CN218622616U - Container system for combined construction of secondary hospital heating outpatient service - Google Patents
Container system for combined construction of secondary hospital heating outpatient service Download PDFInfo
- Publication number
- CN218622616U CN218622616U CN202221715267.5U CN202221715267U CN218622616U CN 218622616 U CN218622616 U CN 218622616U CN 202221715267 U CN202221715267 U CN 202221715267U CN 218622616 U CN218622616 U CN 218622616U
- Authority
- CN
- China
- Prior art keywords
- plate
- wall
- baffle
- sliding
- container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Purses, Travelling Bags, Baskets, Or Suitcases (AREA)
Abstract
The utility model relates to a combined construction second grade hospital generates heat outpatient service's container system, include: the plurality of containers are assembled to form an assembled building body, a buffer area, a potential pollution area, a pollution area and a cleaning area are formed on the inner side of the assembled building body, and the assembled building body is provided with a medical staff passage and a patient passage which are separately arranged; an inner courtyard area is formed in the middle of the assembly type building body; the roof structure is arranged at the top of the fabricated building body; the container comprises a modular structure, an outer wall, an inner wall and a bottom plate, wherein the modular structure is formed by assembling beams, columns, secondary beams and corner fittings, and the outer wall comprises a base layer and a surface layer; the inner wall comprises a module inner wall, a surface layer and a partition wall; the bottom plate layer comprises a base layer formed by the high-strength cement fiberboard, floor tiles and a surface layer formed by anti-static floors or floor leathers, the whole container is convenient to transport after being folded, and the cost brought by transporting the container is reduced.
Description
Technical Field
The utility model relates to a container equipment specifically is a combination construction second grade hospital generates heat outpatient service's container system.
Background
In the later epidemic situation period, the design and construction of the fever outpatient clinic coping with the sudden epidemic situation frequently occur due to the phenomena of long time consumption, large investment, non-standard medical streamline and the like, and the construction scales of the fever outpatient clinics of hospitals with different levels are uneven.
Because the outpatient service that generates heat need be built alone, the former outpatient service that generates heat of a lot of second grade hospitals can not satisfy the requirement of setting up, and every second grade hospital is again different to the actual function demand of outpatient service that generates heat, consequently appear in the design many lines of seeing a doctor, medical care streamline overlength, the environment of waiting for a doctor is not good, and the health is passed and the waste of buffering space area, stays to observe and examine regional subregion thoroughly, phenomenon such as stream mutual interference. And the emergency capacity is limited in the face of sudden public health events.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a combined construction second grade hospital generates heat outpatient service's container system to solve the problem of proposing among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a container system for combined construction of a secondary hospital fever clinic, comprising:
the plurality of containers are assembled to form an assembled building body, a buffer area, a potential pollution area, a pollution area and a cleaning area are formed on the inner side of the assembled building body, and the assembled building body is provided with a medical staff passage and a patient passage which are separately arranged;
an inner courtyard area is formed in the middle of the assembly type building body;
the roof structure is arranged at the top of the fabricated building body;
the container comprises a modular structure, an outer wall, an inner wall and a bottom plate, wherein the modular structure is formed by assembling beams, columns, secondary beams and corner fittings, and the outer wall comprises a base layer and a surface layer;
the inner wall comprises a module inner wall, a surface layer and a partition wall;
the bottom plate layer comprises a base layer formed by a high-strength cement fiberboard, a surface layer formed by floor tiles and an anti-static floor or floor leather.
As a further aspect of the present invention: the container includes: the device comprises a plurality of bottom plates, a plurality of baffle plates and a plurality of connecting plates, wherein a group of first baffle plate assemblies are rotatably arranged on two sides of each bottom plate, a second baffle plate assembly is arranged on each bottom plate, and the first baffle plate assemblies, the second baffle plate assemblies and the bottom plates can form a closed cavity;
the bottom of the bottom plate is provided with two sliding grooves, sliding parts connected with the second baffle plate assembly are arranged in the sliding grooves in a sliding mode, the second baffle plate assembly can be attached to the surface of the bottom plate when the sliding parts slide to the end part of one end of the sliding grooves, and the second baffle plate assembly can be perpendicular to the bottom plate when the sliding parts slide to the end part of the other end of the sliding grooves;
the first baffle plate assembly is provided with a convex column, and the convex column is matched with a locking sleeve arranged on the second baffle plate assembly;
the first baffle plate assemblies on two adjacent bottom plates are connected through a quick-release assembly.
As a further aspect of the present invention: the first baffle assembly comprises a second turnover plate which is rotatably installed on the bottom plate, the interior of the second turnover plate is of a hollow structure, a second embedded plate is movably arranged in the second turnover plate, two first bulges are arranged at one end of the second embedded plate, and the bulges are symmetrically arranged on the first sliding rail of the second turnover plate in a sliding fit mode.
As a further aspect of the present invention: the second baffle component comprises a first turnover plate, the interior of the first turnover plate is also of a hollow structure, a first embedded plate is movably arranged in the first turnover plate, two second protrusions are arranged at the end part of the first embedded plate, and the second protrusions are in sliding fit with second sliding rails symmetrically arranged on the first turnover plate.
As a further aspect of the present invention: two convex plates are symmetrically arranged on the first turnover plate, and the convex plates are matched with grooves formed in the second turnover plate.
As a further aspect of the present invention: the locking kit includes that the symmetry is seted up the circular arc segment form on the gomphosis board leads to the groove and is formed at the chamber that stagnates of appearance in the gomphosis board, it has the locking piece that extends to the through inslot of circular arc segment form to hold the intracavity slidable mounting, the locking piece with hold and detain through spring coupling between the inner wall in chamber.
As a further aspect of the present invention: the quick-release assembly comprises a connecting piece arranged at one end of the second turnover plate and a connecting seat arranged at the other end of the second turnover plate, a chimeric cavity for embedding the connecting piece is arranged on the connecting seat, a guide groove is arranged on the connecting seat, a locking rod is slidably arranged in the guide groove, two ends of the locking rod are connected with the connecting plate, and an elastic sheet is arranged between the connecting plate and the connecting seat;
the locking rod is adapted to a locking groove provided on the connecting member.
As a further aspect of the present invention: the locking groove comprises three structures, namely a horizontal groove body, an inclined groove body and a vertical groove body, wherein the tail end of the horizontal groove body is smoothly connected with the head end of the inclined groove body, and the tail end of the inclined groove body is smoothly connected with the head end of the vertical groove body.
Compared with the prior art, the beneficial effects of the utility model are that:
the bottom plate, the first baffle plate assembly and the second baffle plate assembly are arranged, so that the three are kept in an overlapped state during transportation, the space occupied by a single container during transportation is smaller, the transportation cost is reduced, meanwhile, the first baffle plate assembly and the second baffle plate assembly can be kept in a vertical state through a physical method, and stability is realized under the action of a locking kit;
through the quick detach subassembly that sets up, realize the equipment of a plurality of containers to satisfy on-the-spot actual demand.
Drawings
FIG. 1 is a plan layout functional partition diagram of one embodiment of a container system for building up a secondary hospital heating clinic.
Figure 2 is an elevational view of one embodiment of a container system for the modular construction of a secondary hospital heating clinic.
Figure 3 is a cross-sectional view of one embodiment of a container system for the modular construction of a secondary hospital heating clinic.
Fig. 4 is a medical flow diagram of one embodiment of a system for building a shipping container for a secondary hospital heating clinic.
Fig. 5 is a schematic structural diagram of another embodiment of a container system for combined construction of a secondary hospital heating clinic.
Fig. 6 is a schematic view of a quick release assembly in another embodiment of a container system for assembling and constructing a secondary hospital heating clinic.
Fig. 7 is a schematic structural diagram of a container system for building up a secondary hospital heating clinic in a combined manner when the container is completely retracted in another embodiment.
Fig. 8 is a schematic view of another embodiment of a container system for building secondary hospital heating clinics in combination from a different angle.
Fig. 9 is a schematic view of the construction of a first baffle assembly in another embodiment of a container system for the combined construction of a secondary hospital heating clinic.
Fig. 10 is a schematic view of the construction of a second baffle assembly in another embodiment of a container system for the combined construction of a secondary hospital heating clinic.
Fig. 11 is an enlarged view of the structure at a in fig. 10.
Fig. 12 is a schematic view of the construction of locking elements in another embodiment of a container system for the combined construction of a secondary hospital heating clinic.
In the figure: 1. a base plate; 2. a first turnover plate; 3. a first tabling plate; 4. a slider; 5. a chute; 6. turning the folded plate; 7. a second tabling plate; 8. a convex column; 9. a stagnation-tolerant chamber; 10. a spring; 11. a locking member; 12. a convex plate; 13. a groove; 14. a connecting member; 15. a locking groove; 16. a connecting seat; 17. a fitting chamber; 18. a locking lever; 19. a yoke plate; 20. an elastic sheet; 21. and a guide groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In addition, an element of the present invention may be said to be "secured to" or "disposed on" another element, either directly on the other element or with intervening elements present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not denote a single embodiment.
According to the national institute for dealing with the new type coronavirus pneumonia epidemic situation joint defense joint control mechanism, release
The research and development mainly reflects the characteristics of modularization, standard flow and high assembly rate, adopts a standard container as a basic module unit, and meets the functional space requirement and the construction speed requirement of a heating whistle point through reliable connection combination so as to meet the emergency requirement of emergent public health incidents and meet the requirements of medical isolation observation and temporary treatment on a patient with fever in a secondary hospital. The standardized and modularized design mode has strong reproducibility, and the emergency capacity of the level hospital for dealing with the emergent public health events can be improved through the duplication of the module unit.
The modular and standard container and the gallery box are used as basic module units and are reliably connected and combined with each other, so that the functional space requirement of the heating whistle point is met.
Example one
Referring to fig. 1-4, a container system for the combined construction of a secondary hospital fever clinic includes:
the plurality of containers are assembled to form an assembled building body, a buffer area, a potential pollution area, a pollution area and a cleaning area are formed on the inner side of the assembled building body, and the assembled building body is provided with a medical staff passage and a patient passage which are separately arranged;
an inner courtyard area is formed in the middle of the assembly type building body;
still include the ceiling structure, the ceiling structure is arranged in assembled building body top, the ceiling structure includes structural layer, heat preservation and furred ceiling surface course, and the structural layer adopts the roof frame sandalwood strip, and the heat preservation adopts polyurethane foam, glass silk cotton, rock wool or EPX extruded sheet, and the furred ceiling surface course adopts high-strength cement fiberboard, fire prevention gypsum board, scribbles glass magnesium board, aluminous gusset plate or the mineral wool board that is equipped with coating.
The invention adopts a standard modular container house and applies a standardized flow design method to provide comfortable diagnosis and treatment environment and observation environment for fever patients in secondary hospitals. The sewage cleaning partition is clear, and the medical streamline is convenient. The three-zone two-channel principle is strictly executed to arrange the functional rooms. The standardized production of modules and the modular combined construction are realized, the construction efficiency can be greatly improved, and the repeated combination of the modules can provide technical support for the design of the heating outpatient service of the secondary hospital with different requirements. The design and construction cost of a secondary hospital is reduced, the construction efficiency and the construction quality are improved, the medical process is standardized, and the use quality is guaranteed.
The invention realizes the standardization and modularization of the assembly type building, meets different requirements of different secondary hospitals on the actual functions of the heating outpatient service, and solves various problems in the construction process of the heating outpatient service of the secondary hospitals: for example, the construction speed is low, the construction scale is uneven, the medical streamline is disordered and the like, and the method can be widely applied to the design and construction of the second-level hospital fever clinic.
The container comprises a modular structure, an outer wall, an inner wall and a bottom plate layer, wherein the modular structure is formed by assembling beams, columns, secondary beams and corner pieces, and the outer wall comprises a base layer made of cement fiber boards and a surface layer formed by integrated boards or clean boards;
the inner wall comprises a module inner wall, a surface layer formed by an integrated plate or a clean plate and a light steel keel partition wall;
the bottom plate layer includes surface course, basic unit, heat preservation, structural layer, dampproof course and the back cover that from the top down set gradually, the back cover adopts various steel sheet, dampproof ventilated membrane, structural layer adoption side pipe sandalwood strip, heat preservation adopt polyester foaming, glass silk floss or rock wool, basic unit adopt high strength cement fibreboard or strenghthened type glass magnesium board, the surface course adopts bottom plate leather, wood composite sheet, stone plastic floor, antistatic floor or ceramic tile, specifically can select or arrange according to actual demand.
The utility model discloses a 1 kind of standard container module to fully consider interior decoration, the integrated design that equipment and pipeline were arranged, standard container 54, size 3000 (wide) X6000 (length) X2900 (height).
The single module is designed by taking the steel structure frame as a main structure, is assembled into a module building through reliable connection, and designs the whole building.
It should be noted that the indoor sanitary part comprises an overhead layer, a waterproof layer, a ground surface layer and a wall surface layer, specifically, the overhead layer can adopt a square tube keel to realize a supporting function, and an access hole is required to be reserved; the waterproof layer can adopt two layers of waterproof polyurethane coating, waterproof coiled materials or water-releasing cloth; the floor surface layer can adopt anti-skidding ceramic tiles, and the wall surface layer can adopt wall tiles, UV boards or decorative boards.
In the actual operation process, the floor joint, the wall joint and the roof joint need to be jointed, the joint needs to be sealed by adopting a sealing layer to improve the sealing performance after connection, and the sealing layer comprises adhesive tapes, glass silk floss, polyurethane foam and the like.
Example two
Referring to fig. 5 to 12, in an embodiment of the present invention, a container system for combined construction of a second-level hospital heating clinic includes:
the structure comprises a plurality of bottom plates 1, wherein a group of first baffle plate assemblies are rotatably mounted on two sides of each bottom plate 1, a second baffle plate assembly is further arranged on each bottom plate 1, and the first baffle plate assemblies, the second baffle plate assemblies and the bottom plates 1 can form a closed cavity;
the bottom of the bottom plate 1 is provided with two sliding grooves 5, a sliding part 4 connected with the second baffle plate assembly is arranged in the sliding grooves 5 in a sliding mode, the second baffle plate assembly can be attached to the surface of the bottom plate 1 when the sliding part 4 slides to the end part of one end of each sliding groove 5, and the second baffle plate assembly can be perpendicular to the bottom plate 1 when the sliding part 4 slides to the end part of the other end of each sliding groove 5;
the first baffle plate assembly comprises a second turnover plate 6 which is rotatably installed on the bottom plate 1, the second turnover plate 6 is of a hollow structure, a second embedded plate 7 is movably arranged in the second turnover plate 6, one end of the second embedded plate 7 is provided with two first bulges, and the bulges are in sliding fit with first sliding rails which are symmetrically arranged on the second turnover plate 6;
the second baffle component comprises a first turnover plate 2, the first turnover plate 2 is also of a hollow structure, a first embedded plate 3 is movably arranged in the first turnover plate 2, two second protrusions are arranged at the end part of the first embedded plate 3, and the second protrusions are symmetrically arranged on second sliding rails on the first turnover plate 2 in a sliding fit mode.
In an initial state, the second embedded plate 7 is sleeved in the second turnover plate 6, the two second turnover plates 6 are in a state of being parallel to and attached to the bottom plate 1, meanwhile, the first embedded plate 3 is sleeved in the first turnover plate 2, and the sliding part 4 is located at one end of the sliding groove 5 at the moment, namely, the first turnover plate 2 is also in a state of being parallel to and attached to the bottom plate 1, in short, the bottom plate 1, the first turnover plate 2 and the first embedded plate 3, and the second turnover plate 6 and the second embedded plate 7 are in an overlapped state at the moment, so that the whole container is more convenient to transport, and the cost brought by transporting the container is reduced.
When the container needs to be assembled, the first turnover plate 2 is firstly pulled out and is turned to be perpendicular to the bottom plate 1, the second turnover plate 6 is turned to be perpendicular to the bottom plate 1, then the first embedded plate 3 and the second embedded plate 7 are pulled out and are turned over, the first embedded plate 3 is perpendicular to the first turnover plate 2, the second embedded plate 7 is perpendicular to the second turnover plate 6, and at the moment, the bottom plate 1, the first turnover plate 2, the first embedded plate 3, the two groups of second turnover plates 6 and the second embedded plate 7 can form a closed cavity for medical staff to carry out medical operation inside.
It should be noted that, the length of the first slide rail is greater than the length of the second folded plate 6, the length of the second slide rail is greater than the length of the first folded plate 2, and when the first engaging plate 3 is perpendicular to the first folded plate 2, the second protrusion is located at the end of the second slide rail, at this time, the end of the first folded plate 2 can be used as a fulcrum to enable the first engaging plate 3 and the second folded plate 6 to be kept in a parallel state when the first engaging plate 3 is deflected, and similarly, the perpendicular state of the second engaging plate 7 and the second folded plate 6 is also achieved.
Furthermore, the upper surface of one end of the bottom plate 1 rotatably connected with the second turnover plate 6 is arranged in a original smooth manner, so as to prevent the second turnover plate 6 from interfering with the bottom plate 1 when the second turnover plate 6 is rotated, and similarly, the upper surface is also arranged at the connection position of the bottom plate 1 and the first turnover plate 2.
Referring to fig. 5 and 6, two convex plates 12 are symmetrically arranged on the first turnover plate 2, and the convex plates 12 are matched with grooves 13 arranged on the second turnover plate 6;
be provided with projection 8 on the first baffle subassembly, projection 8 with set up and be in closure external member adaptation on the second baffle subassembly:
the locking external member comprises circular arc section-shaped through grooves symmetrically formed in the first embedded plate 3 and a containing stagnation chamber 9 formed in the first embedded plate 3, a locking member 11 extending into the circular arc section-shaped through grooves is slidably mounted in the containing stagnation chamber 9, and the locking member 11 is connected with the inner wall of the containing stagnation chamber 9 through a spring 10.
When using, through the flange 12, recess 13, closure 11 and the projection 8 that set up for the stability of being connected between a turnover plate 2 and No. two turnover plates 6 and between a gomphosis board 3 and No. two gomphosis boards 7 is stronger, avoids accomplishing the equipment back, and the gliding phenomenon takes place for the container that assembles, reduces the risk that the container collapses.
Referring to fig. 2, the first baffle assemblies on two adjacent bottom plates 1 are connected by a quick release assembly;
the quick release assembly comprises a connecting piece 14 mounted at one end of the second turnover plate 6 and a connecting seat 16 mounted at the other end of the second turnover plate 6, wherein a tabling cavity 17 for the connecting piece 14 to be embedded is arranged on the connecting seat 16, a guide groove 21 is arranged on the connecting seat 16, a locking rod 18 is slidably mounted in the guide groove 21, two ends of the locking rod 18 are connected with a connecting plate 19, and an elastic sheet 20 is arranged between the connecting plate 19 and the connecting seat 16;
the locking lever 18 is fitted with a locking groove 15 provided on the connecting member 14;
the locking groove 15 comprises a three-part structure, namely a horizontal groove body, an inclined groove body and a vertical groove body, wherein the tail end of the horizontal groove body is smoothly connected with the head end of the inclined groove body, and the tail end of the inclined groove body is smoothly connected with the head end of the vertical groove body.
When the container locking device is used, in order to connect two containers more conveniently, the container locking device is arranged on the connecting piece 14 and the connecting seat 16, when the container locking device is used, the connecting piece 14 is used for rotating the embedding cavity 17 on the connecting seat 16, the connecting piece 14 is driven to move towards the inside of the embedding cavity 17, the locking groove 15 is matched with the locking rod 18, the elastic sheet 20 is compressed along with the movement of the connecting piece 14, when the locking rod 18 moves to the arrangement end of the locking groove 15, the elastic sheet 20 releases elastic potential energy, the connecting piece 14 is fixed with the connecting seat 16 by utilizing the matching of the locking rod 18 and the vertical groove body, and then the two containers are fixed, and when the container locking device is unlocked, the unlocking can be realized by pressing the connecting plate 19.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (8)
1. A container system for combined construction of a secondary hospital fever clinic, comprising:
the containers are assembled to form an assembled building body;
the roof structure is arranged at the top of the fabricated building body;
the container comprises a modular structure, an outer wall, an inner wall and a bottom plate layer, wherein the modular structure is formed by assembling beams, columns, secondary beams and corner pieces, and the outer wall comprises a base layer and a surface layer;
the inner wall comprises a module inner wall, a surface layer and a partition wall;
the base plate layer comprises a base layer formed by a high-strength cement fiberboard and a surface layer formed by floor tiles, anti-static floors or floor leathers.
2. The system of claim 1, in combination with a secondary hospital fever clinic container, comprising: the device comprises a plurality of bottom plates (1), wherein a group of first baffle plate assemblies are rotatably mounted on two sides of each bottom plate (1), a second baffle plate assembly is further arranged on each bottom plate (1), and the first baffle plate assemblies, the second baffle plate assemblies and the bottom plates (1) can form a closed cavity;
the bottom of the bottom plate (1) is provided with two sliding grooves (5), a sliding part (4) connected with the second baffle component is arranged in each sliding groove (5) in a sliding mode, the second baffle component can be attached to the surface of the bottom plate (1) when the sliding part (4) slides to the end part of one end of each sliding groove (5), and the second baffle component can be perpendicular to the bottom plate (1) when the sliding part (4) slides to the end part of the other end of each sliding groove (5);
be provided with projection (8) on the first baffle subassembly, projection (8) with set up the closure external member adaptation on the second baffle subassembly:
the first baffle plate assemblies on two adjacent bottom plates (1) are connected through a quick-release assembly.
3. The container system for the combined construction of the secondary hospital fever clinic according to claim 2, wherein the first baffle plate component comprises a second turnover plate (6) rotatably mounted on the bottom plate (1), the second turnover plate (6) is hollow inside and movably provided with a second embedding plate (7) inside, one end of the second embedding plate (7) is provided with two first bulges, and the bulges are in sliding fit with first sliding rails symmetrically arranged on the second turnover plate (6).
4. The container system for combined construction of the secondary hospital fever clinic according to claim 3, characterized in that the second baffle component comprises a first turnover plate (2), the interior of the first turnover plate (2) is also hollow, a first embedding plate (3) is movably arranged in the first turnover plate (2), the end part of the first embedding plate (3) is provided with two second bulges, and the second bulges are in sliding fit with second sliding rails symmetrically arranged on the first turnover plate (2).
5. A combined construction secondary hospital fever clinic container system according to claim 4, characterized in that two convex plates (12) are symmetrically arranged on said first turnover plate (2), said convex plates (12) are adapted to the grooves (13) arranged on said second turnover plate (6).
6. The container system for combined construction of the secondary hospital fever clinic according to claim 4, wherein the locking kit comprises a circular arc segment-shaped through groove symmetrically formed on the first embedded plate (3) and a stagnation accommodating chamber (9) formed in the first embedded plate (3), a locking piece (11) extending into the circular arc segment-shaped through groove is slidably mounted in the stagnation accommodating chamber (9), and the locking piece (11) is connected with the inner wall of the stagnation accommodating chamber (9) through a spring (10).
7. The combined construction secondary hospital fever clinic container system according to claim 3, wherein the quick release assembly comprises a connecting piece (14) installed at one end of the second turnover plate (6) and a connecting seat (16) installed at the other end of the second turnover plate (6), the connecting seat (16) is provided with a jogging chamber (17) for the connecting piece (14) to be embedded in, the connecting seat (16) is provided with a guide groove (21), a locking rod (18) is slidably installed in the guide groove (21), two ends of the locking rod (18) are connected with a connecting plate (19), and an elastic sheet (20) is arranged between the connecting plate (19) and the connecting seat (16);
the locking rod (18) is matched with a locking groove (15) arranged on the connecting piece (14).
8. The combined construction secondary hospital heating clinic container system as claimed in claim 7, wherein said locking groove (15) comprises a three-part structure, namely a horizontal groove body, an inclined groove body and a vertical groove body, wherein the tail end of said horizontal groove body is smoothly connected with the head end of said inclined groove body, and the tail end of said inclined groove body is smoothly connected with the head end of said vertical groove body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221715267.5U CN218622616U (en) | 2022-07-05 | 2022-07-05 | Container system for combined construction of secondary hospital heating outpatient service |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221715267.5U CN218622616U (en) | 2022-07-05 | 2022-07-05 | Container system for combined construction of secondary hospital heating outpatient service |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218622616U true CN218622616U (en) | 2023-03-14 |
Family
ID=85457504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221715267.5U Active CN218622616U (en) | 2022-07-05 | 2022-07-05 | Container system for combined construction of secondary hospital heating outpatient service |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218622616U (en) |
-
2022
- 2022-07-05 CN CN202221715267.5U patent/CN218622616U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015525B (en) | A kind of combined building structure and mounting method, house, washroom | |
CN204001201U (en) | Be convenient to the folding container house of mobile transportation | |
CN201241396Y (en) | Multi-purpose assembled house | |
CN218622616U (en) | Container system for combined construction of secondary hospital heating outpatient service | |
CN110185197A (en) | A kind of wallboard frame, modularization wallboard and its assemble method | |
CN115387644B (en) | System and method for constructing heating clinic of secondary hospital by adopting container combination | |
CN219061063U (en) | Container device for combined construction of three-stage hospital heating clinic | |
CN206233681U (en) | A kind of body-connected tent for expanding SUV interior spaces | |
CN115075631B (en) | Assembled modularized heating whistle point, assembling method and distribution mode thereof | |
CN210980286U (en) | Environment-friendly gypsum ceiling | |
CN113175135A (en) | Unit modular assembly's big plate stone material hoist and mount system | |
CN209323818U (en) | A kind of environment-friendly type has the building wall board of sound insulation and heat insulation effect | |
EP2189352B1 (en) | A railway system, a railway carriage and a railway siding | |
CN201301649Y (en) | Dismountable floating window structure | |
CZ108797A3 (en) | Container | |
CN212453807U (en) | Modular negative pressure and vacuum health system diagnosis and treatment unit | |
CN205296897U (en) | Portable small log cabin | |
CN217128636U (en) | Aluminum veneer for curtain wall | |
KR102504782B1 (en) | Shared housing system | |
CN216428872U (en) | Light waterproof decorative gypsum board building material | |
CN217478820U (en) | Connection structure of hall glass and elevator | |
CN210530013U (en) | Light steel composite wall for building | |
CN218205060U (en) | Concatenation formula shelter baffle linking bridge | |
CN214574878U (en) | Green building hoist and mount wall structure | |
CN109903628A (en) | A kind of combined pipeline and heating practical traning platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |