CN218694061U - Drilling device for pipe for construction site - Google Patents

Drilling device for pipe for construction site Download PDF

Info

Publication number
CN218694061U
CN218694061U CN202222739350.2U CN202222739350U CN218694061U CN 218694061 U CN218694061 U CN 218694061U CN 202222739350 U CN202222739350 U CN 202222739350U CN 218694061 U CN218694061 U CN 218694061U
Authority
CN
China
Prior art keywords
fixed mounting
drilling device
motor
threaded rod
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222739350.2U
Other languages
Chinese (zh)
Inventor
王锦飞
胡畅通
王海峰
王伟
王贺超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Brilliant Beijing Construction Engineering Group Co ltd
Original Assignee
Cccc Brilliant Beijing Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Brilliant Beijing Construction Engineering Group Co ltd filed Critical Cccc Brilliant Beijing Construction Engineering Group Co ltd
Priority to CN202222739350.2U priority Critical patent/CN218694061U/en
Application granted granted Critical
Publication of CN218694061U publication Critical patent/CN218694061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model belongs to tubular product processing equipment field, especially, drilling device for tubular product for building site, including placing the supporting leg on building site, it is a plurality of the top fixed mounting of supporting leg has the box, fixed mounting has the backup pad between the inboard of box, the equal fixed mounting in top left and right sides of backup pad has a brace table, left side the top fixed mounting of brace table has first motor, the output fixed mounting of first motor has first pivot, the outside fixed mounting of first pivot has the belt pulley, the inboard of belt pulley is provided with the threaded rod, the one end of threaded rod is rotated and is installed the right side inner wall at the box, the outside threaded connection of threaded rod has the slider. The utility model relates to a rationally, can the automatic movement drill bit position and drilling, need not manually, save time, it is efficient to bore the hole, and need not to dismantle and can rotate continuation bore the hole, easy operation, labour saving and time saving.

Description

Drilling device for pipe for construction site
Technical Field
The utility model relates to a tubular product processing equipment technical field especially relates to a drilling device for tubular product for building site.
Background
The construction site refers to a place where a construction project is being developed and constructed, the range of the construction site is usually closed by a coaming, a wire netting or a fence so as to limit the access of external personnel, materials, machinery and vehicles, and is supervised by a manager of property management;
the publication number is CN211680102U, and a drilling device for pipes for a building site is disclosed, and comprises a placing seat, wherein two fixing seats are fixedly mounted at the top of the placing seat, fixing grooves are formed in the tops of the two fixing seats, the same processing pipe is placed in the two fixing grooves, two fixing plates are fixedly mounted at the top of the placing seat, the same connecting plate is slidably mounted on one side, close to each other, of the two fixing plates, a fixing hole is formed in the top of the connecting plate, a moving seat is slidably mounted in the fixing hole, and a drilling machine is fixedly mounted at the bottom of the moving seat;
it makes the threaded rod rotate through the turning block is rotatory to make the fixed drilling machine in the threaded rod outside remove drilling, but its turning block needs manual rotation, the drain time is long, drilling latency is too of a specified duration, make drilling inefficiency, and fixed tubular product for the building site not only can't be rotatory while drilling, need loosen earlier when needs rotatory tubular product the centre gripping arm again rotatory tubular product for the building site fix again, the troublesome poeration, waste time and energy, therefore we have proposed a drilling device for the tubular product for the building site.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the drilling device for tubular product for building site who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a drilling device for tubular product for building site, is including placing the supporting leg on building site, and is a plurality of the top fixed mounting of supporting leg has the box, fixed mounting has the backup pad between the inboard of box, the equal fixed mounting in the top left and right sides of backup pad has a brace table, the left side the top fixed mounting of brace table has first motor, the output fixed mounting of first motor has first pivot, the outside fixed mounting of first pivot has the belt pulley, the inboard of belt pulley is provided with the threaded rod, the one end of threaded rod is rotated and is installed the right side inner wall at the box, the outside threaded connection of threaded rod has the slider, the outside of first pivot and the right-hand fixed mounting that is located the belt pulley have wheel hub, wheel hub's outside slidable mounting has the ring gear, the top left and right sides of backup pad all is provided with the holder.
Preferably, the left side and the right side of the inner wall of the top of the box body and the left side of the top of the supporting plate are fixedly provided with rotating seats, the first rotating shaft is rotatably arranged on the inner side of the rotating seat below, the threaded rod is rotatably arranged on the inner side of the rotating seat above, and the rotating seats can support the first rotating shaft and the threaded rod.
Preferably, slider slidable mounting is at the top inner wall of box, the bottom fixed mounting of slider has electric telescopic handle, electric telescopic handle's bottom fixed mounting has the connecting plate, the bottom fixed mounting of connecting plate has the second motor, the output fixed mounting of second motor has the drill bit, and the drill bit can remove drilling about to tubular product for the building site.
Preferably, the left side holder fixed mounting is at the top of backup pad, right side holder slidable mounting is at the top of backup pad, the inboard of holder is rotated and is installed the chuck, the outside fixed mounting of chuck has the rubber circle, the outside joint of rubber circle has tubular product for the building site, the left side fixed mounting of chuck has the second pivot, the outside fixed mounting of second pivot has the cooperation gear, ring gear and cooperation gear engagement, the chuck can press from both sides tight tubular product for the building site.
Preferably, the top of box has been seted up the heat dissipation strip hole, and has been arranged after to in the past in proper order, the preceding right side fixed mounting of box has the visual window, the preceding right side of box and the below that is located the visual window rotate and install the feed door, and heat dissipation strip hole steam in the guiding device of can being convenient for.
Preferably, pin holes are formed in the top of the inner gear ring and the top of the second rotating shaft, a taper pin is clamped on the inner side of each pin hole, and the inner gear ring can be limited by the taper hole.
Preferably, an electric push rod is fixedly mounted at the top of the supporting table at the right side, the output end of the electric push rod is fixedly mounted at the right side of the clamping seat at the right side, and the electric push rod can enable the clamping seat to move left and right.
Preferably, a control panel is fixedly mounted on the front left side of the box body, the control panel is electrically connected with the first motor, the electric telescopic rod, the second motor and the electric push rod, and the control panel can control starting and stopping of each electric element in the device.
Compared with the prior art, the beneficial effects of the utility model reside in that:
(1) The utility model discloses a drilling device for tubular product for building site, it is rotatory that first motor drives the threaded rod through the belt pulley in first pivot and the outside, and the slider that makes the threaded rod outside passes through the connecting piece and drives about the drill bit, uses through the cooperation of above-mentioned spare part for but this drilling device automatically move drill bit position and drilling need not manually, and save time bores the eye efficiently.
(2) The utility model discloses a tubular product is with boring device for building site, the ring gear slides simultaneously in the outside of wheel hub and cooperation gear, and with taper pin chucking pinhole, first motor can drive the second pivot rotation through first pivot and connecting piece on it for the tubular product need not to dismantle and can rotate continuation boring, easy operation, labour saving and time saving for the building site.
Drawings
Fig. 1 is a schematic perspective view of a drilling device for a pipe for a construction site according to the present invention;
fig. 2 is a schematic cross-sectional structural view of the drilling device for the pipe for the construction site according to the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2.
In the figure: 1. a box body; 2. a support plate; 3. a support table; 4. a first motor; 5. a first rotating shaft; 6. a pulley; 7. a threaded rod; 8. rotating the base; 9. a slider; 10. an electric telescopic rod; 11. a connecting plate; 12. a second motor; 13. a drill bit; 14. a hub; 15. an inner gear ring; 16. a holder; 17. a chuck; 18. a rubber ring; 19. a second rotating shaft; 20. a mating gear; 21. a pin hole; 22. a taper pin; 23. an electric push rod; 24. a heat dissipating bar hole; 25. a visual window; 26. a feed gate; 27. supporting legs; 28. a control panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples
Referring to fig. 1-3, a drilling device for pipes for construction sites comprises supporting legs 27 placed on a construction site, a box body 1 is fixedly installed at the tops of the supporting legs 27, a supporting plate 2 is fixedly installed between the inner sides of the box body 1, supporting tables 3 are fixedly installed on the left and right sides of the top of the supporting plate 2, a first motor 4 is fixedly installed at the top of the supporting table 3 on the left side, a first rotating shaft 5 is fixedly installed at the output end of the first motor 4, a belt pulley 6 is fixedly installed on the outer side of the first rotating shaft 5, a threaded rod 7 is arranged on the inner side of the belt pulley 6, one end of the threaded rod 7 is rotatably installed on the inner wall of the right side of the box body 1, a sliding block 9 is connected to the outer side of the threaded rod 7, a wheel hub 14 is fixedly installed on the outer side of the first rotating shaft 5 and located on the right side of the belt pulley 6, the wheel hub 14 can drive an inner gear ring 15 to rotate simultaneously, an inner gear ring 15 is slidably installed on the outer side of the wheel hub 14, clamping seats 16 are arranged on the left and right sides of the top of the supporting plate 2, and the clamping seats can fix the clamping head 17 and pipes for construction sites.
In this embodiment, the equal fixed mounting in top inner wall left and right sides and the backup pad 2 of top left side of box 1 has a seat 8 of rotating, and first pivot 5 rotates the inboard of installing seat 8 of rotating in the below, and threaded rod 7 rotates the inboard of installing seat 8 in the top, rotates seat 8 through providing the support and making the slip in its inboard to first pivot 5 and threaded rod 7 for the rotation of first pivot 5 and threaded rod 7 is more steady, not fragile, and life is high.
In this embodiment, slider 9 slidable mounting is at the top inner wall of box 1, the bottom fixed mounting of slider 9 has electric telescopic handle 10, electric telescopic handle 10's bottom fixed mounting has connecting plate 11, the bottom fixed mounting of connecting plate 11 has second motor 12, the output fixed mounting of second motor 12 has drill bit 13, slider 9 can drive about the drill bit 13 removes, electric telescopic handle 10 can drive drill bit 13 and reciprocate, second motor 12 can drive drill bit 13 high-speed rotatory, fixed electric telescopic handle 10 and second motor 12 can be connected to connecting plate 11, make drill bit 13 reciprocate and remove about and bore the hole, the degree of automation of boring the hole has been improved, and convenient operation.
In this embodiment, left side holder 16 fixed mounting is at the top of backup pad 2, right side holder 16 slidable mounting is at the top of backup pad 2, chuck 17 is installed in the inboard rotation of holder 16, the outside fixed mounting of chuck 17 has rubber circle 18, the outside joint of rubber circle 18 has the tubular product for the building site, the left side fixed mounting of left side chuck 17 has second pivot 19, the outside fixed mounting of second pivot 19 has cooperation gear 20, ring gear 15 and cooperation gear 20 meshing, chuck 17 makes the tubular product for the building site can stabilize and rotate simultaneously along with chuck 17 through the frictional force that rubber circle 18 and the tubular product for the building site contact and extrusion in its outside provided, avoid producing relative slip, the reaming precision has been guaranteed.
In this embodiment, heat dissipation strip hole 24 has been seted up at the top of box 1, and arranges in proper order from the past to the back, and the preceding right side fixed mounting of box 1 has visual window 25, and the preceding right side of box 1 just is located the below rotation of visual window 25 and installs feed door 26, and visual window 25 can observe the drilling condition in real time, and the timely adjustment of being convenient for has improved the real operability of the device.
In this embodiment, the top of the inner gear ring 15 and the top of the second rotating shaft 19 are provided with pin holes 21, the inner sides of the pin holes 21 are clamped with taper pins 22, the taper pins 22 are clamped in the pin holes 21 to limit the left and right movement of the inner gear ring 15 when being meshed with the matching gear 20, the pipe for adjusting the building site is prevented from slipping when rotating, and the reliability of the device is ensured.
In this embodiment, the top fixed mounting of right side brace table 3 has electric putter 23, and electric putter 23's output fixed mounting is on the right side of right side holder 16, and electric putter 23 removes about through driving right side holder 16, can realize pressing from both sides tightly fixedly to the tubular product for the building site of different length, has improved the universality of device.
In this embodiment, a control panel 28 is fixedly installed on the front left side of the box body 1, the control panel 28 is electrically connected with the first motor 4, the electric telescopic rod 10, the second motor 12 and the electric push rod 23, and the control panel 28 can control the start and stop of the first motor 4, the electric telescopic rod 10, the second motor 12 and the electric push rod 23 in real time.
In the embodiment, when the drilling device is used, firstly, the drilling device is connected with an external power supply, one end of a pipe for a building site is sleeved on the outer side of a left-end chuck 17, the electric push rod 23 is controlled to start working through the control panel 28, the electric push rod 23 which starts working drives the right-side chuck 16 to move left and right, the other end of the pipe for the building site is sleeved on the outer side of the right-side chuck 17, the electric push rod 23 which starts working drives the right-side chuck 16 to move left until the pipe is completely clamped by the two chucks 16, the inner gear ring 15 slides left to ensure that the inner gear ring is not meshed with the matching gear 20, the first motor 4, the second motor 12 and the electric telescopic rod 10 are controlled to start working through the control panel 28, the first motor 4 which starts working drives the first rotating shaft 5 to rotate, the first rotating shaft 5 drives the belt pulley 6 on the outer side of the rotating shaft to rotate, the belt pulley 6 drives the threaded rod 7 on the inner side of the rotating shaft to rotate, the rotating threaded rod 7 enables the sliding block 9 on the outer side to move left and right, when the sliding block 9 moves to a proper position, the first motor 4 is controlled to stop working through the control panel 28, the electric telescopic rod 10 which starts working drives the lower connecting piece to move up and down, meanwhile, the second motor 12 which starts working drives the drill bit 13 to rotate at a high speed, drilling holes on the pipe used for the construction site is carried out, when the pipe used for the construction site needs to be rotated, the electric telescopic rod 10 which starts working is controlled to drive the lower connecting piece to move up, interference in rotation of the pipe used for the construction site is avoided, meanwhile, the inner gear ring 15 slides rightwards until the rightmost end completely fits the matching part of the matching gear 20, the taper pin 22 is inserted inwards along the pin hole 21 on the outer side of the inner gear ring 15 until the pipe is tightly inserted, the first motor 4 is controlled to start working through the control panel 28, and the first motor 4 which starts working drives the first rotating shaft 5 to rotate slowly, the first rotating shaft 5 rotating slowly drives the hub 14 to rotate slowly, the hub 14 rotating slowly drives the inner gear ring 15 to rotate slowly, the inner gear ring 15 rotating slowly drives the matching gear 20 to rotate slowly, the matching gear 20 rotating slowly drives the second rotating shaft 19 to rotate slowly, the second rotating shaft 19 rotating slowly drives the left chuck 17 to rotate slowly, and the chuck 17 rotating slowly drives the attached pipe for the building site to rotate slowly to a proper drilling angle through the rubber ring 18 attached to the outer side.
It is right above the utility model provides a drilling device for tubular product for building site has carried out detailed introduction. The principles and embodiments of the present invention have been explained herein using specific embodiments, which are merely used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (8)

1. The utility model provides a drilling device for tubular product for building site, its characterized in that, is including placing supporting leg (27) on building site, a plurality of the top fixed mounting of supporting leg (27) has box (1), fixed mounting has backup pad (2) between the inboard of box (1), the equal fixed mounting in the top left and right sides of backup pad (2) has brace table (3), the left side the top fixed mounting of brace table (3) has first motor (4), the output fixed mounting of first motor (4) has first pivot (5), the outside fixed mounting of first pivot (5) has belt pulley (6), the inboard of belt pulley (6) is provided with threaded rod (7), the one end of threaded rod (7) is rotated and is installed the right side inner wall in box (1), the outside threaded connection of threaded rod (7) has slider (9), the outside of first pivot (5) and the right-hand fixed mounting that is located belt pulley (6) have wheel hub (14), the outside slidable mounting of wheel hub (14) has ring gear (15), the top left and right sides of backup pad (2) all is provided with holder (16).
2. The drilling device for the pipe used in the construction site according to claim 1, wherein rotating seats (8) are fixedly installed on the left and right sides of the inner wall of the top of the box body (1) and the left side of the top of the supporting plate (2), the first rotating shaft (5) is rotatably installed on the inner side of the lower rotating seat (8), and the threaded rod (7) is rotatably installed on the inner side of the upper rotating seat (8).
3. The pipe drilling device for the construction site as claimed in claim 1, wherein the sliding block (9) is slidably mounted on the inner wall of the top of the box body (1), the bottom of the sliding block (9) is fixedly provided with the electric telescopic rod (10), the bottom of the electric telescopic rod (10) is fixedly provided with the connecting plate (11), the bottom of the connecting plate (11) is fixedly provided with the second motor (12), and the output end of the second motor (12) is fixedly provided with the drill bit (13).
4. The drilling device for the pipe used for the building site according to claim 1, wherein the holder (16) is fixedly arranged at the top of the support plate (2) at the left side, the holder (16) is slidably arranged at the top of the support plate (2) at the right side, the chuck (17) is rotatably arranged at the inner side of the holder (16), the rubber ring (18) is fixedly arranged at the outer side of the chuck (17), the pipe used for the building site is clamped at the outer side of the rubber ring (18), the second rotating shaft (19) is fixedly arranged at the left side of the chuck (17) at the left side, the matching gear (20) is fixedly arranged at the outer side of the second rotating shaft (19), and the inner gear ring (15) is meshed with the matching gear (20).
5. The drilling device for the pipe used in the construction site according to claim 1, wherein the top of the box body (1) is provided with heat dissipation strip holes (24) which are sequentially arranged from front to back, a visual window (25) is fixedly installed on the front right side of the box body (1), and a feeding door (26) is rotatably installed on the front right side of the box body (1) and below the visual window (25).
6. The drilling device for the pipe used in the construction site according to claim 4, wherein a pin hole (21) is formed in the top of the inner gear ring (15) and the top of the second rotating shaft (19), and a taper pin (22) is clamped on the inner side of the pin hole (21).
7. The drilling device for the pipe used in the construction site according to claim 1, wherein an electric push rod (23) is fixedly installed on the top of the right supporting platform (3), and the output end of the electric push rod (23) is fixedly installed on the right side of the right clamping seat (16).
8. The drilling device for the pipe used for the construction site according to claim 1, 3 or 7, wherein a control panel (28) is fixedly installed at the front left side of the box body (1), and the control panel (28) is electrically connected with the first motor (4), the electric telescopic rod (10), the second motor (12) and the electric push rod (23).
CN202222739350.2U 2022-10-18 2022-10-18 Drilling device for pipe for construction site Active CN218694061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222739350.2U CN218694061U (en) 2022-10-18 2022-10-18 Drilling device for pipe for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222739350.2U CN218694061U (en) 2022-10-18 2022-10-18 Drilling device for pipe for construction site

Publications (1)

Publication Number Publication Date
CN218694061U true CN218694061U (en) 2023-03-24

Family

ID=85584631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222739350.2U Active CN218694061U (en) 2022-10-18 2022-10-18 Drilling device for pipe for construction site

Country Status (1)

Country Link
CN (1) CN218694061U (en)

Similar Documents

Publication Publication Date Title
CN110480049B (en) Automatic chip removing drilling robot
CN215846999U (en) Novel drilling device for hardware machining
CN112191880B (en) Efficient and stable thread drilling equipment
CN114986172B (en) High-speed drill carriage combined machine tool and using method thereof
CN112192769A (en) Squaring machine silicon crystal bar clamping device
CN218694061U (en) Drilling device for pipe for construction site
CN210046035U (en) Quick drilling equipment in gear surface
CN218341056U (en) Lathe drilling device capable of being positioned
CN217964917U (en) Machine tool special for machining mechanical spare and accessory parts
CN215616907U (en) Numerical control inner hole machining equipment
CN114012124B (en) Quick drilling device with dust absorption function for machining
CN212945599U (en) Drilling machine equipment capable of automatically feeding
CN213317831U (en) Drilling machine tool for die machining
CN214290983U (en) Fixing clamp for radial drilling machine
CN217551209U (en) Drilling machine for machining joints of manikin
CN113245579A (en) Drilling device for machining die castings with controllable drilling depth
CN112757002A (en) Auxiliary processing device for old drilling machine
CN220636368U (en) Perforating equipment is used in burglary-resisting door processing
CN220739487U (en) Clamping device of vertical lathe fixture
CN212885127U (en) Device convenient to drilling
CN215033831U (en) Inner hole numerical control drilling machine
CN216151192U (en) Drilling machine workpiece fixing device
CN220862802U (en) Drilling machine for machining
CN220178236U (en) Drilling machine with rotating function
CN219746373U (en) Bench drill automatic feeding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant