CN109629822A - The installation method of external scaffolding and its used tool-type wall-connecting piece - Google Patents

The installation method of external scaffolding and its used tool-type wall-connecting piece Download PDF

Info

Publication number
CN109629822A
CN109629822A CN201910118907.0A CN201910118907A CN109629822A CN 109629822 A CN109629822 A CN 109629822A CN 201910118907 A CN201910118907 A CN 201910118907A CN 109629822 A CN109629822 A CN 109629822A
Authority
CN
China
Prior art keywords
wall
connecting piece
embedded bolt
frame plate
shaped frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910118907.0A
Other languages
Chinese (zh)
Other versions
CN109629822B (en
Inventor
余海
肖廷亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910118907.0A priority Critical patent/CN109629822B/en
Publication of CN109629822A publication Critical patent/CN109629822A/en
Application granted granted Critical
Publication of CN109629822B publication Critical patent/CN109629822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The installation method of external scaffolding of the present invention and its used tool-type wall-connecting piece belong to the technical field of construction;Technical problem to be solved are as follows: the installation method and its used tool-type wall-connecting piece, safety quick for installation of a kind of external scaffolding are provided, and can effectively prevent exterior wall leakage, construction quality is improved, to reduce engineering cost and construction risk;The technical solution of use are as follows: tool-type wall-connecting piece, including U-shaped frame plate, pre embedded bolt, short steel pipes and cross fixing buckle, the pre embedded bolt of full surface screw thread, which is embedded in, to be poured in wall and one end exposing pours outside wall, the sealing end of U-shaped frame plate is fixedly connected on pouring wall outer wall by nut and pre embedded bolt, the open end of U-shaped frame plate is welded with short steel pipes, cross fixing buckle is installed on the short steel pipes, the installation method of external scaffolding includes the following steps, the first step, it is pre-buried, second step, wall-connecting piece is installed, third step, vertical supporting steel pipe is installed, 4th step, the horizontal even wall steel pipe of installation.

