CN218667532U - Positioning equipment for pile foundation construction - Google Patents

Positioning equipment for pile foundation construction Download PDF

Info

Publication number
CN218667532U
CN218667532U CN202222815505.6U CN202222815505U CN218667532U CN 218667532 U CN218667532 U CN 218667532U CN 202222815505 U CN202222815505 U CN 202222815505U CN 218667532 U CN218667532 U CN 218667532U
Authority
CN
China
Prior art keywords
pile foundation
sides
pile
bottom plate
mount pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222815505.6U
Other languages
Chinese (zh)
Inventor
张永安
王如麟
李宏伟
陈龙
孙俊泰
魏宝华
金龙军
陈天天
张银忠
祝剑军
王丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiuzhou Geotechnical Engineering Co ltd
Original Assignee
Gansu Jiuzhou Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiuzhou Geotechnical Engineering Co ltd filed Critical Gansu Jiuzhou Geotechnical Engineering Co ltd
Priority to CN202222815505.6U priority Critical patent/CN218667532U/en
Application granted granted Critical
Publication of CN218667532U publication Critical patent/CN218667532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a pile foundation construction technical field especially relates to a positioning equipment for pile foundation construction. The technical scheme comprises the following steps: guide cylinder, mount pad, bottom plate and fixed subassembly, the internally mounted of mount pad has communicating pipe, and guide cylinder is installed at the top of mount pad, and the collar is installed to guide cylinder's top, and the fixing base is installed to the both sides of collar, and the steel cable is installed to the bottom both sides of collar, and the bottom plate is installed to the bottom of mount pad, and two sets of fixed subassemblies are installed to the bottom both sides of bottom plate, installs the spud pile in the fixed subassembly, and the inside both sides of spud pile are equipped with the blowoff hole. The utility model discloses an install the spud pile in the bottom of bottom plate, can be through spud pile embedding ground, and then carry out the fixed of horizontal direction to the bottom of bottom plate for the device is after aligning with the entrance to a cave of installation hole, can avoid the pile foundation to exert thrust to the device and cause the skew of device, has increased the location effect of device to the pile foundation.

Description

Positioning equipment for pile foundation construction
Technical Field
The utility model relates to a pile foundation construction technical field specifically is a positioning equipment for pile foundation construction.
Background
The pile foundation construction makes at the construction initial stage, carries out the construction of concrete pile to the basis of building to can guarantee the stability of building bottom, and the pile foundation when burying the installation, need adopt positioner to carry on spacingly to the pile foundation, with the accuracy of guaranteeing the construction, therefore we provide a positioning device for the pile foundation construction.
Through the retrieval, patent publication number is CN214194538U discloses a pile foundation construction positioner, relates to pile foundation construction technical field, including the support column, the lift groove has been seted up to the inside of support column, the mouth that rotates has been seted up at the front surface top of lift groove, the inside swing joint of lift groove has the lift post, the top one side fixedly connected with fixed plate of lift post, the shifting chute has all been seted up at the both ends of fixed plate, one side fixedly connected with second pinion rack of shifting chute, the mouth that rotates is seted up at the top of shifting chute.
The existing positioning equipment for pile foundation construction has the following defects:
1. when the conventional positioning equipment for pile foundation construction is used for fixing the device, the conventional positioning device can only be used by being placed on the ground, so that the device is easy to be pushed by the pile foundation to cause horizontal deviation when the pile foundation is installed, the pile foundation cannot be positioned, and the practicability of the device is reduced;
2. current positioning device for pile foundation construction is when installing the pile foundation, and traditional pile foundation positioner is not ideal enough to the guide effect of pile foundation, and the device is when fixing a position the pile foundation, and the pile foundation needs longer time with the alignment work of installation hole, not only has higher operating requirement to operating personnel, still can influence the installation effectiveness of pile foundation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a positioning device is used in pile foundation construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a positioning equipment is used in pile foundation construction, includes guide tube, mount pad, bottom plate and fixed subassembly, the internally mounted of mount pad has communicating pipe, guide tube is installed at the top of mount pad, the collar is installed to guide tube's top, the fixing base is installed to the both sides of collar, the steel cable is installed to the bottom both sides of collar, the bottom plate is installed to the bottom of mount pad, two sets of fixed subassemblies are installed to the bottom both sides of bottom plate, install the spud pile in the fixed subassembly, the inside both sides of spud pile are equipped with the blowoff hole, the internally mounted of spud pile has spacing cover.
When using a positioning device for pile foundation construction among this technical scheme, through the marginal block of spacing section of thick bamboo and pot hole, place the device perpendicularly subaerial around the pot hole downwards, the spud pile carries out the spacing of horizontal direction to the device in inserting soil simultaneously, avoids the device to produce the skew when using, utilizes the guide section of thick bamboo to guide the pile foundation, makes the pile foundation pass through communicating pipe and gets into the pot hole of installation use, and then makes the pile foundation receive the location of device and install in appointed position.
Preferably, pulleys are installed on two sides of the interior of the guide cylinder, and six groups of fixing bolts are installed at the bottom of the guide cylinder. The pulley can contact with the outside of pile foundation, and then avoids the pile foundation to produce the friction with the inner wall of guide section of thick bamboo and cause the guide section of thick bamboo to damage, and fixing bolt can be with guide section of thick bamboo and mount pad fixed connection, and then can increase the installation stability of device.
Preferably, the top of the mounting seat is provided with a top plate, and the two sides of the top plate are provided with anti-skid pads. The roof can provide the position of installation for the subassembly at top, and the slipmat can carry out anti-skidding to staff's sole and handle, and then can avoid the staff to skid when the operation and cause the engineering accident.
Preferably, the bottom of bottom plate is installed with a spacing section of thick bamboo, and the internally mounted of a spacing section of thick bamboo has two sets of guide wheels. Spacing section of thick bamboo can with the edge block of hole, and then can be convenient for carry on spacingly to the bottom of device for the pile foundation can get into the inside of pot hole and install, the guide wheel can contact with the outside of pile foundation, and then avoids the pile foundation to trigger with spacing coupling and takes place wearing and tearing.
Preferably, the connecting rod is installed at the top of spud pile, and spacing dish is installed at the top of connecting rod. The connecting rod can extend to the top of bottom plate, and then can with spud pile fixed mounting in the bottom of bottom plate, spacing dish can carry out spacing fixed to the top of connecting rod, and then has increased the installation stability of spud pile.
Preferably, the bottom of the steel cable is provided with a hanging ring, and the bottom of the hanging ring is provided with a hook. Rings can be connected with the steel cable, and then can utilize steel cable and couple fixed connection, one side and the guide section of thick bamboo fixed connection of couple, and then can utilize couple and rings cooperation, make the steel cable hoist and mount the device to in remove the device.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install the spud pile in the bottom of bottom plate, can be through spud pile embedding ground, and then carry out the fixed of horizontal direction to the bottom of bottom plate for the device is after aligning with the entrance to a cave of installation hole, can avoid the pile foundation to exert thrust to the device and cause the skew of device, has increased the location effect of device to the pile foundation.
2. The utility model discloses an install guide cylinder at the top of mount pad, can get into communicating pipe through the toper opening guide pile foundation at guide cylinder top, and then make the pile foundation from getting into underground pot hole communicating pipe, not only can make the pile foundation easily put into the pot hole, can also reduce pile foundation operation required precision when the installation, and then can promote the work efficiency when the pile foundation is installed.
Drawings
Fig. 1 is a schematic view of a three-dimensional structure of the present invention;
fig. 2 is a schematic front sectional structure of the present invention;
FIG. 3 is a front external view of the present invention;
fig. 4 is a schematic view of a local structure of the fixing assembly of the present invention.
In the figure: 1. a guide cylinder; 101. a pulley; 102. fixing the bolt; 2. a mounting seat; 201. a non-slip mat; 202. a top plate; 203. a communicating pipe; 3. a base plate; 301. a limiting cylinder; 302. a guide wheel; 4. a fixing assembly; 401. fixing the pile; 402. a sewage draining hole; 403. a limiting disc; 404. a connecting rod; 405. a limiting cover; 5. a mounting ring; 501. hooking; 502. a hoisting ring; 503. a fixed seat; 504. a wire rope.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1-4, the utility model provides a positioning device is used in pile foundation construction, including guide tube 1, mount pad 2, bottom plate 3 and fixed subassembly 4, the internally mounted of mount pad 2 has communicating pipe 203, guide tube 1 is installed at the top of mount pad 2, collar 5 is installed to guide tube 1's top, fixing base 503 is installed to collar 5's both sides, steel cable 504 is installed to collar 5's bottom both sides, bottom plate 3 is installed to mount pad 2's bottom, two sets of fixed subassemblies 4 are installed to bottom 3's bottom both sides, install spud pile 401 in the fixed subassembly 4, the inside both sides of spud pile 401 are equipped with blowoff hole 402, the internally mounted of spud pile 401 has spacing cover 405.
The working principle of the positioning equipment for pile foundation construction based on the first embodiment is as follows: through the marginal block of spacing section of thick bamboo 301 with the pot hole, place the device perpendicularly subaerial around the pot hole downwards, the spud pile 401 carries out horizontal direction's spacing to the device in inserting soil simultaneously, avoids the device to produce the skew when using, utilizes guide section of thick bamboo 1 to guide the pile foundation, makes the pile foundation get into the pot hole of installation use through communicating pipe 203 in, and then makes the pile foundation receive the location that the device installs at appointed position.
Example two
As shown in fig. 1-4, the utility model provides a positioning device for pile foundation construction compares in embodiment one, and this embodiment still includes: pulley 101 is installed to the inside both sides of guide cylinder 1, and six sets of fixing bolt 102 are installed to the bottom of guide cylinder 1, roof 202 is installed at the top of mount pad 2, and slipmat 201 is installed to the top both sides of roof 202, spacing section of thick bamboo 301 is installed to the bottom of bottom plate 3, and the internally mounted of spacing section of thick bamboo 301 has two sets of guide wheels 302, connecting rod 404 is installed at the top of spud pile 401, and spacing dish 403 is installed at the top of connecting rod 404, rings 502 are installed to the bottom of steel cable 504, and couple 501 is installed to the bottom of rings 502.
In this embodiment, the pulley 101 may contact with an outer side of a pile foundation, and further prevent the pile foundation from being damaged by the guiding cylinder 1 due to friction generated by the inner wall of the guiding cylinder 1, the fixing bolt 102 may fixedly connect the guiding cylinder 1 with the mounting seat 2, and further increase the installation stability of the device, the top plate 202 may provide an installation position for the top component, the non-slip mat 201 may perform non-slip treatment on a sole of a worker, and further may prevent the worker from slipping during operation to cause an engineering accident, the limiting cylinder 301 may be engaged with an edge of a hole, and further may facilitate limiting the bottom of the device, so that the pile foundation may enter the inside of a pot hole to be installed, the guiding wheel 302 may contact with an outer side of the pile foundation, and further prevent the pile foundation from being worn due to contact with the limiting cylinder 301, the connecting rod 404 may extend to the top of the bottom plate 3, and further may fixedly install the fixing pile at the bottom of the bottom plate 3, the limiting disc 403 may perform limiting fixation and fixation on the top of the connecting rod 404, and further increase the installation stability of the fixing pile 401, the hanging ring 502 may be connected with the steel cable 504, and further may facilitate moving of the hanging device, and hanging ring 501.
The above embodiments are merely some preferred embodiments of the present invention, and those skilled in the art can make various alternative modifications and combinations to the above embodiments based on the technical solution of the present invention and the related teachings of the above embodiments.

Claims (6)

1. The utility model provides a positioning equipment is used in pile foundation construction, includes guide cylinder (1), mount pad (2), bottom plate (3) and fixed subassembly (4), its characterized in that: the internally mounted of mount pad (2) has communicating pipe (203), guide tube (1) is installed at the top of mount pad (2), collar (5) is installed to the top of guide tube (1), fixing base (503) are installed to the both sides of collar (5), steel cable (504) are installed to the bottom both sides of collar (5), bottom plate (3) are installed to the bottom of mount pad (2), two sets of fixed subassembly (4) are installed to the bottom both sides of bottom plate (3), install spud pile (401) in fixed subassembly (4), the inside both sides of spud pile (401) are equipped with blowoff hole (402), the internally mounted of spud pile (401) has spacing cover (405).
2. The positioning device for pile foundation construction according to claim 1, wherein: pulleys (101) are installed on two sides of the interior of the guide cylinder (1), and six groups of fixing bolts (102) are installed at the bottom of the guide cylinder (1).
3. The positioning device for pile foundation construction according to claim 1, wherein: a top plate (202) is installed at the top of the installation seat (2), and anti-slip pads (201) are installed on two sides of the top plate (202).
4. The positioning device for pile foundation construction according to claim 1, wherein: the bottom of bottom plate (3) is installed a spacing section of thick bamboo (301), and the internally mounted of a spacing section of thick bamboo (301) has two sets of guide wheels (302).
5. The positioning device for pile foundation construction according to claim 1, wherein: connecting rod (404) is installed at the top of spud pile (401), and spacing dish (403) is installed at the top of connecting rod (404).
6. The positioning device for pile foundation construction according to claim 1, wherein: hanging rings (502) are installed at the bottom of the steel cable (504), and hooks (501) are installed at the bottom of the hanging rings (502).
CN202222815505.6U 2022-10-25 2022-10-25 Positioning equipment for pile foundation construction Active CN218667532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222815505.6U CN218667532U (en) 2022-10-25 2022-10-25 Positioning equipment for pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222815505.6U CN218667532U (en) 2022-10-25 2022-10-25 Positioning equipment for pile foundation construction

Publications (1)

Publication Number Publication Date
CN218667532U true CN218667532U (en) 2023-03-21

Family

ID=85567429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222815505.6U Active CN218667532U (en) 2022-10-25 2022-10-25 Positioning equipment for pile foundation construction

Country Status (1)

Country Link
CN (1) CN218667532U (en)

Similar Documents

Publication Publication Date Title
CN108678752B (en) Shaft equipment rapid installation process
JPH0585681A (en) Elevator hoist way work platform and installation method for elevator system structual part
CN110552703B (en) Duct piece mounting system applied to shaft construction
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN205709343U (en) The inverse dress special building hoist of moldeed depth foundation ditch
CN218667532U (en) Positioning equipment for pile foundation construction
CN215287701U (en) Special lifting appliance for prefabricated wall
CN105715028B (en) Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear
CN208150862U (en) A kind of lifting platform for the construction of large-scale deep shaft
US6354769B1 (en) Apparatus and method for replacing in-ground elevator cylinder casings
CN113503042B (en) Butt joint installation device for building curtain wall
CN211735679U (en) Urban sewage pipeline treatment device
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN216788331U (en) Mast lying pipe support of core drill
CN214828320U (en) Deep well pump hoisting fixture
CN218088597U (en) Town road drainage pipe laying device
CN219585666U (en) Manhole cover lifting device
CN215755914U (en) Novel special frock is lifted by crane to hydroelectric set runner
CN205687456U (en) A kind of portable high-pressure line guy dish delivery device
CN212742940U (en) Multi-rope open type wall connecting box
CN204253042U (en) Vertical rail guide pit shaft hanging scaffold structure
CN215946554U (en) Pipe elevator
CN219973848U (en) Steel pipe concrete pouring platform
CN212248305U (en) Supplementary foundation ditch falls drain pipe fixed bolster
JP7440435B2 (en) Fluid collection mount

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant