CN218625799U - PE water supply pipe with high stability during installation - Google Patents

PE water supply pipe with high stability during installation Download PDF

Info

Publication number
CN218625799U
CN218625799U CN202222999255.6U CN202222999255U CN218625799U CN 218625799 U CN218625799 U CN 218625799U CN 202222999255 U CN202222999255 U CN 202222999255U CN 218625799 U CN218625799 U CN 218625799U
Authority
CN
China
Prior art keywords
wall
plate
fixed
high stability
during installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222999255.6U
Other languages
Chinese (zh)
Inventor
苏百强
陈恺
王振都
傅旭杉
陈建方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Lvsu Pipe Industry Co ltd
Original Assignee
Guangxi Lvsu Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Lvsu Pipe Industry Co ltd filed Critical Guangxi Lvsu Pipe Industry Co ltd
Priority to CN202222999255.6U priority Critical patent/CN218625799U/en
Application granted granted Critical
Publication of CN218625799U publication Critical patent/CN218625799U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses a high PE of stability supplies water tubular product during installation belongs to tubular product technical field. A PE water supply pipe with high stability during installation comprises a pipe body, wherein ring plates are clamped at two ends of the pipe body; the utility model discloses be equipped with the guard plate, the shrinkage pool, the slide, the fixture block, the draw-in groove inner wall joint that fixed fixture block outer wall of use guard plate one end and the crown plate other end were seted up, order about the fixed slide one side of guard plate outer wall simultaneously and slide with the outer wall of guard plate, be equipped with bonding plate, spout, shock attenuation pole, the inner wall of use crown plate and the outer wall joint of body, the circular slot inner wall that uses crown plate one end to set up and the fixed cylinder outer wall joint in backup pad one side, the spout inner wall that the outer wall of use bonding plate was seted up respectively with the crown plate other end slides.

Description

PE water supply pipe with high stability during installation
Technical Field
The utility model belongs to the technical field of tubular product, concretely relates to high PE of stability supplies water tubular product during installation.
Background
The PE water supply pipe with high stability during installation is PE water supply pipe device equipment with high stability during installation of external connecting facilities.
At present, a lot of PE water supply pipes with high stability during installation are available on the market, but the PE water supply pipes with high stability during general installation are generally directly installed and fixed with external connecting facilities by bolts, so that the joints are easy to loosen due to external impact;
the PE water supply pipe with high stability in the existing installation is installed between the pipe and a connecting facility by using a bolt, so that the bolt at the connecting part is directly exposed on the outer side and is very easy to wear, and the normal use of the device is influenced.
Therefore, a PE water supply pipe with high stability during installation is needed, and the problems that the pipe is installed and fixed with an external connection facility by bolts in the prior art, the connection part is easy to loosen due to external impact, the bolts at the connection part are directly exposed to the outside, and the abrasion is easy to cause are solved.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high PE of stability feeds water tubular product during installation to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a high PE of stability feedwater tubular product during installation, includes the body, the equal joint in both ends of body has the crown plate, two circular slots have all been seted up to the one end of crown plate, two the one end of crown plate all bonds there are two backup pads, four one side of backup pad all is fixed with the cylinder, four the cylindrical outer wall all with the inner wall joint of circular slot, the outer wall of body is equipped with coupling mechanism, coupling mechanism includes two guard plates, two guard plate one end all with set up the shrinkage pool, two the inner wall of shrinkage pool all with the outer wall joint of body, two the outer wall of guard plate all is fixed with two slides, four one side of slide all slides with the outer wall of crown plate, four one side of slide all bonds with one side of backup pad, two the one end of guard plate all is fixed with two fixture blocks, two the other end of crown plate has all seted up two draw-in grooves, four the inner wall of draw-in groove all with the outer wall joint of fixture block.
What need explain in the scheme is, two the other end of crown plate is equipped with stop gear, stop gear includes two bonding boards, two the one end of bonding board all bonds with the one end of guard plate, two the other end of crown plate all is equipped with the spout, two the inner wall of spout all slides with the outer wall of bonding board, two the one end of bonding board all is fixed with two shock-absorbing bars, four the one end of shock-absorbing bar all is fixed with the inner wall one end of spout, four the outer wall of shock-absorbing bar all overlaps and is equipped with the spring.
It is further worth explaining that the depth dimension of the inner walls of the four circular grooves is matched with the length dimension of the outer wall of the cylinder, and the cross section area dimension of the inner walls of the four circular grooves is matched with the cross section area dimension of the outer wall of the cylinder.
It should be further noted that the diameters of the inner surfaces of the inner annular walls of the two concave holes are matched with the diameter of the outer surface of the outer annular wall of the tube body, and the lengths of the outer walls of the four clamping blocks are matched with the depth of the inner wall of the clamping groove.
Preferably, the sizes of the cross sections of the outer walls of the two bonding plates are matched with the size of the cross section of the inner wall of the sliding groove.
Preferably, the inner surfaces of the inner ring walls of the four springs are matched with the outer surface of the outer ring wall of the shock absorption rod in diameter size.
Compared with the prior art, the utility model provides a high PE of stability supplies water tubular product has following beneficial effect during installation:
(1) The utility model discloses a be equipped with guard plate, shrinkage pool, slide, fixture block, draw-in groove, use the fixed fixture block outer wall of guard plate one end and the draw-in groove inner wall joint that the crown plate other end was seted up, order about the fixed slide one side of guard plate outer wall simultaneously and slide with the outer wall of guard plate for the guard plate protects the bolt outer wall that runs through guard plate and crown plate, avoids the bolt directly to expose and uses normal the practicality of improving device to outside influencing device.
(2) The utility model discloses a be equipped with the bonding board, the spout, the shock attenuation pole, use the inner wall of crown plate and the outer wall joint of body, the circular slot inner wall that uses crown plate one end to set up and the fixed cylinder outer wall joint in backup pad one side, make the one end of crown plate and the one end of backup pad closely install, the outer wall that uses the bonding board slides with the spout inner wall that the crown plate other end was seted up respectively, the other end up to the bonding board keeps the level with the other end of crown plate, the stability of being connected between the outer wall that uses the thrust of bonding board to consolidate the guard plate and the external connection facility.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the separation structure of the supporting plate and the annular plate of the present invention;
FIG. 3 is a schematic view of the connecting mechanism of the present invention;
fig. 4 is a schematic structural diagram of the limiting mechanism of the present invention.
Description of the reference numerals:
1. a pipe body; 11. a ring plate; 12. a circular groove; 13. a support plate; 14. a cylinder; 2. a connecting mechanism; 21. a protection plate; 22. concave holes; 23. a slide plate; 24. a clamping block; 25. a card slot; 3. a limiting mechanism; 31. bonding a plate; 32. a chute; 33. a shock-absorbing rod; 34. a spring.
Detailed Description
The present invention will be further described with reference to the following examples.
In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the following will combine the drawings of the embodiments of the present invention to clearly and completely describe the technical solution of the embodiments of the present invention, and obviously, the described embodiments are a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative labor are within the scope of the protection of the present invention based on the described embodiments of the present invention.
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention. The condition in the embodiment can be according to concrete condition do further adjustment the utility model discloses a it is right under the design prerequisite the utility model discloses a simple improvement of method all belongs to the utility model discloses the scope of requiring protection.
Please refer to fig. 1-4, the utility model provides a high stable PE water supply pipe material during installation, including body 1, the equal joint in both ends of body 1 has circular slab 11, two circular slots 12 have all been seted up to the one end of two circular slabs 11, the one end of two circular slabs 11 all bonds has two backup pads 13, one side of four backup pads 13 all is fixed with cylinder 14, four cylinder 14's outer wall all with the inner wall joint of circular slot 12, the outer wall of body 1 is equipped with coupling mechanism 2, it protects the bolt outer wall of junction installation to be convenient for the raising device, avoid the bolt outer wall to receive wearing and tearing influence the normal installation of body 1, coupling mechanism 2 includes two guard plates 21, two guard plates 21 one end all with seted up the shrinkage pool 22, the inner wall of two shrinkage pools 22 all with the outer wall joint of body 1, the outer wall of two guard plates 21 all is fixed with two slides 23, one side of four slides with the outer wall of circular slab 11, one side of four slides 23 all bonds with one side of backup pad 13, two fixture blocks 24 are all fixed to the one end of two guard plates 21, two fixture blocks 25 have all been seted up to the other end of two circular slabs 11, the inner wall of four clamp grooves 25 all with the clamping groove 24's fixture block 24.
Further as shown in fig. 3 and 4, it is worth specifically explaining that, the other end of two ring plates 11 is equipped with stop gear 3, stop gear 3 includes two bonding plates 31, the one end of two bonding plates 31 all bonds with the one end of guard plate 21, the other end of two ring plates 11 all is equipped with spout 32, the inner wall of two spout 32 all slides with the outer wall of bonding plate 31, the one end of two bonding plates 31 all is fixed with two shock-absorbing rods 33, the one end of four shock-absorbing rods 33 all is fixed with the inner wall one end of spout 32, the outer wall of four shock-absorbing rods 33 all overlaps and is equipped with spring 34, use bonding plate 31 outer wall and spout 32 inner wall to slide, make the shock-absorbing rods 33 shrink that bonding plate 31 one end is fixed, thereby make between reverse thrust bonding plate 31 of shock-absorbing rods 33 and the guard plate 21 firm the connection of ordering about, then strengthen the firm installation of body 1.
Further as shown in fig. 2, it is worth specifically explaining that the depth dimension of the inner walls of the four circular grooves 12 is matched with the length dimension of the outer wall of the cylinder 14, the cross-sectional area dimension of the inner walls of the four circular grooves 12 is matched with the cross-sectional area dimension of the outer wall of the cylinder 14, so that the inner walls of the circular grooves 12 are stably connected with the outer wall of the cylinder 14, and the stability of connection between the support plate 13 and the annular plate 11 is improved.
The scheme has the following working processes: in the actual use process, at first, the inner wall of the ring plate 11 is clamped with the outer wall of the pipe body 1, the inner wall of the circular groove 12 formed in one end of the ring plate 11 is clamped with the outer wall of the cylinder 14 fixed on one side of the supporting plate 13, one end of the ring plate 11 is tightly installed with one end of the supporting plate 13, then the outer wall of the bonding plate 31 slides with the inner wall of the sliding groove 32 formed in the other end of the ring plate 11 respectively, the damping rod 33 fixed at one end of the bonding plate 31 contracts, meanwhile, the spring 34 sleeved on the outer wall of the damping rod 33 contracts and moves until the other end of the bonding plate 31 and the other end of the ring plate 11 are kept horizontal, then the outer wall of the clamping block 24 fixed at one end of the protecting plate 21 is clamped with the inner wall of the clamping groove 25 formed in the other end of the ring plate 11, meanwhile, one side of the sliding plate 23 fixed on the outer wall of the protecting plate 21 is driven to slide with the outer wall of the protecting plate 21, one side of the sliding plate 23 is bonded with one side of the supporting plate 13, and finally, one end of the pipe body 1 is installed and fixed with an external connecting facility.
According to the working process, the following steps are known: through the inner wall that uses the crown plate 11 and the outer wall joint of body 1, the circular slot 12 inner wall that uses the one end of crown plate 11 to set up and the fixed cylinder 14 outer wall joint in backup pad 13 one side, make the one end of crown plate 11 and the one end of backup pad 13 closely install, use the outer wall of bonding board 31 to slide with the spout 32 inner wall that the crown plate 11 other end was seted up respectively, make the fixed bumper bar 33 of bonding board 31 one end shrink, drive the shrink of the spring 34 that bumper bar 33 outer wall cover was established and remove simultaneously, the other end that uses bonding board 31 and the other end of crown plate 11 keep the level, use the thrust of bonding board 31 to consolidate the stability of being connected between the outer wall of guard plate 21 and the external connection facility, further improve the steadiness of installing between body 1 and the external connection facility simultaneously, use the fixed fixture block 24 outer wall of guard plate 21 one end and the draw-in groove 25 inner wall joint that the ring plate 11 other end was seted up, order to simultaneously slide 23 one side of the fixed slide of guard plate 21 outer wall and the outer wall of guard plate 21 slide, make one side of slide plate 23 bond with one side of backup pad 13, be favorable to guard plate 21 to carry out the protection of bolt and carry out the protection on the outer wall of running through 21, avoid the direct influence of bolt in the outside, the improvement of the device, the utility of the exposed device, improve the practicality of the utility of the device.
As shown in fig. 3, it should be specifically described that the diameters of the inner surfaces of the inner annular walls of the two concave holes 22 are matched with the diameters of the outer surfaces of the outer annular walls of the tube body 1, and the lengths of the outer walls of the four locking blocks 24 are matched with the depth of the inner wall of the locking groove 25, so that the outer walls of the locking blocks 24 and the inner wall of the locking groove 25 can be stably mounted.
Further, as shown in fig. 4, it is worth specifically explaining that the sizes of the cross-sectional areas of the outer walls of the two bonding plates 31 are both matched with the sizes of the cross-sectional areas of the inner walls of the sliding grooves 32, so that the outer walls of the bonding plates 31 can stably slide on the inner walls of the sliding grooves 32.
As further shown in fig. 4, it should be noted that the inner diameters of the inner walls of the four springs 34 are matched with the outer diameter of the outer wall of the damper rod 33, so as to facilitate the stable installation between the outer walls of the springs 34 and the outer wall of the damper rod 33.
To sum up: through the inner wall joint that uses crown plate 11 and the outer wall of body 1, the circular slot 12 inner wall that uses crown plate 11 one end to set up and the fixed cylinder 14 outer wall joint in backup pad 13 one side, make the one end of crown plate 11 and the one end of backup pad 13 closely install, the outer wall that uses bonding plate 31 slides with the spout 32 inner wall that the crown plate 11 other end was seted up respectively, until the other end of bonding plate 31 and the other end of crown plate 11 keep the level, the stability of being connected between the outer wall that uses bonding plate 31's thrust reinforcement guard plate 21 and the external connection facility, further improve the steadiness of installing between body 1 and the external connection facility simultaneously, use the draw-in groove 25 inner wall joint that the fixed fixture block 24 outer wall of guard plate 21 one end and the crown plate 11 other end were seted up, be favorable to guard plate 21 to protecting the bolt outer wall that runs through guard plate 21 and crown plate 11, avoid the bolt directly expose in the outside to influence the device and normally use, improve the practicality of device.
Unless defined otherwise, technical or scientific terms used herein should be understood as commonly understood by one of ordinary skill in the art, and the use of the terms "comprising" or "including" and the like in the present invention is intended to mean that elements or items listed before the term encompass elements or items listed after the term and their equivalents, without excluding other elements or items, that "connected" or "connected" and the like are not limited to physical or mechanical connections, but may also include electrical connections, whether direct or indirect, that "up", "down", "left", "right", and the like are used merely to indicate relative positional relationships, which may also change accordingly when the absolute position of the object being described changes.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A PE water supply pipe with high stability during installation comprises a pipe body (1), it is characterized in that the two ends of the pipe body (1) are respectively clamped with a ring plate (11), one end of each of the two ring plates (11) is provided with two circular grooves (12), one end of each of the two ring plates (11) is respectively bonded with two supporting plates (13), one side of each of the four supporting plates (13) is fixed with a cylinder (14), the outer walls of the four cylinders (14) are respectively clamped with the inner walls of the circular grooves (12), the outer wall of body (1) is equipped with coupling mechanism (2), coupling mechanism (2) include two guard plates (21), two guard plate (21) one end all with seted up shrinkage pool (22), two the inner wall of shrinkage pool (22) all with the outer wall joint of body (1), two the outer wall of guard plate (21) all is fixed with two slide (23), four one side of slide (23) all slides with the outer wall of crown plate (11), four one side of slide (23) all bonds with one side of backup pad (13), two the one end of guard plate (21) all is fixed with two fixture blocks (24), two draw-in groove (25) have all been seted up to the other end of crown plate (11) four the inner wall of draw-in groove (25) all with the outer wall joint of fixture block (24).
2. A PE feed water pipe material with high stability when installed according to claim 1, characterized in that: two the other end of crown plate (11) is equipped with stop gear (3), stop gear (3) are including two bonding board (31), two the one end of bonding board (31) all bonds with the one end of guard plate (21), two the other end of crown plate (11) all is equipped with spout (32), two the inner wall of spout (32) all slides with the outer wall of bonding board (31), two the one end of bonding board (31) all is fixed with two shock attenuation poles (33), four the one end of shock attenuation pole (33) all is fixed, four with the inner wall one end of spout (32) the outer wall of shock attenuation pole (33) all overlaps and is equipped with spring (34).
3. The PE water supply pipe material with high stability during installation according to claim 1, wherein: the depth dimension of the inner wall of the circular groove (12) is matched with the length dimension of the outer wall of the cylinder (14), and the cross-sectional area dimension of the inner wall of the circular groove (12) is matched with the cross-sectional area dimension of the outer wall of the cylinder (14).
4. The PE water supply pipe material with high stability during installation according to claim 1, wherein: the diameter of the inner surface of the inner ring wall of each concave hole (22) is matched with the diameter of the outer surface of the outer ring wall of the pipe body (1), and the length of the outer wall of each clamping block (24) is matched with the depth of the inner wall of each clamping groove (25).
5. The PE water supply pipe material with high stability during installation according to claim 2, wherein: the size of the cross section area of the outer wall of each of the two bonding plates (31) is matched with the size of the cross section area of the inner wall of the sliding groove (32).
6. A PE feed water pipe material with high stability when installed according to claim 2, characterized in that: the inner surfaces of the inner annular walls of the four springs (34) are matched with the outer surface of the outer annular wall of the shock absorption rod (33) in diameter.
CN202222999255.6U 2022-11-11 2022-11-11 PE water supply pipe with high stability during installation Active CN218625799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222999255.6U CN218625799U (en) 2022-11-11 2022-11-11 PE water supply pipe with high stability during installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222999255.6U CN218625799U (en) 2022-11-11 2022-11-11 PE water supply pipe with high stability during installation

Publications (1)

Publication Number Publication Date
CN218625799U true CN218625799U (en) 2023-03-14

Family

ID=85446704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222999255.6U Active CN218625799U (en) 2022-11-11 2022-11-11 PE water supply pipe with high stability during installation

Country Status (1)

Country Link
CN (1) CN218625799U (en)

Similar Documents

Publication Publication Date Title
CN112900753B (en) Anti-deviation structure for vertical steel bars of constructional engineering and construction method
CN218625799U (en) PE water supply pipe with high stability during installation
CN215632060U (en) Electric pole with segmented clamping structure
CN210217639U (en) Off tracking device is prevented with probing to engineering reconnaissance
CN219159714U (en) Water conservancy pipeline supporting connection structure
CN213226891U (en) Steel bar positioning clamp for prefabricated part
CN112031467A (en) Interim escape way is used to foundation ditch
CN216831483U (en) Hole reservation structure of large-scale prefabricated component
CN217998362U (en) Assembled concrete prefabricated component with location structure
CN209760992U (en) novel fender is enclosed in construction
CN217291162U (en) Quick-release type clamp for metal product machining
CN219052499U (en) Shaping device for machining deck railing
CN217078768U (en) Optimizing device for inner support of subway foundation pit
CN214535133U (en) Natural gas line protector
CN209989802U (en) Mechanical connection joint device
CN218233702U (en) Municipal administration water supply and drainage pipe gallery structure
CN213653531U (en) Concrete pile structure for earthquake-resistant building
CN217153286U (en) Engineering pipeline connecting structure for water supply and drainage construction
CN212773771U (en) Fender is enclosed with protection to construction that can carry out multi-angle concatenation
CN218346205U (en) Foundation construction is with supporting plate that foundation lateral wall prevents collapsing
CN219508651U (en) Easily install grid well lid
CN219364584U (en) Concrete filling pile
CN216641386U (en) Novel outer frame wall connecting piece device
CN216040697U (en) Device convenient to prestressing steel arranges fixedly
CN216242693U (en) Arm head structure of concrete pump truck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant