CN218714425U - Assembled steel structure for high-rise building - Google Patents

Assembled steel structure for high-rise building Download PDF

Info

Publication number
CN218714425U
CN218714425U CN202222498032.1U CN202222498032U CN218714425U CN 218714425 U CN218714425 U CN 218714425U CN 202222498032 U CN202222498032 U CN 202222498032U CN 218714425 U CN218714425 U CN 218714425U
Authority
CN
China
Prior art keywords
groove
assembled steel
fixedly connected
steel structure
header tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222498032.1U
Other languages
Chinese (zh)
Inventor
张贺臣
郭志杰
王红阳
魏大梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dejiu Construction Engineering Co ltd
Original Assignee
Henan Dejiu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dejiu Construction Engineering Co ltd filed Critical Henan Dejiu Construction Engineering Co ltd
Priority to CN202222498032.1U priority Critical patent/CN218714425U/en
Application granted granted Critical
Publication of CN218714425U publication Critical patent/CN218714425U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an assembled steel construction for high-rise building relates to high-rise building steel construction technical field, specifically is an assembled steel construction for high-rise building, including assembled steel construction main part, the top fixedly connected with of assembled steel construction main part separates the temperature groove, separates the top in temperature groove and is equipped with the sunshading board, separates the both sides fixedly connected with header tank in temperature groove, and the water inlet has been seted up towards one side of sunshading board to the header tank, and the inside of water inlet is equipped with the protection network. This an assembled steel construction for high-rise building, through header tank, collecting vat, reposition of redundant personnel case, the cooperation setting of storing up dirty groove and drain, can deposit heavy debris such as silt dust that mixes in the rainwater in the in-process that uses in storing up dirty inslot, avoid such debris to enter into the drain pipe in and block up the drain pipe, guaranteed unobstructed in the drain pipe in the long-time use, realized simultaneously that to the preliminary sedimentation of rainwater handle, more be convenient for carry out recycle to the rainwater.

Description

Assembled steel structure for high-rise building
Technical Field
The utility model relates to a high-rise building steel construction technical field specifically is an assembled steel construction for high-rise building.
Background
Fabricated steel structure building (Assembled building with steel-structure): the structural system of the building is a fabricated building composed of steel (structural) members, which are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer. The steel structure is easy to rust, and generally the steel structure needs to be derusted, galvanized or painted, and needs to be maintained regularly.
The building plate of steel construction is easy to rust, and the roof of high-rise building often has certain difficulty to its periodic maintenance because the floor is too high when adopting steel building plate. And the steel building board direct contact rainwater and snow of roof can have certain corruption to the roof steel building board, reduces the life of steel building board, and high temperature in summer, and the direct exposure of sun steel building board can make its temperature rise bring the not good life experience for the resident, and in the region or season that the rainwater is more, the rainwater of its top gathering usually passes through the drain pipe and discharges, and the collection that can not be fine utilizes the rainwater, leads to the waste of resource, for this reason, we provide the assembled steel structure of high-rise building structure system.
The assembled steel structure of a high-rise building structure system that discloses in chinese utility model patent application publication specification CN 213837391U, though this utility model discloses a through be equipped with the collection device who collects the rainwater on high-rise building's roof, make the rainwater can the reutilization, the water economy resource, and through be equipped with the sunshading board on roof steel building board, avoided roof steel building board direct contact rainwater to lead to its corruption or the direct exposure of sun roof steel building board makes its temperature rise bring not good life experience for the resident, but this utility model the silt of roof is along with during the rainwater together enters into rainwater collection system when carrying out the rainwater collection, cause blocking phenomenon easily, influence normal use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an assembled steel construction for high-rise building has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides an assembled steel structure for high-rise building, includes assembled steel structure main part, assembled steel structure main part's top fixedly connected with separates the temperature groove, the top that separates the temperature groove is equipped with the sunshading board, separate the both sides fixedly connected with header tank of temperature groove, the water inlet has been seted up towards one side of sunshading board to the header tank, the inside of water inlet is equipped with the protection network, the both sides that the side of header tank is located the water inlet are equipped with coupling mechanism, the mouth of a river has been seted up down to the bottom of header tank, the lower fixed surface of header tank is connected with the collecting vat, the bottom fixedly connected with of collecting vat shunts the case, it has the drain pipe to peg graft in one side of shunting the case, the other end of shunting the case is equipped with stores up dirty groove, the bottom of shunting case side is equipped with the drain that is linked together with storing up dirty groove.
Optionally, a plurality of transverse and longitudinal heat insulation supporting plates are arranged inside the heat insulation groove, two ends of each transverse heat insulation supporting plate are fixedly connected to the side wall of the inner surface of the heat insulation groove, and the top of each longitudinal heat insulation supporting plate is abutted to the lower surface of the sun shield.
Optionally, the middle of the sun shield is raised upwards, the two ends of the sun shield are inclined downwards, and the bottom height of the water inlet corresponds to the lowest position of the inclined planes at the two ends of the sun shield.
Optionally, the connecting mechanism includes a connecting mounting groove, a connecting insertion rod is inserted into the connecting mounting groove, a reset baffle is fixedly connected to the outer surface of the connecting insertion rod, an elastic rod is fixedly connected to the vertical side surface of the reset baffle, and the other end of the elastic rod abuts against the side wall of the inner surface of the connecting mounting groove.
Optionally, a connecting slot is formed in the side face of the protective net, one end of the connecting inserted rod penetrates through the side wall of the water collecting tank and is inserted into the connecting slot, and the connecting inserted rod is in clearance fit with the connecting slot.
Optionally, the bottom of reposition of redundant personnel case is the inclined plane setting, just the lower one end in reposition of redundant personnel bottom of the case inclined plane is located the homonymy with storing up dirty groove, store up the height that highly is higher than the drain pipe at dirty groove top, fixedly connected with prevents stifled groove on the lateral wall of reposition of redundant personnel incasement surface, prevent that the opening in stifled groove sets up down, just fixedly connected with filter screen in the opening in the stifled groove.
(III) advantageous effects
The utility model provides an assembled steel construction for high-rise building possesses following beneficial effect:
1. this an assembled steel construction for high-rise building, through the header tank, the collecting vat, the flow distribution box, store up dirty groove and drain's cooperation setting, can deposit heavy debris such as muddy silt dust in the rainwater in storing up dirty inslot at the in-process that uses, avoid this kind of debris to enter into the drain pipe and block up the drain pipe, guaranteed unobstructed in the drain pipe in the long-time use, realized simultaneously and carried out recycle to the preliminary sedimentation of rainwater, more be convenient for to the rainwater.
2. This an assembled steel construction for high-rise building through the setting of protection network, can avoid great debris to enter into the header tank at the in-process that uses, influences the normal flow of the inside rainwater of header tank, through the reposition of redundant personnel case, prevents the cooperation setting of stifled groove and filter screen, guarantees to avoid the muddy water that the rainfall initial stage contains more dust to drop on the filter screen and cause the jam when can carrying out filterable to the rainwater at the in-process that uses.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic side sectional view of the thermal insulation tank of the present invention;
FIG. 3 is a front sectional view of the flow distribution box of the present invention;
fig. 4 is a schematic structural diagram of a section view of the utility model a.
In the figure: 1. an assembled steel structural body; 2. a thermal insulation groove; 201. a thermally insulating support plate; 3. a sun visor; 4. a water collection tank; 5. a water inlet; 6. a protective net; 601. connecting the slots; 7. a connecting mechanism; 701. connecting the mounting groove; 702. connecting the inserted link; 703. resetting the baffle; 704. an elastic rod; 8. a water outlet; 9. collecting tank; 10. a shunt box; 1001. anti-blocking grooves; 1002. a filter screen; 11. a drain pipe; 12. a sewage storage tank; 13. a sewage draining outlet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: an assembly type steel structure for high-rise buildings comprises an assembly type steel structure main body 1, a heat insulation groove 2 is fixedly connected to the top of the assembly type steel structure main body 1, a plurality of transverse and longitudinal heat insulation supporting plates 201 are arranged inside the heat insulation groove 2, two ends of each transverse heat insulation supporting plate 201 are fixedly connected to the side wall of the inner surface of the heat insulation groove 2, the top of each longitudinal heat insulation supporting plate 201 is abutted to the lower surface of a sun shield 3, a sun shield 3 is arranged at the top of the heat insulation groove 2, the middle of each sun shield 3 protrudes upwards, two ends of each sun shield are inclined planes which incline downwards, the bottom height of each water inlet 5 corresponds to the lowest position of the inclined planes at the two ends of each sun shield 3, water collecting tanks 4 are fixedly connected to two sides of the heat insulation groove 2, one side of each water collecting tank 4, facing the sun shield 3, is provided with a water inlet 5, protective nets 6 are arranged inside the water inlet 5, and connecting mechanisms 7 are arranged on two sides of the side faces of the water inlet 5, the connecting mechanism 7 comprises a connecting installation groove 701, a connecting inserted bar 702 is inserted in the connecting installation groove 701, a reset baffle 703 is fixedly connected to the outer surface of the connecting inserted bar 702, an elastic bar 704 is fixedly connected to the vertical side surface of the reset baffle 703, the other end of the elastic bar 704 is abutted to the side wall of the inner surface of the connecting installation groove 701, a connecting slot 601 is arranged on the side surface of the protective net 6, one end of the connecting inserted bar 702 penetrates through the side wall of the water collecting tank 4 and is inserted in the connecting slot 601, the connecting inserted bar 702 is in clearance fit with the connecting slot 601, a water outlet 8 is arranged at the bottom of the water collecting tank 4, a collecting tank 9 is fixedly connected to the lower surface of the water collecting tank 4, a flow distribution tank 10 is fixedly connected to the bottom of the collecting tank 9, the bottom of the flow distribution tank 10 is arranged in an inclined plane, the lower end of the inclined plane at the bottom of the flow distribution tank 10 is positioned at the same side as the sewage storage tank 12, and the top of the sewage storage tank 12 is higher than the height of the drain pipe 11, fixedly connected with prevents stifled groove 1001 on the lateral wall of reposition of redundant personnel case 10 internal surface, prevents that the opening of stifled groove 1001 sets up down, and prevents fixedly connected with filter screen 1002 in the opening of stifled groove 1001, and one side of reposition of redundant personnel case 10 is pegged graft and is had drain pipe 11, and the other end of reposition of redundant personnel case 10 is equipped with stores up dirty groove 12, and the bottom of reposition of redundant personnel case 10 side is equipped with the drain 13 that is linked together with storing up dirty groove 12.
During the use, sunshading board 3 can avoid external sunshine to penetrate the roof of building directly, and when rainfall drainage is inside with rainwater drainage to header tank 4, because sunshading board 3 establishes in no protection environment, debris such as dust and dust can be piled up to its surface unavoidably, at the early stage of rainfall, rainwater and debris mix and form the muddy water that contains more impurity, protection network 6 can block the great impurity that mixes in the muddy water in the external world, the muddy water passes through inlet 8 and gets into in collecting tank 9 afterwards, gather together by collecting tank 9 and flow into reposition of redundant personnel case 10 in, the muddy water that contains more impurity at the early stage of rainfall falls on the inclined plane of reposition of redundant personnel case 10 bottom flows into dirt storage tank 12 through drain 13 after, along with going on of rainfall, reposition of redundant personnel case 10 and the water level in dirt storage tank 12 rise, the comparatively clean muddy water of later stage is through the filtration of filter screen 1002 outwards discharge through drain pipe 11, get into the rainwater collection system of additional configuration, recycle to the rainwater belongs to current conventional technology, give redundant details here, because the opening of blockage prevention groove 1001 sets up, can avoid debris to form in addition the rainwater drainage pipe 11, rainwater is no longer accumulated in the preferential drainage pipe, the filter screen 11, the rainwater drainage pipe 11 is in the top is guaranteed to be too much.
To sum up, the utility model discloses a cooperation setting of header tank 4, collecting vat 9, flow divider box 10, storing up dirty groove 12 and drain 13 can deposit the heavy debris such as silt dust that mix in the rainwater in storing up dirty groove 12 in the in-process of using, avoids such debris to enter into drain pipe 11 and blocks up drain pipe 11, has guaranteed the unobstructed in the drain pipe 11 in the long-time use, has realized the preliminary sedimentation treatment to the rainwater simultaneously, more is convenient for recycle the rainwater; through the setting of protection network 6, can avoid great debris to enter into header tank 4 at the in-process that uses, influence the normal flow of the inside rainwater of header tank 4, through reposition of redundant personnel case 10, prevent that the cooperation of stifled groove 1001 and filter screen 1002 sets up, guarantee to avoid the muddy water that the rainfall initial stage contains more dust to drop on filter screen 1002 and cause the jam when can carrying out filterable to the rainwater at the in-process that uses.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. An assembled steel structure for high-rise buildings, comprising an assembled steel structure body (1), characterized in that: the top fixedly connected with of assembled steel structure main part (1) separates warm groove (2), the top that separates warm groove (2) is equipped with sunshading board (3), separate both sides fixedly connected with header tank (4) of warm groove (2), water inlet (5) have been seted up towards one side of sunshading board (3) in header tank (4), the inside of water inlet (5) is equipped with protection network (6), the both sides that the side of header tank (4) is located water inlet (5) are equipped with coupling mechanism (7), mouth of a river (8) down have been seted up to the bottom of header tank (4), the lower fixed surface of header tank (4) is connected with collecting vat (9), the bottom fixedly connected with collecting vat (10) of collecting vat (9), peg graft and have drain pipe (11) in one side of dividing vat (10), the other end of dividing vat (10) is equipped with stores up dirty groove (12), the bottom of dividing vat (10) side is equipped with drain (13) that are linked together with storing up dirty groove (12).
2. The assembled steel structure for high-rise buildings according to claim 1, wherein: the novel sun visor is characterized in that a plurality of transverse and longitudinal heat insulation supporting plates (201) are arranged inside the heat insulation groove (2), two ends of each transverse heat insulation supporting plate (201) are fixedly connected to the side wall of the inner surface of the heat insulation groove (2), and the top of each longitudinal heat insulation supporting plate (201) is abutted to the lower surface of the sun visor (3).
3. An assembled steel structure for high-rise buildings according to claim 1, wherein: the middle part of the sun shield (3) protrudes upwards, the two ends of the sun shield are inclined surfaces inclining downwards, and the bottom height of the water inlet (5) corresponds to the lowest position of the inclined surfaces at the two ends of the sun shield (3).
4. The assembled steel structure for high-rise buildings according to claim 1, wherein: the connecting mechanism (7) comprises a connecting installation groove (701), a connecting inserted bar (702) is inserted into the connecting installation groove (701), a reset baffle (703) is fixedly connected to the outer surface of the connecting inserted bar (702), an elastic bar (704) is fixedly connected to the vertical side face of the reset baffle (703), and the other end of the elastic bar (704) abuts against the side wall of the inner surface of the connecting installation groove (701).
5. An assembled steel structure for high-rise buildings according to claim 4, wherein: the side of the protective net (6) is provided with a connecting slot (601), one end of the connecting inserted rod (702) penetrates through the side wall of the water collecting tank (4) and is inserted into the connecting slot (601), and the connecting inserted rod (702) is in clearance fit with the connecting slot (601).
6. The assembled steel structure for high-rise buildings according to claim 1, wherein: the bottom of flow distribution box (10) is the inclined plane setting, just the lower one end in flow distribution box (10) bottom inclined plane is located the homonymy with storing up dirty groove (12), store up the height that highly is higher than drain pipe (11) at dirty groove (12) top, fixedly connected with prevents stifled groove (1001) on the lateral wall of flow distribution box (10) internal surface, prevent that the opening of stifled groove (1001) sets up down, just fixedly connected with filter screen (1002) in the opening of preventing stifled groove (1001).
CN202222498032.1U 2022-09-21 2022-09-21 Assembled steel structure for high-rise building Active CN218714425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222498032.1U CN218714425U (en) 2022-09-21 2022-09-21 Assembled steel structure for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222498032.1U CN218714425U (en) 2022-09-21 2022-09-21 Assembled steel structure for high-rise building

Publications (1)

Publication Number Publication Date
CN218714425U true CN218714425U (en) 2023-03-24

Family

ID=85635230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222498032.1U Active CN218714425U (en) 2022-09-21 2022-09-21 Assembled steel structure for high-rise building

Country Status (1)

Country Link
CN (1) CN218714425U (en)

Similar Documents

Publication Publication Date Title
JP2012107451A (en) Rainwater storage structure and rainwater circulation system using the same
CN111411744A (en) Roof structure for sponge city
CN218714425U (en) Assembled steel structure for high-rise building
CN208105043U (en) A kind of bridge drainage system
CN104074233B (en) The outdoor water-storing device of Multifunctional ecotype
CN216339997U (en) Rainwater grate capable of automatically adjusting drainage
CN216239414U (en) Ecological environmental protection cast-in-place steel-concrete structure green building of ZK
CN206052854U (en) A kind of skyscraper rainwater utilization system
CN212841936U (en) Greening building outer facade convenient for overhauling air conditioner outer unit
CN213837391U (en) Assembled steel structure of high-rise building structure system
CN214423796U (en) Building drainage structure capable of avoiding water accumulation
CN215211961U (en) Landscape rainwater collection device
CN212876873U (en) Building outer wall greening structure
CN111732212A (en) Be used for green ecosystem in sponge city roof
CN217680076U (en) Municipal works take drainage structures roof certainly
CN213448754U (en) Composite energy dissipation facility
CN216292287U (en) Building roof green planting structure
CN219840283U (en) Traceless hidden drainage structure of building roof
CN218911260U (en) A keep off drainage structures for subway station access & exit
CN213359152U (en) Steel construction canopy
CN218580673U (en) Safety protection mechanism with drainage function
CN218028506U (en) Full light concrete heat preservation floor structure
CN218117000U (en) Roof waterproof structure
CN210288912U (en) Roof rainwater collecting structure
CN220725147U (en) Slope protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant