CN209989802U - Mechanical connection joint device - Google Patents

Mechanical connection joint device Download PDF

Info

Publication number
CN209989802U
CN209989802U CN201920403034.3U CN201920403034U CN209989802U CN 209989802 U CN209989802 U CN 209989802U CN 201920403034 U CN201920403034 U CN 201920403034U CN 209989802 U CN209989802 U CN 209989802U
Authority
CN
China
Prior art keywords
ring
cutting sleeve
snap ring
barrel
mechanical connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CN201920403034.3U
Other languages
Chinese (zh)
Inventor
陈巧
赵鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jianhua Construction Materials China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=69290272&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN209989802(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Jianhua Construction Materials China Co Ltd filed Critical Jianhua Construction Materials China Co Ltd
Priority to CN201920403034.3U priority Critical patent/CN209989802U/en
Application granted granted Critical
Publication of CN209989802U publication Critical patent/CN209989802U/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a mechanical connection piecing devices, including last section of thick bamboo, lower section of thick bamboo, inserted bar, last cutting ferrule, lower cutting ferrule and snap ring. Wherein, the upper cutting sleeve and the lower cutting sleeve are arranged in the lower cylinder, and a snap ring is arranged between the upper cutting sleeve and the lower cutting sleeve; the upper part of the inserted bar is arranged in the upper barrel, and the clamping head at the bottom of the inserted bar is inserted into the clamping ring and is clamped at the bottom of the clamping ring, so that the upper barrel is connected with the lower barrel. The utility model discloses a mechanical connection simple structure, use simple to operate have resistance to plucking and bear the weight of the dynamic height, exempt from the welding, connect characteristics such as high-efficient simple and convenient, cost low, efficiency of construction height.

Description

Mechanical connection joint device
Technical Field
The utility model relates to a building connection spare technical field especially relates to a mechanical connection piecing devices.
Background
At present, the precast pile used for building foundation is mostly connected with the pile by adopting the form of electric welding and welding of end plates. Because the welding mode receives the influence of two aspects factors, it has the potential safety hazard to lead to precast pile head department end plate welded structure easily, specifically is: on one hand, the construction quality problem is caused, the quality difference of welding between the pile head and the pile head is large due to the level difference of site pile foundation construction units and personnel, the welding quality directly influences the connection quality of the pile head, and potential safety hazards are caused to engineering; on the other hand, the welding mode is greatly influenced by weather factors, the required welding time is long, the progress of a project is influenced, the workload of constructors is increased, the time for waiting for cooling of a welding part is required to be about 8 minutes after the pile head and the pile head are welded, pile sinking can be performed later, a large amount of time is wasted, and the construction efficiency is influenced. Meanwhile, a plurality of pile foundation constructors continue to sink piles without waiting for the cooling of the welding positions, so that the welding quality is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mechanical connection piecing devices, this mechanical connection simple structure, use simple to operate.
In order to achieve the above object, the utility model adopts the following technical scheme:
a mechanical connection joint device comprises an upper barrel, a lower barrel, an inserted link, an upper cutting sleeve, a lower cutting sleeve and a snap ring, wherein the upper cutting sleeve and the lower cutting sleeve are arranged in the lower barrel, and the snap ring is arranged between the upper cutting sleeve and the lower cutting sleeve; the upper portion of inserted bar installs in last section of thick bamboo, and the dop of inserted bar bottom inserts in the snap ring and buckle in the bottom of snap ring.
Further, the upper portion of snap ring is provided with the arc platform.
Furthermore, a right-angle clamping table is arranged on the clamping head and clamped at the bottom of the clamping ring.
Furthermore, the cross-sectional shape of the end of the chuck comprises a vertical side section, a linear oblique side section and an arc section.
Furthermore, the outer parts of the upper cutting sleeve and the lower cutting sleeve are provided with threads, and the upper cutting sleeve and the lower cutting sleeve are respectively in threaded connection with the inner wall of the lower barrel.
Furthermore, the upper clamping sleeve and the lower clamping sleeve are both provided with mounting holes.
Furthermore, all be equipped with the draw-in groove on last cutting ferrule and the lower cutting ferrule, be equipped with the ka tai on the snap ring, the ka tai is placed in the draw-in groove.
Further, the joint device further comprises an elastic ring, wherein the elastic ring is located between the upper clamping sleeve and the lower clamping sleeve and sleeved outside the clamping ring.
Further, the elastic ring is hollow and circular arc-shaped.
Furthermore, more than two elastic rings are adopted, and the connecting end surfaces of the inner ring and the outer ring of each elastic ring are V-shaped, W-shaped or Z-shaped.
Compared with the prior art, the utility model discloses mechanical connection connects device has following beneficial effect:
(1) the utility model discloses the simple structure of cutting ferrule does not need purpose-made mounting tool to install, has that resistance to plucking bears the weight of the dynamic height, connects high-efficient simple and convenient, the cost is low, the efficiency of construction is high, exempts from welded characteristics during the field installation, has improved the efficiency of construction greatly.
(2) Elastic rings are arranged on the outer portion of the clamping ring in a sleeved mode, the clamping ring is in an extending state before installation due to the effect of elastic force, when the clamping ring is installed, the clamping ring is evenly and radially expanded outwards due to the fact that extrusion of the clamping head is received, after the clamping head penetrates through the clamping ring, the clamping ring is tightly attached to a clamping table on the clamping head under the effect of the elastic rings, and therefore connection of an upper barrel and a lower barrel is effectively achieved.
(3) The utility model discloses the attach fitting device is through setting up the mounting hole at upper and lower cutting ferrule up end, can adopt conventional instrument to pass through the mounting hole with upper and lower cutting ferrule screw in down in the section of thick bamboo to through the inseparable internal thread combination with a lower section of thick bamboo of external screw thread that the cutting ferrule surface set up, it is convenient to connect.
(4) The utility model discloses the upper and lower cutting ferrule among the attach fitting device is identical with the shape of snap ring, and draw-in groove through the cutting ferrule and the inseparable interlock of ka tai of snap ring, greatly increased frictional force makes the atress concentrate on the inserted bar completely.
Drawings
Fig. 1 is a schematic structural diagram of the device in the connection state of the present invention.
Fig. 2 is a schematic structural diagram of the device of the present invention in an unconnected state.
Fig. 3 is a schematic structural view of the chuck of the present invention.
Fig. 4 is a schematic cross-sectional view of the elastic ring and the snap ring of the present invention.
In the figure, 1-upper cylinder, 2-lower cylinder, 3-inserted bar, 4-upper cutting sleeve, 5-lower cutting sleeve, 6-snap ring, 7-elastic ring, 8-main rib, 9-clamping head, 10-thread, 11-clamping groove, 12-clamping table, 13-mounting hole, 14-arc table, 15-right-angle clamping table, 16-vertical edge section, 17-oblique edge section, 18-arc section, 19-inner ring and 20-outer ring.
Detailed Description
The invention will be elucidated below on the basis of an embodiment shown in the drawing. The embodiments disclosed herein are to be considered in all respects as illustrative and not restrictive. The scope of the present invention is not limited by the following description of the embodiments, but is defined only by the scope of the claims, and includes all modifications that have the same meaning as the scope of the claims and are within the scope of the claims.
A mechanical connecting joint device of the embodiment is used for connecting concrete piles. The structure of the device is shown in figures 1 and 2 and comprises an upper barrel 1, a lower barrel 2, a plunger 3, an upper cutting sleeve 4, a lower cutting sleeve 5, a snap ring 6 and an elastic ring 7. The outer parts of the upper cutting sleeve 4 and the lower cutting sleeve 5 are provided with threads 10, the inner wall of the lower barrel 2 is also provided with threads 10, and the upper cutting sleeve 4 and the lower cutting sleeve 5 are arranged in the lower barrel 2 through the threads 10. The upper cutting sleeve 4 and the lower cutting sleeve 5 are both provided with a clamping groove 11 for placing a clamping table 12 of the clamping ring 6. The upper end surfaces of the upper cutting sleeve 4 and the lower cutting sleeve 5 are both provided with mounting holes 13, and the mounting holes 13 are preferably arranged at positions corresponding to the clamping platforms 12. The number of the mounting holes 13 of the present embodiment is two or more.
Go up and be equipped with snap ring 6 and elastic ring 7 between cutting ferrule 4 and the lower cutting ferrule 5, elastic ring 7 cover is established in the outside of snap ring 6, and the quantity of snap ring 6 and elastic ring 7 in this embodiment is two. The upper end face of the snap ring 6 is provided with a structure of an arc table 14. The outer side edge of the snap ring 6 is provided with a clamping table 12, and the clamping table 12 is clamped into the clamping grooves 11 of the upper clamping sleeve 4 and the lower clamping sleeve 5 respectively, so that the snap ring 6 and the clamping sleeves are tightly meshed. When inserted bar 3 is at the male in-process, because the arc setting of arc platform 14, can not contradict with dop 9 of inserted bar 3, on the contrary because receive the extrusion of dop 9, make snap ring 6 even toward radially expanding outward, treat that dop 9 passes snap ring 6 after, under the effect of elastic ring 7, make snap ring 6 and the card platform 12 on the dop 9 tightly paste together to effectively realize the connection of upper and lower section of thick bamboo.
The upper part of the inserted bar 3 is arranged in the upper barrel 1, and the clamping head 9 at the bottom of the inserted bar 3 is inserted into the clamping ring 6. The structure of the chuck 9 is as shown in fig. 3, a right-angle chuck 15 is arranged on the upper part of the chuck 9, and the cross section of the lower part of the chuck 9 comprises a vertical side section 16, a straight inclined side section 17 and an arc section 18. The setting of circular arc section 18 and sharp sloping side section 17 can make dop 9 and snap ring 6's contact smooth transition more, is favorable to the installation of inserted bar 3, and the setting of perpendicular side section 16 is except the installation of the dop 9 of being convenient for, still ensures the bottom area of contact maximize of the right angle ka tai 15 of dop 9 and snap ring 6 to promote connecting device's tensile strength.
After the inserted bar 3 passes through the snap ring 6, the right-angle clamping table 15 on the inserted bar 3 is buckled at the bottom of the snap ring 6, and the inserted bar 3 is connected with the snap ring 6 under the locking of the elastic ring 7 and the upper and lower clamping sleeves, so that the connection of the upper barrel 1 and the lower barrel 2 is realized.
As shown in fig. 4, the elastic ring 7 of the present embodiment is hollow and circular arc-shaped, and the connection end surface between the inner ring 19 and the outer ring 20 of the elastic ring 7 is V-shaped, W-shaped or Z-shaped. In the process of installing the inserted rod 3, the elastic ring 7 is extruded by the clamping head 9 on the inserted rod 3 to deform in the radial direction, and a V-shaped, W-shaped or Z-shaped connecting end face is adopted, so that the elastic ring 7 can still be restored to the shape before installation after the inserted rod 3 is installed.

Claims (10)

1. A mechanical connection joint device is characterized by comprising an upper barrel, a lower barrel, an inserted link, an upper cutting sleeve, a lower cutting sleeve and a snap ring, wherein the upper cutting sleeve and the lower cutting sleeve are arranged in the lower barrel, and the snap ring is arranged between the upper cutting sleeve and the lower cutting sleeve; the upper portion of inserted bar installs in last section of thick bamboo, and the dop of inserted bar bottom inserts in the snap ring and buckle in the bottom of snap ring.
2. A mechanical connector assembly according to claim 1 wherein the upper end face of the collar is provided with an arcuate shelf.
3. A mechanical connector assembly as in claim 1 wherein said collet is formed with a right angle abutment, said right angle abutment engaging a bottom portion of said snap ring.
4. A mechanical connector assembly as in claim 3 wherein said collet has a cross-sectional shape at an end thereof comprising a vertical edge segment, a straight oblique edge segment and a circular arc segment.
5. The mechanical connector device of claim 1, wherein the upper and lower ferrules are externally threaded and are respectively threadedly coupled to the inner wall of the lower barrel.
6. The mechanical connector assembly of claim 5, wherein the upper and lower ferrules have mounting holes therein.
7. The mechanical connector device of claim 1, wherein the upper and lower ferrules are provided with a locking groove, and the locking ring is provided with a locking platform, and the locking platform is disposed in the locking groove.
8. The mechanical joint connection device of any one of claims 1 to 7, further comprising a resilient ring disposed between the upper ferrule and the lower ferrule and disposed outside the snap ring.
9. A mechanical connector assembly according to claim 8 wherein said resilient ring is hollow and arcuate.
10. The mechanical connection joint device according to claim 9, wherein the number of the elastic rings is two or more, and the connection end surfaces of the inner ring and the outer ring of the elastic rings are V-shaped, W-shaped or Z-shaped.
CN201920403034.3U 2019-03-27 2019-03-27 Mechanical connection joint device Ceased CN209989802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920403034.3U CN209989802U (en) 2019-03-27 2019-03-27 Mechanical connection joint device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920403034.3U CN209989802U (en) 2019-03-27 2019-03-27 Mechanical connection joint device

Publications (1)

Publication Number Publication Date
CN209989802U true CN209989802U (en) 2020-01-24

Family

ID=69290272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920403034.3U Ceased CN209989802U (en) 2019-03-27 2019-03-27 Mechanical connection joint device

Country Status (1)

Country Link
CN (1) CN209989802U (en)

Similar Documents

Publication Publication Date Title
CN204212399U (en) Flip-shell is to clasp
CN209989802U (en) Mechanical connection joint device
CN210164219U (en) Civil construction scaffold bottom stabilization and reinforcement structure
CN209780216U (en) Scaffold node connection structure
CN214785949U (en) Quick-assembly early-disassembly ear-shaped connecting piece for primary and secondary keels on board
CN214834737U (en) Plug-in type board primary and secondary keel fast-assembling early-dismantling ear-shaped connecting piece
CN216839062U (en) Jack support structure for replacing bridge support in limited space
CN210104727U (en) Mechanical connection structure
CN214834739U (en) Quick-assembly early-dismantling plate strip-shaped supporting structure
CN210164055U (en) Quick butt joint fine adjustment device for upper layer and lower layer of steel concrete composite pipe
CN211369314U (en) Building guardrail for civil engineering convenient to concatenation
CN109869386A (en) A kind of connection inserted link, jointing device and prestressing force prefabricated component
CN208169271U (en) A kind of jointing device and prestressing force prefabricated component
CN211228140U (en) High-strength connecting device for top plate construction bracket
CN202706521U (en) Fast-building scaffold
CN209855237U (en) Connecting and locking device for building template
CN218373804U (en) Combined photovoltaic tubular pile
CN214783272U (en) Bridge floor steel structure convenient to high-speed joint is fixed
CN211421599U (en) Quick connection structure of steel core concrete column
CN220827639U (en) Paving board connecting piece
CN215717075U (en) Ultrahigh-support die carrier
CN207944783U (en) A kind of construction fixture type protective fence
CN217896473U (en) Tubular pile connector for super high-rise building safety
CN212670999U (en) Building structure design wall column base quick connecting device
CN216276137U (en) Constructional engineering assembled building steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
IW01 Full invalidation of patent right
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20230119

Decision number of declaring invalidation: 60412

Granted publication date: 20200124