CN2186402Y - Actual load parity checker - Google Patents

Actual load parity checker Download PDF

Info

Publication number
CN2186402Y
CN2186402Y CN 93227677 CN93227677U CN2186402Y CN 2186402 Y CN2186402 Y CN 2186402Y CN 93227677 CN93227677 CN 93227677 CN 93227677 U CN93227677 U CN 93227677U CN 2186402 Y CN2186402 Y CN 2186402Y
Authority
CN
China
Prior art keywords
utility
model
switch
hexagonal
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93227677
Other languages
Chinese (zh)
Inventor
赵振东
周庆亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benxi Iron & Steel Co
Original Assignee
Benxi Iron & Steel Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Benxi Iron & Steel Co filed Critical Benxi Iron & Steel Co
Priority to CN 93227677 priority Critical patent/CN2186402Y/en
Application granted granted Critical
Publication of CN2186402Y publication Critical patent/CN2186402Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an electromagnetic integrated actual load parity checker of an electric energy meter, which is suitable for checking and adjusting 1.0 stage, 2.0 stage and three-phase electric energy meters under the condition that a power generating plant and a power exchanging station have no power failure. The utility model can directly measure a hexagonal figure through changing the positions of a function converter and a switch. The utility model is composed of two 1.2 stage standard kilowatt hour meters, the function converter, a starting switch, and a polarity switch. The utility model has the advantages of reasonable design and simple structure, overcomes the defects of the measuring method of manually connecting wires repeatedly and easy to generate equipment and fatal accidents for measuring the hexagonal figure, and can be safely operated under the condition of no power failure.

Description

Actual load parity checker
The utility model belongs to the comprehensive tester of electromagnetic system, can be widely used under the situation that generating plant and electric substation do not have a power failure verification and adjustment to 1.0 grades, 2.0 grades three-phase electric energy meters, and can directly survey hexagonal figure.
Existing detecting instrument, the general portable watt-hour meter tester that all uses homemade or import, the testing result relative error of this method of calibration is bigger, and for the work on the spot inconvenience, and can not directly survey hexagonal figure.
It is with the accurate kilowatt-hour meter of two station symbols that present detecting instrument is done the hexagonal drawing method, and the method for interim wiring is repeatedly measured.This method operation more complicated, and the equipment personal injury appears easily.
The purpose of this utility model is that the problem at above-mentioned proposition provides a kind of simple in structure, in light weight, easy to carry, does not need external power supply, has the verification of three-phase electric energy meter and the real load of the electric energy meter checker of adjusting function and having straight survey hexagonal figure function.
Figure (1) is a schematic circuit of the present utility model, it by function translator (WS), starting switch (Ka) and (Kc), polarity switch (Ja) and (Jc), and standard kilowatt-hour meter (KWha) and (KWhc) form, the method for attachment of kilowatt-hour meter and switch is the connected mode of a kind of translate phase and polarity.
Figure (2) is a straight survey hexagonal coordinate diagram of the present utility model
Principle of the present utility model is achieved in that 1), during the verification electric energy meter, respectively voltage circuit and the current loop of corresponding tested table of the voltage circuit of two standard scales, current loop when function translator WS is placed on the abc position; During the verification error, it is identical that its principle is surveyed three phase power with two element power, when function translator is cut respectively at ab, bc, during the ca position, the voltage circuit of two standard scales is respectively Vab, Vbc, Vca, during the position of a function translator of every switching, can read two data WA and WC at standard scale, can measure six data according to above-mentioned situation, can be at Vab, Vbc, proportional vertical line that draws on the Vca coordinate axle namely draws an intersection point, the direction that is connected to electric current I in this intersection point and the center of circle, if three bar line intersects a triangle, take barycenter oftriangle as intersection point, when two senses of current are similar to 120 ° so, illustrate that circuit in service is correct. When if two senses of current differ approximate 60 °, wherein a phase current mistake, as can be seen from the figure which phase reversal connection or mistake of explanation then.
2), in six data being surveyed when being hexagonal figure, occur always wherein that two data are negative values, so in instrument, establish the demonstration that two polarity switchs (Ja, Jc) have solved negative value.
Below in conjunction with accompanying drawing, specific embodiments of the present utility model is described in further details:
KWha, KWhc are two 0.2 grade WH-VA type standard kilowatt-hour meter among Fig. 1, and WS is a function translator, adopt three cuttves four to throw the porcelain switch, and KA, KC are starting switch, and (Ja, Jc) is polarity switch, and method of attachment as shown in Figure 1.
Use the utility model can be to test of kilo watthour meter and adjustment, and has straight survey hexagonal figure function, the utility model reasonable in design, method of operating is simple, the accuracy of detection height, the utility model can not checked electric energy meter under the power-off condition and adjusted and straight test cross angle figure, brings many conveniences to work in generating plant, alternating current institute, save lot of manpower and material resources, for enterprise brings certain economic benefits.

Claims (1)

1, a kind of by kilowatt-hour meter (KWha) (KWhc), function translator (WS), starting switch (Ka) (Kc) and the real load of the electric energy meter checker (Jc) formed of polarity switch (Ja), the connected mode that it is characterized in that kilowatt-hour meter and switch is a kind of connected mode of changing position and polarity.
CN 93227677 1993-03-25 1993-03-25 Actual load parity checker Expired - Fee Related CN2186402Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93227677 CN2186402Y (en) 1993-03-25 1993-03-25 Actual load parity checker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93227677 CN2186402Y (en) 1993-03-25 1993-03-25 Actual load parity checker

Publications (1)

Publication Number Publication Date
CN2186402Y true CN2186402Y (en) 1994-12-28

Family

ID=33804894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93227677 Expired - Fee Related CN2186402Y (en) 1993-03-25 1993-03-25 Actual load parity checker

Country Status (1)

Country Link
CN (1) CN2186402Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103163409A (en) * 2011-12-19 2013-06-19 上海安科瑞电气股份有限公司 Method and device used for correcting inverse current wiring of field electric instrument
CN105607028A (en) * 2015-12-23 2016-05-25 中国电力科学研究院 Method for improving batch test accuracy of single-phase intelligent electric energy meter under real load working condition

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103163409A (en) * 2011-12-19 2013-06-19 上海安科瑞电气股份有限公司 Method and device used for correcting inverse current wiring of field electric instrument
CN103163409B (en) * 2011-12-19 2016-01-27 上海安科瑞电气股份有限公司 Anti-bearing calibration and device is connect for the wiring of on-the-spot electric instrument electric current
CN105607028A (en) * 2015-12-23 2016-05-25 中国电力科学研究院 Method for improving batch test accuracy of single-phase intelligent electric energy meter under real load working condition

Similar Documents

Publication Publication Date Title
CN102680798B (en) Online measurement method and device for grounding resistor of rod tower
CN102072999A (en) Connection testing device of electric energy metering device and using method thereof
CN110058188A (en) The active detector of electric energy metering device
CN201069470Y (en) Real time online monitoring device for integrated error of high-voltage power calculation device
CN113064018B (en) Direct current charging pile metering detection circuit, device and method
CN103777077A (en) Wireless pincerlike phase detection device
CN206003413U (en) Intelligent electric energy meter simulation application testing stand
CN214473893U (en) Alternating magnetometer verification system
CN2186402Y (en) Actual load parity checker
CN105845007A (en) Intelligent electric energy meter simulation application test stand and use method thereof
CN2427816Y (en) Instrument for measuring and calibrating electricity meter testing device
CN205880191U (en) A isolated plant for being directed at electric energy meter that possesses CT secondary circuit state monitor function carries out global function and detects
CN207780219U (en) A kind of voltage transformer no-load loss comprehensive tester
CN206557369U (en) High-voltage electric-energy meter on-line monitoring system based on carrier communication
CN110579676A (en) Automatic polarity detection device
CN216411535U (en) Distributed deployed portable current transformer polarity detection equipment
CN213517457U (en) Convenient detection circuitry of relay power and device
CN215263995U (en) Electric energy metering accuracy on-site calibration instrument
CN202939297U (en) Verification system for ground resistance tester
CN111474512B (en) Acceptance detection method and device for newly-installed metering equipment and readable storage medium
CN2289249Y (en) Communication cable failure detector
CN105093011B (en) A kind of electric vehicle alternating current-direct current charging pile calibrating conversion equipment
CN201509075U (en) Labor frequency mutually ordered survey meter and relay
CN201837694U (en) Wiring tester for electric energy metering device
CN211505845U (en) Automatic polarity detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee