CN218708979U CN202222982931.9U CN202222982931U CN218708979U CN 218708979 U CN218708979 U CN 218708979U CN 202222982931 U CN202222982931 U CN 202222982931U CN 218708979 U CN218708979 U CN 218708979U
Authority
CN
China
Prior art keywords
tower crane
tower
bin
hoisting
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222982931.9U
Other languages
Chinese (zh)
Inventor
贾梦虹
张旭
贾梦晴
刘瑞欣
吴雨坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Da'an Construction Engineering Co ltd
Original Assignee
Sichuan Da'an Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Da'an Construction Engineering Co ltd filed Critical Sichuan Da'an Construction Engineering Co ltd
Priority to CN202222982931.9U priority Critical patent/CN218708979U/en
Application granted granted Critical
Publication of CN218708979U publication Critical patent/CN218708979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a tower crane structure convenient to from top to bottom, the on-line screen storage device comprises a base, the top fixed mounting of base has the tower gallows, the inside of tower gallows is provided with lifts by crane the mechanism, the top fixed mounting of tower gallows has the backup pad, the top of backup pad is provided with the davit, the back fixed mounting of backup pad has the roof. This tower crane structure convenient to from top to bottom, through setting up hoisting mechanism, in the artifical tower crane from top to bottom of tower crane operation, only need get into the inside of lifting the storehouse, start driving motor, output shaft through driving motor drives the bull stick and rotates, the bull stick will drive the rolling wheel and rotate, remove to the top of tower gallows, the operation personnel only need climb up from the staircase department this moment, enter into the inside of cockpit from the opening part, in tower crane staff's tower crane from top to bottom, need not the climbing, thereby avoid the consumption of physical power, and adopt more stable structure of taking off and land, make tower crane operation in-process safety and stability more, reduce the danger coefficient of tower crane operation.

Description

一种便于上下的塔吊结构A tower crane structure that is convenient for going up and down

技术领域technical field

本实用新型涉及塔吊技术领域,具体为一种便于上下的塔吊结构。The utility model relates to the technical field of tower cranes, in particular to a tower crane structure which is convenient for going up and down.

背景技术Background technique

塔吊是建筑工地上最常用的一种起重设备,以一节一节的接长,用来吊施工用的钢筋、木楞、混凝土、钢管等施工的原材料,塔吊是工地上一种必不可少的设备,塔吊尖的功能是承受臂架拉绳及平衡臂拉绳传来的上部荷载,并通过回转塔架、转台、承座等的结构部件式直接通过转台传递给塔身结构。Tower crane is the most commonly used lifting equipment on construction sites. It is used to lift steel bars, wood corrugated, concrete, steel pipes and other construction materials used for construction. Tower crane is a must-have on the construction site. With less equipment, the function of the tower suspension tip is to bear the upper load from the jib stay rope and the balance jib stay rope, and transmit it directly to the tower structure through the turntable through the structural components such as the slewing tower, turntable, and bearing.

塔吊属于高空作业,操作人员上下塔吊的时候,多采用攀爬扶梯进行,高空攀爬不仅需要消耗大量的体力,而采用简单的拉绳式升降电梯进行起降,稳定性不佳,存在一定的安全隐患,采用轨道式的升降电梯安装难度大,成本过高,为了保证上下塔吊的安全性和成本把控,提出一种便于上下的塔吊结构。Tower cranes belong to high-altitude operations. When operators go up and down the tower cranes, they often use climbing escalators. High-altitude climbing not only consumes a lot of physical strength, but the use of simple pull-rope elevators for take-off and landing is not stable, and there are certain problems. Potential safety hazards, the installation of track-type elevators is difficult and the cost is too high. In order to ensure the safety and cost control of the upper and lower tower cranes, a tower crane structure that is convenient for going up and down is proposed.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种具备提高塔吊安全性的便于上下的塔吊结构,。Aiming at the deficiencies of the prior art, the utility model provides a tower crane structure which can improve the safety of the tower crane and is convenient for going up and down.

为实现上述目的,本实用新型提供如下技术方案:一种便于上下的塔吊结构,包括底座,所述底座的顶部固定安装有塔吊架,所述塔吊架的内部设置有起吊机构,所述塔吊架的顶部固定安装有支撑板,所述支撑板的顶部设置有起吊臂,所述支撑板的背面固定安装有顶板,所述顶板的顶部固定安装有驾驶舱,所述支撑板的顶部固定安装有支撑架,所述塔吊架的内部设置有滑轨;In order to achieve the above purpose, the utility model provides the following technical solutions: a tower crane structure that is convenient to go up and down, including a base, a tower hanger is fixedly installed on the top of the base, a lifting mechanism is arranged inside the tower hanger, and the tower hanger The top of the support plate is fixedly installed with a support plate, the top of the support plate is provided with a lifting arm, the back of the support plate is fixed with a top plate, the top of the top plate is fixed with a cockpit, and the top of the support plate is fixed with a A support frame, the interior of the tower hanger is provided with slide rails;

所述起吊机构包括起吊仓,所述塔吊架的内部滑动安装有起吊仓,所述起吊仓的左右两侧均固定安装有滑块,所述起吊仓的内部设置有扶梯,所述起吊仓的顶部设置有起吊绳,所述支撑架的内部转动安装有转杆,所述转杆的外表面固定安装有收卷轮,所述支撑板的顶部开设有开口,所述支撑架的左侧固定安装有驱动电机,所述转杆的外表面固定安装有锁紧轮,所述支撑架的顶部固定安装有电动推杆,所述电动推杆的顶端固定安装有顶块,所述顶块的顶部固定安装有插销,所述起吊仓顶部的左右两侧均固定安装有连接套,所述连接套的顶部活动安装有连接环,所述连接环的底部固定安装有卡板,所述卡板与连接套之间固定安装有连接弹簧。The hoisting mechanism includes a hoisting bin, the inside of the tower hanger is slidably installed with a hoisting bin, the left and right sides of the hoisting bin are fixedly equipped with sliders, the inside of the hoisting bin is provided with an escalator, and the inside of the hoisting bin The top is provided with a lifting rope, the inside of the support frame is rotated and installed with a rotating rod, the outer surface of the rotating rod is fixedly equipped with a winding wheel, the top of the support plate is provided with an opening, and the left side of the support frame is fixed. A driving motor is installed, a locking wheel is fixedly installed on the outer surface of the rotating rod, an electric push rod is fixedly installed on the top of the support frame, and a top block is fixedly installed on the top of the electric push rod. The top is fixedly installed with a latch, the left and right sides of the top of the lifting bin are fixedly installed with connecting sleeves, the top of the connecting sleeve is movably installed with a connecting ring, and the bottom of the connecting ring is fixedly installed with a clamping plate, and the clamping plate A connection spring is fixedly installed between the connection sleeve and the connection sleeve.

进一步,所述塔吊架的内部固定安装有交叉排料的加强钢,所述起吊臂转动安装于支撑板的顶部。Further, the inside of the tower hanger is fixedly installed with cross-discharging reinforcing steel, and the lifting arm is rotatably installed on the top of the support plate.

进一步,所述滑块滑动安装于滑轨的内部,所述滑轨延伸至支撑板的底部,所述起吊仓的顶部开设有出仓口。Further, the slider is slidably installed inside the slide rail, the slide rail extends to the bottom of the support plate, and the top of the lifting bin is provided with a bin outlet.

进一步,所述起吊仓的内壁固定安装有扶手,所述起吊绳缠绕于收卷轮的外表面,且起吊绳的顶端与收卷轮固定连接。Further, the inner wall of the hoisting bin is fixedly equipped with handrails, the hoisting rope is wound around the outer surface of the take-up wheel, and the top end of the hoisting rope is fixedly connected to the take-up wheel.

进一步,所述收卷轮处于驾驶舱的前侧,所述起吊仓处于驾驶舱的下方,所述开口的直径大于起吊仓的宽度。Further, the winding wheel is at the front side of the cockpit, the hoisting bin is under the cockpit, and the diameter of the opening is larger than the width of the hoisting bin.

进一步,所述锁紧轮的外表面开设有插槽,所述插销插接于插槽的内部,所述顶块活动安装于转杆的下方,所述驱动电机的输出轴与转杆固定连接。Further, a slot is opened on the outer surface of the locking wheel, the pin is plugged into the slot, the top block is movably installed under the rotating rod, and the output shaft of the driving motor is fixedly connected to the rotating rod .

进一步,所述卡板卡接于连接套的内部,所述起吊绳的底端安装有两个支撑绳,且两个支撑绳翻倍与两个连接环固定连接。Further, the clamping plate is clamped inside the connecting sleeve, two supporting ropes are installed at the bottom end of the lifting rope, and the two supporting ropes are doubled and fixedly connected to the two connecting rings.

与现有技术相比,本申请的技术方案具备以下有益效果:Compared with the prior art, the technical solution of the present application has the following beneficial effects:

该便于上下的塔吊结构,通过设置起吊机构,在塔吊作业人工上下塔吊的时候,只需要进入起吊仓的内部,启动驱动电机,通过驱动电机的输出轴带动转杆转动,转杆将会带动收卷轮转动,移动至塔吊架的顶部,此时作业人员只需要从扶梯处向上爬起,从开口处进入到驾驶舱的内部,在塔吊工作人员上下塔吊的时候,无需攀爬,从而避免体力的消耗,而且采用更加稳定的起降结构,使得塔吊作业过程中更加安全稳定,降低塔吊作业的危险系数,使得塔吊工作人员得到更好的保障。The tower crane structure is convenient for going up and down. By setting up the lifting mechanism, when the tower crane is manually going up and down the tower crane, it only needs to enter the interior of the hoisting chamber, start the drive motor, and drive the rotating rod to rotate through the output shaft of the driving motor. The rotating rod will drive the retractable The reel rotates and moves to the top of the tower hanger. At this time, the operator only needs to climb up from the escalator and enter the interior of the cockpit from the opening. When the tower crane staff go up and down the tower crane, they do not need to climb, thus avoiding physical fatigue. consumption, and adopts a more stable take-off and landing structure, which makes the tower crane operation safer and more stable, reduces the risk factor of the tower crane operation, and makes the tower crane staff better protected.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型正视剖视图;Fig. 2 is a front sectional view of the utility model;

图3为本实用新型图2中B处结构放大图;Fig. 3 is the enlarged view of the structure at B place in Fig. 2 of the utility model;

图4为本实用新型图2中A处结构放大图。Fig. 4 is an enlarged view of the structure at A in Fig. 2 of the present invention.

图中:1、底座;2、塔吊架;3、起吊机构;301、起吊仓;302、滑块;303、扶梯;304、起吊绳;305、转杆;306、收卷轮;307、开口;308、驱动电机;309、锁紧轮;310、电动推杆;311、顶块;312、插销;313、连接套;314、连接环;315、卡板;316、连接弹簧;4、支撑板;5、起吊臂;6、顶板;7、驾驶舱;8、支撑架;9、滑轨。In the figure: 1, base; 2, tower hanger; 3, hoisting mechanism; 301, hoisting bin; 302, slider; 303, escalator; 304, hoisting rope; 305, rotating rod; 306, winding wheel; 307, opening ; 308, driving motor; 309, locking wheel; 310, electric push rod; 311, top block; 312, latch; 313, connecting sleeve; 314, connecting ring; 315, clamping plate; 316, connecting spring; 5. Lifting arm; 6. Roof; 7. Cockpit; 8. Support frame; 9. Slide rail.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-4,本实施例中的一种便于上下的塔吊结构,包括底座1,底座1的顶部固定安装有塔吊架2,塔吊架2的内部设置有起吊机构3,塔吊架2的顶部固定安装有支撑板4,支撑板4的顶部设置有起吊臂5,支撑板4的背面固定安装有顶板6,顶板6的顶部固定安装有驾驶舱7,支撑板4的顶部固定安装有支撑架8,塔吊架2的内部设置有滑轨9;Please refer to Fig. 1-4, a kind of tower crane structure that is convenient to go up and down in the present embodiment, comprises base 1, and the top of base 1 is fixedly installed with tower hanger 2, and the inside of tower hanger 2 is provided with hoisting mechanism 3, and tower hanger 2 The top is fixedly equipped with a support plate 4, the top of the support plate 4 is provided with a lifting arm 5, the back of the support plate 4 is fixedly installed with a top plate 6, the top of the top plate 6 is fixedly installed with a cockpit 7, and the top of the support plate 4 is fixedly installed with a support frame 8, the inside of the tower hanger 2 is provided with a slide rail 9;

起吊机构3包括起吊仓301,塔吊架2的内部滑动安装有起吊仓301,起吊仓301的左右两侧均固定安装有滑块302,起吊仓301的内部设置有扶梯303,起吊仓301的顶部设置有起吊绳304,支撑架8的内部转动安装有转杆305,转杆305的外表面固定安装有收卷轮306,支撑板4的顶部开设有开口307,支撑架8的左侧固定安装有驱动电机308,转杆305的外表面固定安装有锁紧轮309,支撑架8的顶部固定安装有电动推杆310,电动推杆310的顶端固定安装有顶块311,顶块311的顶部固定安装有插销312,起吊仓301顶部的左右两侧均固定安装有连接套313,连接套313的顶部活动安装有连接环314,连接环314的底部固定安装有卡板315,卡板315与连接套313之间固定安装有连接弹簧316。The hoisting mechanism 3 includes a hoisting bin 301, the inside of the tower hanger 2 is slidably installed with a hoisting bin 301, the left and right sides of the hoisting bin 301 are all fixedly equipped with a slide block 302, the inside of the hoisting bin 301 is provided with an escalator 303, and the top of the hoisting bin 301 A lifting rope 304 is provided, a rotating rod 305 is mounted on the inside of the support frame 8, and a winding wheel 306 is fixedly installed on the outer surface of the rotating rod 305. The top of the support plate 4 is provided with an opening 307, and the left side of the support frame 8 is fixedly installed. There is a driving motor 308, the outer surface of the rotating rod 305 is fixedly equipped with a locking wheel 309, the top of the support frame 8 is fixedly installed with an electric push rod 310, and the top of the electric push rod 310 is fixedly installed with a top block 311, and the top of the top block 311 The latch 312 is fixedly installed, and the left and right sides of the hoisting bin 301 top are all fixedly equipped with connecting sleeves 313, and the top of the connecting sleeve 313 is movably equipped with a connecting ring 314, and the bottom of the connecting ring 314 is fixedly equipped with a clamping plate 315, which is connected with A connecting spring 316 is fixedly installed between the connecting sleeves 313 .

在实施时,启动驱动电机308,通过驱动电机308的输出轴带动转杆305转动,转杆305将会带动收卷轮306转动,在转杆305转动的时候,电动推杆310将会带动顶块311向下方移动,使得插销312从锁紧轮309的外表面脱离,此时转杆305失去限位,此时收卷轮306将会转动,收卷轮306转动将会带动起吊绳304收卷在收卷轮306的外表面,从而将起吊仓301向上方移动,移动的过程中滑块302将会在滑轨9上移动,从而使得起吊仓301移动至塔吊架2的顶部,此时作业人员只需要从扶梯303处向上爬起,从开口307处进入到驾驶舱7的内部。During implementation, start the driving motor 308, drive the rotating rod 305 to rotate through the output shaft of the driving motor 308, the rotating rod 305 will drive the winding wheel 306 to rotate, and when the rotating rod 305 rotates, the electric push rod 310 will drive the top The block 311 moves downwards, so that the latch 312 breaks away from the outer surface of the locking wheel 309. At this time, the rotating rod 305 loses its limit. At this time, the winding wheel 306 will rotate, and the rotation of the winding wheel 306 will drive the hoisting rope 304 to retract. Rolled on the outer surface of the winding wheel 306, thereby moving the lifting bin 301 upwards, during the moving process, the slider 302 will move on the slide rail 9, so that the lifting bin 301 moves to the top of the tower hanger 2, at this time The operator only needs to climb up from the escalator 303 and enter the interior of the cockpit 7 from the opening 307 .

通过采用上述技术方案,该便于上下的塔吊结构,通过设置起吊机构3,在塔吊作业人工上下塔吊的时候,只需要进入起吊仓301的内部,启动驱动电机308,通过驱动电机308的输出轴带动转杆305转动,转杆305将会带动收卷轮306转动,移动至塔吊架2的顶部,此时作业人员只需要从扶梯303处向上爬起,从开口307处进入到驾驶舱7的内部,在塔吊工作人员上下塔吊的时候,无需攀爬,从而避免体力的消耗,而且采用更加稳定的起降结构,使得塔吊作业过程中更加安全稳定,降低塔吊作业的危险系数,使得塔吊工作人员得到更好的保障,解决了塔吊操作人员上下塔吊的时候,需要攀爬扶梯进行,高空攀爬不仅需要消耗大量的体力,还会存在一定的安全隐患,因此塔吊成为高空危险职业的问题。By adopting the above-mentioned technical scheme, the tower crane structure that is convenient to go up and down, by setting the lifting mechanism 3, when the tower crane is manually going up and down the tower crane, it only needs to enter the inside of the lifting chamber 301, start the drive motor 308, and drive the drive motor 308 through the output shaft. When the rotating rod 305 rotates, the rotating rod 305 will drive the winding wheel 306 to rotate and move to the top of the tower hanger 2. At this time, the operator only needs to climb up from the escalator 303 and enter the interior of the cockpit 7 from the opening 307. , when the tower crane staff go up and down the tower crane, there is no need to climb, so as to avoid the consumption of physical strength, and a more stable take-off and landing structure is adopted, which makes the tower crane operation process safer and more stable, reduces the risk factor of the tower crane operation, and makes the tower crane staff get better Better protection solves the problem that tower crane operators need to climb escalators when going up and down the tower crane. High-altitude climbing not only consumes a lot of physical strength, but also has certain safety hazards. Therefore, tower cranes have become a problem of high-altitude dangerous occupations.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (7)

1. The utility model provides a tower crane structure convenient to from top to bottom, includes base (1), its characterized in that: a tower hanger (2) is fixedly mounted at the top of the base (1), a lifting mechanism (3) is arranged inside the tower hanger (2), a support plate (4) is fixedly mounted at the top of the tower hanger (2), a lifting arm (5) is arranged at the top of the support plate (4), a top plate (6) is fixedly mounted at the back of the support plate (4), a cockpit (7) is fixedly mounted at the top of the top plate (6), a support frame (8) is fixedly mounted at the top of the support plate (4), and a slide rail (9) is arranged inside the tower hanger (2);
the hoisting mechanism (3) comprises a hoisting bin (301), the hoisting bin (301) is installed in the tower crane (2) in a sliding manner, the left side and the right side of the hoisting bin (301) are both fixedly provided with a sliding block (302), an escalator (303) is arranged in the lifting bin (301), a lifting rope (304) is arranged at the top of the lifting bin (301), a rotating rod (305) is rotatably arranged in the supporting frame (8), a winding wheel (306) is fixedly arranged on the outer surface of the rotating rod (305), an opening (307) is arranged at the top of the supporting plate (4), a driving motor (308) is fixedly arranged at the left side of the supporting frame (8), the outer surface of the rotating rod (305) is fixedly provided with a locking wheel (309), an electric push rod (310) is fixedly arranged at the top of the supporting frame (8), the top end of the electric push rod (310) is fixedly provided with a top block (311), the top of the top block (311) is fixedly provided with a bolt (312), the left side and the right side of the top of the hoisting bin (301) are both fixedly provided with connecting sleeves (313), the top of the connecting sleeve (313) is movably provided with a connecting ring (314), a clamping plate (315) is fixedly arranged at the bottom of the connecting ring (314), and a connecting spring (316) is fixedly arranged between the clamping plate (315) and the connecting sleeve (313).
2. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the tower crane is characterized in that reinforcing steel for crossed material discharge is fixedly installed inside the tower crane (2), and the lifting arm (5) is rotatably installed at the top of the supporting plate (4).
3. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the sliding block (302) is slidably mounted inside the sliding rail (9), the sliding rail (9) extends to the bottom of the supporting plate (4), and a bin outlet is formed in the top of the hoisting bin (301).
4. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the inner wall of the lifting bin (301) is fixedly provided with a handrail, the lifting rope (304) is wound on the outer surface of the winding wheel (306), and the top end of the lifting rope (304) is fixedly connected with the winding wheel (306).
5. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the winding wheel (306) is located on the front side of the cockpit (7), the hoisting bin (301) is located below the cockpit (7), and the diameter of the opening (307) is larger than the width of the hoisting bin (301).
6. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the outer surface of the locking wheel (309) is provided with a slot, the bolt (312) is inserted into the slot, the top block (311) is movably arranged below the rotating rod (305), and the output shaft of the driving motor (308) is fixedly connected with the rotating rod (305).
7. The tower crane structure convenient to go up and down according to claim 1, characterized in that: the clamping plate (315) is clamped in the connecting sleeve (313), two supporting ropes are mounted at the bottom end of the lifting rope (304), and the two supporting ropes are doubled and fixedly connected with the two connecting rings (314).
CN202222982931.9U 2022-11-09 2022-11-09 A tower crane structure that is convenient for going up and down Expired - Fee Related CN218708979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222982931.9U CN218708979U (en) 2022-11-09 2022-11-09 A tower crane structure that is convenient for going up and down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222982931.9U CN218708979U (en) 2022-11-09 2022-11-09 A tower crane structure that is convenient for going up and down

Publications (1)

Publication Number Publication Date
CN218708979U true CN218708979U (en) 2023-03-24

Family

ID=85613159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222982931.9U Expired - Fee Related CN218708979U (en) 2022-11-09 2022-11-09 A tower crane structure that is convenient for going up and down

Country Status (1)

Country Link
CN (1) CN218708979U (en)

Similar Documents

Publication Publication Date Title
CN201809077U (en) Portable curtain wall material lifting device
CN110485289A (en) A retractable maintenance platform for the cable area of the pylon column of a double-cable-plane cable-stayed bridge
CN218375115U (en) Detachable tower crane aerial walkway
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN218708979U (en) A tower crane structure that is convenient for going up and down
CN209411648U (en) A fully rotating self-climbing simple hoisting device in a high-altitude closed environment
CN216971826U (en) High-rise tower crane movable arm type mast with loading trolley
CN207537025U (en) A kind of novel meet an urgent need adjusts the windproof tower crane of tower crane height
CN205369033U (en) Gallows formula bridge tool car
CN112897283A (en) Wind power generation tower cylinder maintenance and repair device
CN111634826A (en) A rope storage and anti-twist device for preventing partial wear of the main steel rope of a tower crane
CN112942829B (en) Self-installation and dismantling equipment for cement decompression cone formwork
CN211444795U (en) Elevator for construction machinery
CN212769725U (en) An automatic lifting platform for pier top operation gondola
CN121269549A (en) Auxiliary hoisting device special for construction elevator
CN209618713U (en) A simple gantry crane used for unequal height foundations
CN113845037A (en) Electric hoist bridge crane
CN211004305U (en) A turnover-free lifting device
CN110980548A (en) Maintenance channel for crane
CN220078545U (en) Aerial working platform with shake prevention function
CN208995097U (en) The portable safe boom hoisting of well lid
CN223213681U (en) Multi-lifting-point portal crane
CN219044808U (en) Crane with adjustable arm length
CN221917353U (en) Elevator for construction
CN223201563U (en) Indoor aerial work platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230324

CF01 Termination of patent right due to non-payment of annual fee