CN114961310B - All-steel climbing frame convenient to installation - Google Patents

All-steel climbing frame convenient to installation Download PDF

Info

Publication number
CN114961310B
CN114961310B CN202110193175.9A CN202110193175A CN114961310B CN 114961310 B CN114961310 B CN 114961310B CN 202110193175 A CN202110193175 A CN 202110193175A CN 114961310 B CN114961310 B CN 114961310B
Authority
CN
China
Prior art keywords
frame
inner cavity
hole
fixedly connected
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110193175.9A
Other languages
Chinese (zh)
Other versions
CN114961310A (en
Inventor
余翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shujie Construction Technology Co ltd
Original Assignee
Shanghai Shujie Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shujie Construction Technology Co ltd filed Critical Shanghai Shujie Construction Technology Co ltd
Priority to CN202110193175.9A priority Critical patent/CN114961310B/en
Publication of CN114961310A publication Critical patent/CN114961310A/en
Application granted granted Critical
Publication of CN114961310B publication Critical patent/CN114961310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses an all-steel climbing frame convenient to install, which comprises a frame, wherein a reinforcing support frame is fixedly connected to the rear side of an inner cavity of the frame, a separation net is fixedly connected to the front side of the inner cavity of the frame, an inserting block is fixedly connected to the surface of the bottom of the frame, positioning holes are formed in two sides of the front surface of the inserting block, and guide sliding grooves are formed in the bottoms of the front side and the rear side of the inner cavity of the positioning holes. According to the invention, the frame, the rotating plate, the positioning hole, the guide sliding chute, the inserting block, the clamping column, the pulling plate, the positioning screw, the inserting groove, the reset spring, the positioning rod, the clamping hole, the sliding groove, the containing hole, the limiting ring groove, the elastic limiting block, the elastic moving column and the pressure spring are matched for use, so that the splicing of the all-steel climbing frame is facilitated, the installation of the all-steel climbing frame is more convenient, and the problem that a great amount of time is consumed in the installation process of the all-steel climbing frame because the all-steel climbing frame cannot be spliced in the use process is solved, and the installation inconvenience is caused.

Description

All-steel climbing frame convenient to installation
Technical Field
The invention relates to the technical field of buildings, in particular to an all-steel climbing frame convenient to install.
Background
In order to improve the security of construction in the building trade need use all-steel to climb the frame, current all-steel climb the frame and in the in-process of using, can not splice the installation for all-steel has consumed a large amount of time in climbing the frame installation, thereby has led to all-steel to climb the frame and has appeared the inconvenient problem of installation, greatly reduced all-steel practicality of climbing the frame.
Disclosure of Invention
The invention aims to provide an all-steel climbing frame convenient to install, which has the advantage of convenient splicing, and solves the problem that the all-steel climbing frame is inconvenient to install because a large amount of time is consumed in the installation process of the all-steel climbing frame because the all-steel climbing frame cannot be spliced and installed in the use process.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides an all steel climbing frame convenient to installation, includes the frame, the rear side fixedly connected with reinforcement support frame of frame inner chamber, the front side fixedly connected with of frame inner chamber separates the net, the fixed surface of frame bottom is connected with the inserted block, the locating hole has all been seted up to the both sides of inserted block front surface, guide spout has all been seted up to the bottom of locating hole inner chamber front side rear side, guide spout inner chamber's bottom runs through the interlude piece, the slot has been seted up on the surface at frame top, the top of frame front surface and back surface all fixedly connected with reset spring, one side fixedly connected with arm-tie that the reset spring kept away from the frame, the fixed surface that the arm-tie is close to frame one side is connected with the locating lever, one side that the locating lever kept away from the arm-tie extends to the inner chamber of slot;
The left top and bottom of the front surface of the frame are fixedly connected with positioning screws, the surface of the positioning screws is in threaded connection with a rotating plate, one side of the front surface of the rotating plate far away from the positioning screws is longitudinally provided with clamping holes in a penetrating way, the left side and the right side of the inner cavity of the clamping holes are provided with sliding grooves, the right top and the bottom of the inner cavity of the frame are provided with storage holes, the utility model discloses a compression spring, including the hole inner chamber of accomodating, the retainer groove has been seted up to the outer lane of accomodating hole inner chamber rear side, accomodate the rear side fixedly connected with pressure spring of hole inner chamber, the front side fixedly connected with of pressure spring and the card post that the card hole cooperation was used, the front side of card post runs through accomodate the hole and extends to the front side of frame, the fixed surface of pressure spring outer lane has the elasticity to remove the post, one side fixedly connected with elasticity stopper that the pressure spring was kept away from to the elasticity removal post.
Preferably, the surface of the insert block is tightly matched with the inner cavity of the slot, the surface of the positioning rod is in sliding contact with the inner cavity of the positioning hole, the surface of one side of the positioning rod, which is far away from the pull plate, is in sliding contact with the inner cavity of the guide chute, and the vertical height of the insert block is the same as the vertical depth of the slot.
Preferably, the longitudinal depth of the guide chute is gradually increased from bottom to top, both sides of the front side and the rear side of the inner cavity of the slot are provided with the inlet and outlet holes, and the inner ring of the inlet and outlet holes is in sliding contact with the surface of the positioning rod.
Preferably, the rotating plate is provided with a threaded hole matched with the positioning screw rod in a penetrating mode, and the inner ring of the threaded hole is connected with the surface of the positioning screw rod through threads.
Preferably, the surface of one side of the elastic limiting block far away from the elastic moving column is in sliding contact with the inner cavity of the limiting ring groove, the outer diameter of the pressure spring and the outer diameter of the clamping column are smaller than the inner diameter of the containing hole, and the surface of the outer ring of the clamping column is in sliding contact with the inner cavity of the clamping hole.
Compared with the prior art, the invention has the following beneficial effects:
1. According to the invention, the frame, the rotating plate, the positioning hole, the guide sliding chute, the inserting block, the clamping column, the pulling plate, the positioning screw, the inserting groove, the reset spring, the positioning rod, the clamping hole, the sliding groove, the containing hole, the limiting ring groove, the elastic limiting block, the elastic moving column and the pressure spring are matched for use, so that the splicing of the all-steel climbing frame is facilitated, the installation of the all-steel climbing frame is more convenient, the problem that a great amount of time is consumed in the installation process of the all-steel climbing frame because the splicing installation cannot be carried out in the use process of the all-steel climbing frame is solved, and the problem that the all-steel climbing frame is inconvenient to install is solved, and the all-steel climbing frame is worthy of popularization.
2. According to the invention, the inserting block can be stored by arranging the inserting grooves, the inserting block can be positioned by matching the positioning rod with the positioning holes, the positioning rod can be guided by the guiding sliding groove, the positioning rod can conveniently move forwards and backwards by passing through the inlet and outlet holes, the rotating plate can conveniently rotate on the surface of the positioning screw rod by the threaded holes, the clamping column can be limited by matching the elastic limiting block, the elastic moving column and the limiting ring groove, and the clamping column can conveniently move forwards and backwards.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a top view of the frame structure of the present invention;
FIG. 3 is a rear view of the rotating plate structure of the present invention;
fig. 4 is an enlarged view of a of fig. 1 according to the present invention.
In the figure: the device comprises a frame 1, a rotating plate 2, a reinforcing support frame 3, a positioning hole 4, a separation net 5, a guide chute 6, an inserting block 7, a clamping column 8, a pulling plate 9, a positioning screw 10, a slot 11, a return spring 12, a positioning rod 13, a clamping hole 14, a threaded hole 15, a sliding groove 16, a storage hole 17, a limit ring groove 18, an elastic limit block 19, an elastic moving column 20 and a pressure spring 21.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-4, an all-steel climbing frame convenient to install comprises a frame 1, wherein a reinforcing support frame 3 is fixedly connected to the rear side of the inner cavity of the frame 1, a separation net 5 is fixedly connected to the front side of the inner cavity of the frame 1, an insert block 7 is fixedly connected to the surface of the bottom of the frame 1, positioning holes 4 are formed in two sides of the front surface of the insert block 7, a guide chute 6 is formed in the bottom of the rear side of the inner cavity of the positioning hole 4, a through-penetration block 7 is arranged at the bottom of the inner cavity of the guide chute 6, a slot 11 is formed in the surface of the top of the frame 1, a reset spring 12 is fixedly connected to the top of the front surface and the rear surface of the frame 1, a pull plate 9 is fixedly connected to a positioning rod 13, one side of the pull plate 13, which is far away from the pull plate 9, extends to the inner cavity of the slot 11, the surface of the insert block 7 is in close fit with the inner cavity of the slot 11, the surface of the positioning rod 13 is in sliding contact with the inner cavity of the positioning hole 4, the surface of one side of the insert block 9 is in sliding contact with the inner cavity of the guide chute 6, the vertical height of the insert block 7 is gradually increased from the inner cavity of the insert block 7 to the inner cavity 7, the vertical depth of the insert block is gradually increased from the inner cavity 7 is matched with the inner cavity 7 through the vertical depth of the insert block 11, and the inner cavity 7 is arranged to the inner cavity 7, and the inner cavity 13 is matched with the inner cavity 7 is arranged to be convenient to be in the front and back through the vertical depth of the inner cavity 7 and the inner cavity 7 is matched with the inner cavity and the inner cavity 7 is;
The top and the bottom of the left side of the front surface of the frame 1 are fixedly connected with a positioning screw rod 10, the surface thread of the positioning screw rod 10 is connected with a rotating plate 2, one side of the front surface of the rotating plate 2, which is far away from the positioning screw rod 10, is longitudinally penetrated and provided with a clamping hole 14, the left side and the right side of the inner cavity of the clamping hole 14 are respectively provided with a sliding groove 16, the top and the bottom of the right side of the inner cavity of the frame 1 are respectively provided with a containing hole 17, the outer ring of the back side of the inner cavity of the containing hole 17 is provided with a limit ring groove 18, the back side of the inner cavity of the containing hole 17 is fixedly connected with a pressure spring 21, the front side of the pressure spring 21 is fixedly connected with a clamping column 8 which is matched with the clamping hole 14, the front side of the clamping column 8 penetrates through the containing hole 17 and extends to the front side of the frame 1, the surface of the outer ring of the pressure spring 21 is fixedly connected with an elastic moving column 20, one side of the elastic moving column 20, which is far away from the pressure spring 21, is fixedly connected with an elastic limit block 19, through the matching use of the frame 1, the rotating plate 2, the positioning hole 4, the guide sliding chute 6, the inserting block 7, the clamping post 8, the pulling plate 9, the positioning screw 10, the slot 11, the reset spring 12, the positioning rod 13, the clamping hole 14, the sliding groove 16, the storage hole 17, the limit ring groove 18, the elastic limit block 19, the elastic moving post 20 and the pressure spring 21, the splicing of the all-steel climbing frame is facilitated, the installation of the all-steel climbing frame is more convenient, the problem that a great deal of time is consumed in the installation process of the all-steel climbing frame because the splicing installation cannot be carried out in the use process of the all-steel climbing frame is solved, the problem that the installation of the all-steel climbing frame is inconvenient is caused, the threaded hole 15 matched with the positioning screw 10 is formed in a penetrating way on the rotating plate 2, the inner ring of the threaded hole 15 is in threaded connection with the surface of the positioning screw 10, the surface of one side of the elastic limit block 19 away from the elastic moving post 20 is in sliding contact with the inner cavity of the limit ring groove 18, the external diameter of the pressure spring 21 and the external diameter of the clamping column 8 are both smaller than the internal diameter of the storage hole 17, the surface of the outer ring of the clamping column 8 is in sliding contact with the inner cavity of the clamping hole 14, the rotating plate 2 is conveniently rotated on the surface of the positioning screw 10 through the threaded hole 15, and the clamping column 8 can be limited through the cooperation of the elastic limiting block 19, the elastic moving column 20 and the limiting ring groove 18, so that the front and back movement of the clamping column 8 is facilitated.
When the vertical installation is used, the all-steel climbing frame is lifted up to insert the insert block 7 at the bottom of the all-steel climbing frame into the slot 11 at the top of the all-steel climbing frame, the guide chute 6 corresponds to the positioning rod 13 in the insertion process, the positioning rod 13 is driven to move outwards in the sliding contact process of the positioning rod 13 and the guide chute 6, the return spring 12 is supported, the pull plate 9 is driven to be far away from the frame 1, and finally the positioning rod 13 enters the positioning hole 4 to finish the vertical installation; during transverse installation, the rotating plate 2 is rotated, so that the rotating plate 2 moves to the front side of the clamping column 8, the clamping column 8 corresponds to the sliding groove 16 in the process, the clamping column 8 moves backwards to compress the pressure spring 21, and the clamping column 8 completely corresponds to the clamping hole 14 and then the clamping column 8 enters the inner cavity of the clamping hole 14 under the reset action of the pressure spring 21.
The various components used in the document of the application are standard components, and can be purchased from the market, and the specific connection modes of the components adopt conventional means such as mature bolts, rivets and welding in the prior art, and the specific description is not made here.
To sum up: this all steel climbs frame convenient to installation is through setting up frame 1, rotor plate 2, locating hole 4, guide chute 6, inserted block 7, card post 8, arm-tie 9, positioning screw 10, slot 11, reset spring 12, locating lever 13, card hole 14, slide groove 16, accomodate hole 17, spacing collar groove 18, elasticity stopper 19, elasticity removes the cooperation of post 20 and pressure spring 21 and uses, has solved all steel and has climbed the frame in the in-process of using, because of can not splice the installation for all steel climbs frame installation in-process has consumed a large amount of time, thereby leads to all steel to climb the frame and appears the inconvenient problem of installation.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated is based on the orientation or positional relationship shown in the drawings, and is merely for convenience in describing the present invention and simplifying the description, and does not indicate or imply that the apparatus or element referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. All-steel climbing frame convenient to installation, including frame (1), its characterized in that: the device is characterized in that a reinforcing support frame (3) is fixedly connected to the rear side of an inner cavity of the frame (1), a separation net (5) is fixedly connected to the front side of the inner cavity of the frame (1), an inserting block (7) is fixedly connected to the surface of the bottom of the frame (1), positioning holes (4) are formed in two sides of the front surface of the inserting block (7), guide sliding grooves (6) are formed in the bottom of the rear side of the front side of the inner cavity of the positioning holes (4), through the block (7) at the bottom of the inner cavity of the guide sliding grooves (6), slots (11) are formed in the surface of the top of the frame (1), return springs (12) are fixedly connected to the tops of the front surface and the back surface of the frame (1), a pulling plate (9) is fixedly connected to one side, which is far away from the frame (1), of the pulling plate (9), of the positioning rod (13) extends to the inner cavity of the slots (11);
The utility model discloses a frame, including frame (1), locating screw (10) are all fixedly connected with in the top and the bottom of frame (1) front surface left side, the surface threaded connection of locating screw (10) has rotating plate (2), clamping hole (14) have been vertically run through to one side of rotating plate (2) and keeping away from locating screw (10), sliding groove (16) have all been seted up to the left and right sides of clamping hole (14) inner chamber, accomodate hole (17) have all been seted up at the top and the bottom on frame (1) inner chamber right side, limit collar groove (18) have been seted up to the outer lane of accomodating hole (17) inner chamber rear side, the rear side fixedly connected with pressure spring (21) of accomodating hole (17) inner chamber, the front side fixedly connected with of pressure spring (21) is with clamping post (8) that the cooperation of clamping hole (14) was used, the front side of clamping post (8) runs through accomodating hole (17) and extends to the front side of frame (1), the fixed surface connection of pressure spring (21) has elasticity removal post (20), elasticity removal post (20) one side of keeping away from pressure spring (19) of stopper.
2. An all-steel climbing frame convenient to install according to claim 1, wherein: the surface of inserted block (7) is closely matched with the inner cavity of slot (11), the surface of locating lever (13) is sliding contact with the inner cavity of locating hole (4), the surface of locating lever (13) one side of keeping away from arm-tie (9) is sliding contact with the inner cavity of guide chute (6), the vertical height of inserted block (7) is the same with the vertical degree of depth of slot (11).
3. An all-steel climbing frame convenient to install according to claim 1, wherein: the longitudinal depth of the guide chute (6) is gradually increased from bottom to top, both sides of the front side and the rear side of the inner cavity of the slot (11) are provided with inlet and outlet holes, and the inner ring of the inlet and outlet holes is in sliding contact with the surface of the positioning rod (13).
4. An all-steel climbing frame convenient to install according to claim 1, wherein: threaded holes (15) matched with the positioning screw rods (10) are formed in the rotating plate (2) in a penetrating mode, and the inner rings of the threaded holes (15) are connected with the surfaces of the positioning screw rods (10) through threads.
5. An all-steel climbing frame convenient to install according to claim 1, wherein: the surface of one side of the elastic limiting block (19) far away from the elastic moving column (20) is in sliding contact with the inner cavity of the limiting ring groove (18), the outer diameter of the pressure spring (21) and the outer diameter of the clamping column (8) are smaller than the inner diameter of the containing hole (17), and the surface of the outer ring of the clamping column (8) is in sliding contact with the inner cavity of the clamping hole (14).
CN202110193175.9A 2021-02-20 2021-02-20 All-steel climbing frame convenient to installation Active CN114961310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110193175.9A CN114961310B (en) 2021-02-20 2021-02-20 All-steel climbing frame convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110193175.9A CN114961310B (en) 2021-02-20 2021-02-20 All-steel climbing frame convenient to installation

Publications (2)

Publication Number Publication Date
CN114961310A CN114961310A (en) 2022-08-30
CN114961310B true CN114961310B (en) 2024-06-14

Family

ID=82971029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110193175.9A Active CN114961310B (en) 2021-02-20 2021-02-20 All-steel climbing frame convenient to installation

Country Status (1)

Country Link
CN (1) CN114961310B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211500456U (en) * 2019-10-15 2020-09-15 黑龙江德誉达实业有限公司 Aluminum alloy burglary-resisting window that security performance is good
CN214942223U (en) * 2021-02-19 2021-11-30 上海率捷建筑科技有限公司 Full-steel climbing frame with good splicing firmness

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004015475A1 (en) * 2004-03-26 2005-10-13 Schüring GmbH & Co. Fenster-Technologie KG Joint hinge for a door or window comprises a first catch element rotatably mounted on the shaft of a screw screwed into the lower end of a hinge pin and secured against rotation, and a compression spring arranged about the screw shaft
CN212129506U (en) * 2020-02-24 2020-12-11 甘肃盛宏建筑工程有限责任公司 Building board convenient to connect
CN112332767A (en) * 2020-11-02 2021-02-05 安徽鑫铂科技有限公司 High-precision solar photovoltaic panel aluminum frame

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211500456U (en) * 2019-10-15 2020-09-15 黑龙江德誉达实业有限公司 Aluminum alloy burglary-resisting window that security performance is good
CN214942223U (en) * 2021-02-19 2021-11-30 上海率捷建筑科技有限公司 Full-steel climbing frame with good splicing firmness

Also Published As

Publication number Publication date
CN114961310A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN114961310B (en) All-steel climbing frame convenient to installation
CN206185445U (en) Press copper device
CN216517250U (en) Gardens rail guard
CN213239544U (en) Agricultural technology promotes and uses soil sampling device
CN218724338U (en) Drainage pipe water yield and water quality monitoring device
CN218917312U (en) Pump flow detection device for ion chromatograph
CN211799969U (en) Absorbing device for hydrolysable fluoride in sulfur hexafluoride gas
CN218623323U (en) Building engineering frame post template reinforcing apparatus based on hospital
CN217033781U (en) Sample introduction auxiliary device of liquid chromatograph
CN216773958U (en) Installation device for building electrical construction
CN221168608U (en) Frame safety protection structure is climbed in construction
CN212321170U (en) Chemical reagent sampling device
CN219035775U (en) PE composite pipeline
CN219801687U (en) Insulating turn-buckle for electric power construction
CN213107349U (en) Wood fire retardant processing is with impregnating device
CN216433600U (en) Sampler for volatile organic compounds in soil
CN212672883U (en) Home security monitoring equipment
CN219645958U (en) Animal doctor uses long handle injection rifle
CN213587414U (en) Cigarette clip
CN215630108U (en) Novel side slope retaining wall supporting construction
CN217226537U (en) Pull rod structure for piston rod on injection molding machine mold
CN215694096U (en) Fixed chemical injection working barrel
CN214449661U (en) Multifunctional accounting voucher binding machine
CN218992427U (en) ABS jacket melt valve
CN211878004U (en) Automatic sample introduction device of heavy oil analysis instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant