of convenient equipment
CN214942222U (en) Climbing frame equipment convenient to install
CN217518091U (en) Working frame for maintaining construction engineering machinery
CN212154061U (en) Multifunctional building support assembly
CN217054268U (en) Climbing frame butt-joint structure suitable for engineering
CN212926963U (en) Scaffold for building construction
CN211257752U (en) Environment-friendly construction steel construction scaffold
CN217268806U (en) Climbing frame structure with cantilever plate
CN220747577U (en) Reinforced steel structure platform
CN217175582U (en) Safety protection supporting platform for municipal engineering construction
CN216446831U (en) Sectional type detachable safety ladder stand
CN216196406U (en) Metal wall fixing device with protection component
CN217480663U (en) Assembled stair
CN217326391U (en) Building engineering climbs a connector
CN214995874U (en) Scaffold convenient to build
CN220015037U (en) Building construction ladder with safeguard function
CN213626584U (en) Heightening device for connection of climbing frame and building structure

Legal Events

Date Code Title Description
GR01 Patent grant