Description

The installation method of external scaffolding and its used tool-type wall-connecting piece
Technical field
The installation method of external scaffolding of the present invention and its used tool-type wall-connecting piece belong to the technology neck of construction Domain.
Background technique
According to Section 6.4 of " construction fastener type steel pipe scaffold technical specification of security " (JGJ130-2011) to even wall The regulation of part: wall-connecting piece must using pulling force and pressure configuration can be born, for height 24 m single, double row's scaffold below, Preferably rigid connecting tube is used to be reliably connected with building;To the double-pole scaffold of height 24m or more, Ying Caiyong rigid connecting tube with Building is reliably connected.But the way for standardizing not concrete regulation rigid connecting tube, leads to doing for current various regions rigid connecting tube Method is different, brings many quality, security risk to engineering construction.
The existing main wall-connecting piece mode of external scaffolding has:
(1) the pre-buried short steel pipes method of tradition: embedded steel tube is presently the most common wall-connecting piece way, can play rigid connection and make With.Embedded steel tube is embedded in beam about 300mm with a vertical short steel pipes before concreting, and exposing beam is broken an agreement 200mm, to After the completion of concreting, with horizontal long steel pipe connecting upright pole and vertical short steel pipes;
(2) welding steel bolt of lower base connector: in wall-connecting piece steel tube end part welding steel pedestal, using expansion (or pre-buried) Bolt is connect with structure;
(3) it welds screw rod wall-connecting piece through walls: welding through-wall bolt in wall-connecting piece steel tube end part, connected using through-wall bolt and structure It connects;
(4) weld steel expansion bolt anchor ear wall-connecting piece: using fashioned iron welding support, by shape steel bracket by scaffold and structure into Row connection.
The shortcomings that above wall-connecting piece mode, is: 1, influence masonry, decorative engineering construction, to engineering construction quality, safety and There are risks for cost, are especially in the presence of the risk of exterior wall leakage;2, material utilization amount is big, labor content is big, production is cumbersome, such as It is used in turn, the later period needs pile, and occupied ground is big, and since length fixes, may not be available in structure change.
Summary of the invention
The present invention overcomes the shortcomings of the prior art, technical problem to be solved are as follows: provides a kind of external scaffolding Installation method and its used tool-type wall-connecting piece, safety quick for installation, and can effectively prevent exterior wall leakage, improve construction matter Amount, to reduce engineering cost and construction risk.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows: tool-type wall-connecting piece, including U-shaped frame plate, Pre embedded bolt, short steel pipes and cross fixing buckle, pre embedded bolt are that full surface sets threaded rod-shaped, and pre embedded bolt, which is embedded in, to be poured In wall and one end exposing pours outside wall, and U-shaped frame plate is the U-shaped truss that band iron is bent into, the sealing of U-shaped frame plate End is provided with the through-hole passed through for pre embedded bolt, and U-shaped frame plate is pouring wall by nut and being fixedly connected for pre embedded bolt On outer wall, the open end of U-shaped frame plate is welded with short steel pipes, and cross fixing buckle, the cross are equipped on the short steel pipes Fixing buckle is the adjustable fastener set there are two mutually perpendicular mounting hole.
It is in hook solid that the pre embedded bolt, which is located at the one end poured inside wall,.
The pre-embedded bolt, which is located at, to be poured the intracorporal end of wall and is fixedly installed with anti-drawing fixed block.
The pre embedded bolt is expansion bolt.
The bottom center of the U-shaped frame plate is equipped with stiffener plate, and the stiffener plate close pour sets on the side of wall There is pressure-bearing steel plate.
The installation method of external scaffolding is constructed as steps described below:
The first step, it is pre-buried, pre embedded bolt is got out, electric drill aperture is used on beam, wall, column side form, pre embedded bolt is fixed on knot On structure framework of steel reinforcement and expose one end outside mould, then the casting concrete in beam, wall, column side form, after concrete setting Demoulding formation pours wall;
Cross fixing buckle is fixedly mounted on the short steel pipes of U-shaped frame plate by second step, mounting tool type wall-connecting piece, then will be U-shaped The sealing end of frame plate be mounted on pre-embedded bolt be located at pour one end outside wall and be fastened and fixed with nut;
Third step installs vertical supporting steel pipe, is pouring the fixed multiple vertically arranged supporting steel pipes of wall outer side;
4th step installs horizontal even wall steel pipe, and one end of multiple horizontal even wall steel pipes is each passed through to the cross of corresponding wall-connecting piece It in another mounting hole of fixing buckle and is fastened and fixed, the middle part that level connects wall steel pipe passes through with corresponding multiple supporting steel pipes respectively Cross fixing buckle is fixedly connected.
It is flat close to the side for pouring wall in multiple horizontal even wall steel pipes after 4th step installs horizontal even wall steel pipe Row is taken equipped at least two stay tubes, is connected and installed with scaffold board or horizontal safety net between stay tube.
Compared with the prior art, the invention has the following beneficial effects:
1, wall-connecting piece is suitable for the various drawbacks of engineering construction bring when the present invention has well solved the installation of traditional scaffold All kinds of engineerings significantly reduce engineering cost, and avoid the risk of wall-connecting piece part leakage, improve construction quality;
2, tool-type used by connecting it with pre-buried good bolt by tool-type wall-connecting piece when present invention installation scaffold connects The pre-buried position of wall part, pre-embedded bolt allows certain deviation, and constructing operation is extremely convenient, has saved construction time cost, and Tool-type wall-connecting piece makes easy to process, strong applicability, facilitates reuse;
3, the present invention will not have any impact to other working procedures, and can avoid wall-connecting piece part leakage risk completely.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing;
Fig. 1 is the mounting structure schematic diagram of external scaffolding in the present invention;
Fig. 2 is the structural schematic diagram of tool-type wall-connecting piece in the present invention;
Fig. 3 is the side structure schematic view of tool-type wall-connecting piece in the present invention;
In figure: 1 is U-shaped frame plate, and 2 be pre embedded bolt, and 3 be short steel pipes, and 4 be cross fixing buckle, and 5 is pour wall, and 6 is solid for anti-drawing Determine block, 7 be stiffener plate, and 8 be pressure-bearing steel plate, and 9 be supporting steel pipe, and 10 be horizontal even wall steel pipe, and 11 be stay tube.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments;Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
As shown in Figure 1-3, inventive article formula wall-connecting piece, including U-shaped frame plate 1, pre embedded bolt 2, short steel pipes 3 and cross are solid Surely 4 are detained, it is threaded rod-shaped that pre embedded bolt 2 is that full surface is set, and pre embedded bolt 2, which is embedded in, to be poured in wall 5 and one end is exposed It pours outside wall 5, U-shaped frame plate 1 is the U-shaped truss that band iron is bent into, and the sealing end of U-shaped frame plate 1 is provided with for pre-buried spiral shell The through-hole that bar 2 passes through, U-shaped frame plate 1 is fixedly connected on pouring 5 outer wall of wall by nut and pre embedded bolt 2, U-shaped The open end of frame plate 1 is welded with short steel pipes 3, and cross fixing buckle 4, the cross fixing buckle 4 are equipped on the short steel pipes 3 To set the adjustable fastener there are two mutually perpendicular mounting hole.Using wall-connecting piece of the invention constructed in scaffold peace Dress, can be avoided traditional wall-connecting piece and gives engineering construction bring various disadvantages, be applicable to all kinds of engineerings, greatly reduce engineering Cost, and avoid wall-connecting piece part leakage risk.
Before construction, first band steel is bent by the tool-type wall-connecting piece in the production present invention using 60cm × 5cm band steel At U-shaped band steel, short steel pipes are welded in U-shaped band steel open end, one, the hole U-shaped band steel sealing end centre drill φ 16mm, then are used One 50cm long, the threaded screw rod in full surface of diameter phi 14mm and the nut matched at least one, so far connect wall Part completes the process.
The full surface of pre embedded bolt 2 has screw thread in the present invention, is to reinforce it and pouring the pre-buried firm effect in wall 5 Fruit, in order to save cost, the reinforcing bar that surface is equipped with raised lira, one end of reinforcing bar is can also be used in the pre-embedded bolt 2 in the present invention Process the thread segment of 5-7cm.
It is in hook solid that the pre embedded bolt 2, which is located at the one end poured inside wall 5, reinforces and pour the connection of wall 5 Intensity keeps its pre-buried effect more preferable.
The pre-embedded bolt 2 is located at the end poured in wall 5 and is fixedly installed with anti-drawing fixed block 6, further strengthens pre- It buries bolt 2 and pours the connection tightness of wall 5.
The pre embedded bolt 2 is expansion bolt.
The bottom center of the U-shaped frame plate 1 is equipped with stiffener plate 7, and the stiffener plate 7 is close to the side for pouring wall 5 It is equipped with pressure-bearing steel plate 8.Stiffener plate 7 can avoid deforming due to the excessive caused U-shaped frame plate 1 of scaffold pressure-bearing, make its use Longer life expectancy, reuse number is more, reduces construction cost depletions, and pressure-bearing steel plate 8 then can avoid 7 side of stiffener plate and pour Since pressure causes wall to damage when walling body 5 contacts.
As shown in Figure 1, the installation method of external scaffolding, constructs as steps described below:
The first step, it is pre-buried, pre embedded bolt 2 is got out, electric drill aperture is used on beam, wall, column side form, pre embedded bolt 2 is fixed on On structure reinforcing bars skeleton and one end is made to expose the outer 5-7cm of mould, then the casting concrete in beam, wall, column side form, to concrete Demoulding formation pours wall 5 after solidification;
Cross fixing buckle 4 is fixedly mounted on the short steel pipes 3 of U-shaped frame plate 1 by second step, mounting tool type wall-connecting piece, then will The sealing end of U-shaped frame plate 1 be mounted on pre-embedded bolt 2 be located at pour one end outside wall 5 and be fastened and fixed with nut;
Third step installs vertical supporting steel pipe 9, fixes multiple vertically arranged supporting steel pipes 9 on the outside of wall 5 pouring;
4th step installs horizontal even wall steel pipe 10, and one end of multiple horizontal even wall steel pipes 10 is each passed through corresponding wall-connecting piece In cross fixing buckle 4 another mounting hole and be fastened and fixed, level even wall steel pipe 10 middle part respectively with corresponding multiple supports Steel pipe 9 is fixedly connected by cross fixing buckle.
Tool used by connecting it with pre-buried good bolt by tool-type wall-connecting piece when present invention installation scaffold The pre-buried position of formula wall-connecting piece, pre-embedded bolt allows certain deviation, and constructing operation is extremely convenient, saved the construction time at This, and tool-type wall-connecting piece makes easy to process, strong applicability, facilitates reuse.
Tool-type wall-connecting piece in the present invention will not have any impact to other working procedures, and can the company's of avoiding wall completely Part part leakage risk.
After 4th step installs horizontal even wall steel pipe 10, in multiple horizontal even wall steel pipes 10 close to pouring wall 5 Side is taken in parallel equipped at least two stay tubes 11, is connected and installed with scaffold board or horizontal safety net between stay tube 11.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (7)

1. tool-type wall-connecting piece, it is characterised in that: fixed including U-shaped frame plate (1), pre embedded bolt (2), short steel pipes (3) and cross It detains (4), it is threaded rod-shaped that pre embedded bolt (2) is that full surface is set, and pre embedded bolt (2), which is embedded in, to be poured in wall (5) and one End, which is exposed, pours wall (5) outside, and U-shaped frame plate (1) is the U-shaped truss that band iron is bent into, the sealing end of U-shaped frame plate (1) It is provided with the through-hole passed through for pre embedded bolt (2), U-shaped frame plate (1) is being poured by nut with being fixedly connected for pre embedded bolt (2) On walling body (5) outer wall, the open end of U-shaped frame plate (1) is welded with short steel pipes (3), is equipped with ten on the short steel pipes (3) Word fixing buckle (4), the cross fixing buckle (4) are the adjustable fastener set there are two mutually perpendicular mounting hole.
2. tool-type wall-connecting piece according to claim 1, it is characterised in that: the pre embedded bolt (2), which is located at, pours walling The internal one end of body (5) is in hook solid.
3. tool-type wall-connecting piece according to claim 1 or 2, it is characterised in that: the pre-embedded bolt (2), which is located at, pours walling End in body (5) is fixedly installed with anti-drawing fixed block (6).
4. tool-type wall-connecting piece according to claim 3, it is characterised in that: the pre embedded bolt (2) is expansion bolt.
5. tool-type wall-connecting piece according to claim 1, it is characterised in that: the bottom center of the U-shaped frame plate (1) is equipped with Stiffener plate (7), the stiffener plate (7) are equipped with pressure-bearing steel plate (8) close to the side for pouring wall (5).
6. the installation method of external scaffolding, it is characterised in that construct as steps described below:
The first step, it is pre-buried, pre embedded bolt (2) are got out, electric drill aperture is used on beam, wall, column side form, pre embedded bolt (2) are solid It is scheduled on structure reinforcing bars skeleton and exposes one end outside mould, then the casting concrete in beam, wall, column side form, to concrete Demoulding formation pours wall (5) after solidification;
Cross fixing buckle (4) is fixedly mounted on the short steel pipes (3) of U-shaped frame plate (1) by second step, mounting tool type wall-connecting piece, Then the sealing end of U-shaped frame plate (1) is mounted on pre-embedded bolt (2) and be located at and poured the outer one end of wall (5) and fastened with nut It is fixed;
Third step is installed vertical supporting steel pipe (9), and fixed multiple vertically arranged supporting steel pipes on the outside of wall (5) are being poured (9);
4th step, installation is horizontal even wall steel pipe (10), and the one end of multiple horizontal even wall steel pipe (10) are each passed through the company's of correspondence wall In cross fixing buckle (4) of part another mounting hole and be fastened and fixed, level even wall steel pipe (10) middle part respectively with it is corresponding Multiple supporting steel pipes (9) are fixedly connected by cross fixing buckle.
7. the installation method of external scaffolding according to claim 6, it is characterised in that: the 4th step installs horizontal connect After wall steel pipe (10), taken in parallel close to the side for pouring wall (5) equipped at least two supports in multiple horizontal even wall steel pipe (10) It manages (11), stay tube is connected and installed with scaffold board or horizontal safety net between (11).
CN201910118907.0A 2019-02-18 2019-02-18 Method for installing external scaffold and tool type wall connecting piece used by same Active CN109629822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910118907.0A CN109629822B (en) 2019-02-18 2019-02-18 Method for installing external scaffold and tool type wall connecting piece used by same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910118907.0A CN109629822B (en) 2019-02-18 2019-02-18 Method for installing external scaffold and tool type wall connecting piece used by same

Publications (2)

Publication Number Publication Date
CN109629822A true CN109629822A (en) 2019-04-16
CN109629822B CN109629822B (en) 2024-06-14

Family

ID=66065425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910118907.0A Active CN109629822B (en) 2019-02-18 2019-02-18 Method for installing external scaffold and tool type wall connecting piece used by same

Country Status (1)

Country Link
CN (1) CN109629822B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201535062U (en) * 2009-11-05 2010-07-28 南通市常青建筑安装工程有限公司 Movable scaffold
JP2010275743A (en) * 2009-05-27 2010-12-09 Panahome Corp Structure for fixing wall panel
CN205296807U (en) * 2016-01-15 2016-06-08 南通职业大学 Novel fastener -style steel pipe scaffold U type is wall spare even
CN209653365U (en) * 2019-02-18 2019-11-19 余海 Tool-type wall-connecting piece

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010275743A (en) * 2009-05-27 2010-12-09 Panahome Corp Structure for fixing wall panel
CN201535062U (en) * 2009-11-05 2010-07-28 南通市常青建筑安装工程有限公司 Movable scaffold
CN205296807U (en) * 2016-01-15 2016-06-08 南通职业大学 Novel fastener -style steel pipe scaffold U type is wall spare even
CN209653365U (en) * 2019-02-18 2019-11-19 余海 Tool-type wall-connecting piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof

Also Published As

Publication number Publication date
CN109629822B (en) 2024-06-14

Similar Documents

Publication Publication Date Title
CN106906955B (en) Shear wall integral prefabricated reinforcement mesh structure and construction method thereof
CN104831818A (en) Connection node of precast reinforced concrete beam and laminated column
CN209653365U (en) Tool-type wall-connecting piece
CN204753836U (en) Connected node of precast reinforced concrete roof beam and coincide post
CN109629822A (en) The installation method of external scaffolding and its used tool-type wall-connecting piece
CN108729544B (en) Dry-and wet-type composite joint pin-connected panel construction
CN212405468U (en) Stiff concrete structure beam column core area structure
CN205063330U (en) Close clearance double shear wall movement joint template
CN111576620A (en) Construction method for beam-column core area of stiffened concrete structure
CN114032967A (en) Template device for sealing basement outer wall post-cast strip in advance and template supporting method
CN211572640U (en) Pre-buried positioner of constructional column reinforcing bar
CN113073678A (en) Construction method for embedded bolt sleeve of upper structure of turbine generator base
CN111962673A (en) Column base structure of steel pipe concrete column and construction method thereof
CN216446166U (en) Reinforced concrete frame
JP2007262872A (en) Pile head joining structure of surrounding pile head reinforcement and pile head side surface by basket-shaped reinforcement
CN220598504U (en) Novel strengthen cantilever type retaining wall structure
CN214091003U (en) Shaped support stirrup for hanging mould
CN216974186U (en) Full cast in situ concrete outer wall boundary beam supports with regularization strutting arrangement
CN213014380U (en) Stagnant water steel sheet fixed knot constructs
CN218091000U (en) Temporary fixing device for sounding pipe during connection of cast-in-place pile reinforcement cage
CN215594925U (en) Device for reserving hole in cast-in-place reinforced concrete wall
CN215253507U (en) Connection structure of assembled outer wall body and cast-in-place wall body
CN219587180U (en) Hanging basket erection system suitable for cantilever beam
CN216641425U (en) Adjustable supporting device for high-rise building construction
CN115126213A (en) Construction method for outer wall scaffold wall connecting piece without leaving hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant