CN218669233U - Drilling equipment for building construction - Google Patents

Drilling equipment for building construction Download PDF

Info

Publication number
CN218669233U
CN218669233U CN202222651170.9U CN202222651170U CN218669233U CN 218669233 U CN218669233 U CN 218669233U CN 202222651170 U CN202222651170 U CN 202222651170U CN 218669233 U CN218669233 U CN 218669233U
Authority
CN
China
Prior art keywords
fixedly connected
support body
plate
cleaning
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222651170.9U
Other languages
Chinese (zh)
Inventor
郭建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangjun Construction Engineering Co ltd
Original Assignee
Xiangjun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangjun Construction Engineering Co ltd filed Critical Xiangjun Construction Engineering Co ltd
Priority to CN202222651170.9U priority Critical patent/CN218669233U/en
Application granted granted Critical
Publication of CN218669233U publication Critical patent/CN218669233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of building construction, in particular to drilling equipment for building construction, which comprises a bracket body; a hydraulic rod is fixedly connected to the bottom of one side of the support body, a push plate is fixedly connected to the bottom of the hydraulic rod, a motor is fixedly connected to the top end of the push plate, and a drill rod is fixedly connected to the bottom of the motor; through setting up the storage water tank on the mounting panel, can pass through the connecting pipe with the water in the storage water tank and convey the guiding gutter in, when the drilling rod need be followed in the soil and taken out, the valve is opened to the accessible, make the water in the storage water tank flow into the guiding gutter of mounting panel through the connecting pipe in, and the guiding gutter that passes through transmits to the shower nozzle on the cleaning plate in, spout water through the shower nozzle, because two sets of cleaning plates are the arc, can wash the both sides of drilling rod simultaneously, the abluent efficiency has been improved, thereby the abluent problem of mud that has stored up on the drilling equipment drilling rod has been solved and has been not convenient for.

Description

Drilling equipment for building construction
Technical Field
The utility model relates to a construction technical field specifically is a drilling equipment of construction.
Background
The building construction refers to production activities in an engineering construction implementation stage, refers to construction processes of various buildings, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and during the building construction, a construction site needs to be drilled in advance.
At the in-process of carrying out the probing to the construction place, can use drilling equipment, after removing drilling equipment to appointed place, the starter motor drives the drilling rod and rotates downwards to carry out the probing to the earth layer of construction place.
After drilling equipment for building construction drills, a drill bit can carry a large amount of mud, and in the prior art, the drilling equipment is not provided with a device for cleaning the mud, so that time and labor are wasted when the mud is manually cleaned, and the mud is inconvenient to clean; accordingly, a drilling apparatus for building construction has been proposed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
In order to compensate the not enough of prior art, solve the problem that exists among the prior art, the utility model provides a construction's drilling equipment.
The utility model provides a technical scheme that its technical problem adopted is: the utility model relates to a drilling device for building construction, which comprises a bracket body; the hydraulic support comprises a support body and is characterized in that a hydraulic rod is fixedly connected to the bottom of one side of the support body, a push plate is fixedly connected to the bottom of the hydraulic rod, a motor is fixedly connected to the top end of the push plate, a drill rod is fixedly connected to the bottom of the motor, the push plate is slidably connected to the inner wall of the support body, a mounting plate is fixedly connected to the bottom of the support body, and a cleaning assembly is arranged at the top of the mounting plate;
the utility model discloses a wash subassembly, including the support column, the support column rigid coupling is on the mounting panel top, support column top rigid coupling has the storage water tank, storage water tank bottom rigid coupling has the connecting pipe, connecting pipe center department rigid coupling has the valve, the guiding gutter has been seted up to the mounting panel inner wall, the connecting pipe bottom is linked together with the guiding gutter, support body inner wall rigid coupling has the washing board, it is fluted to set up washing board one side, recess inner wall rigid coupling has the shower nozzle, the guiding gutter is linked together with the shower nozzle of wasing in the board.
Preferably, the cleaning plate is arc-shaped, the spray head is provided with a plurality of groups and is distributed on the inner wall of the groove in an arc shape, the cleaning plate and the hydraulic rod are both arranged in two groups and are symmetrically distributed on two sides of the bracket body respectively, and the distance between the cleaning plates is two groups and is greater than the outer wall of the drill rod.
Preferably, one side rigid coupling that the mounting panel was kept away from to the support body has the landing leg, landing leg length is greater than the length of mounting panel, the landing leg sets up two sets ofly to be parallel distribution in one side of support body.
Preferably, landing leg top rigid coupling has first connecting block, first connecting block one side rigid coupling has electric putter, electric putter bottom sliding connection has the removal wheel, mounting panel one side rigid coupling has the second connecting block, first connecting block and second connecting block all are provided with two sets ofly to be parallel distribution respectively, it all sets up four groups to remove wheel and electric putter to be symmetric distribution in two sets of first connecting block and second connecting block one side.
Preferably, the storage water tank top rigid coupling has the water inlet, the water inlet shape is for leaking hopper-shaped, the water inlet top has the apron through the pivot rigid coupling, apron bottom rigid coupling has sealed the pad.
Preferably, the bottom of one side of the support body is fixedly connected with a side plate, the side plate is square, and the side plates are arranged in two groups and symmetrically distributed on two sides of the support body.
The utility model discloses an useful part lies in:
1. the utility model discloses a set up the storage water tank on the mounting panel, can pass through the connecting pipe with the water in the storage water tank and convey the guiding gutter in, when the drilling rod need be followed in the soil and taken out, the valve is opened to the accessible, make the water in the storage water tank flow into the guiding gutter of mounting panel through the connecting pipe in, and the guiding gutter that passes through transmits to the shower nozzle on the cleaning plate in, spout water through the shower nozzle, because two sets of cleaning plates are the arc, can wash the both sides of drilling rod simultaneously, abluent efficiency has been improved, thereby the mud that has stored up on the drilling equipment drilling rod has been solved and has been not convenient for abluent problem.
2. The utility model discloses a set up first connecting block on one side of the landing leg, can install electric putter and remove the wheel on first connecting block, when needs remove, the wheel is removed in the promotion of four group electric putter of accessible to will remove the wheel downstream, and the wheel is removed to the removal wheel of four groups of accessible and move the support body, thereby conveniently remove the support body to the workplace.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic perspective view of a first embodiment;
FIG. 2 is a schematic perspective cross-sectional view of the first embodiment;
FIG. 3 is an enlarged view of FIG. 2 at A;
FIG. 4 is an enlarged view of FIG. 2 at B;
fig. 5 is a schematic structural view of a reinforcing rib according to a second embodiment.
In the figure: 1. a stent body; 2. a hydraulic lever; 3. pushing the plate; 4. a motor; 5. drilling a rod; 6. mounting a plate; 701. a support pillar; 702. a water storage tank; 703. a connecting pipe; 704. a valve; 705. a diversion trench; 706. cleaning the plate; 707. a groove; 708. a spray head; 8. a water inlet; 9. a side plate; 10. a support leg; 11. a first connection block; 12. an electric push rod; 13. a moving wheel; 14. a second connecting block; 15. and (7) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Example one
Referring to fig. 1 to 4, a drilling apparatus for construction includes a stand body 1; the hydraulic support is characterized in that a hydraulic rod 2 is fixedly connected to the bottom of one side of the support body 1, a push plate 3 is fixedly connected to the bottom of the hydraulic rod 2, a motor 4 is fixedly connected to the top end of the push plate 3, a drill rod 5 is fixedly connected to the bottom of the motor 4, the push plate 3 is slidably connected to the inner wall of the support body 1, a mounting plate 6 is fixedly connected to the bottom of the support body 1, and a cleaning assembly is arranged at the top of the mounting plate 6;
the cleaning assembly comprises a supporting column 701, the supporting column 701 is fixedly connected to the top end of the mounting plate 6, a water storage tank 702 is fixedly connected to the top end of the supporting column 701, a connecting pipe 703 is fixedly connected to the bottom of the water storage tank 702, a valve 704 is fixedly connected to the center of the connecting pipe 703, a diversion trench 705 is formed in the inner wall of the mounting plate 6, the bottom of the connecting pipe 703 is communicated with the diversion trench 705, a cleaning plate 706 is fixedly connected to the inner wall of the support body 1, a groove 707 is formed in one side of the cleaning plate 706, a spray head 708 is fixedly connected to the inner wall 707 of the groove, and the diversion trench 705 is communicated with the spray head 708 in the cleaning plate 706;
in the working process, after drilling equipment for building construction drills, a large amount of mud can be carried on a drill bit, in the prior art, the drilling equipment is not provided with a device for cleaning the mud, manual cleaning of the mud is time-consuming and labor-consuming, cleaning of the mud is not convenient, the problem that the mud accumulated on a drill rod 5 of the drilling equipment is not convenient to clean is solved, when drilling operation is carried out, the hydraulic rod 2 is started to push the push plate 3 downwards through the hydraulic rod 2, so that the motor 4 and the drill rod 5 arranged on the push plate 3 are moved downwards, the motor 4 is started, the motor 4 drives the drill rod 5 to rotate, the drill rod 5 rotates to drill on a building site, when drilling is finished, the hydraulic rod 2 is contracted to drive the push plate 3, the motor 4 and the drill rod 5 to reset upwards, the valve 704 is opened at the same time, water in the water storage tank 702 flows into the diversion groove through the connecting pipe 703, and flows into the cleaning plate 706 through the spray head on the cleaning plate 706, and the water can be sprayed out from the spray head on the cleaning plate 706 to clean the drill rod 5 in the process of moving upwards.
The cleaning plates 706 are arc-shaped, the spray heads 708 are provided with a plurality of groups and are distributed on the inner wall of the groove 707 in an arc shape, the cleaning plates 706 and the hydraulic rod 2 are respectively provided with two groups and are symmetrically distributed on two sides of the bracket body 1, and the distance between the two groups of cleaning plates 706 is larger than the outer wall of the drill rod 5;
during operation, curved cleaning plate 706 is favorable to circular shape drilling rod 5 to wash, and two sets of cleaning plate 706 can wash drilling rod 5 both sides simultaneously to improve abluent efficiency, two sets of hydraulic stem 2 can be favorable to push pedal 3 both sides to promote, makes push pedal 3 both sides keep balance.
The side, away from the mounting plate 6, of the support body 1 is fixedly connected with support legs 10, the length of each support leg 10 is greater than that of the mounting plate 6, and the support legs 10 are arranged in two groups and distributed on one side of the support body 1 in parallel;
during operation, through set up two sets of landing legs 10 in support body 1 one side, accessible landing leg 10 comes to keep away from one side bottom reinforcing stable effect of mounting panel 6 to support body 1, prevents that storage water tank 702 on the mounting panel 6 from overweight to cause support body 1 slope.
The top end of the supporting leg 10 is fixedly connected with a first connecting block 11, one side of the first connecting block 11 is fixedly connected with an electric push rod 12, the bottom of the electric push rod 12 is connected with a moving wheel 13 in a sliding mode, one side of the mounting plate 6 is fixedly connected with a second connecting block 14, the first connecting block 11 and the second connecting block 14 are respectively provided with two groups and are respectively distributed in parallel, and the moving wheels 13 and the electric push rod 12 are respectively provided with four groups and are symmetrically distributed on one side of the two groups of the first connecting block 11 and the second connecting block 14;
when the drilling support is in use, when the support body 1 needs to be moved, the electric push rod 12 arranged on one side of the first connecting block 11 and the second connecting block 14 is started, so that the electric push rod 12 can push the moving wheels 13 downwards, and after the four groups of moving wheels 13 move downwards, the support body 1 can be supported and moved, so that the support body 1 can be conveniently moved to a drilling place.
A water inlet 8 is fixedly connected to the top end of the water storage tank 702, the water inlet 8 is funnel-shaped, a cover plate is fixedly connected to the top end of the water inlet 8 through a rotating shaft, and a sealing gasket is fixedly connected to the bottom of the cover plate;
during operation, through set up hourglass hopper-shaped water inlet 8 on storage water tank 702 top, can be convenient for add water in to storage water tank 702, through set up sealed the pad in apron inside, can prevent that water from spilling over.
The bottom of one side of the bracket body 1 is fixedly connected with side plates 9, the side plates 9 are square, and two groups of the side plates 9 are symmetrically distributed on two sides of the bracket body 1;
during operation, through set up two sets of curb plates 9 in support body 1 bottom, the area of contact on multiplicable support body 1 bottom and ground to improve the stability of support body 1 bottom.
Example two
Referring to fig. 5, in a first comparative example, as another embodiment of the present invention, a reinforcing rib 15 is fixedly connected to a top end of the supporting leg 10, and a top end of the reinforcing rib 15 is fixedly connected to one side of the bracket body 1; the reinforcement ribs 15 increase the stability of the leg 10 during operation.
Working principle, in order to solve the problem that mud accumulated on a drill rod 5 of drilling equipment is not convenient to clean, when drilling operation is carried out, by starting a hydraulic rod 2, the hydraulic rod 2 pushes a push plate 3 downwards, so that a motor 4 and the drill rod 5 arranged on the push plate 3 move downwards, and the motor 4 is started, the motor 4 drives the drill rod 5 to rotate, the drill rod 5 rotates to drill on a building site, by arranging two groups of supporting legs 10 on one side of a support body 1, the bottom of one side of the support body 1, which is far away from a mounting plate 6, can be enhanced in stabilizing effect through the supporting legs 10, by arranging two groups of side plates 9 on the bottom of the support body 1, the contact area between the bottom of the support body 1 and the ground can be increased, so that the stability of the bottom of the support body 1 is improved, when drilling is finished, by contracting the hydraulic rod 2, the push plate 3 is driven, the motor 4 and the drill rod 5 reset upwards, the funnel-shaped water inlet 8 is arranged at the top end of the water storage tank 702, water can be conveniently added into the water storage tank 702, the valve 704 is opened when the drill rod 5 moves upwards, the water in the water storage tank 702 flows into the guide groove 705 through the connecting pipe 703, the water flows into the cleaning plate 706 through the guide groove 705 and is sprayed out from the spray heads 708 on the cleaning plate 706, the arc-shaped cleaning plate 706 is favorable for cleaning the circular drill rod 5, two groups of cleaning plates 706 can simultaneously clean two sides of the drill rod 5, the areas of water spray can be increased by the groups of spray heads 708, the cleaning efficiency is improved, the drill rod 5 can be cleaned in the process of moving upwards of the drill rod 5, when the support body 1 needs to be moved, the electric push rod 12 arranged on one side of the first connecting block 11 and the second connecting block 14 is started, the electric push rod 12 can push the moving wheel 13 downwards, and the four groups of moving wheels 13 move downwards, the support body 1 can be supported and the support body 1 can be moved, so that the support body 1 can be conveniently moved to a drilling site.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (6)

1. A drilling rig for building construction, comprising a bracket body (1); the cleaning device is characterized in that a hydraulic rod (2) is fixedly connected to the bottom of one side of the support body (1), a push plate (3) is fixedly connected to the bottom of the hydraulic rod (2), a motor (4) is fixedly connected to the top end of the push plate (3), a drill rod (5) is fixedly connected to the bottom of the motor (4), the push plate (3) is slidably connected to the inner wall of the support body (1), a mounting plate (6) is fixedly connected to the bottom of the support body (1), and a cleaning assembly is arranged at the top of the mounting plate (6);
the cleaning assembly comprises a supporting column (701), the supporting column (701) is fixedly connected to the top end of the mounting plate (6), a water storage tank (702) is fixedly connected to the top end of the supporting column (701), a connecting pipe (703) is fixedly connected to the bottom of the water storage tank (702), a valve (704) is fixedly connected to the center of the connecting pipe (703), a guide groove (705) is formed in the inner wall of the mounting plate (6), the bottom of the connecting pipe (703) is communicated with the guide groove (705), a cleaning plate (706) is fixedly connected to the inner wall of the support body (1), a groove (707) is formed in one side of the cleaning plate (706), a spray head (708) is fixedly connected to the inner wall of the groove (707), and the guide groove (705) is communicated with the spray head (708) in the cleaning plate (706).
2. A drilling equipment for building construction according to claim 1, characterized in that: the shape of the cleaning plate (706) is arc-shaped, the spray head (708) is provided with a plurality of groups and is distributed on the inner wall of the groove (707) in an arc shape, the cleaning plate (706) and the hydraulic rod (2) are both provided with two groups and are symmetrically distributed on two sides of the bracket body (1) respectively, and the distance between the cleaning plates (706) is larger than the outer wall of the drill rod (5).
3. A construction drilling apparatus according to claim 2, wherein: one side rigid coupling that mounting panel (6) were kept away from in support body (1) has landing leg (10), landing leg (10) length is greater than the length of mounting panel (6), landing leg (10) set up two sets ofly to be parallel distribution in one side of support body (1).
4. A drilling equipment for building construction according to claim 3, characterized in that: landing leg (10) top rigid coupling has first connecting block (11), first connecting block (11) one side rigid coupling has electric putter (12), electric putter (12) bottom sliding connection has removal wheel (13), mounting panel (6) one side rigid coupling has second connecting block (14), first connecting block (11) and second connecting block (14) all are provided with two sets ofly to be parallel distribution respectively, removal wheel (13) and electric putter (12) all set up four groups to be symmetric distribution in two sets of first connecting block (11) and second connecting block (14) one side.
5. A drilling rig for building construction according to claim 4, characterized in that: storage water tank (702) top rigid coupling has water inlet (8), water inlet (8) shape is for leaking hopper-shaped, water inlet (8) top has the apron through the pivot rigid coupling, apron bottom rigid coupling has sealed the pad.
6. A drilling rig for building construction according to claim 5, characterized in that: the support is characterized in that a side plate (9) is fixedly connected to the bottom of one side of the support body (1), the side plate (9) is square, and the side plates (9) are arranged in two groups and are symmetrically distributed on two sides of the support body (1).
CN202222651170.9U 2022-10-09 2022-10-09 Drilling equipment for building construction Active CN218669233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222651170.9U CN218669233U (en) 2022-10-09 2022-10-09 Drilling equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222651170.9U CN218669233U (en) 2022-10-09 2022-10-09 Drilling equipment for building construction

Publications (1)

Publication Number Publication Date
CN218669233U true CN218669233U (en) 2023-03-21

Family

ID=85562117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222651170.9U Active CN218669233U (en) 2022-10-09 2022-10-09 Drilling equipment for building construction

Country Status (1)

Country Link
CN (1) CN218669233U (en)

Similar Documents

Publication Publication Date Title
CN207386083U (en) Hose sheath cleaning device
CN206309285U (en) A kind of Geotechnical Engineering drilling machine
CN108774980B (en) Tunnel cleaning vehicle
US20060144961A1 (en) Pressure washer
CN218669233U (en) Drilling equipment for building construction
CN215252955U (en) Ecological restoration equipment for high and steep slope of southern quarry
CN212200723U (en) Ditch wall cleaning device
CN112170329A (en) Foundation pit support bored pile construction equipment and method thereof
CN213662894U (en) Building roof greening water-saving irrigation device
CN205895298U (en) Tunnel construction building site dust collector
CN211055103U (en) Water-saving car washing equipment
CN114164834A (en) Ultrahigh-pressure jet grouting pile machine and jet grouting pile construction method
CN217911813U (en) Quick cleaning device for drill bit of rotary drilling machine
CN215758993U (en) Stirring pile for geotechnical engineering
CN110935672A (en) Construction machinery cleaning method
CN217203530U (en) Sprinkler is used in road bridge maintenance
CN219528979U (en) Rotary-digging filling pile for foundation pit
CN216739430U (en) Concrete cleaning device
CN220550618U (en) Multifunctional dredging device for culvert
CN214831754U (en) A maintenance device of moisturizing for concrete bridge
CN217896373U (en) Dust collector is used in building engineering construction
CN220697727U (en) Decontamination equipment for chemical industry
CN219671247U (en) Construction device for post-pouring zone of aqueduct body of irrigation area
CN212473397U (en) Assembled removes carwash pond
CN212561668U (en) Ditching device for construction