Prior art keywords
pile body
sheet pile
pressure water
lower sheet
picture peg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222232846.0U
Other languages
Chinese (zh)
Inventor
鲍华
王尔雷
田光清
王程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengyu Construction Group Co ltd
Original Assignee
Hengyu Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengyu Construction Group Co ltd filed Critical Hengyu Construction Group Co ltd
Priority to CN202222232846.0U priority Critical patent/CN218712597U/en
Application granted granted Critical
Publication of CN218712597U publication Critical patent/CN218712597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an automatic receive dirty water conservancy picture peg stake, include: the lower sheet pile comprises a lower sheet pile body and an upper sheet pile body, wherein a containing cavity matched with the upper sheet pile body is formed inside the lower sheet pile body; the high-pressure water component is arranged inside the lower sheet pile body and the upper sheet pile body and is arranged at the central positions of the lower sheet pile body and the upper sheet pile body; and the slurry discharge assembly is arranged inside the lower sheet pile body and the upper sheet pile body. The utility model can discharge the mud generated during installation when the lower inserting plate pile body is installed, thereby avoiding the mud from flowing back upwards around the lower inserting plate pile body, destroying the original stratum and landform around and being beneficial to the environmental protection; simultaneously lower picture peg body and last picture peg body can clear away the floater on the surface of water when using, reduce the floater to the pollution in waters, save labour's expenditure, improve the efficiency that the floater was salvaged.

Description

Automatic receive dirty water conservancy picture peg stake
Technical Field
The utility model relates to an inserted sheet pile technical field especially relates to an automatic receive dirty water conservancy inserted sheet pile.
Background
The water conservancy sheet inserting pile is used for water conservancy project construction such as reservoirs, dykes and water gates, not only can construction efficiency be effectively improved, but also engineering construction quality can be improved, and the method has important application significance. In the construction process of the existing water conservancy sheet pile, when high-pressure water is used for driving the water conservancy sheet pile from the middle of the water conservancy sheet pile, silt can be entrained by the water, and then the silt can upwards flow back around the sheet pile, so that the bottom layer and the landform are damaged; meanwhile, a plurality of floating objects are often arranged in the river channel, if the floating objects are not timely treated, the attractiveness of the water surface is affected, the water area is greatly polluted, manual salvage is adopted, the working strength is high, the salvage efficiency is low, and therefore the water conservancy spile pile capable of automatically collecting the pollutants is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing an automatic dirt collecting water conservancy inserting plate pile.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an automatic collect dirty water conservancy picture peg stake includes: the pile comprises a lower sheet pile body and an upper sheet pile body, wherein a containing cavity matched with the upper sheet pile body is formed inside the lower sheet pile body; the high-pressure water component is arranged inside the lower sheet pile body and the upper sheet pile body and is arranged in the central positions of the lower sheet pile body and the upper sheet pile body; the slurry discharging components are arranged inside the lower sheet pile body and the upper sheet pile body and arranged on two sides of the high-pressure water component; and the dirt collecting assembly is arranged outside the upper sheet pile body and is positioned on the upper part outside the upper sheet pile.
The utility model provides an automatic receive dirty water conservancy picture peg stake of aspect embodiment includes lower picture peg stake body, go up the picture peg stake body, accomodate the chamber, high pressure water components, mud discharge assembly and filth collection subassembly, can install the assigned position with lower picture peg stake body through high pressure water components, can discharge the mud that produces behind the letting in high pressure water through mud discharge assembly, and the filth collection subassembly then can be with going up picture peg stake body and lower picture peg stake body when using, collect the floater of the surface of water, reduce the pollution of floater to quality of water.
The above technical solution further comprises:
preferably, go up the sheet pile body with sliding connection between the sheet pile body down, go up the sheet pile body with it is sealed down between the sheet pile body, can avoid water to get into the intracavity of accomodating between sheet pile body and the sheet pile body down.
Preferably, the high pressure water assembly comprises: the high-pressure water channel penetrates through the upper inserting plate pile body; the communicating pipe is connected to the inside of the containing cavity and is in sliding connection with the high-pressure water channel; the high-pressure water jet hole is formed in the bottom of the lower inserting plate pile body, a hole for enabling the communicating pipe to be communicated with the high-pressure water jet hole is formed in the lower inserting plate pile body, high-pressure water is introduced through the high-pressure water channel, and stratum silt is removed under the action of the high-pressure water jet hole, so that the lower inserting plate pile body gradually sinks in a river channel until the lower inserting plate pile body is installed at a specified position.
Preferably, the mud discharge assembly comprises: the two slurry discharge channels symmetrically penetrate through the upper inserting plate pile body; the two slurry discharge pipes are connected inside the containing cavity and are in sliding connection with the slurry discharge channel; the two submersible pumps are connected to the insides of the two mud discharge pipes; two effluent water ponds set up the bottom of picture peg body down, the inside of picture peg body is offered and is used for making down the mud discharge pipe with the hole that the effluent water pond is linked together, the mud that the picture peg body produced in the installation then stays in the effluent water pond down, under the effect of immersible pump, discharges mud, avoids mud upwards to flow backward around the picture peg body down, reduces the destruction that causes original stratum, landform on every side.
Preferably, the bottom of lower picture peg body symmetry is provided with the sprayer, both sides the sprayer with rotate jointly between the high pressure water jet hole and be connected with the spiral leaf, the spiral leaf is located the inside of effluent water sump, and the spiral leaf can stir the inside mud of effluent water sump, avoids the inside mud of effluent water sump to take place to block up.
Preferably, the dirt collection assembly includes: the floating platform is connected to the upper part of the outer side of the upper inserting plate pile body; the discharging hole penetrates through the upper sheet inserting pile body and the floating platform, and is obliquely arranged; the collecting box is connected go up the picture peg body and keep away from one side of floating platform, the collecting box is located the below of relief hole, the part of floating platform can suitably be located the surface of water for the floater on the surface of water can be collected to the collecting box in through the relief hole, thereby clears away the floater of the surface of water.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, the lower inserting plate pile body, the upper inserting plate pile body, the high-pressure water component, the slurry discharging component and the dirt collecting component are used in a matched manner, so that the slurry generated during installation can be discharged when the lower inserting plate pile body is installed, the slurry is prevented from flowing back upwards around the lower inserting plate pile body, the original stratum and landform around the lower inserting plate pile body are damaged, and the environmental protection is facilitated; simultaneously lower picture peg body and last picture peg body can clear away the floater on the surface of water when using, reduce the floater to the pollution in waters, save labour's expenditure, improve the efficiency that the floater was salvaged.
Drawings
Fig. 1 is a schematic view of a three-dimensional structure of a water conservancy sheet pile capable of automatically collecting sewage provided by the utility model;
fig. 2 is a schematic view of a main section structure of a water conservancy sheet inserting pile capable of automatically collecting sewage provided by the utility model;
fig. 3 is a schematic top view of the lower sheet pile body of the present invention;
fig. 4 is a schematic side view of the upper inserting plate pile body of the present invention.
In the figure: 1. a lower sheet pile body; 2. a receiving cavity; 3. an upper sheet pile body; 4. a high-pressure water channel; 5. a communicating pipe; 6. a slurry discharge channel; 7. a slurry discharge pipe; 8. a submersible pump; 9. an ejector; 10. a high-pressure water jet hole; 11. a sewage tank; 12. helical leaves; 13. a floating platform; 14. a discharge hole; 15. and a collection box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Examples
As shown in fig. 1-4, the utility model provides an automatic receive dirty water conservancy picture peg stake includes: the lower sheet pile comprises a lower sheet pile body 1 and an upper sheet pile body 3, wherein a containing cavity 2 matched with the upper sheet pile body 3 is formed inside the lower sheet pile body 1; the high-pressure water component is arranged inside the lower sheet pile body 1 and the upper sheet pile body 3, and is arranged in the central positions of the lower sheet pile body 1 and the upper sheet pile body 3; the slurry discharging assemblies are arranged inside the lower sheet pile body 1 and the upper sheet pile body 3 and arranged on two sides of the high-pressure water assembly; the filth collection assembly is arranged outside the upper sheet pile body 3 and is positioned on the upper part of the outer side of the upper sheet pile body 3.
The utility model provides an automatic collect dirty water conservancy picture peg stake of aspect embodiment includes picture peg stake body 1 down, go up picture peg stake body 3, accomodate chamber 2, high pressure water components, mud discharge assembly and filth collection subassembly, can install the assigned position with picture peg stake body 1 down through high pressure water components, can discharge the mud that produces after letting in the high pressure water through mud discharge assembly, and filth collection subassembly then can be with last picture peg stake body 3 and lower picture peg stake body 1 when using, collect the floater of the surface of water, reduce the pollution of floater to quality of water.
The upper sheet pile body 3 is connected with the lower sheet pile body 1 in a sliding mode, and the upper sheet pile body 3 is sealed with the lower sheet pile body 1.
In some embodiments, the upper sheet pile body 3 can move in the lower sheet pile body 1 in the up-down direction, and at the same time, when moving, water can be prevented from entering the receiving cavity 2 in the upper sheet pile body 3, and the use of the lower sheet pile body 1 and the upper sheet pile body 3 will not be affected.
The high pressure water assembly comprises: the high-pressure water channel 4 penetrates through the upper inserting plate pile body 3; the communicating pipe 5 is connected to the inside of the containing cavity 2, and the communicating pipe 5 is connected with the high-pressure water channel 4 in a sliding mode; and the high-pressure water injection hole 10 is arranged at the bottom of the lower sheet pile body 1, and a hole for communicating the communicating pipe 5 with the high-pressure water injection hole 10 is formed in the lower sheet pile body 1.
In some embodiments, water is introduced through the high-pressure water channel 4, and the bottom and the side of the high-pressure water injection hole 10 are provided with holes for injecting high-pressure water, so that silt on the surface of the ground can be blown out during the high-pressure water injection, and the lower sheet pile body 1 sinks continuously until the lower sheet pile body 1 is installed at a specified position.
The mud discharge assembly includes: the two slurry discharge channels 6 symmetrically penetrate through the upper inserting plate pile body 3; two slurry discharge pipes 7 connected to the inside of the storage chamber 2, the slurry discharge pipes 7 being slidably connected to the slurry discharge passage 6; two submersible pumps 8 connected to the inside of the two slurry discharge pipes 7; and the two sewage pools 11 are arranged at the bottom of the lower sheet pile body 1, and holes for communicating the slurry discharge pipe 7 with the sewage pools 11 are formed in the lower sheet pile body 1.
In some embodiments, the slurry retained in the wastewater tank 11 is discharged through the slurry discharge channel 6 and the slurry discharge pipe 7 under the action of the submersible pump 8, so that damage to the stratum and the landform during installation of the lower sheet pile body 1 is reduced, wherein the structure of the submersible pump 8 can refer to the technical scheme in the prior art, and the structure can be known by those skilled in the art and is not described herein.
The bottom of the lower sheet inserting pile body 1 is symmetrically provided with ejectors 9, the ejectors 9 on two sides and the high-pressure water injection holes 10 are connected with spiral blades 12 in a rotating mode, and the spiral blades 12 are located inside the sewage pool 11.
In some embodiments, the high-pressure water can drive the spiral blade 12 to rotate when spraying, avoid the mud in the effluent water sump 11 to take place to deposit, cause effluent water sump 11 to block up, the import has been seted up to one side that the sprayer 9 is close to effluent water sump 11 to be provided with filtration equipment, the bottom of sprayer 9 is seted up porosely, wherein the technical scheme among the prior art can be referred to the structure of sprayer 9, and technical personnel in the field can know, do not do this and give unnecessary details here.
The dirt collection assembly includes: the floating platform 13 is connected to the upper part of the outer side of the upper sheet pile body 3; a discharge hole 14 penetrating the upper sheet pile body 3 and the floating platform 13, the discharge hole 14 being provided in an inclined shape; collecting box 15, connect the one side of keeping away from floating platform 13 at last picture peg body 3, collecting box 15 is located the below of relief hole 14, floating platform 13 has certain buoyancy on the surface of water, can make the top of last picture peg body 3 float on the surface of water, floater on the surface of water then can be in discharge collecting box 15 through relief hole 14 simultaneously, collecting box 15 bottom seted up a plurality of holes, when making to collect surface of water floater, remaining water passes through collecting box 15 bottom and discharges, then get back to in the river course again afterwards.
An automatic collect dirty water conservancy picture peg stake theory of operation is based on the embodiment: when the lower sheet pile body 1 is installed, the lower sheet pile body 1 is placed at a designated position of a river channel, water is introduced through the high-pressure water channel 4, the water reaches the high-pressure water injection hole 10 through the communicating pipe 5, and then is injected downwards and from two sides, and the water left in mud in the sewage pool 11 enters the injector 9 and is injected downwards, so that the lower sheet pile body 1 gradually sinks on the stratum.
Remaining silt then stays in effluent water sump 11, under immersible pump 8's effect, discharges mud through mud discharge pipe 7 and mud discharge passage 6, avoids installing the mud that lower picture peg body 1 produced when the installation upwards flows around lower picture peg body 1, causes stratum, physiognomy to suffer destruction, is favorable to the protection of environment, and is accomplished until lower picture peg body 1 installation.
Lower picture peg body 1 and last picture peg body 3 are when using, under the effect of floating platform 13, can make the picture peg body 3 suitable taking in chamber 2 internal upward movement, the surface of water is located relief hole 14 department promptly, can make the floater of the surface of water discharge in collecting box 15 through relief hole 14, the inside a small amount of water of entering collecting box 15 then discharges through collecting box 15 bottom, get back to the river course again at last, reduce the pollution of floater to the waters, save labour's expenditure, the efficiency of floating object salvage is improved.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an automatic collect dirty water conservancy picture peg stake which characterized in that includes:
the lower sheet pile comprises a lower sheet pile body and an upper sheet pile body, wherein a containing cavity matched with the upper sheet pile body is formed inside the lower sheet pile body;
the high-pressure water component is arranged inside the lower sheet pile body and the upper sheet pile body and is arranged in the central positions of the lower sheet pile body and the upper sheet pile body;
the slurry discharging assemblies are arranged inside the lower sheet pile body and the upper sheet pile body and arranged on two sides of the high-pressure water assembly;
and the dirt collecting assembly is arranged outside the upper sheet pile body and is positioned on the upper part outside the upper sheet pile body.
2. The automatic water conservancy sheet pile who collects dirt of claim 1, characterized in that, sliding connection between the sheet pile body of going up and the sheet pile body of going down, it is sealed between the sheet pile body of going up and the sheet pile body of going down.
3. An automatically soil collecting water conservancy blade pile according to claim 1, wherein the high pressure water assembly comprises:
the high-pressure water channel penetrates through the upper inserting plate pile body;
the communicating pipe is connected to the inside of the containing cavity and is in sliding connection with the high-pressure water channel;
and the high-pressure water injection hole is arranged at the bottom of the lower sheet pile body, and a hole for communicating the communicating pipe with the high-pressure water injection hole is formed in the lower sheet pile body.
4. An automatically soil collecting water conservancy sheet piling according to claim 3 wherein said mud discharge assembly includes:
the two slurry discharge channels symmetrically penetrate through the upper inserting plate pile body;
the two slurry discharge pipes are connected inside the containing cavity and are in sliding connection with the slurry discharge channel;
the two submersible pumps are connected to the insides of the two mud discharge pipes;
and the two sewage pools are arranged at the bottom of the lower sheet inserting pile body, and holes for communicating the slurry discharge pipe with the sewage pools are formed in the lower sheet inserting pile body.
5. The automatic water conservancy inserted sheet pile of collecting dirt of claim 4, characterized in that, the bottom symmetry of lower inserted sheet pile body is provided with the sprayer, rotates jointly between the sprayer of both sides and the high pressure water jet hole and is connected with the spiral leaf, the spiral leaf is located the inside of effluent water sump.
6. An automatically soil collecting water conservancy blade pile according to claim 1, wherein the soil collecting assembly comprises:
the floating platform is connected to the upper part of the outer side of the upper inserting plate pile body;
the discharging hole penetrates through the upper sheet inserting pile body and the floating platform, and is obliquely arranged;
the collecting box is connected to one side, far away from the floating platform, of the upper sheet pile body and located below the discharge hole.
CN202222232846.0U 2022-08-24 2022-08-24 Automatic collect dirty water conservancy picture peg stake Active CN218712597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222232846.0U CN218712597U (en) 2022-08-24 2022-08-24 Automatic collect dirty water conservancy picture peg stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222232846.0U CN218712597U (en) 2022-08-24 2022-08-24 Automatic collect dirty water conservancy picture peg stake

Publications (1)

Publication Number Publication Date
CN218712597U true CN218712597U (en) 2023-03-24

Family

ID=85630563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222232846.0U Active CN218712597U (en) 2022-08-24 2022-08-24 Automatic collect dirty water conservancy picture peg stake

Country Status (1)

Country Link
CN (1) CN218712597U (en)

Similar Documents

Publication Publication Date Title
JP3895505B2 (en) Equipment for collecting and transferring sediment
ZA200507095B (en) Saltwater intrusion prevention system
CN218712597U (en) Automatic collect dirty water conservancy picture peg stake
KR101463223B1 (en) Apparatus and method for removing local emission and precipitated sand of underground water excavation and geothermal heat excavation
KR101089024B1 (en) Tidal current coast applied seawater intake system and its construction method
CN103755085A (en) Device and method for removing algal bloom and purifying algae source in branch reservoir bay of channel reservoir
KR101893392B1 (en) Removing method of sludge deposit using brush and it's apparatus
CN214883774U (en) Foundation pit dewatering and water stopping device
CN212388647U (en) Hydraulic engineering desilting device
CN210078926U (en) Rain sewage filtering and precipitating device for river, lake, storehouse and sea sewage draining port
CN114163083A (en) Floating type ocean sewage treatment device
KR20130020188A (en) Seawater intake system having submerged weir and its construction method
CN108325902B (en) Constructed wetland belt cleaning device that packs
CN220927813U (en) Water conservancy picture peg stake
CN220071005U (en) Mud sediment filters utilizes system
CN209741955U (en) dynamic and static spiral water diversion energy-activated dredging treatment system suitable for weir pond
CN219508683U (en) Channel ecological restoration device in land comprehensive restoration
CN213086768U (en) Water conservancy picture peg stake
CN211172154U (en) Silt clearance economizer of small-size reservoir
CN216156674U (en) Water conservancy water and electricity is ditch desilting device for construction
CN219569054U (en) Vertical shaft type water taking device system applied to reservoir area
CN219690615U (en) Continuous high-efficient anti-blocking separation dredging device for underwater mud taking in river channel
CN213173897U (en) Ship-mounted device for lake sediment dredging and promoting sediment disturbance
CN213508529U (en) Energy-saving foundation pit drainage system