CN218597854U - Simple and easy steel construction brickmaking machine factory building of being suitable for - Google Patents

Simple and easy steel construction brickmaking machine factory building of being suitable for Download PDF

Info

Publication number
CN218597854U
CN218597854U CN202222691319.6U CN202222691319U CN218597854U CN 218597854 U CN218597854 U CN 218597854U CN 202222691319 U CN202222691319 U CN 202222691319U CN 218597854 U CN218597854 U CN 218597854U
Authority
CN
China
Prior art keywords
steel
big
arch shelter
brickmaking machine
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222691319.6U
Other languages
Chinese (zh)
Inventor
王广生
鱼童
孙海军
吕威
张春辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harbour Engineering Co Ltd
Original Assignee
China Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harbour Engineering Co Ltd filed Critical China Harbour Engineering Co Ltd
Priority to CN202222691319.6U priority Critical patent/CN218597854U/en
Application granted granted Critical
Publication of CN218597854U publication Critical patent/CN218597854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a simply be suitable for steel construction brickmaking machine factory building, including cement concrete sclerosis ground, finished product maintenance big-arch shelter and feed bin big-arch shelter, the top on cement concrete sclerosis ground is provided with the brickmaking machine big-arch shelter. The utility model discloses an install cement concrete sclerosis ground and finished product maintenance big-arch shelter etc, make the device optimize the structure of self, the staff adorns finished product maintenance big-arch shelter on cement concrete sclerosis ground, the steel skeleton of brickmaking machine big-arch shelter and feed bin big-arch shelter, the steel skeleton of factory building mainly adopts I-steel bearing stand, rectangle steel pipe is even tie beam and steel pipe truss girder and is constituteed, the component is twenty-five tons hoist and mount crane on the ground, all tie points are welded connection, it is anticorrosive to wholly brush paint, side and roof adopt various steel tile top facing, and be convenient for realize putting up fast, and do benefit to the prefabricated work of interlocking piece.

Description

Simple and easy steel construction brickmaking machine factory building of being suitable for
Technical Field
The utility model relates to an interlocking piece is prefabricated and steel construction factory building technical field, specifically is a simply be suitable for steel construction brickmaking machine factory building.
Background
The steel structure factory building is widely applied in various industry fields, has the advantages of light weight, high strength, large span, short construction period and relatively low cost, and is convenient to popularize.
Because simple and easy steel construction brickmaking machine factory building that is suitable for often can appear complex operation's problem when actual assembly, it is difficult for realizing building fast, be unfavorable for carrying out interlocking piece prefabrication work, for this reason, we provide a novel simple and easy steel construction brickmaking machine factory building that is suitable for, solve the above-mentioned problem, satisfy the operation demand better.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simply be suitable for steel construction brickmaking machine factory building to the difficult realization that proposes in solving above-mentioned background art builds fast, is unfavorable for carrying out the problem of the prefabricated work of interlocking piece.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a simply be suitable for steel construction brickmaking machine factory building, includes cement concrete sclerosis ground, finished product maintenance big-arch shelter and feed bin big-arch shelter, the top on cement concrete sclerosis ground is provided with the brickmaking machine big-arch shelter, the finished product maintenance big-arch shelter sets up in the cement concrete sclerosis subaerial of brickmaking machine big-arch shelter one end, the feed bin big-arch shelter sets up in the cement concrete sclerosis subaerial of the brickmaking machine big-arch shelter other end, one side on cement concrete sclerosis ground is provided with generator and accessory rest complex room, all evenly be fixed with I-steel bearing stand, rectangle steel pipe even tie beam, steel side's pipe and steel pipe truss girder on finished product maintenance big-arch shelter, just the bottom welding of I-steel bearing stand has the stand to enlarge the basis, be fixed with brick built concrete wall body gird on the feed bin big-arch shelter, evenly be provided with the reinforced concrete stand with I-steel bearing stand assorted on the brick built concrete wall body gird beam, evenly be provided with the cement jar body on the brickmaking machine big-arch shelter, just the bottom welding of cement jar body has the cement jar to enlarge the basis.
Preferably, the cement concrete hardened ground is internally and uniformly provided with embedded steel plates matched with the I-steel bearing stand columns, and the I-steel bearing stand columns are connected with the embedded steel plates in a welded mode, so that the stability of the I-steel bearing stand columns is improved.
Preferably, paint anti-corrosion layers are uniformly coated on the finished product maintenance greenhouse, the brick making machine greenhouse and the storage bin greenhouse, so that the anti-corrosion effect and the attractiveness of the device are improved.
Preferably, the side surfaces and the top surfaces of the finished product maintenance greenhouse, the brick making machine greenhouse and the storage bin greenhouse are uniformly paved with color steel tiles, so that the structure of the device is optimized.
Preferably, the rectangular steel pipe connecting beam and the steel pipe truss main beam are connected in a welding mode, so that the steel pipe connecting beam and the steel pipe truss main beam are welded by a welding structure, and the firmness of the joint of the steel structure is improved.
Preferably, the upright column enlarged foundation is made of reinforced concrete, so that the structural strength of the upright column enlarged foundation is improved.
Preferably, the steel pipe truss main beam and the top surface of the I-shaped steel bearing stand column are connected in a welding mode, and the non-contact positions of the tops of the steel pipe truss main beam and the top surface of the I-shaped steel bearing stand column are welded in an overlapping mode, so that the firmness of the steel pipe truss main beam and the top surface of the I-shaped steel bearing stand column in the connection process is improved.
Preferably, the material of the cement tank expansion foundation is reinforced concrete, so that the structural strength of the cement tank expansion foundation is improved.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) The simple and applicable steel structure brick making machine factory building is provided with a cement concrete hardened ground, a finished product maintenance greenhouse and the like, so that the device optimizes the structure of the device, workers mount steel frameworks of the finished product maintenance greenhouse, the brick making machine greenhouse and the storage bin greenhouse on the cement concrete hardened ground, the steel frameworks of the factory building mainly comprise I-shaped steel bearing upright posts, rectangular steel pipe connecting beams and steel pipe truss main beams, overground components are hoisted by twenty-five tons of cranes, all connecting points are welded and connected, paint is integrally brushed for corrosion prevention, the side surfaces and the roof are covered by color steel tile, the quick building is convenient to realize, and the prefabrication work of interlocking blocks is facilitated;
(2) According to the simple and applicable steel structure brick making machine factory building, the I-shaped steel bearing stand column, the steel pipe truss main beam and the like are installed, when the device is used, on one hand, the steel pipe truss main beam and the I-shaped steel bearing stand column are directly welded at a contact part, and the lap joint welding structure is additionally installed at a non-contact part, so that the firmness of the connection of the steel pipe truss main beam and the I-shaped steel bearing stand column is improved, on the other hand, the embedded steel plates which are uniformly arranged inside the cement concrete hardened ground and welded with the I-shaped steel bearing stand column are utilized, the stability of the I-shaped steel bearing stand column is improved, in addition, the cement tank expansion foundation which is made of reinforced concrete and fixedly connected with the cement concrete hardened ground is additionally arranged at the bottom of the cement tank body, the wind resistance stability of the cement tank body is improved, in addition, the foundation which is made of reinforced concrete and fixedly connected with the cement concrete hardened ground is additionally arranged at the bottom of the I-shaped steel bearing stand column, and the wind resistance stability of the I-shaped steel stand column is improved;
(3) This simply be suitable for steel construction brickmaking machine factory building is through installing generator and accessory rest compound room etc for during device actual operation, through being provided with generator and accessory rest compound room on cement concrete hardening ground, both be convenient for improve the electric power resource when the construction, make the device possess again can be used to the accessory and can be used to the independent room that the workman had a rest, strengthened the flexibility of device.
Drawings
FIG. 1 is a schematic view of the overall three-dimensional structure of the present invention;
FIG. 2 is a schematic view of a partial three-dimensional structure of the present invention;
FIG. 3 is a schematic view of a partial three-dimensional structure of the present invention;
FIG. 4 is a schematic view of a partial three-dimensional structure of an I-steel load-bearing column of the present invention;
fig. 5 is a schematic view of the local three-dimensional structure of the cement tank body of the present invention.
In the figure: 1. cement concrete hardened ground; 2. maintaining the greenhouse with the finished product; 3. a brick making machine greenhouse; 4. a cement silo body; 5. a storage bin greenhouse; 6. a generator; 7. the fittings rest the compound room; 8. i-shaped steel load-bearing upright columns; 9. the rectangular steel pipe is connected with the beam; 10. a steel square tube; 11. the upright column expands the foundation; 12. a steel pipe truss girder; 13. a reinforced concrete column; 14. expanding the foundation of the cement tank; 15. a ring beam of a bricked concrete wall body.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a simple and applicable steel structure brick making machine factory building comprises a cement concrete hardened ground 1, a finished product curing greenhouse 2 and a storage bin greenhouse 5, wherein a brick making machine greenhouse 3 is arranged at the top of the cement concrete hardened ground 1;
the finished product curing greenhouse 2 is arranged on the cement concrete hardened ground 1 at one end of the brick making machine greenhouse 3, and the stock bin greenhouse 5 is arranged on the cement concrete hardened ground 1 at the other end of the brick making machine greenhouse 3;
a generator 6 and an accessory rest compound room 7 are arranged on one side of the cement concrete hardened ground 1, I-shaped steel bearing upright posts 8, rectangular steel pipe connecting beams 9, steel square tubes 10 and steel tube truss main beams 12 are uniformly fixed on the finished product curing greenhouse 2, the brick making machine greenhouse 3 and the storage bin greenhouse 5, and upright post enlarged foundations 11 are welded at the bottoms of the I-shaped steel bearing upright posts 8;
a brick concrete wall ring beam 15 is fixed on the bin greenhouse 5, and reinforced concrete columns 13 matched with the I-shaped steel load-bearing columns 8 are uniformly arranged on the brick concrete wall ring beam 15;
the cement tank bodies 4 are uniformly arranged on the brick making machine greenhouse 3, and cement tank expansion foundations 14 are welded at the bottoms of the cement tank bodies 4;
embedded steel plates matched with the I-shaped steel bearing stand columns 8 are uniformly arranged inside the cement concrete hardened ground 1, and the I-shaped steel bearing stand columns 8 are connected with the embedded steel plates in a welding mode;
when the concrete floor is used, the embedded steel plates which are uniformly arranged in the cement concrete hardened ground 1 and welded with the I-shaped steel bearing stand columns 8 are utilized, so that the stability of the I-shaped steel bearing stand columns 8 is improved;
paint anti-corrosion layers are uniformly coated on the finished product curing greenhouse 2, the brick making machine greenhouse 3 and the storage bin greenhouse 5;
when the device is used, the finished product curing greenhouse 2, the brick making machine greenhouse 3 and the storage bin greenhouse 5 are uniformly coated with the paint anticorrosive layers, so that the anticorrosive effect and the attractiveness of the device are improved;
color steel tiles are uniformly paved on the side surfaces and the top surfaces of the finished product curing greenhouse 2, the brick making machine greenhouse 3 and the storage bin greenhouse 5; so that the structure of the device is optimized;
the rectangular steel pipe connecting beam 9 and the steel pipe truss main beam 12 are connected in a welding mode; the welding structure is utilized, so that the firmness of the joint of the steel structure is improved;
the upright column enlarged foundation 11 is made of reinforced concrete; the structural strength of the column enlarged foundation 11 is improved;
the steel pipe truss main beam 12 is welded with the top surface of the I-shaped steel bearing stand column 8, and the non-contact part of the steel pipe truss main beam 12 and the top of the I-shaped steel bearing stand column 8 is welded in an overlapping manner;
when the steel pipe truss girder and the I-shaped steel bearing upright post are used, the main girder 12 of the steel pipe truss and the I-shaped steel bearing upright post 8 are directly welded at the contactable part, and the lap joint welding structure is additionally arranged at the non-contactable part, so that the firmness of the connection of the main girder and the I-shaped steel bearing upright post is improved;
the material of the cement silo enlarged foundation 14 is reinforced concrete; so that the structural strength of the cement silo enlarged foundation 14 is improved.
When the embodiment of the application is used: a worker installs a finished product maintenance greenhouse 2, a brick making machine greenhouse 3 and a steel framework of a storage bin greenhouse 5 on a cement concrete hardened ground 1, the steel framework of a factory building mainly comprises I-steel bearing upright posts 8, rectangular steel pipe connecting beams 9 and steel pipe truss main beams 12, overground components are hoisted by twenty-five tons of cranes, all connecting points are welded and coated with paint integrally for corrosion prevention, the side surface and the roof are coated with color steel tile covers, the quick construction is convenient to realize, the interlocking block prefabrication work is facilitated, meanwhile, the generator 6 and an accessory rest compound room 7 are arranged on the cement concrete hardened ground 1, the power resource is convenient to improve during construction, the device is provided with independent rooms which can be used for accessories and workers to rest, the flexibility of the device is enhanced, in addition, on one hand, the steel pipe truss main beam 12 and the I-shaped steel bearing upright post 8 are directly welded at a contactable part, and a lap joint welding structure is additionally arranged at a non-contact part, so that the firmness of the connection between the steel pipe truss main beam 12 and the I-shaped steel bearing upright post 8 is improved, on the other hand, the embedded steel plate which is uniformly arranged inside the cement concrete hardened ground 1 and welded with the I-shaped steel bearing upright post 8 is utilized, the stability of the I-shaped steel bearing upright post 8 is improved, the foundation 14 is expanded by additionally arranging the cement tank which is fixedly connected with the cement concrete hardened ground 1 at the bottom of the cement tank body 4 and is made of reinforced concrete, the wind resistance stability of the cement tank body 4 is improved, the foundation 11 is expanded by additionally arranging the stand which is made of reinforced concrete and is fixedly connected with the cement concrete hardened ground 1 at the bottom of the I-shaped steel bearing upright post 8, and the wind resistance stability of the I-shaped steel bearing upright post 8 is improved.

Claims (8)

1. The utility model provides a simple and easy steel construction brickmaking machine factory building that is suitable for, its characterized in that, including cement concrete sclerosis ground (1), finished product maintenance big-arch shelter (2) and feed bin big-arch shelter (5), the top of cement concrete sclerosis ground (1) is provided with brickmaking machine big-arch shelter (3), finished product maintenance big-arch shelter (2) set up on cement concrete sclerosis ground (1) of brickmaking machine big-arch shelter (3) one end, feed bin big-arch shelter (5) set up on cement concrete sclerosis ground (1) of the brickmaking machine big-arch shelter (3) other end, one side of cement concrete sclerosis ground (1) is provided with generator (6) and accessory rest complex room (7), all evenly be fixed with I-steel bearing stand (8), rectangle steel pipe tie beam (9), steel square pipe (10) and steel pipe truss compound room (12) on finished product maintenance big-arch shelter (2), brickmaking machine big-arch shelter (3) and feed bin big-arch shelter (5), all be fixed with I-steel bearing stand expansion basis (11) on the feed bin (5) evenly, concrete ring beam (15), the concrete ring roof beam (15) is provided with the even wall body (13) and the brickmaking machine wall body (4), and a cement tank enlarged foundation (14) is welded at the bottom of the cement tank body (4).
2. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: the concrete floor is characterized in that embedded steel plates matched with the I-shaped steel bearing stand columns (8) are uniformly arranged inside the cement concrete hardened ground (1), and the I-shaped steel bearing stand columns (8) are connected with the embedded steel plates in a welded mode.
3. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: paint anticorrosive coatings are uniformly coated on the finished product maintenance greenhouse (2), the brick making machine greenhouse (3) and the storage bin greenhouse (5).
4. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: and color steel tiles are uniformly paved on the side surfaces and the top surfaces of the finished product curing greenhouse (2), the brick making machine greenhouse (3) and the storage bin greenhouse (5).
5. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: the rectangular steel pipe connecting beam (9) is connected with the steel pipe truss main beam (12) in a welding mode.
6. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: the upright post enlarged foundation (11) is made of reinforced concrete.
7. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: the steel pipe truss girder comprises a steel pipe truss main girder (12) and an I-shaped steel bearing stand column (8), wherein the steel pipe truss main girder (12) is welded with the top surface of the I-shaped steel bearing stand column (8) in a welded mode, and the top portions of the steel pipe truss main girder (12) and the I-shaped steel bearing stand column (8) which are not in contact with each other are welded in a lap joint mode.
8. The simple and easy applicable steel construction brickmaking machine factory building of claim 1, characterized by: the cement tank enlarged foundation (14) is made of reinforced concrete.
CN202222691319.6U 2022-10-13 2022-10-13 Simple and easy steel construction brickmaking machine factory building of being suitable for Active CN218597854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222691319.6U CN218597854U (en) 2022-10-13 2022-10-13 Simple and easy steel construction brickmaking machine factory building of being suitable for

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222691319.6U CN218597854U (en) 2022-10-13 2022-10-13 Simple and easy steel construction brickmaking machine factory building of being suitable for

Publications (1)

Publication Number Publication Date
CN218597854U true CN218597854U (en) 2023-03-10

Family

ID=85402142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222691319.6U Active CN218597854U (en) 2022-10-13 2022-10-13 Simple and easy steel construction brickmaking machine factory building of being suitable for

Country Status (1)

Country Link
CN (1) CN218597854U (en)

Similar Documents

Publication Publication Date Title
CN103422672B (en) A kind of reinforced concrete precast assembling housing construction construction method
CN205444458U (en) Integrated assembled steel construction building
CN203768810U (en) Prefabricated bridge deck space steel pipe concrete truss combined beam
CN107143068A (en) Steel plate concrete combined shear wall and construction method that a kind of steel bar girder is put more energy into
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN111395356A (en) Prestressed anchor cable assembly type steel waist beam and construction method thereof
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN111663698A (en) Assembled steel structure roof and assembling construction method thereof
CN218597854U (en) Simple and easy steel construction brickmaking machine factory building of being suitable for
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN202865996U (en) Room modular structure for nuclear power plant
CN111364622A (en) Construction method of long-span arched net rack strip-shaped building
CN209958656U (en) Connection node structure for stone and steel column
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN207122021U (en) Assembled bolt connection concrete-filled steel tube shear wall
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN102287050B (en) Construction method for long-span steel reinforced concrete roof truss
CN206189891U (en) Existing building reinforcement is from load -bearing and insulating integration system
CN215107098U (en) Theatre main stage truck crane hoisting platform
CN112814019A (en) Prefabricated formula steel concrete combination looped netowrk cabinet basis
CN111088904A (en) Integral hoisting device and process for iron chimney steel frame with hectometer-height barrel
CN208039004U (en) Suitable for the UHPC prefabricated panel trestles under strong corrosive environment
CN206800625U (en) Novel light energy-saving environmental-protection hollow pre-fabricated panels frame structure
CN211816893U (en) Steel structure frame prefabricated plate house