CN218668620U - Steel construction embedded bolt support device - Google Patents
Steel construction embedded bolt support device Download PDFInfo
- Publication number
- CN218668620U CN218668620U CN202222910351.9U CN202222910351U CN218668620U CN 218668620 U CN218668620 U CN 218668620U CN 202222910351 U CN202222910351 U CN 202222910351U CN 218668620 U CN218668620 U CN 218668620U
- Authority
- CN
- China
- Prior art keywords
- pull rod
- standard
- upper portion
- support device
- adjusting mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 45
- 239000010959 steel Substances 0.000 title claims abstract description 45
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 230000007246 mechanism Effects 0.000 claims abstract description 41
- 230000000694 effects Effects 0.000 claims abstract description 12
- 239000011150 reinforced concrete Substances 0.000 abstract description 7
- 210000003205 muscle Anatomy 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 5
- 230000009471 action Effects 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000004567 concrete Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a pre-buried bolt support device of steel construction, which comprises a bracket body, the upper portion of stake body is provided with a plurality of first shaped steel, two be provided with a plurality of first connecting plates between the first shaped steel, left side be provided with first adjustment mechanism on the first connecting plate, first adjustment mechanism's upper portion is provided with a plurality of second shaped steel, two be provided with second connecting plate, front side between the second shaped steel be provided with second adjustment mechanism on the second connecting plate, second adjustment mechanism's upper portion is provided with a plurality of standard rulers. The utility model discloses when using, can go on around the standard ruler, control the direction and adjust the calibration, ensured buried bolt's position precision, can adjust the interval between two standard rulers simultaneously for buried bolt has guaranteed the construction progress with the excellent in connection effect of reinforced concrete basis owner muscle, has practiced thrift the cost, is applicable to burying underground of the bolt of multiple form.
Description
Technical Field
The utility model relates to a steel construction engineering construction technical field specifically is a steel construction buried bolt support device in advance.
Background
In the construction process of steel structure engineering, large-scale reinforced concrete foundations and equipment foundations need to be built for the buildings, structural bolts connected with the steel structure (column) and the reinforced concrete foundations are buried, usually, independent support systems and fixed molds are manufactured for the buried bolts, the molds in the fixed forms are only installed for the bolts in one form, the manufacturing cost is high, the construction speed is low, the structures are mostly disposable products, the turnover performance is poor, and the position precision is not high. Therefore, the technical personnel in the field provide a steel structure embedded bolt bracket device to solve the problems provided in the background technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pre-buried bolt support device of steel construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pre-buried bolt support device of steel construction, includes the stake body, the upper portion of stake body is provided with a plurality of first shaped steel, two be provided with a plurality of first connecting plates between the first shaped steel, the left side be provided with first adjustment mechanism on the first connecting plate, first adjustment mechanism's upper portion is provided with a plurality of second shaped steel, two be provided with the second connecting plate between the second shaped steel, the front side be provided with second adjustment mechanism on the second connecting plate, second adjustment mechanism's upper portion is provided with a plurality of standard rulers, two be provided with third adjustment mechanism between the standard ruler.
Preferably, the first adjusting mechanism comprises a first connecting frame and a first movable pull rod, the first connecting frame is installed on the left first connecting plate in a penetrating mode, the first movable pull rod is installed at the right end of the first connecting frame, the first movable pull rod is connected with the two first section steels in a sliding mode, the upper end of the first movable pull rod is connected with the bottom of the second section steel, and a first rotating handle is installed at the left end of the first connecting frame.
Preferably, the second adjusting mechanism comprises a second connecting frame and a second movable pull rod, the second connecting frame is arranged on the left second connecting plate in a penetrating mode, the second movable pull rod is arranged at the rear end of the second connecting frame and connected with two second type steels in a sliding mode, the upper end of the second movable pull rod is connected with the bottom of the standard ruler, and a second rotating handle is arranged at the left end of the second connecting frame.
Preferably, the third adjusting mechanism comprises a first connecting sleeve and a second connecting sleeve, the first connecting sleeve is rotatably installed at the bottom of the upper end standard ruler, the second connecting sleeve is installed at the bottom of the first connecting sleeve in a threaded mode, and the bottom of the second connecting sleeve is connected with the upper portion of the lower end standard ruler.
Preferably, the middle of the upper portion of the standard ruler is provided with a pouring vibration hole, and the periphery of the upper portion of the standard ruler is provided with bolt holes.
Preferably, the pouring vibration hole in the standard ruler at the upper end is the same as the inner diameter of the first connecting sleeve, and the pouring vibration hole in the standard ruler at the lower end is the same as the inner diameter of the second connecting sleeve.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model is provided with the first adjusting mechanism and the second adjusting mechanism, the left and right positions of the standard ruler can be adjusted through the first adjusting mechanism, and the front and back positions of the standard ruler can be adjusted through), so that the position precision of the embedded bolt can be ensured;
2. the utility model discloses still set up third adjustment mechanism simultaneously, can adjust the interval between two standard rulers through third adjustment mechanism to can adapt to the buried bolt in advance of different length, and then make buried bolt in advance's installation effect can be better.
Drawings
Fig. 1 is a schematic structural view of a first viewing angle of the present invention;
fig. 2 is a schematic structural view of a second viewing angle of the present invention;
fig. 3 is an illustration of the explosive connection structure between the two gauge rules and the third adjusting mechanism of the present invention.
In the figure: 1. a stent body; 2. a first section steel; 3. a first connecting plate; 4. a first adjustment mechanism; 41. a first connection frame; 42. a first movable pull rod; 5. a second section steel; 6. a second connecting plate; 7. a second adjustment mechanism; 71. a second connection frame; 72. a second movable pull rod; 8. a standard ruler; 9. a third adjustment mechanism; 91. a first connecting sleeve; 92. a second connecting sleeve; 10. pouring a vibrating hole; 11. bolt holes; 12. a first rotating handle; 13. a second turning handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a steel structure pre-buried bolt support device comprises a support body 1, wherein a plurality of first section steels 2 are fixedly mounted on the upper portion of the support body 1, a plurality of first connecting plates 3 are fixedly mounted between the two first section steels 2, a first adjusting mechanism 4 is arranged on the first connecting plate 3 on the left side, a plurality of second section steels 5 are fixedly mounted on the upper portion of the first adjusting mechanism 4, a second connecting plate 6 is fixedly mounted between the two second section steels 5, a second adjusting mechanism 7 is arranged on the second connecting plate 6 on the front side, a plurality of standard rulers 8 are mounted on the upper portion of the second adjusting mechanism 7, and a third adjusting mechanism 9 is arranged between the two standard rulers 8;
the first adjusting mechanism 4 comprises a first connecting frame 41 and a first movable pull rod 42, the first connecting frame 41 is installed on the first connecting plate 3 on the left side in an inserting mode, the first movable pull rod 42 is installed at the right end of the first connecting frame 41, the first movable pull rod 42 is connected with the two first section steels 2 in a sliding mode, the upper end of the first movable pull rod 42 is connected with the bottom of the second section steel 5, the first rotating handle 12 is installed at the left end of the first connecting frame 41, and the left position and the right position of the standard ruler 8 can be calibrated through the first adjusting mechanism 4;
the second adjusting mechanism 7 comprises a second connecting frame 71 and a second movable pull rod 72, the second connecting frame 71 is installed on the second connecting plate 6 on the left side in an inserting mode, the second movable pull rod 72 is installed at the rear end of the second connecting frame 71, the second movable pull rod 72 is connected with the two second section steels 5 in a sliding mode, the upper end of the second movable pull rod 72 is connected with the bottom of the standard ruler 8, the left end of the second connecting frame 71 is provided with a second rotating handle 13, and the front position and the rear position of the standard ruler 8 can be calibrated through the second adjusting mechanism 7;
the third adjusting mechanism 9 comprises a first connecting sleeve 91 and a second connecting sleeve 92, the first connecting sleeve 91 is rotatably installed at the bottom of the upper standard ruler 8, the second connecting sleeve 92 is installed at the bottom of the first connecting sleeve 91 in a threaded manner, the bottom of the second connecting sleeve 92 is connected with the upper part of the lower standard ruler 8, and the distance between the two standard rulers 8 can be calibrated through the third adjusting mechanism 9, so that the third adjusting mechanism is suitable for embedding bolts in various forms;
a pouring vibration hole 10 is formed in the middle of the upper portion of the standard ruler 8, bolt holes 11 are formed in the periphery of the upper portion of the standard ruler 8, concrete is poured through the pouring vibration hole 10, and embedded bolts are installed through the bolt holes 11;
the inner diameter of the pouring vibration hole 10 on the upper standard ruler 8 is the same as that of the first connecting sleeve 91, and the inner diameter of the pouring vibration hole 10 on the lower standard ruler 8 is the same as that of the second connecting sleeve 92.
The working principle is as follows: the utility model discloses when using, at first place the stake body 1 on reinforced concrete basis and fixed, then promote first rotation handle 12 and can drive first movable pull rod 42 through first carriage 41 and remove, first movable pull rod 42 removes and can make standard ruler 8 remove, can adjust the position about standard ruler 8, then promote second rotation handle 13 and can drive second movable pull rod 72 through second carriage 71 and remove, second movable pull rod 72 removes and can make standard ruler 8 back-and-forth movement, can adjust the front and back position of standard ruler 8, thereby can carry out the front and back to standard ruler 8, left and right sides direction regulation calibration, align bolt hole 12 in the locating plate with reinforced concrete basis owner muscle, then penetrate bolt hole 11 with buried bolt hole 91, with buried bolt hole and reinforced concrete basis owner muscle welded fastening, concrete is pour at last, then mix through hole 10 that vibrates, and when penetrating bolt hole 11 with buried bolt hole, can adjust the distance between two standard ruler 8 through first adapter sleeve 91 and the 92 threaded connection of second built-in advance bolt hole, thereby can adapt to the bolt of different length, make the foundation bolt and buried steel bar connection effect better.
The utility model discloses when using, can go on around, control the direction regulation calibration to standard ruler 8, ensured buried bolt's position precision, can adjust the interval between two standard rulers 8 simultaneously for buried bolt has been guaranteed the construction progress better with the connected effect of reinforced concrete basis owner muscle in advance, has practiced thrift the cost, is applicable to burying underground of the bolt of multiple form.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a pre-buried bolt support device of steel construction, includes stake body (1), its characterized in that: the upper portion of the support body (1) is provided with a plurality of first section steels (2), two a plurality of first connecting plates (3) are arranged between the first section steels (2), the left side is provided with a first adjusting mechanism (4) on the first connecting plate (3), the upper portion of the first adjusting mechanism (4) is provided with a plurality of second section steels (5), two a second connecting plate (6) is arranged between the second section steels (5), the front side is provided with a second adjusting mechanism (7) on the second connecting plate (6), the upper portion of the second adjusting mechanism (7) is provided with a plurality of standard rulers (8), and two a third adjusting mechanism (9) is arranged between the standard rulers (8).
2. The steel structure embedded bolt support device according to claim 1, characterized in that: first adjustment mechanism (4) include first connection frame (41) and first activity pull rod (42), first connection frame (41) alternate and install on left first connecting plate (3), the right-hand member at first connection frame (41) is installed in first activity pull rod (42), first activity pull rod (42) and two first shaped steel (2) sliding connection, just the upper end of first activity pull rod (42) is connected with the bottom of second shaped steel (5), first handle (12) of rotating is installed to the left end of first connection frame (41).
3. The steel structure embedded bolt support device according to claim 1, characterized in that: second adjustment mechanism (7) include second connecting frame (71) and second activity pull rod (72), second connecting frame (71) alternate and install on left second connecting plate (6), the rear end at second connecting frame (71) is installed in second activity pull rod (72), second activity pull rod (72) and two second type steel (5) sliding connection, just the upper end and the bottom of standard ruler (8) of second activity pull rod (72) are connected, second rotation handle (13) are installed to the left end of second connecting frame (71).
4. The steel structure embedded bolt support device according to claim 1, characterized in that: the third adjusting mechanism (9) comprises a first connecting sleeve (91) and a second connecting sleeve (92), the first connecting sleeve (91) is rotatably installed at the bottom of the upper end standard ruler (8), the second connecting sleeve (92) is installed at the bottom of the first connecting sleeve (91) in a threaded mode, and the bottom of the second connecting sleeve (92) is connected with the upper portion of the lower end standard ruler (8).
5. The steel structure embedded bolt support device according to claim 1, characterized in that: the upper portion of standard chi (8) middle part seted up pour hole of vibrating (10), bolt hole (11) have all been seted up all around on the upper portion of standard chi (8).
6. The steel structure embedded bolt support device according to claim 4, characterized in that: the inner diameters of the pouring vibrating holes (10) in the standard ruler (8) at the upper end and the first connecting sleeve (91) are the same, and the inner diameters of the pouring vibrating holes (10) in the standard ruler (8) at the lower end and the second connecting sleeve (92) are the same.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222910351.9U CN218668620U (en) | 2022-11-02 | 2022-11-02 | Steel construction embedded bolt support device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222910351.9U CN218668620U (en) | 2022-11-02 | 2022-11-02 | Steel construction embedded bolt support device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218668620U true CN218668620U (en) | 2023-03-21 |
Family
ID=85569338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222910351.9U Active CN218668620U (en) | 2022-11-02 | 2022-11-02 | Steel construction embedded bolt support device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218668620U (en) |
-
2022
- 2022-11-02 CN CN202222910351.9U patent/CN218668620U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758787B (en) | A kind of Precast Pier Columns mounting and positioning device | |
CN211735428U (en) | Rock slope guiding and guiding hole construction platform | |
CN113622316A (en) | Steel truss girder multipoint traction type pushing construction system and construction method thereof | |
CN218668620U (en) | Steel construction embedded bolt support device | |
CN206233595U (en) | Pump line sliding support | |
CN214005742U (en) | Adjustable anti-settling well lid installation auxiliary device | |
CN206111241U (en) | A steel structure support bracket that is used for at tunnel top arrangement total powerstation | |
CN218466604U (en) | Soft foundation monitoring middle and deep layer settlement monitoring device | |
CN111549815A (en) | Steel structure foundation bolt pre-embedding construction method | |
CN215759019U (en) | Deep hole bored concrete pile steel reinforcement cage correcting unit | |
CN110004939A (en) | A kind of device and construction method applied to foundation pit support replacement | |
CN113356185B (en) | Assembled underground station steel pipe column and accurate installation method thereof | |
CN211898441U (en) | Pipeline slot soil stone excavation protective structure | |
CN207330189U (en) | A kind of pipe pile foundation tower crane steel platform | |
CN113309101B (en) | Positioning device for prefabricated support pile and using method | |
CN219825295U (en) | Horizontal steel supporting structure for reverse construction method | |
CN220953518U (en) | Tower crane concrete foundation fixing device of steel tube bundle structure | |
CN211816194U (en) | Reinforced structure is used in construction of city rail underground station ground diaphragm wall | |
CN218643865U (en) | Special-shaped beam oblique angle positioning concrete pouring formwork | |
CN217923620U (en) | Deep foundation pit supporting device | |
JPH0717715Y2 (en) | Concrete pouring rail support structure | |
CN210127477U (en) | Foundation pit and side slope retaining structure of prestress assembly type special-shaped pile wall | |
CN216865717U (en) | Water-stopping fish scale net sheet for basement post-cast strip | |
CN213978539U (en) | Steel-concrete composite beam embedded part | |
CN108678289B (en) | Steel bar positioning integrated device for building construction and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 130033 no.3799 dongnanhu Road, Changchun Economic and Technological Development Zone, Jilin Province Patentee after: SINOHYDRO BUREAU 1 Co.,Ltd. Patentee after: China Power Construction First Bureau Dongyuan Engineering Co.,Ltd. Address before: 130033 no.3799 dongnanhu Road, Changchun Economic and Technological Development Zone, Jilin Province Patentee before: SINOHYDRO BUREAU 1 Co.,Ltd. Patentee before: Jilin Dongyuan water conservancy and Hydropower Engineering Consulting Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |