CN218623201U - Support for construction - Google Patents
Support for construction Download PDFInfo
- Publication number
- CN218623201U CN218623201U CN202222836260.5U CN202222836260U CN218623201U CN 218623201 U CN218623201 U CN 218623201U CN 202222836260 U CN202222836260 U CN 202222836260U CN 218623201 U CN218623201 U CN 218623201U
- Authority
- CN
- China
- Prior art keywords
- bearing plate
- bolt
- guardrail
- recess
- line socket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a building technical field especially relates to a support for construction, including first landing leg and bearing plate, every first recess, four have all been seted up to the inboard of first landing leg the inside slidable mounting of first recess has same bearing plate, line socket, every have all been seted up to two lateral extremes of bearing plate two equal fixed mounting of inside wall of line socket has the bullet button, is located line socket both sides two lateral extremes of bearing plate have all been seted up two third recesses, every the inside slidable mounting of third recess has the bolt. The utility model discloses an inside inserting the hypomere of guardrail into the strip line socket, at this moment play the button and play the inside of entering third screw thread mouth, according to the working height pulling guardrail simultaneously and let the telescopic link stretch perpendicularly, change the height of guardrail, fastening the fixed block in the inboard of first landing leg, can guarantee the security of bearing plate in the use through the guardrail, improved the convenience of using through the telescopic link simultaneously.
Description
Technical Field
The utility model relates to a building technical field especially relates to a support for construction.
Background
The support is a term of the building industry, particularly relates to a temporary support erected during building of a building, can be removed along with building of the building, is fixedly connected and cannot move in the using process, and is high in danger in use due to the fact that a common support is not provided with a fence.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model provides a support for building construction.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a support for construction, includes first landing leg and bearing plate, every first recess, four have all been seted up to the inboard of first landing leg the inside slidable mounting of first recess has same bearing plate, line socket, every have all been seted up to two side ends of bearing plate the equal fixed mounting of two inside walls of line socket has bullet button, is located line socket both sides two third recesses, every have all been seted up to two side ends of bearing plate the inside slidable mounting of third recess has the bolt, is located in the middle of third recess and line socket two side ends of bearing plate have all been seted up two bolts, every the inside movable mounting of line socket has the guardrail, every the outside fixed mounting of first landing leg has the second landing leg, every the side end movable mounting of second landing leg has the ground nail.
As an optimal technical scheme of the utility model, every the bottom fixed mounting of bolt has first spring block, every the side tip fixed mounting of bolt has the pull rod, every the inboard movable mounting of guardrail has two at least telescopic links, every the upper segment fixed mounting of guardrail has the fixed block, every the third screw thread mouth has all been seted up to two side tips of guardrail hypomere.
As an optimal technical scheme of the utility model, every two at least first screw threads mouth has been seted up to the inner wall of first recess, is located first recess one side every two at least second screw threads mouth, every have been seted up to the inboard of first landing leg the inside fixed mounting of second landing leg has second spring block, every the bottom fixed mounting of second spring block has the smooth group of wheel, two second recesses have all been seted up to two side tip of bearing plate, and every second recess is connected with the pull rod.
Compared with the prior art, the utility model discloses the beneficial effect that can reach is:
1. through pulling the pull rod, let its orbit along the second recess backward, pull rod pulling bolt removes, extrude the first spring block at the back, the bolt leaves the inside of first screw thread mouth this moment, the lifting bearing plate lets the bolt along the orbit vertical motion of first recess, release the second recess to suitable position, the bolt is under the effort of first spring block, horizontal motion enters into the inside of first screw thread mouth, fasten bolt and fixed block again, can remove the position of bearing plate through bolt and first screw thread mouth, the service efficiency is improved, and the functionality is increased.
2. Insert the hypomere of guardrail inside the line socket, at this moment play the inside that the button bullet goes into third screw thread mouth, let the telescopic link vertical stretching according to the operating height pulling guardrail simultaneously, change the height of guardrail, fastening the fixed block in the inboard of first landing leg, can guarantee the security of bearing plate in the use through the guardrail, improved the convenience of using through the telescopic link simultaneously.
Drawings
Fig. 1 is a schematic structural view of the bracket body of the present invention;
fig. 2 is a schematic structural view of the bearing plate of the present invention;
fig. 3 is a schematic structural view of the guardrail of the present invention;
fig. 4 is a schematic structural view of the support leg of the present invention.
Wherein: 1. a first leg; 11. a first threaded port; 12. a first groove; 13. a second threaded port; 14. a guardrail; 15. a second leg; 16. a second groove; 17. a third groove; 18. a bolt; 19. a strip line socket; 2. a bearing plate; 21. snapping a button; 22. a pull rod; 23. a first spring block; 24. a bolt; 25. a fixed block; 26. a telescopic rod; 27. a third threaded port; 28. a ground nail; 29. a second spring block; 31. and a wheel slide group.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the invention easy to understand, the invention is further explained below with reference to the specific embodiments, but the following embodiments are only the preferred embodiments of the invention, not all. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention. The experimental methods in the following examples are conventional methods unless otherwise specified, and materials, reagents and the like used in the following examples are commercially available unless otherwise specified.
As shown in fig. 1, 2, 3 and 4, a support for building construction includes first legs 1 and bearing plates 2, a first groove 12 is formed in an inner side of each first leg 1, the same bearing plate 2 is slidably mounted inside four first grooves 12, wire sockets 19 are formed in two side ends of each bearing plate 2, spring buttons 21 are fixedly mounted on two inner side walls of each wire socket 19, two third grooves 17 are formed in two side ends of each bearing plate 2 on two sides of each wire socket 19, a bolt 24 is slidably mounted inside each third groove 17, two bolts 18 are formed in two side ends of each bearing plate 2 between each third groove 17 and each wire socket 19, the bolt 18 is rotated away from the inside of the second screw port 13, the bolt 22 can be pulled to move backwards along a trajectory of a leg 16 by pulling the leg 22, the bolt 24 is pulled to squeeze the first spring block 23 behind, the bolt 24 leaves the first screw port 11, the bearing plate 2 is lifted, the bolt 24 moves vertically along the trajectory of the first groove 12, the leg 16 is pulled to a proper position by the leg, the bolt 22 pulls the bolt 24 to move to squeeze the first spring block 23 behind the first spring block 23, the bolt 24, each bolt 15 is mounted below the movable bolt 15, each movable bolt 15 and a movable bolt 15 is mounted on a movable bolt 15, and a movable bolt 15, each movable bolt 15 is mounted below the wire bolt 15 and a movable bolt 15, each wire bolt 15 is fastened to a movable bolt 15, and a movable bolt 15, each wire bolt 15, and a bolt 15, each movable bolt 15 fixed block 15 fixed in each wire bolt 15.
A first spring block 23 is fixedly installed at the bottom end of each bolt 24, a pull rod 22 is fixedly installed at the side end of each bolt 24, at least two telescopic rods 26 are movably installed at the inner side of each guardrail 14, the guardrail 14 and the bearing plate 2 are fastened at the side end of the first supporting leg 1, then the ground nail 28 is opened and inserted into the ground, a user climbs on the surface of the bearing plate 2, the second spring block 29 is pressed through weight to enable the first supporting leg 1 and the second supporting leg 15 to be tightly attached to the ground, at this time, the ground nail 28 is extruded under the action of a spring, after the user leaves the bearing plate 2, the second supporting leg 15 is lifted upwards under the action of the second spring block 29, then the ground nail 28 is pulled, the position of the first supporting leg 1 can be moved, the flexibility in the using process can be improved through the wheel sliding group 31, a fixing block 25 is fixedly installed at the upper section of each guardrail 14, third threaded ports 27 are all installed at the two side ends of the lower section of each guardrail 14, at least two first threaded ports 11 are installed on the inner wall of each first groove 12, at least two threaded ports 13 are installed at one side end of each first supporting leg 1, two threaded ports 16 are installed at the inner side end of each spring fixing block 29, each bearing plate, and two sliding blocks 16 of each spring sliding block are connected with the second spring sliding block 29, and each bearing plate 29, and each bearing plate 16.
The working principle is as follows:
first, in the using process, the first supporting leg 1 is pulled to a designated position through the roller sliding group 31, the ground nail 28 is put down, the position of the second supporting leg 15 is fastened, the bolt 24 is put into the first groove 12, the first spring block 23 is moved to one side through pulling the pull rod 22, the first spring block 23 is pulled to enter the first thread opening 11, the bolt 18 is screwed to enter the second thread opening 13, the bearing plate 2 can be quickly and stably installed through two fixing modes, when the bolt is used, the bolt on the surface of the fixing block 25 can be opened, the bolt 18 is rotated away from the inside of the second thread opening 13, the bolt 24 can be vertically moved along the track of the first groove 12 by pulling the pull rod 22, the pull rod 22 pulls the bolt 24 to move along the track of the second groove 16, the bolt 24 is pressed to the first spring block 23 behind, the bolt 24 leaves the inside the first thread opening 11, the bolt 24 is lifted up, the bearing plate 2 is vertically moved along the track of the first groove 12, the second groove 16 is put in a proper position, the bolt 24 is released, the bolt 23 enters the first spring block 23, the horizontal movement, the bolt 11, and the bolt 18 and the bolt fastening efficiency can be improved, and the bolt use efficiency can be improved.
Secondly, during installation, the lower section of the guardrail 14 is inserted into the wire inserting port 19, at the same time, the spring button 21 springs into the third threaded port 27, the guardrail 14 is pulled according to the working height to vertically stretch the telescopic rod 26, the height of the guardrail 14 is changed, the fixing block 25 is fastened on the inner side of the first supporting leg 1, the safety of the supporting leg 2 in the using process can be guaranteed through the guardrail 14, the using convenience is improved through the telescopic rod 26, the guardrail 14 and the supporting leg 2 are fastened on the side end of the first supporting leg 1, then the ground nail 28 is opened and inserted into the ground, a user can step on the surface of the supporting leg 2, the first supporting leg 1 and the second supporting leg 15 are tightly attached to the ground through pressing the second spring block 29 through weight, at the moment, the ground nail 28 is extruded under the action of the spring, after the user leaves the supporting leg 2, the second supporting leg 15 is lifted upwards under the action of the second spring block 29, the ground nail 28 is pulled, the position of the first supporting leg 1 can be moved, the flexibility in the using process can be improved through the wheel sliding group 31, and the workload can be reduced.
Claims (6)
1. The utility model provides a support for construction, includes first landing leg (1) and bearing plate (2), its characterized in that, every first recess (12), four have all been seted up to the inboard of first landing leg (1) the inside slidable mounting of first recess (12) has same bearing plate (2), line socket (19), every have all been seted up to two side tip of bearing plate (2) the equal fixed mounting of two inside walls of line socket (19) has bullet button (21), is located line socket (19) both sides two side tips of bearing plate (2) have all seted up two third recess (17), every the inside slidable mounting of third recess (17) has bolt (24), is located in the middle of third recess (17) and line socket (19) two side tips of bearing plate (2) have all seted up two bolt (18), every the inside movable mounting of line socket (19) has guardrail (14), every the outside fixed mounting of first landing leg (1) has second (15), every the landing leg movable mounting of second landing leg (15) has ground nail (28).
2. A support for building construction according to claim 1, wherein a first spring block (23) is fixedly mounted at the bottom end of each bolt (24), and a pull rod (22) is fixedly mounted at the side end of each bolt (24).
3. The support for building construction according to claim 1, wherein at least two telescopic rods (26) are movably mounted on the inner side of each guardrail (14), a fixed block (25) is fixedly mounted on the upper section of each guardrail (14), and third threaded openings (27) are formed in two side ends of the lower section of each guardrail (14).
4. The bracket for building construction according to claim 1, wherein at least two first threaded openings (11) are formed in the inner wall of each first groove (12), and at least two second threaded openings (13) are formed in the inner side of each first leg (1) at one side of the first groove (12).
5. A support for building construction according to claim 1, wherein a second spring block (29) is fixedly mounted inside each second leg (15), and a roller set (31) is fixedly mounted at the bottom end of each second spring block (29).
6. A support for building construction according to claim 1, characterized in that two second grooves (16) are provided at both side ends of the bearing plate (2), each second groove (16) being connected to a tie rod (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222836260.5U CN218623201U (en) | 2022-10-27 | 2022-10-27 | Support for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222836260.5U CN218623201U (en) | 2022-10-27 | 2022-10-27 | Support for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218623201U true CN218623201U (en) | 2023-03-14 |
Family
ID=85474145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222836260.5U Active CN218623201U (en) | 2022-10-27 | 2022-10-27 | Support for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218623201U (en) |
-
2022
- 2022-10-27 CN CN202222836260.5U patent/CN218623201U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218623201U (en) | Support for construction | |
CN2799740Y (en) | Assembling bis-adjustable multifunctional early-demolishment device | |
CN113152749A (en) | Hang argil board curtain wall construction futilely | |
CN114753665A (en) | High-rise concrete engineering construction faces limit protector | |
CN213038586U (en) | Steel construction combination formula temporary support | |
CN213682638U (en) | Steel construction building assembled light wall body | |
CN112065020B (en) | Combined scaffold for civil engineering | |
CN212535083U (en) | Building construction stair template with quick assembly disassembly structure | |
CN210622165U (en) | External corner section bar | |
CN211369069U (en) | Steel construction coupling assembling of prefabricated floor | |
CN114182966A (en) | Overhanging type unloading platform main beam | |
CN217028026U (en) | Building construction attaches wall scaffold frame | |
CN208396157U (en) | A kind of energy-saving curtain wall daylighting roof construction | |
CN219034043U (en) | Assembled strutting arrangement | |
CN220395362U (en) | Fixed shaping protection railing of vertical bolt | |
CN216787722U (en) | Wall tile dry-hanging device | |
CN220620643U (en) | Light steel structure for changing flat roof into sloping roof | |
CN217028000U (en) | A building hanging flower basket frame for building engineering | |
CN219732735U (en) | Scaffold antiskid plate convenient to disassemble and assemble and stable to fix | |
CN217642348U (en) | Air switch assembly and disassembly tools | |
CN218062181U (en) | Climbing frame for building construction tower crane | |
CN115199021B (en) | Fabricated platform for parapet construction of steel structure transformer substation | |
CN220814960U (en) | Steel structural layer traction reinforcing rib structure | |
CN216340834U (en) | Auxiliary plate mounting device for attached lifting scaffold | |
CN211641784U (en) | Side door capable of being installed and opened without tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |