Steel construction combination formula temporary support Download PDFInfo
- Publication number
- CN213038586U CN213038586U CN202020956769.1U CN202020956769U CN213038586U CN 213038586 U CN213038586 U CN 213038586U CN 202020956769 U CN202020956769 U CN 202020956769U CN 213038586 U CN213038586 U CN 213038586U
- Authority
- CN
- China
- Prior art keywords
- main part
- groove
- sliding
- rod
- temporary support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 27
- 239000010959 steel Substances 0.000 title claims abstract description 27
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 abstract description 9
- 230000000694 effects Effects 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a steel construction combination formula temporary support, including base main part, support column main part, bracing piece main part and backup pad, the welding of base main part top has the support column main part, the inside embedded bracing piece main part that has of support column main part, the backup pad is installed on bracing piece main part top, the inside fixing device that is provided with of backup pad, the inside adjusting device that is provided with of support column main part. The utility model discloses a get into the draw-in groove with the fixture block, through the elastic action of spring, carry out spacing fixed to the fixture block, the device has solved present steel construction combination formula temporary support and has used the bolt more and install fixedly, but it is comparatively loaded down with trivial details when installing and dismantling, holistic installation and dismantlement efficiency have been reduced, the problem of holistic work efficiency has been reduced, stability when having guaranteed the device is fixed, the work efficiency of device when installing in dismantling has been promoted, and the simple operation, high durability and convenient use, the practicality of device has been guaranteed.
Description
Technical Field
The utility model relates to the technical field of supports, specifically be a steel construction combination formula temporary support.
Background
The steel structure support is widely applied to the building industry, particularly relates to temporary support erected during building of a building, the support can be removed along with the building, the temporary support is an object for supporting tents and the like which are erected temporarily, and the steel structure support has the characteristic of convenience in carrying, so that the existing steel structure combined type temporary support basically meets the requirements of people, but still has some problems.
The first problem is that: present steel construction combination formula temporary support uses the bolt to install fixedly more, but it is comparatively loaded down with trivial details when the installation with dismantle, has reduced holistic installation and dismantlement efficiency, has reduced holistic work efficiency.
The second problem is that: present steel construction combination formula temporary support can't carry out altitude mixture control, leads to it can't be applicable to multiple occasion, has reduced the suitability of device, therefore needs a steel construction combination formula temporary support urgently to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction combination formula temporary support to the traditional temporary support installation that proposes in solving above-mentioned background is inconvenient, and can't carry out altitude mixture control's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure combined temporary support comprises a base main body, a support column main body, a support rod main body and a support plate, wherein the support column main body is welded at the top end of the base main body, the support rod main body is embedded in the support column main body, the support plate is installed at the top end of the support rod main body, a fixing device is arranged in the support plate, an adjusting device is arranged in the support column main body, the fixing device comprises a clamping block, a clamping groove, a cavity, a first sliding groove, a first sliding block, a limiting plate, a hinged rod, a pull rod, a spring, a handle, a second sliding groove and a second sliding block, the top end of the support rod main body is fixedly connected with the clamping block, the clamping groove is formed in the support plate, the cavity is formed in the support plate, the first sliding groove is formed in the cavity, a first sliding block is embedded in the first, and the limiting plate is embedded in the clamping groove, the limiting plate left end is articulated with the hinge rod, the hinge rod other end is articulated with the pull rod, the welding of pull rod top has the spring, and the spring other end welds in the cavity inner wall, pull rod bottom fixedly connected with handle.
Preferably, a second sliding groove is formed in the cavity, a second sliding block is embedded in the second sliding groove, and one end, far away from the clamping block, of the second sliding block is fixedly connected to the pull rod.
Preferably, the adjusting device comprises an anti-slip pad, a fixing groove, a fixing bolt, a sliding rail and a sliding rod, the anti-slip pad is glued to the bottom end of the base main body, the fixing groove is formed in the supporting rod main body, the fixing bolt is connected to the inside of the fixing groove in a threaded mode, and the fixing bolt is embedded in the supporting column main body.
Preferably, the inside slide rail of having seted up of bracing piece main part, the slide rail is inside to be embedded to have a slide bar, and the slide bar keeps away from the one end fixed connection of slide rail in support column main part left end inner wall.
Preferably, the top end of the clamping block is arc-shaped, and the length of the bottom end of the clamping block is greater than that of the supporting rod main body.
Preferably, the shape of the non-slip mat is rectangular, and the non-slip mat is made of rubber.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the steel structure combined temporary support is provided with a clamping block, a clamping groove, a cavity, a first sliding chute, a first sliding block, a limiting plate, a hinge rod, a pull rod, a spring, a handle, a second sliding chute and a second sliding block, the clamping block enters the clamping groove, the limiting plate is driven to move towards the inside of the clamping groove under the elastic action of the spring, thereby limiting and fixing the clamping block, when the clamping block is disassembled, the handle is pulled to drive the limiting plate to be separated from the inside of the clamping groove, thereby completing the disassembly, the device solves the problems that the prior steel structure combined temporary support is mostly installed and fixed by bolts, but it is comparatively loaded down with trivial details when installation and dismantlement, has reduced holistic installation and dismantlement efficiency, has reduced holistic work efficiency's problem, has guaranteed the stability when the device is fixed, has promoted the work efficiency of device when installing in the dismantlement, and the simple operation, and simple to use has guaranteed the practicality of device.
2. This interim support of steel construction combination formula is provided with the slipmat, the fixed slot, fixing bolt, slide rail and slide bar, when needing the height of adjusting support board, rotatory fixing bolt, effect through fixing bolt and fixed slot threaded connection, it breaks away from inside the fixed slot to drive fixing bolt, upwards stimulate the backup pad, when removing to suitable height, reverse rotation fixing bolt, it gets into inside the fixed slot to drive fixing bolt, accomplish the regulation this moment, the above-mentioned device, it can't carry out the altitude mixture control to have solved present interim support of steel construction combination formula, lead to it can't be applicable to multiple occasion, the problem of the suitability of device has been reduced, the stability that the device supported has been guaranteed, the controllability of device has been increased, the suitability of device has been promoted.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of a front view cross section of the present invention;
FIG. 3 is a schematic view of a front view cross section of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 3 according to the present invention;
fig. 5 is an enlarged schematic structural diagram of the position B in fig. 2 according to the present invention.
In the figure: 1. a base body; 2. a support post body; 3. a support rod main body; 4. a support plate; 511. a clamping block; 512. a card slot; 513. a chamber; 514. a first chute; 515. a first slider; 516. a limiting plate; 517. a hinged lever; 518. a pull rod; 519. a spring; 520. a handle; 521. a second chute; 522. a second slider; 611. a non-slip mat; 612. fixing grooves; 613. fixing the bolt; 614. a slide rail; 615. a slide bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a steel structure combined temporary support comprises a base main body 1, a support column main body 2, a support rod main body 3 and a support plate 4, wherein the support column main body 2 is welded at the top end of the base main body 1, the support rod main body 3 is embedded in the support column main body 2, the support plate 4 is installed at the top end of the support rod main body 3, a fixing device is arranged in the support plate 4, an adjusting device is arranged in the support column main body 2, the fixing device comprises a clamping block 511, a clamping groove 512, a cavity 513, a first sliding groove 514, a first sliding block 515, a limiting plate 516, a hinge rod 517, a pull rod 518, a spring 519, a handle 520, a second sliding groove 521 and a second sliding block 522, the clamping block 511 is fixedly connected to the top end of the support rod main body 3, the clamping groove 512 is formed in the support plate 4, the cavity 513 is formed in the support plate 4, one end of the first sliding block 515, which is far away from the first sliding groove 514, is fixedly connected with a limiting plate 516, the limiting plate 516 is embedded in the clamping groove 512, the left end of the limiting plate 516 is hinged with a hinged rod 517, the other end of the hinged rod 517 is hinged with a pull rod 518, the top end of the pull rod 518 is welded with a spring 519, the other end of the spring 519 is welded on the inner wall of the chamber 513, the bottom end of the pull rod 518 is fixedly connected with a handle 520, the problems that the existing steel structure combined temporary support is installed and fixed by bolts in many times are solved, but the installation and the disassembly are complicated, the integral installation and disassembly efficiency is reduced, the integral working efficiency is reduced, the stability during the fixation of the device is ensured, the working efficiency during the installation and the disassembly of the device is improved, the operation is convenient and simple, the practicability of the device is ensured, the second sliding groove 521 is arranged, and the one end of the second slider 522 that is far away from fixture block 511 is fixedly connected to the pull rod 518, through the effect that the second chute 521 slides in the second slider 522, can promote the stability of pull rod 518 when moving, the top of fixture block 511 sets up to the arc, and the length of fixture block 511 bottom is greater than the length of bracing piece main part 3, when fixture block 511 gets into the draw-in groove 512 inside, can directly extrude the block to accomplish fixedly.
The adjusting device comprises an anti-skid pad 611, a fixing groove 612, a fixing bolt 613, a sliding rail 614 and a sliding rod 615, the anti-skid pad 611 is glued at the bottom end of the base main body 1, the fixing groove 612 is formed in the supporting rod main body 3, the fixing bolt 613 is in threaded connection in the fixing groove 612, and the fixing bolt 613 is embedded in the supporting column main body 2, so that the problem that the conventional steel structure combined temporary support cannot be used in various occasions due to the fact that height adjustment cannot be carried out on the conventional steel structure combined temporary support is solved, the applicability of the device is reduced, the supporting stability of the device is guaranteed, the adjustability of the device is improved, the sliding rail 614 is formed in the supporting rod main body 3, the sliding rod 615 is embedded in the sliding rail 614, one end, far away from the sliding rail 614, of the sliding rod 615 is fixedly connected to the inner wall of the left end of the, the shape of the non-slip mat 611 is set to be rectangular, and the non-slip mat 611 is made of rubber, so that the friction force between the device and the ground is further increased, and the stability of the device is improved.
The working principle is as follows: when the fixture block 511 is installed, the fixture block 511 enters the clamping groove 512, the fixture block 511 extrudes the limiting plate 516 at the moment, the limiting plate 516 is driven to move towards one end far away from the clamping groove 512, the pull rod 518 is driven to move downwards through the action of the pull rod 518 and the sliding action of the second sliding block 522 in the second sliding groove 521, the spring 519 deforms, when the fixture block 511 moves to the position above the limiting plate 516, the limiting plate 516 is driven to move towards the inside of the clamping groove 512 through the elastic action of the spring 519, so that the fixture block 511 is limited and fixed, and when the fixture block 511 is disassembled, the handle 520 is pulled, the limiting plate 516 is driven to be separated from the inside;
when the height of the supporting plate 4 needs to be adjusted, the fixing bolt 613 is rotated, the fixing bolt 613 is driven to be separated from the inside of the fixing groove 612 through the effect of threaded connection between the fixing bolt 613 and the fixing groove 612, the supporting plate 4 is pulled upwards, and when the supporting plate is moved to a proper height, the fixing bolt 613 is rotated reversely to drive the fixing bolt 613 to enter the inside of the fixing groove 612, and the adjustment is completed at this moment.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a steel construction combination formula temporary support, includes base main part (1), support column main part (2), bracing piece main part (3) and backup pad (4), base main part (1) top welding has support column main part (2), the inside embedded bracing piece main part (3) that has of support column main part (2), backup pad (4) are installed on bracing piece main part (3) top, backup pad (4) inside fixing device that is provided with, the inside adjusting device that is provided with of support column main part (2), its characterized in that: the fixing device comprises a clamping block (511), a clamping groove (512), a cavity (513), a first sliding groove (514), a first sliding block (515), a limiting plate (516), a hinged rod (517), a pull rod (518), a spring (519), a handle (520), a second sliding groove (521) and a second sliding block (522), the clamping block (511) is fixedly connected to the top end of the supporting rod main body (3), the clamping groove (512) is formed in the supporting plate (4), the clamping block (511) is embedded in the clamping groove (512), the cavity (513) is formed in the supporting plate (4), the first sliding groove (514) is formed in the cavity (513), the first sliding block (515) is embedded in the first sliding groove (514), the limiting plate (516) is fixedly connected to one end, far away from the first sliding groove (514), of the first sliding block (515), and the limiting plate (516) is embedded in the clamping groove (512, limiting plate (516) left end is articulated to have articulated rod (517), articulated rod (517) other end articulates there is pull rod (518), pull rod (518) top welding has spring (519), and the spring (519) other end welds in cavity (513) inner wall, pull rod (518) bottom fixedly connected with handle (520).
2. The combined temporary support frame of steel structure as claimed in claim 1, wherein: the cavity (513) is internally provided with a second sliding groove (521), a second sliding block (522) is embedded in the second sliding groove (521), and one end, far away from the fixture block (511), of the second sliding block (522) is fixedly connected to the pull rod (518).
3. The combined temporary support frame of steel structure as claimed in claim 1, wherein: the adjusting device comprises a non-slip mat (611), a fixing groove (612), a fixing bolt (613), a sliding rail (614) and a sliding rod (615), the non-slip mat (611) is glued to the bottom end of the base main body (1), the fixing groove (612) is formed in the supporting rod main body (3), the fixing bolt (613) is connected to the fixing groove (612) through internal threads, and the fixing bolt (613) is embedded in the supporting column main body (2).
4. The combined temporary support frame of steel structure as claimed in claim 3, wherein: slide rail (614) have been seted up to bracing piece main part (3) inside, slide rail (614) inside is embedded to have slide bar (615), and slide bar (615) keep away from the one end fixed connection of slide rail (614) in support column main part (2) left end inner wall.
5. The combined temporary support frame of steel structure as claimed in claim 1, wherein: the top end of the clamping block (511) is arc-shaped, and the length of the bottom end of the clamping block (511) is larger than that of the support rod main body (3).
6. The combined temporary support frame of steel structure as claimed in claim 3, wherein: the shape of the non-slip mat (611) is set to be rectangular, and the non-slip mat (611) is made of rubber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020956769.1U CN213038586U (en) | 2020-05-31 | 2020-05-31 | Steel construction combination formula temporary support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020956769.1U CN213038586U (en) | 2020-05-31 | 2020-05-31 | Steel construction combination formula temporary support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213038586U true CN213038586U (en) | 2021-04-23 |
Family
ID=75523077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020956769.1U Active CN213038586U (en) | 2020-05-31 | 2020-05-31 | Steel construction combination formula temporary support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213038586U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113701875A (en) * | 2021-07-21 | 2021-11-26 | 福建九五检测技术服务有限公司 | Noise detection device convenient to carry |
-
2020
- 2020-05-31 CN CN202020956769.1U patent/CN213038586U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113701875A (en) * | 2021-07-21 | 2021-11-26 | 福建九五检测技术服务有限公司 | Noise detection device convenient to carry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213038586U (en) | Steel construction combination formula temporary support | |
CN114562106B (en) | Overweight template support | |
CN218265062U (en) | Pretightening length-adjustable diagonal brace rod | |
CN212453616U (en) | Energy-conserving stable template fixed bolster for building | |
CN112575684B (en) | Pipe support fastening device with self-locking structure for bridge construction | |
CN211143839U (en) | Assembled side top supporting device | |
CN210003009U (en) | construction adjustable rail guard is built in room | |
CN113309340A (en) | Support arrangement for early tear template open | |
CN216640320U (en) | Mounting device for sound barrier stand column | |
CN211773148U (en) | Assembled telescopic railing | |
CN220336291U (en) | Stainless steel railing base | |
CN213925958U (en) | Novel highway notice board | |
CN210485133U (en) | Stage is with support frame of being convenient for install display screen | |
CN214363107U (en) | Gateway door for parking entrance management | |
CN219627177U (en) | Portable function post | |
CN215252437U (en) | Self-luminous signboard for road of automatic clearance | |
CN212613645U (en) | A novel scaffold draw bar structure for civil construction engineering | |
CN115874811B (en) | Keel structure | |
CN215949004U (en) | Equipment for pulling column from joist | |
CN220822502U (en) | Cable bridge convenient to fixed cable | |
CN218918408U (en) | Truss extension tool convenient to detach | |
CN219034156U (en) | Temporary support device for demolishing house wall | |
CN220203408U (en) | Large-span beam-free top plate supporting structure | |
CN220978866U (en) | Reinforcing steel bar auxiliary fixing device for assembled building | |
CN221256118U (en) | Connecting piece for staggered connection of vertical rods of frame body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211215 Address after: 510145 B02, shop 2276, No. 418, Xihua Road, Liwan District, Guangzhou City, Guangdong Province Patentee after: Guangdong Precision Technology Development Co.,Ltd. Address before: 235121 No.23, gaowafangzhuang, Liuli village, sunting Town, Suixi County, Huaibei City, Anhui Province Patentee before: Gao Maosan |