CN218622678U - Three-section type wire hole hanging hole reinforcing member - Google Patents

Three-section type wire hole hanging hole reinforcing member Download PDF

Info

Publication number
CN218622678U
CN218622678U CN202222859719.3U CN202222859719U CN218622678U CN 218622678 U CN218622678 U CN 218622678U CN 202222859719 U CN202222859719 U CN 202222859719U CN 218622678 U CN218622678 U CN 218622678U
Authority
CN
China
Prior art keywords
hole
poured
nut
wire hole
hanging hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222859719.3U
Other languages
Chinese (zh)
Inventor
黄德亮
吴二林
张玉龙
赵艳恒
牛增聪
党飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
China Overseas Construction Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
China Overseas Construction Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, China Overseas Construction Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202222859719.3U priority Critical patent/CN218622678U/en
Application granted granted Critical
Publication of CN218622678U publication Critical patent/CN218622678U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a syllogic line hole hangs hole reinforcement. The three-section type wire hole hanging hole reinforcing piece comprises a three-section type water stopping bolt inserted into a wire hole hanging hole to be poured, wherein the three-section type water stopping bolt extends up and down, a tray penetrates through the lower part of the three-section type water stopping bolt to prevent concrete poured in the wire hole hanging hole to be poured from falling off, and a first reinforcing component is arranged below the tray to prevent the tray from falling off; the upper portion of the three-section type water stopping bolt is provided with a first steel pipe and a second steel pipe, the first steel pipe and the second steel pipe are symmetrical, and the second steel pipe is reinforced through a second reinforcing assembly. This syllogic line hole hangs hole reinforcement, the line hole that will pour hangs the hole and pours the back, and the interior pole of syllogic stagnant water bolt is located the concrete of pouring, and the line hole after having avoided pouring hangs the hole and leaves the hole, avoids leaking.

Description

Three-section type wire hole hanging hole reinforcing member
Technical Field
The utility model belongs to building main body structural engineering field, concretely relates to syllogic line hole hangs hole reinforcement.
Background
In the current floor work progress, can reserve some line hole hanging holes on the floor board, the main part back of capping is accomplished, can adopt the concrete shutoff to get up, and its standard reinforcement way is for adopting pole setting, top support, steel pipe back-lifting, supports to pour after the template bottom is cleared up. In the construction of hanging holes in floor line holes, because the top support reinforcing process is troublesome, the times of using standard reinforcing methods are very few, and the potential safety hazard that the steel pipe falls exists in the construction process.
The utility model discloses an authorization notice number is CN 212002279U's utility model discloses a hang hole support reinforcement template, this hang hole support reinforcement template, including concrete floor (1), concrete floor (1) upper end is provided with supporting shoe (2) of symmetry, just double steel pipe (3) have been placed to supporting shoe (2) top level, concrete floor (1) bottom is provided with supporting template (4), just supporting template (4) top is provided with PVC sleeve pipe (5), PVC sleeve pipe (5) inside is provided with split bolt (6), just split bolt (6) run through supporting template (4) bottom to its outside, the bottom of supporting template (4) is provided with formwork support frame (7), just formwork support frame (7) are in cup jointing split bolt (6) one end, formwork support frame (7) below is provided with first nut (8) and second nut (9), the one end of keeping away from supporting template (4) to split bolt (6) is provided with butterfly buckle (10), the top is provided with third butterfly buckle (10) and butterfly nut (11) and fourth nut (12) connection hole position concrete floor (1), and connection stud (13) are provided with the butterfly nut (13). This hang hole and support reinforcing template, hang the hole and pour the concrete after, the PVC sleeve pipe needs remain in the middle of the concrete of pouring, and the PVC sleeve pipe that remains still has the hole.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a syllogic line hole hangs hole reinforcement hangs more troublesome technical problem in the hole reinforcement process in order to solve the line hole.
In order to realize the above purpose, the utility model discloses the technical scheme who takes does: a three-section type wire hole hanging hole reinforcing member comprises a three-section type water stopping bolt inserted into a wire hole hanging hole to be poured, wherein the three-section type water stopping bolt extends up and down, a tray penetrates through the lower portion of the three-section type water stopping bolt to prevent concrete poured in the wire hole hanging hole to be poured from falling off, and a first reinforcing component is arranged below the tray to prevent the tray from falling off; the upper portion of the three-section type water stopping bolt is provided with a first steel pipe and a second steel pipe, the first steel pipe and the second steel pipe are symmetrical, and the second steel pipe is reinforced through a second reinforcing assembly.
Furthermore, the first reinforcing component comprises a first mountain-shaped clamp, a first nut and a second nut, wherein the first nut and the second nut are positioned below the first mountain-shaped clamp; the second reinforcing component comprises a second mountain-shaped clamp, a third nut and a fourth nut, wherein the third nut and the fourth nut are positioned above the second mountain-shaped clamp; the mountain-shaped clamp I, the nut II, the mountain-shaped clamp II, the nut III and the nut IV are all in threaded connection with the three-section type water stop bolt.
Further, syllogic stagnant water bolt includes interior pole and the outer pole at interior pole both ends, interior pole passes through the horn head with the outer pole and is connected, horn head and interior pole and outer pole screw joint.
Furthermore, the length of the inner rod is consistent with the depth of the hanging hole of the wire hole to be poured, so that the outer rod is respectively positioned above and below the hanging hole of the wire hole to be poured during pouring; the horn head is flush with the surface of a concrete floor where the wire hole hanging hole to be poured is located, so that after the wire hole hanging hole to be poured is poured, the inner rod is located in the wire hole hanging hole after pouring.
Furthermore, the two first steel pipes and the two second steel pipes are arranged in a cross shape.
Furthermore, the two steel pipes are positioned above the concrete floor where the wire hole hanging hole to be poured is positioned and are respectively positioned at two sides of the wire hole hanging hole to be poured so as to reserve a concrete pouring part.
The utility model has the advantages that:
the utility model discloses a syllogic line hole hangs hole reinforcement, the line hole that will pour hangs the hole and pours the back, and the interior pole of syllogic stagnant water bolt is located the concrete of pouring, and the line hole after having avoided pouring hangs the hole and leaves the hole, avoids leaking.
The utility model discloses a syllogic line hole hangs hole reinforcement, the card has two of chevron card on the steel pipe two, and two tops of chevron card have three nuts and four to two cards of steel pipe admittedly, avoid two separation of steel pipe.
The utility model discloses a syllogic line hole hangs hole reinforcement, the tray has been worn to syllogic stagnant water bolt lower part, avoids pouring the concrete that hangs in the hole in the line hole of pouring and drops.
Drawings
FIG. 1 is a schematic view of an overall structure of a three-stage wire hole hanging hole reinforcement in embodiment 1;
FIG. 2 is a top view of the three-stage wire hole hanging hole reinforcement in example 1.
In the figure: 1. a three-section water stop bolt; 2. a tray; 3. a first reinforcing component; 4. a first steel pipe; 5. a second steel pipe; 6. a second reinforcing component; 11. an inner rod; 12. an outer rod; 13. a horn head; 31. clamping a first mountain shape; 32. a first nut; 33. a second nut; 61. a second mountain-shaped card; 62. a third nut; 63. and fourthly, a nut.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
The embodiment of the three-section wire hole hanging hole reinforcing member of the utility model is shown in figures 1-2.
Example 1
The syllogic line hole hangs hole reinforcement of this embodiment hangs hole reinforcement including being arranged in inserting the syllogic stagnant water bolt 1 in the hole is hung in the line hole that will pour, and syllogic stagnant water bolt 1 extends from top to bottom, and syllogic stagnant water bolt 1 includes interior pole 11 and the outer pole 12 at interior pole 11 both ends, and interior pole 11 is connected through loudspeaker head 13 with outer pole 12, and loudspeaker head 13 and interior pole 11 and outer pole 12 screw joint. The length of the inner rod 11 is consistent with the depth of the hanging hole of the wire hole to be poured, so that the outer rod 12 is respectively positioned above and below the hanging hole of the wire hole to be poured during pouring. The horn head 13 is flush with the surface of the concrete floor where the wire hole hanging hole to be poured is located, so that after the wire hole hanging hole to be poured is poured, the horn head 13 and the inner rod 11 are located in the wire hole hanging hole after pouring.
A tray 2 penetrates through the lower part of the three-section type water stop bolt 1 to prevent concrete poured in a hanging hole of a wire hole to be poured from falling off, the tray 2 is connected with an outer rod of the three-section type water stop bolt in a threaded manner, and a reinforcing assembly I3 is arranged below the tray 2 to prevent the tray 2 from falling off; 1 upper portion of syllogic stagnant water bolt is provided with steel pipe one 4 of two symmetries, and two steel pipe two 5 of two symmetries have been placed to two steel pipe one 4 tops, and two steel pipe one 4 and two steel pipe two 5 alternately are the groined type setting, and a pair of steel pipe two of steel pipe play the supporting role, avoid steel pipe two to hang the concrete contact in the hole with the line hole of will pouring. The first two steel pipes 4 are located above the concrete floor where the to-be-poured wire hole hanging hole is located and located on two sides of the to-be-poured wire hole hanging hole respectively so as to reserve concrete pouring parts. The upper part of the second steel pipe 5 is reinforced by a second reinforcing component 6.
The first reinforcing component 3 comprises a first mountain-shaped clamp 31, a first nut 32 and a second nut 33, wherein the first mountain-shaped clamp 31 is positioned below the first mountain-shaped clamp 31 to reinforce the tray 2; the second reinforcing component 6 comprises a second mountain-shaped clamp 61, a third nut 62 and a fourth nut 63 which are positioned above the second mountain-shaped clamp 61, and the second mountain-shaped clamp 61 is clamped and fixed on the outer sides of the two second steel pipes 5 to fasten the two second steel pipes 5; the first mountain-shaped clamp 31, the first nut 32, the second nut 33, the second mountain-shaped clamp 61, the third nut 62 and the fourth nut 63 are all screwed with the three-section water stop bolt 1.
Application method
The tray is reinforced by the first reinforcing component, a release agent is brushed in the tray, then the three-section type water stopping bolt penetrates through the line hole hanging hole, the inner rod and the horn head of the three-section type water stopping bolt are located in the line hole hanging hole to be poured, and the outer rod is located above and below the line hole hanging hole to be poured. And then placing the first steel pipe on the surface of the concrete floor where the hanging hole with the wire hole to be poured is located, placing the second steel pipe on two sides of the hanging hole with the wire hole, and clamping and fixing the second steel pipe by using the second reinforcing component.
After the pouring is finished, the second reinforcing component at the upper part of the three-section type water stop bolt is removed, the first reinforcing component at the lower part of the three-section type water stop bolt is removed, and then the outer rods at the upper end and the lower end of the inner rod are removed, so that the inner rod and the horn head are positioned in concrete poured in the hanging hole of the wire hole.
Finally, it should be noted that: in the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.

Claims (6)

1. The utility model provides a syllogic line hole hangs hole reinforcement which characterized in that: the three-section water stopping bolt is inserted into a hanging hole of a wire hole to be poured, extends up and down, a tray penetrates through the lower portion of the three-section water stopping bolt to prevent concrete poured in the hanging hole of the wire hole to be poured from falling off, and a first reinforcing component is arranged below the tray to prevent the tray from falling; the upper portion of the three-section type water stopping bolt is provided with a first steel pipe and a second steel pipe, the first steel pipe and the second steel pipe are symmetrical, and the second steel pipe is reinforced through a second reinforcing assembly.
2. The three-section wire hole hanging hole reinforcing member according to claim 1, wherein: the first reinforcing component comprises a first mountain-shaped clamp, and a first nut and a second nut which are positioned below the first mountain-shaped clamp, and the first mountain-shaped clamp is positioned below the tray to reinforce the tray; the second reinforcing component comprises a second mountain-shaped clamp, a third nut and a fourth nut, wherein the third nut and the fourth nut are positioned above the second mountain-shaped clamp; the mountain-shaped clamp I, the nut II, the mountain-shaped clamp II, the nut III and the nut IV are all in threaded connection with the three-section type water stop bolt.
3. The three-section wire hole hanging hole reinforcing member as claimed in claim 1, wherein: the three-section type water stopping bolt comprises an inner rod and outer rods at two ends of the inner rod, the inner rod is connected with the outer rods through a horn head, and the horn head is in threaded connection with the inner rod and the outer rods.
4. The three-section wire hole hanging hole reinforcing member as claimed in claim 3, wherein: the length of the inner rod is consistent with the depth of the hanging hole of the wire hole to be poured, so that the outer rod is respectively positioned above and below the hanging hole of the wire hole to be poured during pouring; the horn head is flush with the surface of a concrete floor where the wire hole hanging hole to be poured is located, so that after the wire hole hanging hole to be poured is poured, the inner rod is located in the wire hole hanging hole after pouring.
5. The three-section wire hole hanging hole reinforcing member according to claim 1, wherein: the two first steel pipes and the two second steel pipes are crossed and arranged in a groined shape.
6. The three-section wire hole hanging hole reinforcing member as claimed in claim 1, wherein: and the two steel pipes are positioned above the concrete floor where the wire hole hanging hole to be poured is positioned and are respectively positioned at two sides of the wire hole hanging hole to be poured so as to reserve a concrete pouring part.
CN202222859719.3U 2022-10-28 2022-10-28 Three-section type wire hole hanging hole reinforcing member Active CN218622678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222859719.3U CN218622678U (en) 2022-10-28 2022-10-28 Three-section type wire hole hanging hole reinforcing member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222859719.3U CN218622678U (en) 2022-10-28 2022-10-28 Three-section type wire hole hanging hole reinforcing member

Publications (1)

Publication Number Publication Date
CN218622678U true CN218622678U (en) 2023-03-14

Family

ID=85475070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222859719.3U Active CN218622678U (en) 2022-10-28 2022-10-28 Three-section type wire hole hanging hole reinforcing member

Country Status (1)

Country Link
CN (1) CN218622678U (en)

Similar Documents

Publication Publication Date Title
CN210177682U (en) Assembled reinforced concrete frame beam column connection structure
CN209907925U (en) Casting device for supporting-free lifting mould and post-cast strip
CN209163438U (en) A kind of drop plate tool formula hoisting die construction structure
CN218622678U (en) Three-section type wire hole hanging hole reinforcing member
CN206091265U (en) Detachable anchor ring device
CN102493480A (en) Reusable die for equipment foundation reserved square hole
CN209653365U (en) Tool-type wall-connecting piece
CN210529735U (en) Building steel structure platform base
CN210947728U (en) Water-stop reverse beam hanging mould fixing structure
CN211850773U (en) Outer wall scaffold even wall spare
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN107327066B (en) Structure for the constraint of honeycomb core anti-floating
CN215671173U (en) Reusable steel bar support
CN215717342U (en) Raft plate steel bar support capable of being repeatedly used
CN218597780U (en) Pre-buried locator of detachable reinforcing bar
CN217711697U (en) Floor slab lowering and hanging die used in aluminum alloy template construction
CN211447277U (en) Constructional column reinforcing bar construction equipment under roof beam
CN109629822A (en) The installation method of external scaffolding and its used tool-type wall-connecting piece
CN215671015U (en) Hang mould reinforced structure
CN220725090U (en) Quick positioner of bored concrete pile built-in fitting
CN212053245U (en) Embedded part for wall
CN219666970U (en) Bridge cast steel template with protection support
CN215889344U (en) Supporting device for fixing and hanging die for pouring floor slab
CN213268933U (en) Wall-penetrating pull rod structure of clear water template
CN215801069U (en) Bridge floor water drain pipe positioning structure at cast-in-place or prefabricated box girder steel mould flange plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant