CN206003413U - Intelligent electric energy meter simulation application testing stand - Google Patents
Intelligent electric energy meter simulation application testing stand Download PDFInfo
- Publication number
- CN206003413U CN206003413U CN201620566478.5U CN201620566478U CN206003413U CN 206003413 U CN206003413 U CN 206003413U CN 201620566478 U CN201620566478 U CN 201620566478U CN 206003413 U CN206003413 U CN 206003413U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- intelligent electric
- module
- demonstration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 29
- 238000004088 simulation Methods 0.000 title claims abstract description 18
- 238000004891 communication Methods 0.000 claims abstract description 25
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000012795 verification Methods 0.000 claims abstract description 10
- 230000005611 electricity Effects 0.000 claims description 13
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 229920005479 Lucite® Polymers 0.000 claims description 3
- 239000000956 alloy Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 239000004926 polymethyl methacrylate Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 4
- 238000012549 training Methods 0.000 abstract description 4
- 238000001514 detection method Methods 0.000 description 6
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 210000004556 brain Anatomy 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005669 field effect Effects 0.000 description 1
- 210000004247 hand Anatomy 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
This utility model is related to a kind of intelligent electric energy meter simulation application testing stand, and including removable stand, testing equipment and demonstration equipment, translational table sets up has Graphic Panel, testing equipment and demonstration equipment to be separately fixed on Graphic Panel;Testing equipment includes panel computer, powermeter verification instrumeter, write by hand device, copies control module, monitoring module, carrier communication module and power module;Described demonstration equipment includes multiple single-phase/three-phase electric energy meters and the current transformer supporting with it and collecting device.This utility model is used for simulated field use environment, demonstration intelligent electric energy meter associated operating steps and method, using moveable structure, makes teaching convenient;Student can grasp O&M skill by the instruction of simulation training repeatedly is skilled, is rapidly achieved operation maintenance personnel criterion of acceptability, and can improve workmanship and the work efficiency of existing operation maintenance personnel, realizes standardized work.
Description
Technical field
This utility model is related to intelligent electric energy meter teaching demonstration device, more particularly, to a kind of intelligent electric energy meter simulation application examination
Test platform.
Background technology
Intelligent electric energy meter is the terminal of intelligent grid, and it achieves basic electricity metering and is no longer necessary to the person of checking meter and manually enters
OK, also there is power information storage, two-way multiple rate function of measuring, user side control function, plurality of data transmission modes
Bidirectional data communication function, anti-stealing electricity function etc..It is just as a miniature computer it is achieved that remotely control, automatization, intelligence
Change, facilitation.User need only to Utilities Electric Co. business hall or in artificial POS electricity payment it is possible to persistently use
Electricity.At present, intelligent electric energy meter has become as the main flow equipment of Electro-metering device, and metering device O&M also becomes power system and carries
For the most important thing of customer service work, it is the tie of contact huge numbers of families, is to embody national grid good service again
Key node.
One endemic electric company, customer table sum typically all can exceed up to a million, therefore daily maintenance work
Amount is very big, needs culture operation maintenance personnel qualified in a large number;But up to now, also do not have to carry out intelligent electric energy meter and phase
Close module, the specialized simulation apparatus for demonstrating of the equipment operation such as concentrator demonstration, be unfavorable for the result of training of personnel and on duty as early as possible.
Content of the invention
This utility model provides a kind of intelligent electric energy meter simulation application testing stand, for simulated field use environment, drills
Show intelligent electric energy meter associated operating steps and method, using moveable structure, make teaching convenient;Student can be by repeatedly
Simulation training instruction is skilled to grasp O&M skill, is rapidly achieved operation maintenance personnel criterion of acceptability, and can improve the work of existing operation maintenance personnel
Make technical ability and work efficiency, realize standardized work.
In order to achieve the above object, this utility model employs the following technical solutions realization:
Intelligent electric energy meter simulation application testing stand, including removable stand, testing equipment and demonstration equipment, described removable
Stand is provided with Graphic Panel, and testing equipment and demonstration equipment are separately fixed on Graphic Panel;Testing equipment includes panel computer, electric energy
Table tester, write by hand device, copy control module, monitoring module, carrier communication module and power module;Described powermeter verification instrumeter, handss
Copy device, copy control module, carrier communication module and power module connect panel computer respectively, wherein write by hand device, copy control module, carrier wave
Communication module constitutes the intelligence electricity actively sending in equipment, with demonstration equipment of remote auto meter reading system together with panel computer
Table can be connected by carrier communication, the instant data of intelligent electric energy meter is uploaded to panel computer;Power module is panel computer
And other electricity consumption instrument provides power supply;Copy control module and in addition connect monitoring module, monitoring module is used for monitoring intelligent electric power meter end
The running status of collecting device;The another Peripheral Interface of panel computer is connected with circuit tester, vibrating sensor, and wherein circuit tester is for right
Intelligent electric energy meter Circuits System is detected, vibrating sensor is used for Vibration Parameter when detecting that intelligent electric energy meter runs;Described
Demonstration equipment includes multiple single-phase/three-phase electric energy meters and the current transformer supporting with it and collecting device.
The main body frame of described removable stand is aluminum alloy material, and Graphic Panel is lucite material.
The described fixing epi-position showing that plate surface sets multiple indents, corresponds to fixed flat planar computer respectively, destroies control module and prison
Control module, carrier communication module and power module are arranged on inside removable stand, powermeter verification instrumeter, write by hand device, circuit tester,
Vibrating sensor is connected with panel computer temporarily
Controlling switch and air switch are additionally provided with described Graphic Panel, wherein controlling switch is used for controlling testing equipment related
Power supply circuits break-make, air switch is used for controlling presentation device correlation power supply circuits break-make.
Compared with prior art, the beneficial effects of the utility model are:
1) it is used for simulated field use environment, demonstration intelligent electric energy meter associated operating steps and method, using packaged type
Structure, makes teaching convenient;
2) student can grasp O&M skill by the instruction of simulation training repeatedly is skilled, is rapidly achieved operation maintenance personnel criterion of acceptability;
3) be conducive to improving workmanship and the work efficiency of existing operation maintenance personnel, realize standardized work.
Brief description
Fig. 1 is the front view of intelligent electric energy meter simulation application testing stand described in the utility model.
Fig. 2 is the annexation block diagram of intelligent electric energy meter simulation application testing stand ingredient described in the utility model.
Fig. 3 is the structural representation of translational table frame body framework described in the utility model and Graphic Panel.
In figure:1. may move stand 2. Graphic Panel, 3. panel computer, 4. single-phase electric energy meter 5. three-phase electric energy meter 6. to copy
Control module 7. monitoring module, 8. collecting device, 9. current transformer, 10. controlling switch 11. air switch
Specific embodiment
Below in conjunction with the accompanying drawings specific embodiment of the present utility model is described further:
As shown in Figures 1 and 2, intelligent electric energy meter simulation application testing stand described in the utility model, including removable stand
1st, testing equipment and demonstration equipment, described removable 6 stands 1 are provided with Graphic Panel 2 (as shown in Figure 3), and testing equipment and demonstration set
Standby it is separately fixed on Graphic Panel 2;Testing equipment includes panel computer 3, powermeter verification instrumeter, write by hand device, destroies control module 6, prison
Control module 7, carrier communication module and power module;Described powermeter verification instrumeter, write by hand device, copy control module 6, carrier communication module
Connect panel computer 3 respectively with power module, wherein write by hand device, copy control module 6, carrier communication module together with panel computer 3
Constitute the intelligent electric energy meter 4/5 actively sending in equipment, with demonstration equipment of remote auto meter reading system by carrier communication even
Connect, the instant data of intelligent electric energy meter 4/5 is uploaded to panel computer 3;Power module is panel computer 3 and other electricity consumption instrument
Power supply is provided;Copy control module 6 and in addition connect monitoring module 7, monitoring module 7 is used for monitoring intelligent electric energy meter 4/5 end collecting device 8
Running status;The another Peripheral Interface of panel computer 3 is connected with circuit tester, vibrating sensor, and wherein circuit tester is used for intelligent electricity
Can watch circuit system be detected, vibrating sensor is used for Vibration Parameter when detecting that intelligent electric energy meter runs;Described demonstration sets
The multiple single-phase/three-phase electric energy meters 4/5 of standby inclusion and the current transformer 9 supporting with it and collecting device 8.
The main body frame of described removable stand 1 is aluminum alloy material, and Graphic Panel 2 is lucite material.
Described Graphic Panel 2 surface sets the fixing epi-position of multiple indents, corresponds to fixed flat planar computer 3 respectively, copies control module 6 and
Monitoring module 7, carrier communication module and power module are arranged on inside removable stand 1, powermeter verification instrumeter, write by hand device, ten thousand
It is connected with panel computer 3 with table, vibrating sensor temporarily
Controlling switch 10 and air switch 11 are additionally provided with described Graphic Panel 2, wherein controlling switch 10 is used for controlling detection
Equipment correlation power supply circuits break-make, air switch 11 is used for controlling presentation device correlation power supply circuits break-make.
The using method of intelligent electric energy meter simulation application testing stand described in the utility model is as follows:
1) intelligent electric energy meter is checked meter demonstration;Check powermeter verification instrumeter, write by hand device, copy control module 6, monitoring module 7 and put down
Whether plate computer 3 is reliably connected, communication with detection equipment and the corresponding controlling switch of demonstration equipment 10 and air switch 11;To write by hand
Device carries out communication setting makes it be connected with panel computer 3 communication, gathers intelligent electric energy meter 4/5 data by write by hand device after connection;
2) intelligent electric energy meter check meter malfunction elimination demonstration;According to step 1) operation, find the intelligence electricity that data returns failure
Energy table, point following three kinds of situations are investigated one by one:A) intelligent electric energy meter circuit connects and breaks down;B) intelligent electric energy meter preset address
It is not inconsistent with actual address;C) carrier module at intelligent electric energy meter or intelligent electric energy meter end, collecting device 8 break down;According to event
Barrier reason is investigated respectively;If investigation result connects for intelligent electric energy meter circuit broken down, using circuit tester to correlation
Circuit is detected, including circuit voltage, resistance, electric current, diode, audion, metal-oxide-semiconductor field effect transistor detection;
3) intelligent electric energy meter calibration demonstration;By powermeter verification instrumeter, single-phase/three-phase electric energy meter 4/5 is calibrated, electricity
The load of 0.5A, 2.5A, 5A third gear virtual current can be provided by table tester, be on-line checking intelligence electricity in the case of zero in real load
Can Watch Error, electrical quantity such as voltage, electric current, frequency, power, the power factor of check intelligent electric energy meter 4/5;And electric current can be measured
Transformer 9 no-load voltage ratio, judges the synthetic error of intelligent electric energy meter 4,5 and current transformer 9 with this;Above detection all not having a power failure,
Carry out in the case of not changing measurement loop wiring;
4)) intelligent electric energy meter running stability detection demonstration;The test side of vibrating sensor is fixed on Graphic Panel 2,
Signal output part is connected with panel computer 3 interface, the Vibration Parameter at detection intelligent electric energy meter, can using digital vibrating sensor
Directly read data and transfer data to panel computer 3;
5) carrier communication module condition monitoring demonstration;Under determining intelligent electric energy meter 4/5 normal operating condition, pass through
Write by hand device is communicated to connect with intelligent electric energy meter 4/5, realizes data by carrier communication module and uploads;Check panel computer 3, if
Panel computer 3 receives the data of detected intelligent electric energy meter 4/5, then prove carrier communication module normal operation;As flat board electricity
Brain 3 is not received by data, then detect its electric property by way of powering up in each stitch of carrier communication module, directly judges
Carrier communication module whether fault.
The above, only this utility model preferably specific embodiment, but protection domain of the present utility model is not
Be confined to this, any those familiar with the art in the technical scope that this utility model discloses, according to this practicality
New technical scheme and its utility model design in addition equivalent or change, all should cover in protection model of the present utility model
Within enclosing.
Claims (4)
1. intelligent electric energy meter simulation application testing stand is it is characterised in that include removable stand, testing equipment and demonstration equipment,
Described translational table sets up has Graphic Panel, testing equipment and demonstration equipment to be separately fixed on Graphic Panel;Testing equipment includes putting down
Plate computer, powermeter verification instrumeter, write by hand device, copy control module, monitoring module, carrier communication module and power module;Described electric energy
Table tester, write by hand device, copy control module, carrier communication module and power module connect panel computer respectively, wherein write by hand device, copy
What control module, carrier communication module constituted remote auto meter reading system together with panel computer actively sends equipment, sets with demonstration
Intelligent electric energy meter in standby is connected by carrier communication, and the instant data of intelligent electric energy meter is uploaded to panel computer;Power supply mould
Block is panel computer and other electricity consumption instrument provides power supply;Copy control module and in addition connect monitoring module, monitoring module is used for monitoring
The running status of intelligent electric energy meter end collecting device;The another Peripheral Interface of panel computer is connected with circuit tester, vibrating sensor, wherein
Circuit tester is used for intelligent electric energy meter Circuits System is detected, vibrating sensor is used for shaking when detecting that intelligent electric energy meter runs
Dynamic parameter;Described demonstration equipment includes multiple single-phase/three-phase electric energy meters and the current transformer supporting with it and collecting device.
2. intelligent electric energy meter simulation application testing stand according to claim 1 is it is characterised in that described removable stand
Main body frame is aluminum alloy material, and Graphic Panel is lucite material.
3. intelligent electric energy meter simulation application testing stand according to claim 1 is it is characterised in that described displaying plate surface sets
The fixing epi-position of multiple indents, corresponds to fixed flat planar computer respectively, copies control module and monitoring module, carrier communication module and power supply
Module is arranged on inside removable stand, and powermeter verification instrumeter, write by hand device, circuit tester, vibrating sensor and panel computer are interim
Connect.
4. intelligent electric energy meter simulation application testing stand according to claim 1 is it is characterised in that also set on described Graphic Panel
There are controlling switch and air switch, wherein controlling switch is used for controlling testing equipment correlation power supply circuits break-make, and air switch is used
In control presentation device correlation power supply circuits break-make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620566478.5U CN206003413U (en) | 2016-06-13 | 2016-06-13 | Intelligent electric energy meter simulation application testing stand |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620566478.5U CN206003413U (en) | 2016-06-13 | 2016-06-13 | Intelligent electric energy meter simulation application testing stand |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206003413U true CN206003413U (en) | 2017-03-08 |
Family
ID=58205376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620566478.5U Active CN206003413U (en) | 2016-06-13 | 2016-06-13 | Intelligent electric energy meter simulation application testing stand |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206003413U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105845007A (en) * | 2016-06-13 | 2016-08-10 | 国网辽宁省电力有限公司朝阳供电公司 | Intelligent electric energy meter simulation application test stand and use method thereof |
CN106683511A (en) * | 2017-03-31 | 2017-05-17 | 滕为兵 | Teaching aid for chemical test |
CN112255587A (en) * | 2020-10-27 | 2021-01-22 | 国网河北省电力有限公司营销服务中心 | Quality detection device is used in smart electric meter production |
CN117420494A (en) * | 2023-11-22 | 2024-01-19 | 国网黑龙江省电力有限公司营销服务中心 | Electric energy meter performance detection platform and application method thereof |
-
2016
- 2016-06-13 CN CN201620566478.5U patent/CN206003413U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105845007A (en) * | 2016-06-13 | 2016-08-10 | 国网辽宁省电力有限公司朝阳供电公司 | Intelligent electric energy meter simulation application test stand and use method thereof |
CN106683511A (en) * | 2017-03-31 | 2017-05-17 | 滕为兵 | Teaching aid for chemical test |
CN112255587A (en) * | 2020-10-27 | 2021-01-22 | 国网河北省电力有限公司营销服务中心 | Quality detection device is used in smart electric meter production |
CN117420494A (en) * | 2023-11-22 | 2024-01-19 | 国网黑龙江省电力有限公司营销服务中心 | Electric energy meter performance detection platform and application method thereof |
CN117420494B (en) * | 2023-11-22 | 2024-05-07 | 国网黑龙江省电力有限公司营销服务中心 | Electric energy meter performance detection platform and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206003413U (en) | Intelligent electric energy meter simulation application testing stand | |
CN201796529U (en) | Installation and calibration simulation device for electric energy meters | |
CN105845007A (en) | Intelligent electric energy meter simulation application test stand and use method thereof | |
CN209764962U (en) | Test device for excitation system control and rectification loop function verification | |
CN205068942U (en) | Experimental hybrid simulation system of high -voltage electrical | |
CN105607027A (en) | High-low temperature weather effect testing device for electric energy meter | |
CN105974355A (en) | Electric energy metering device comprehensive operation detector and use method thereof | |
CN108469569A (en) | A kind of Intelligentized test system for electric coupler | |
CN107909901A (en) | Power supply station's Training Room marketing training cabinet and its application process | |
CN105738857A (en) | Electric energy meter and acquisition terminal integrated testing device | |
CN207380211U (en) | A kind of device of detecting magnetic holding relays in batches | |
CN204720060U (en) | A kind of low voltage electric energy measure device is installed and test training device | |
CN203849400U (en) | Intelligent ammeter carrier wave communication module dynamic power consumption detector | |
CN203224570U (en) | Digital insulation-resistance on-line detector | |
CN201584076U (en) | Simulator for mutual inductor | |
CN104794968A (en) | Low-voltage electric energy measuring, mounting and connection analyzing comprehensive practical training device | |
CN205067670U (en) | A anti -interference medium simulator for high -voltage electrical is experimental | |
CN106959428B (en) | Fault excitation testing device for electric energy meter | |
CN207020295U (en) | A kind of insulating check device and insulating check instrument | |
CN206557369U (en) | High-voltage electric-energy meter on-line monitoring system based on carrier communication | |
CN101719324A (en) | Simulation training system of voltage drop load test in electric power system measurement loop | |
CN112394316B (en) | Dynamic and static power consumption testing device and method for carrier module of electric energy meter | |
CN210005672U (en) | portable fault indicator testing device | |
CN204945358U (en) | A kind of various dimensions information monitoring instrument for current mutual inductor on site verification | |
CN204347173U (en) | High speed on off test system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |