CN218712953U - Anchor rod construction device for constructional engineering - Google Patents

Anchor rod construction device for constructional engineering Download PDF

Info

Publication number
CN218712953U
CN218712953U CN202223007467.8U CN202223007467U CN218712953U CN 218712953 U CN218712953 U CN 218712953U CN 202223007467 U CN202223007467 U CN 202223007467U CN 218712953 U CN218712953 U CN 218712953U
Authority
CN
China
Prior art keywords
fixedly connected
universal seat
anchor
casing body
rubber ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223007467.8U
Other languages
Chinese (zh)
Inventor
李欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223007467.8U priority Critical patent/CN218712953U/en
Application granted granted Critical
Publication of CN218712953U publication Critical patent/CN218712953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, and discloses an anchor rod construction device for constructional engineering, which comprises a rubber sleeve I, wherein the bottom of the rubber sleeve I is fixedly connected with a buffer mechanism; buffer gear includes first universal seat, the universal seat of second, spring one, the main casing body, rubber snare two and slip shell, main casing body lateral wall fixedly connected with rubber snare two, the first universal seat of main casing body inside wall rear portion fixedly connected with annular array, the equal fixedly connected with one end of slip shell in first universal seat front end, the front portion fixedly connected with annular array's the universal seat of second of main casing body inside wall. The utility model discloses in, reached the effect of buffering through the cooperation between first universal seat, the universal seat of second, spring one, the main casing body, rubber snare two, the slip shell, solved and probably produced when the construction is used and collide and lead to the device skew, influence the problem of construction progress.

Description

Anchor rod construction device for constructional engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to an anchor rod construction equipment that building engineering used.
Background
The construction is a production activity which is carried out by people in a certain space and time according to a specific design blueprint by utilizing various building materials and mechanical equipment, the requirement on the basic construction of the building is higher and higher along with the development of the building towards a higher trend, an anchor rod is one of important building materials for foundation pit construction, the anchor rod directly influences the quality of the foundation pit, and how to improve the pulling-resistant bearing capacity of the anchor rod is an important factor for reducing the using amount of the anchor rod and improving the quality of the foundation pit.
However, the existing anchor rod has certain disadvantages that the device is likely to deviate due to collision during construction and use, the construction progress is affected, the anchor head part of the existing anchor rod cannot be detached, the subsequent anchor rod cannot be replaced, and the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing an anchor rod construction device for constructional engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme: an anchor rod construction device for constructional engineering comprises a rubber ring sleeve I, wherein a buffer mechanism is fixedly connected to the bottom of the rubber ring sleeve I;
buffer gear includes first universal seat, the universal seat of second, spring one, the main casing body, rubber snare two and slip shell, main casing body lateral wall fixedly connected with rubber snare two, the first universal seat of main casing body inside wall rear portion fixedly connected with annular array, the one end of the equal fixedly connected with slip shell of first universal seat front end, the universal seat of the second of the anterior fixedly connected with annular array of main casing body inside wall, the universal seat front end of second all slides inside the slip shell, all be provided with spring one in the slip shell.
As a further description of the above technical solution:
the middle of the rubber ring sleeve is in threaded connection with an anchor main rod, the top of the anchor main rod is fixedly connected with a connecting plate, and the middle upper portion of the outer side wall of the anchor main rod is in threaded connection with a nut.
As a further description of the above technical solution:
the outer side wall of the connecting disc is fixedly connected with bilaterally symmetrical rotating rods, and a shell is arranged on one outer side wall of the rubber ring sleeve.
As a further description of the above technical solution:
the anchor rod bottom is provided with the anchor head, the anchor rod bottom is provided with the recess.
As a further description of the above technical solution:
the anchor head top is provided with the spout, the inside sliding connection of spout has bilateral symmetry to hold between the fingers the pole.
As a further description of the above technical solution:
the opposite side of the pinching rod is fixedly connected with a linkage block, and the opposite side of the linkage block is fixedly connected with a clamping block.
As a further description of the above technical solution:
and a second spring is fixedly connected between the linkage blocks in bilateral symmetry.
As a further description of the above technical solution:
the linkage block slides in the groove.
The utility model discloses following beneficial effect has:
1. the utility model discloses in, at first reached the effect of buffering through the cooperation between first universal seat, the universal seat of second, spring one, the main casing body, rubber snare two, the slip shell, solved and probably produced when the construction is used and collide and lead to the device skew, influence the problem of construction progress.
2. The utility model discloses in, cooperation through linkage piece, spring two, fixture block, hold between the fingers pole, spout, anchor head has reached the effect of changing, and the current stock anchor head position of problem solved can't be dismantled, leads to its successor can't change, the comparatively inconvenient problem during the use.
Drawings
Fig. 1 is a schematic perspective view of an anchor rod constructing apparatus for construction engineering according to the present invention;
fig. 2 is a schematic structural view of an anchor head of the anchor rod construction device for construction engineering provided by the utility model;
fig. 3 is the utility model provides a stock construction equipment's for building engineering buffer gear schematic diagram.
Illustration of the drawings:
1. a rubber ring is sleeved with a first ring; 2. a buffer mechanism; 201. a first universal seat; 202. a second gimbal base; 203. a first spring; 204. a main housing; 205. a second rubber ring is sleeved; 206. a slide case; 3. an anchor main rod; 4. a nut; 5. a connecting disc; 6. a rotating rod; 7. an anchor head; 8. a housing; 9. a chute; 10. a linkage block; 11. a clamping block; 12. pinching a rod; 13. and a second spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: an anchor rod construction device for constructional engineering comprises a rubber ring I1, wherein the bottom of the rubber ring I1 is fixedly connected with a buffer mechanism 2;
the buffer mechanism 2 comprises a first universal seat 201, a second universal seat 202, a first spring 203, a main shell 204, a second rubber ring 205 and a sliding shell 206, when the anchor rod 3 is driven into the ground, impact is likely to occur, when impact occurs, the sliding shell 206 rotates around the first universal seat 201, the second rubber ring 205 is fixedly connected to the outer side wall of the main shell 204, the first universal seat 201 in an annular array is fixedly connected to the rear portion of the inner side wall of the main shell 204, one end of the sliding shell 206 is fixedly connected to the front end of the first universal seat 201, the second universal seat 202 in the annular array is fixedly connected to the front portion of the inner side wall of the main shell 204, the front end of the second universal seat 202 slides in the sliding shell 206 to extrude the first spring 203, the first universal seat 201 and the second universal seat 202 can convert force to multiple directions to offset the force, the buffer effect is achieved, the front end of the second universal seat 202 slides in the sliding shell 206, the first spring 203 is arranged in the sliding shell 206, the outer shell 8 and the second rubber ring 205 play a role in trapping the rubber ring 1 and the main shell 204 in buffering effect, and the buffer effect that construction process of impact and the construction process is likely to be caused.
The middle of the rubber ring I1 is in threaded connection with the anchor main rod 3, the top of the anchor main rod 3 is fixedly connected with a connecting disc 5, the middle upper portion of the outer side wall of the anchor main rod 3 is in threaded connection with a nut 4, the rotating rods 6 of bilateral symmetry of the outer side wall of the connecting disc 5 are fixedly connected with the outer shell 8, the bottom of the anchor main rod 3 is provided with an anchor head 7, the bottom of the anchor main rod 3 is provided with a groove, the top of the anchor head 7 is provided with a sliding groove 9, the sliding rods 12 of bilateral symmetry are connected inside the sliding groove 9 in a sliding mode, when the anchor head 7 needs to be replaced, the two sides of the clamping rods 12 are pinched, the linkage blocks 10 are fixedly connected with the relative one side of the clamping rods 12, the linkage blocks 10 are squeezed by the pinching rods 12, the fixture blocks 11 are fixedly connected with the opposite sides of the linkage blocks 10, the springs two 13 are fixedly connected between the linkage blocks 10 of the bilateral symmetry, the springs are squeezed into the grooves 13 at the bottom of the anchor main rod 3, the clamping rods 12 are loosened, the spring rebounding fixture blocks 11 are clamped into the small inner grooves, locking is completed, the quick replacement effect is achieved, and the linkage blocks 10 slide in the grooves.
The working principle is as follows: when the anchor head 7 needs to be replaced, the two-side pinching rods 12 are pinched, the pinching rods 12 squeeze the linkage block 10, the linkage block 10 moves to squeeze the second spring 13, the second spring 13 is clamped into a groove in the bottom of the main anchor rod 3, the pinching rods 12 are loosened, the second spring 13 rebounding clamping block 11 is clamped into a small inner groove, locking is achieved, and the effect of quick replacement is achieved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. The utility model provides an anchor rod construction equipment that building engineering used, includes rubber ring cover one (1), its characterized in that: the bottom of the rubber ring sleeve I (1) is fixedly connected with a buffer mechanism (2);
buffer gear (2) include first universal seat (201), the universal seat of second (202), spring (203), the main casing body (204), rubber ring cover two (205) and slip shell (206), main casing body (204) lateral wall fixedly connected with rubber ring cover two (205), the first universal seat (201) of the main casing body (204) inside wall rear portion fixedly connected with annular array, the equal fixedly connected with one end of slip shell (206) of first universal seat (201) front end, the anterior fixedly connected with annular array's of the universal seat of second (202) of the main casing body (204) inside wall front portion, the universal seat of second (202) front end all slides inside slip shell (206), all be provided with spring (203) in slip shell (206).
2. A rock bolt working apparatus for construction work according to claim 1, wherein: the middle part of the rubber ring sleeve I (1) is in threaded connection with an anchor main rod (3), the top of the anchor main rod (3) is fixedly connected with a connecting disc (5), and the middle upper part of the outer side wall of the anchor main rod (3) is in threaded connection with a nut (4).
3. A rock bolt working apparatus for constructional engineering as claimed in claim 2, wherein: the outer side wall of the connecting disc (5) is fixedly connected with bilaterally symmetrical rotating rods (6), and the outer side wall of the rubber ring sleeve (1) is provided with a shell (8).
4. A rock bolt working apparatus for construction work according to claim 2, wherein: an anchor head (7) is arranged at the bottom of the anchor main rod (3), and a groove is formed in the bottom of the anchor main rod (3).
5. A rock bolt construction device for building engineering according to claim 4, wherein: the anchor head (7) top is provided with spout (9), spout (9) inside sliding connection have bilateral symmetry hold between the fingers pole (12).
6. An anchor rod constructing device for construction engineering according to claim 5, wherein: the opposite side of the pinching rod (12) is fixedly connected with a linkage block (10), and the opposite side of the linkage block (10) is fixedly connected with a clamping block (11).
7. A rock bolt working apparatus for construction work according to claim 6, wherein: a second spring (13) is fixedly connected between the linkage blocks (10) which are bilaterally symmetrical.
8. A rock bolt working apparatus for constructional engineering as claimed in claim 6, wherein: the linkage block (10) slides in the groove.
CN202223007467.8U 2022-11-11 2022-11-11 Anchor rod construction device for constructional engineering Active CN218712953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223007467.8U CN218712953U (en) 2022-11-11 2022-11-11 Anchor rod construction device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223007467.8U CN218712953U (en) 2022-11-11 2022-11-11 Anchor rod construction device for constructional engineering

Publications (1)

Publication Number Publication Date
CN218712953U true CN218712953U (en) 2023-03-24

Family

ID=85614139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223007467.8U Active CN218712953U (en) 2022-11-11 2022-11-11 Anchor rod construction device for constructional engineering

Country Status (1)

Country Link
CN (1) CN218712953U (en)

Similar Documents

Publication Publication Date Title
CN206587817U (en) A kind of Traditional Chinese medicine tamping machine
CN215977411U (en) Building foundation construction shock isolation device
CN218712953U (en) Anchor rod construction device for constructional engineering
CN210181087U (en) Test fixture for flexible package cylindrical lithium ion battery
CN209958818U (en) Reinforcing apparatus of ancient building
CN209550307U (en) A kind of anode plate apparatus for bending
CN214943978U (en) Drilling equipment is used in municipal administration public works construction
CN214263737U (en) Hollow guide arm of reaming formula
CN210265482U (en) Roller wheel bracket
CN212557640U (en) Computer display protector
CN210586378U (en) Stable clamping device for roller production
CN210974908U (en) USB surface treatment electroplating device
CN209895522U (en) Anti-falling English teaching repeater with strong capacity
CN209735672U (en) Cone crusher buffer
CN211007125U (en) Civil engineering antidetonation composite set
CN214863646U (en) Low-loss sample bottle
CN210767223U (en) Steel structure node device applying BIM technology
CN216256037U (en) Special portable measuring device of architectural design
CN210264551U (en) Adjusting device convenient for positioning of frame column type hydraulic drilling machine
CN210270659U (en) Separated portable electronic engineering computer
CN218883560U (en) Air quality monitoring display device in city park
CN216842843U (en) Novel nitrogen spring of guide structure
CN210316496U (en) Bottom seamless connecting piece for attached lifting scaffold
CN219671662U (en) Building steel structure connecting device
CN215214286U (en) High-adaptability stable buffering bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant