CN218653486U - Tail powder absorption tower - Google Patents

Tail powder absorption tower Download PDF

Info

Publication number
CN218653486U
CN218653486U CN202222903950.8U CN202222903950U CN218653486U CN 218653486 U CN218653486 U CN 218653486U CN 202222903950 U CN202222903950 U CN 202222903950U CN 218653486 U CN218653486 U CN 218653486U
Authority
CN
China
Prior art keywords
tower body
tailings
cardboard
absorption tower
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222903950.8U
Other languages
Chinese (zh)
Inventor
刘国集
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingzhou Xinxiang Chemical Co ltd
Original Assignee
Jingzhou Xinxiang Chemical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingzhou Xinxiang Chemical Co ltd filed Critical Jingzhou Xinxiang Chemical Co ltd
Priority to CN202222903950.8U priority Critical patent/CN218653486U/en
Application granted granted Critical
Publication of CN218653486U publication Critical patent/CN218653486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to a tailings treatment technical field discloses a tailings absorption tower, include: the tower body is communicated with an air inlet pipe at the outer side; the filter screen is arranged in the tower body, and a first clamping groove is formed in one side of the filter screen; the collecting frame is arranged inside the tower body, and a second clamping groove is formed in one side of the collecting frame; the mounting assembly comprises a connecting frame, a fixing plate, a first clamping plate and a second clamping plate, wherein the first clamping plate is movably clamped in a first clamping groove, the second clamping plate is movably clamped in a second clamping groove, vertical plates are fixedly mounted on the right sides of the first clamping plate and the second clamping plate, and the two vertical plates are fixedly mounted at the top and the bottom of the connecting frame respectively. The utility model has the advantages of it is following and effect: through the mutual cooperation between installation component and the tower body be convenient for realize the filter screen of tower body inside and collect quick installation and the dismantlement work of frame to be convenient for clear up.

Description

Tail powder absorption tower
Technical Field
The utility model relates to a tail powder treatment technical field, in particular to tail powder absorption tower.
Background
A large amount of tailings can be generated in the production process of the same-nature coke powder, dust and coal dust are easily polluted, the production and living environment is seriously influenced, secondly, a large amount of coke powder particles are contained in the tailings, a large amount of coke powder can be recycled through proper treatment, waste materials can be effectively utilized, and dust pollution in the atmosphere is reduced.
The conventional tail powder absorption tower is inconvenient to open, so that the interior is inconvenient to clean; we therefore propose a tailings absorption tower to solve this problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a tail powder absorption tower has the effect of the clearance of being convenient for.
The above technical purpose of the present invention can be achieved by the following technical solutions: a tailings absorption tower comprising:
the tower body, the outside of the said tower body is communicated with the intake pipe;
the filter screen is arranged inside the tower body, and a first clamping groove is formed in one side of the filter screen;
the collecting frame is arranged inside the tower body, and a second clamping groove is formed in one side of the collecting frame;
the installation component, the installation component includes carriage, fixed plate, first cardboard and second cardboard, and first cardboard activity joint is in first draw-in groove, second cardboard activity joint is in the second draw-in groove, and the equal fixed mounting in right side of first cardboard and second cardboard has the riser, and two risers difference fixed mounting are in the top and the bottom of carriage, fixed plate sliding connection is in the carriage, and two horizontal poles of left side fixedly connected with of fixed plate, the equal fixed connection in the outside of tower body in the left end of two horizontal poles.
The utility model discloses a further set up to: the spout has been seted up on the right side of fixed plate, and slidable mounting has the slide in the spout, and the top fixed mounting of slide has the locating lever, the constant head tank has been seted up on the top inner wall of linking frame, locating lever activity joint is in the constant head tank.
Through adopting above-mentioned technical scheme, fix a position the connection frame.
The utility model discloses a further set up to: the bottom fixedly connected with pressure spring of slide, the bottom fixed connection of pressure spring is on the bottom inner wall of spout.
Through adopting above-mentioned technical scheme, reset the slide.
The utility model discloses a further set up to: the top inner wall and the bottom inner wall of the sliding groove are fixedly connected with a same vertical rod, and the sliding plate is sleeved on the outer side of the vertical rod in a sliding mode.
Through adopting above-mentioned technical scheme, lead to the slide.
The utility model discloses a further set up to: the right side of the connecting frame is fixedly connected with a pull rod.
Through adopting above-mentioned technical scheme, be convenient for pull the connecting frame and remove.
The utility model discloses a further set up to: the left side fixedly connected with coupling spring of fixed plate, coupling spring's left end fixed connection is on one side inner wall of connecting frame.
Through adopting above-mentioned technical scheme, reset the link frame.
The utility model discloses a further set up to: the top intercommunication of tower body has the blast pipe, and the bottom fixed mounting of tower body has a plurality of supporting legs.
Through adopting above-mentioned technical scheme, realize the stable support to the tower body.
The utility model discloses a further set up to: two slide holes are formed in one side of the tower body, and the first clamping plate and the second clamping plate are respectively connected in the corresponding slide holes in a sliding mode.
Through adopting above-mentioned technical scheme, lead first cardboard and second cardboard.
The utility model has the advantages that:
1. the utility model introduces the tail powder and air into the tower body from the air inlet pipe through the air pump, and the tail powder is filtered by the filter screen and falls into the collecting frame for collecting;
2. the utility model discloses a promotion slide downstream drives the locating lever downstream for the locating lever breaks away from the constant head tank, remove the fixed to the carriage, then stimulate the pull rod right and drive the carriage and move right, the carriage drives first cardboard and second cardboard through two risers and moves right, make first cardboard break away from first draw-in groove, remove the fixed to the filter screen, and make the second cardboard break away from the second draw-in groove, remove the fixed to collecting the frame, thereby be convenient for dismantle and clear up the filter screen and collect the frame.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained without creative efforts.
Fig. 1 is a schematic perspective view of the present embodiment.
Fig. 2 is a sectional view of the present embodiment.
Fig. 3 is an enlarged view of a portion a in fig. 2.
In the figure, 1, a tower body; 2. a collection frame; 3. a filter screen; 4. an air inlet pipe; 5. an exhaust pipe; 6. a connecting frame; 7. a vertical plate; 8. a fixing plate; 9. a slide plate; 10. a cross bar; 11. a first clamping plate; 12. a second clamping plate; 13. a connecting spring; 14. a chute; 15. positioning a rod; 16. a pull rod.
Detailed Description
The technical solution of the present invention will be clearly and completely described below with reference to the specific embodiments. It is to be understood that the disclosed embodiments are merely exemplary of the invention, and are not intended to limit the invention to the precise embodiments disclosed. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, a tailings absorption tower comprises:
the tower comprises a tower body 1, wherein an air inlet pipe 4 is communicated with the outer side of the tower body 1;
the filter screen 3 is arranged inside the tower body 1 in a filtering manner, and a first clamping groove is formed in one side of the filter screen 3;
the collecting frame 2 is arranged inside the tower body 1, and a second clamping groove is formed in one side of the collecting frame 2;
the installation component, the installation component includes the splice box 6, fixed plate 8, first cardboard 11 and second cardboard 12, 11 movable joint of first cardboard are in first draw-in groove, 12 movable joint of second cardboard are in the second draw-in groove, and the equal fixed mounting in right side of first cardboard 11 and second cardboard 12 has riser 7, two riser 7 are fixed mounting respectively in the top and the bottom of splice box 6, 8 sliding connection of fixed plate are in splice box 6, and two horizontal poles 10 of 8 left sides fixedly connected with of fixed plate, the equal fixed connection in the outside of tower body 1 in the left end of two horizontal poles 10.
Specifically, the method comprises the following steps: spout 14 has been seted up on the right side of fixed plate 8, and slidable mounting has slide 9 in the spout 14, and slide 9's top fixed mounting has locating lever 15, has seted up the constant head tank on the top inner wall of linking frame 6, and locating lever 15 activity joint is fixed a position linking frame 6 in the constant head tank.
Specifically, the method comprises the following steps: the bottom fixedly connected with pressure spring of slide 9, the bottom fixed connection of pressure spring resets slide 9 on the bottom inner wall of spout 14.
Specifically, the method comprises the following steps: fixedly connected with same montant on the top inner wall of spout 14 and the bottom inner wall, slide 9 slides and cup joints in the outside of montant, leads slide 9.
Specifically, the method comprises the following steps: the right side of the connecting frame 6 is fixedly connected with a pull rod 16, which is convenient for pulling the connecting frame 6 to move.
Specifically, the method comprises the following steps: the left side fixedly connected with coupling spring 13 of fixed plate 8, the left end fixed connection of coupling spring 13 resets to coupling frame 6 on one side inner wall of coupling frame 6.
Specifically, the method comprises the following steps: the top intercommunication of tower body 1 has blast pipe 5, and the bottom fixed mounting of tower body 1 has a plurality of supporting legs, realizes the stable support to tower body 1.
Specifically, the method comprises the following steps: two slide openings are formed in one side of the tower body 1, and the first clamping plate 11 and the second clamping plate 12 are respectively connected in the corresponding slide openings in a sliding mode and guide the first clamping plate 11 and the second clamping plate 12.
The utility model discloses a theory of operation does: leading-in tower body 1's inside from intake pipe 4 tail powder and air through the aspiration pump, filter screen 3 filters the tail powder, and make the tail powder fall into and collect frame 2, collect work, drive locating lever 15 downstream through promoting slide 9 downstream, make locating lever 15 break away from the constant head tank, remove the fixed to link frame 6, then stimulate pull rod 16 right and drive link frame 6 and move right, link frame 6 drives first cardboard 11 and second cardboard 12 through two risers 7 and moves right, make first cardboard 11 break away from first draw-in groove, remove the fixed to filter screen 3, and make second cardboard 12 break away from the second draw-in groove, remove the fixed to collecting frame 2, thereby be convenient for dismantle and clear up filter screen 3 and collecting frame 2.

Claims (8)

1. A tailings absorption tower, comprising:
the tower body (1), the outside of the tower body (1) is communicated with an air inlet pipe (4);
the filter screen (3) is arranged inside the tower body (1), and a first clamping groove is formed in one side of the filter screen (3);
the collecting frame (2) is arranged inside the tower body (1), and a second clamping groove is formed in one side of the collecting frame (2);
the installation component, the installation component includes connecting frame (6), fixed plate (8), first cardboard (11) and second cardboard (12), and first cardboard (11) activity joint is in first draw-in groove, second cardboard (12) activity joint is in the second draw-in groove, and the equal fixed mounting in right side of first cardboard (11) and second cardboard (12) has riser (7), and two riser (7) are fixed mounting respectively at the top and the bottom of connecting frame (6), fixed plate (8) sliding connection is in connecting frame (6), and two horizontal poles (10) of left side fixedly connected with of fixed plate (8), the equal fixed connection in the outside of tower body (1) in the left end of two horizontal poles (10).
2. The tailings absorption tower of claim 1, wherein: spout (14) have been seted up on the right side of fixed plate (8), and slidable mounting has slide (9) in spout (14), and the top fixed mounting of slide (9) has locating lever (15), the constant head tank has been seted up on the top inner wall of connecting frame (6), and locating lever (15) activity joint is in the constant head tank.
3. The tailings absorption tower of claim 2, wherein: the bottom of the sliding plate (9) is fixedly connected with a pressure spring, and the bottom end of the pressure spring is fixedly connected to the inner wall of the bottom of the sliding groove (14).
4. The tailings absorption tower of claim 2, wherein: the top inner wall and the bottom inner wall of the sliding groove (14) are fixedly connected with a same vertical rod, and the sliding plate (9) is sleeved on the outer side of the vertical rod in a sliding mode.
5. The tailings absorption tower of claim 1, wherein: the right side of the connecting frame (6) is fixedly connected with a pull rod (16).
6. The tailings absorption tower of claim 1, wherein: the left side fixedly connected with connecting spring (13) of fixed plate (8), the left end fixed connection of connecting spring (13) is on one side inner wall of connecting frame (6).
7. The tailings absorption tower of claim 1, wherein: the top intercommunication of tower body (1) has blast pipe (5), and the bottom fixed mounting of tower body (1) has a plurality of supporting legs.
8. The tailings absorption tower of claim 1, wherein: two slide holes are formed in one side of the tower body (1), and the first clamping plate (11) and the second clamping plate (12) are respectively connected in the corresponding slide holes in a sliding mode.
CN202222903950.8U 2022-11-02 2022-11-02 Tail powder absorption tower Active CN218653486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222903950.8U CN218653486U (en) 2022-11-02 2022-11-02 Tail powder absorption tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222903950.8U CN218653486U (en) 2022-11-02 2022-11-02 Tail powder absorption tower

Publications (1)

Publication Number Publication Date
CN218653486U true CN218653486U (en) 2023-03-21

Family

ID=85569092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222903950.8U Active CN218653486U (en) 2022-11-02 2022-11-02 Tail powder absorption tower

Country Status (1)

Country Link
CN (1) CN218653486U (en)

Similar Documents

Publication Publication Date Title
CN207247404U (en) A kind of air purifier
CN217829277U (en) Pulse dust collector convenient for cleaning cloth bag
CN110802749A (en) A dust collector for processing graphite slag trap
CN218653486U (en) Tail powder absorption tower
CN214921387U (en) Screen laser cutting smoke and dust and waste material cleaning assembly and cleaning device
CN211635689U (en) Environment-friendly dust removal and filtration device
CN219616095U (en) Powder and residue separator for cat food production
CN211753680U (en) Dust treatment device for industrial waste gas treatment
CN206540251U (en) A kind of indoor air cleaner for being easy to repair
CN217096186U (en) Be applied to supplementary fume extractor of laser cutting forced air down
CN201625469U (en) High-voltage movable dust collector
CN215585733U (en) Mining environmental protection engineering is with dust remover convenient to clearance filter screen
CN212600597U (en) Dust collector for digit control machine tool
CN212822028U (en) Auto parts stamping device that can automatically clean
CN211133458U (en) High-efficient environmental protection air dust collecting device for cement manufacture workshop
CN210356404U (en) Milling machine dust removal large granule recovery unit
CN220758538U (en) Air circulation purifying equipment for ceramic production workshop
CN218690546U (en) Cyclone separator
CN217188653U (en) Dust removal device of stirrer
CN220238080U (en) Pesticide powder recovery unit
CN218610385U (en) Coal mine large gangue screening device
CN218590003U (en) Waste gas treatment structure with filter screen easy to clean
CN218608520U (en) Active carbon environmental protection case of high-efficient absorption gaseous pollutants
CN218875772U (en) Furniture production saw-dust recovery plant
CN214559392U (en) A waste recovery processing apparatus for pipe fitting BTA

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant