CN218638088U - Water cyclic utilization device for green construction - Google Patents
Water cyclic utilization device for green construction Download PDFInfo
- Publication number
- CN218638088U CN218638088U CN202222676250.XU CN202222676250U CN218638088U CN 218638088 U CN218638088 U CN 218638088U CN 202222676250 U CN202222676250 U CN 202222676250U CN 218638088 U CN218638088 U CN 218638088U
- Authority
- CN
- China
- Prior art keywords
- water
- box
- green construction
- bury
- treatment box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The application relates to a water recycling device for green construction, which comprises an underground treatment box, wherein a water seepage cover plate is movably arranged at the top of the water seepage underground treatment box, an interception frame is movably arranged at the top of an inner cavity of the underground treatment box and is positioned at the bottom of the water seepage cover plate, a filter plate is arranged at the bottom of the interception frame, a recovery box is arranged at one side of the underground treatment box, and a drain pipe is inserted into the bottom of the filter plate at one side of the underground treatment box in a penetrating manner; through setting up infiltration apron, interception frame, filter, active carbon, drain pipe and collection box, make it carry out abluent water source to equipment and instruments and can carry out filtration treatment and recycle, because building site cleaning equipment's water source quality requirement is not high, all washes outside concrete of equipment, silt, consequently washes the saving water source once more through the water source of handling the recovery, is favorable to the environmental protection to satisfy green construction requirement.
Description
Technical Field
The application relates to the technical field of water cyclic utilization, especially, relate to a green construction water cyclic utilization device.
Background
The green construction refers to the construction process of saving resources and reducing construction activities which have negative influences on the environment to the maximum extent through scientific management and technical progress in the engineering construction under the premise of ensuring the basic requirements of quality, safety and the like, and realizes four-section and one-environment protection (energy conservation, land conservation, water conservation, material conservation and environmental protection).
When the construction is carried out on the construction site, wheels, equipment and instruments of the vehicle need to be cleaned after being stained with silt and concrete, but the high-pressure water gun is directly used for washing at present, and a water source after the cleaning is directly discharged, so that the water source is wasted, and the requirement of green construction cannot be met. Therefore, those skilled in the art have provided a water recycling device for green construction to solve the problems set forth in the background art.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems in the background art, the application provides a water recycling device for green construction.
The application provides a green water cyclic utilization device for construction adopts following technical scheme:
the utility model provides a green construction water cyclic utilization device, buries including ground and handles the case, the top activity that buries the case with permeating water is equipped with the infiltration apron, bury the inner chamber top movable mounting who handles the case and have the interception frame, and the interception frame is located the bottom of infiltration apron, the filter is installed to the bottom of interception frame, bury one side of handling the case and install the collection box, the bottom that buries one side of handling the case is located the filter with ground runs through the grafting and has the drain pipe, and the one end of drain pipe extends to the inner chamber of collection box, bury the inner chamber bottom fixed mounting who handles the case and have the active carbon.
Through adopting above-mentioned technical scheme, through setting up infiltration apron, interception frame, filter, active carbon, drain pipe and collection box, make it carry out abluent water source to equipment and instruments and can carry out filtration treatment and recycle, because building site cleaning equipment's water source quality requirement is not high, all washes outside concrete of equipment, silt, consequently washes saving water source once more through handling the water source of retrieving, is favorable to the environmental protection to satisfy green construction requirement.
Preferably, bury and handle the case and keep away from one side of recovery case and run through the grafting and have the blow off pipe, the valve is installed to the one end of blow off pipe, the sludge pump is installed to one side that the blow off pipe is located the valve.
Through adopting above-mentioned technical scheme, blow off pipe and sludge pump are convenient takes out cyclic utilization's water source many times out and change.
Preferably, the equal fixed mounting in bottom both sides of infiltration apron has the limiting plate, bury the top both sides of handling the case and all fix and seted up the spacing groove, and the limiting plate is located the inner chamber of spacing groove.
Through adopting above-mentioned technical scheme, limiting plate and spacing groove make it spacing to infiltration apron installation.
Preferably, the top of collection box installs the water pump, and one side pipeline of water pump pegs graft in the inner chamber of collection box, the opposite side of water pump is connected with the hose, and the one end of hose installs high-pressure squirt, peg graft at the top of collection box has the filler pipe.
Through adopting above-mentioned technical scheme, the high-pressure squirt is convenient washes the outside silt of cleaning structure.
Preferably, the two sides of the inner cavity of the underground processing box are fixedly provided with limiting lugs, and the limiting lugs are positioned at the bottom of the intercepting frame.
By adopting the technical scheme, the limit lug supports and limits the interception frame.
To sum up, the application comprises the following beneficial technical effects:
through setting up infiltration apron, interception frame, filter, active carbon, drain pipe and collection box, make it carry out abluent water source to equipment and instruments and can carry out filtration treatment and recycle, because building site cleaning equipment's water source quality requirement is not high, all washes outside concrete of equipment, silt, consequently washes the saving water source once more through the water source of handling the recovery, is favorable to the environmental protection to satisfy green construction requirement.
Drawings
Fig. 1 is a schematic overall structure diagram of a water recycling device for green construction in an embodiment of the present application;
FIG. 2 is a schematic perspective view of an underground treatment tank in the embodiment of the present application;
fig. 3 is a schematic perspective view of a water permeable cover plate in an embodiment of the present application.
Description of the reference numerals: 1. an underground treatment tank; 2. a water seepage cover plate; 3. an interception frame; 4. a filter plate; 5. activated carbon; 6. a recycling bin; 7. a drain pipe; 8. a water pump; 9. a hose; 10. a high pressure water gun; 11. a limiting bump; 12. a blow-off pipe; 13. a valve; 14. a sludge pump; 15. a limiting groove; 16. a limiting plate; 17. and (4) adding a water pipe.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses water cyclic utilization device for green construction. Referring to fig. 1-3, a green construction water cyclic utilization device, bury treatment tank 1 including, bury with permeating water the top activity that treatment tank 1 was equipped with infiltration apron 2, bury inner chamber top movable mounting who treats tank 1 and have interception frame 3, and interception frame 3 is located the bottom of infiltration apron 2, filter 4 is installed to the bottom of interception frame 3, bury one side of treatment tank 1 and install collection box 6, bury one side of treatment tank 1 and be located the bottom of filter 4 and run through the grafting and have drain pipe 7, and the one end of drain pipe 7 extends to the inner chamber of collection box 6, bury the inner chamber bottom fixed mounting who treats tank 1 and have active carbon 5.
Through setting up infiltration apron 2, interception frame 3, filter 4, active carbon 5, drain pipe 7 and collection box 6, make it carry out abluent water source to equipment and instruments and can carry out filtration treatment and recycle, because building site cleaning equipment's water source quality requirement is not high, all washes outside concrete of equipment, silt, consequently washes saving water source once more through handling the water source of retrieving, is favorable to the environmental protection to satisfy green construction requirement.
As shown in the figure 1-2, a sewage discharge pipe 12 is inserted and connected in a penetrating way at one side of the underground processing box 1 far away from the recovery box 6, a valve 13 is installed at one end of the sewage discharge pipe 12, and a sludge pump 14 is installed at one side of the sewage discharge pipe 12, which is positioned at the valve 13.
The sewage draining pipe 12 and the sludge pump 14 are convenient for pumping out the water source which is recycled for many times for replacement.
As shown in fig. 1-3, limiting plates 16 are fixedly mounted on both sides of the bottom of the water-permeable cover plate 2, limiting grooves 15 are fixedly formed on both sides of the top of the underground treatment tank 1, and the limiting plates 16 are located in the inner cavities of the limiting grooves 15.
The limiting plate 16 and the limiting groove 15 enable the water seepage cover plate 2 to be installed and limited.
As shown in fig. 1, a water pump 8 is installed at the top of the recycling bin 6, a pipeline on one side of the water pump 8 is inserted into an inner cavity of the recycling bin 6, the other side of the water pump 8 is connected with a hose 9, a high-pressure water gun 10 is installed at one end of the hose 9, and a water adding pipe 17 is inserted into the top of the recycling bin 6.
The high pressure squirt 10 conveniently washes the outside silt of washing structure.
As shown in fig. 1-2, two sides of the inner cavity of the underground processing box 1 are fixedly provided with a limiting bump 11, and the limiting bump 11 is positioned at the bottom of the intercepting frame 3.
The limit bump 11 supports and limits the interception frame 3.
The implementation principle of the water cyclic utilization device for green construction in the embodiment of the application is as follows: the method comprises the steps that a plurality of devices and instruments on a construction site are polluted by silt, concrete and the like after being used up and then need to be washed by water, an underground treatment box 1 is placed in a pre-buried pit dug in advance, the devices needing to be washed are placed at the top of a water seepage cover plate 2 during washing, then a high-pressure water gun 10 is used for washing, washed sewage flows to the bottom along with the water seepage cover plate 2, then the sewage enters the bottom of an inner cavity of the underground treatment box 1 after being subjected to double filtration through an intercepting frame 3 and a filter plate 4, finer impurities in water are removed from the bottom of the inner cavity of the underground treatment box 1 through precipitation and adsorption of active carbon 5, when the water is subjected to precipitation and adsorption for a period of time, the water rises, then the water is discharged into an inner cavity of a recovery box 6 from a water discharge pipe 7 for recovery, then the recovered water source is conveyed to be washed continuously through a water pump 8, an external water source can also be added into the inner cavity of the recovery box 6 from a water adding pipe 17, and when the washed water source is recycled through multiple times of filtration treatment, the water source is poor in quality, so that the water is discharged from a sewage discharge pipe 12 for utilization, and then the water is not discharged into a new round from the recovery box 6 for cleaning; by arranging the water seepage cover plate 2, the intercepting frame 3, the filter plate 4, the activated carbon 5, the drain pipe 7 and the recovery box 6, a water source for cleaning equipment can be filtered and recycled, and concrete and silt outside the equipment are washed because the quality requirement of the water source of the cleaning equipment in a construction site is not high, so that the water source is saved by washing the treated and recycled water source again, the environment is protected, and the requirement of green construction is met; the water seepage cover plate 2 can be lifted, and then the interception frame 3 is cleaned and replaced.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (5)
1. The utility model provides a green construction water cyclic utilization device, buries including ground and handles case (1), its characterized in that: bury the top activity of handling case (1) and be equipped with infiltration apron (2), bury the inner chamber top movable mounting who handles case (1) and have interception frame (3), and interception frame (3) are located the bottom of infiltration apron (2), filter (4) are installed to the bottom of interception frame (3), bury one side of handling case (1) and install collection box (6), the bottom that one side that buries handling case (1) is located filter (4) runs through the grafting and has drain pipe (7), and the one end of drain pipe (7) extends to the inner chamber of collection box (6), bury the inner chamber bottom fixed mounting who handles case (1) and have active carbon (5).
2. The water recycling device for green construction according to claim 1, wherein: one side of the underground treatment box (1) far away from the recovery box (6) is penetrated and inserted with a sewage discharge pipe (12), one end of the sewage discharge pipe (12) is provided with a valve (13), and one side of the sewage discharge pipe (12) located at the valve (13) is provided with a sludge pump (14).
3. The water recycling device for green construction according to claim 1, wherein: the equal fixed mounting in bottom both sides of infiltration apron (2) has limiting plate (16), bury the top both sides of handling case (1) and all fix and seted up spacing groove (15), and limiting plate (16) are located the inner chamber of spacing groove (15).
4. The water recycling device for green construction according to claim 1, wherein: the water pump (8) is installed at the top of the recycling box (6), a pipeline on one side of the water pump (8) is connected to the inner cavity of the recycling box (6) in an inserting mode, the other side of the water pump (8) is connected with a hose (9), a high-pressure water gun (10) is installed at one end of the hose (9), and a water adding pipe (17) is connected to the top of the recycling box (6) in an inserting mode.
5. The water recycling device for green construction according to claim 1, wherein: the underground treatment box is characterized in that limiting lugs (11) are fixedly mounted on two sides of an inner cavity of the underground treatment box (1), and the limiting lugs (11) are located at the bottom of the intercepting frame (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222676250.XU CN218638088U (en) | 2022-10-11 | 2022-10-11 | Water cyclic utilization device for green construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222676250.XU CN218638088U (en) | 2022-10-11 | 2022-10-11 | Water cyclic utilization device for green construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218638088U true CN218638088U (en) | 2023-03-17 |
Family
ID=85493392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222676250.XU Active CN218638088U (en) | 2022-10-11 | 2022-10-11 | Water cyclic utilization device for green construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218638088U (en) |
-
2022
- 2022-10-11 CN CN202222676250.XU patent/CN218638088U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106881340B (en) | Treatment method for heavy metal polluted farmland | |
CN104452656B (en) | A kind of river course segmentation Dredging Construction method | |
CN218638088U (en) | Water cyclic utilization device for green construction | |
CN107457266A (en) | A kind of heavy-metal contaminated soil repair system | |
CN104032696B (en) | A kind of road purging method and rinse-system | |
CN210421244U (en) | Initial rainwater collecting and processing device | |
CN214143091U (en) | Collapsible loess is drainage device for road bed | |
CN108372196A (en) | Heavy-metal contaminated soil restorative procedure | |
CN213738792U (en) | Water body purification device for ecological restoration | |
CN214050749U (en) | Environmental engineering sewage recovery unit | |
CN108746174A (en) | A kind of ecological elution circuit administered for heavy-metal contaminated soil or slag | |
CN212168514U (en) | Harmless treatment and resource recovery device for heavy metal polluted land | |
CN211753093U (en) | A purifier is retrieved to groundwater for foundation ditch precipitation | |
CN203320598U (en) | River way sewage dredging device | |
CN218596234U (en) | River course water dystopy prosthetic devices | |
CN213327252U (en) | Sludge cleaning device for hydraulic engineering | |
CN205730484U (en) | A kind of blockage resisting sedimentation basin of sewage disposal | |
CN107265754B (en) | Sewage recycling method | |
CN211499114U (en) | Construction rainfall drainage structures | |
CN214022302U (en) | A energy-efficient rice washer for zongzi processing usefulness | |
CN108708413A (en) | A kind of reservoir sewage disposal apparatus for hydraulic engineering | |
CN214767775U (en) | Alternating current electrochemical remediation and leacheate recycling device for heavy metal contaminated soil | |
CN111705885B (en) | Controllable slow flow sewage interception circulating structure based on sponge city construction | |
CN203999118U (en) | SBR treatment tank emptying system | |
CN217840149U (en) | Building engineering construction channel desilting belt cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |