CN218597740U - Construction template - Google Patents

Construction template Download PDF

Info

Publication number
CN218597740U
CN218597740U CN202223223110.3U CN202223223110U CN218597740U CN 218597740 U CN218597740 U CN 218597740U CN 202223223110 U CN202223223110 U CN 202223223110U CN 218597740 U CN218597740 U CN 218597740U
Authority
CN
China
Prior art keywords
aluminium alloy
fixing bolt
base
template
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223223110.3U
Other languages
Chinese (zh)
Inventor
李成伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202223223110.3U priority Critical patent/CN218597740U/en
Application granted granted Critical
Publication of CN218597740U publication Critical patent/CN218597740U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building construction, in particular to a construction template.A base is connected with a template mechanism through a guide mechanism, and the base is connected with an interval adjusting mechanism for adjusting the distance between the base and the template mechanism; template mechanism includes backup pad, recess, first aluminium alloy board, second aluminium alloy board and second fixing bolt, and the upper end to the backup pad is seted up to the recess, and first aluminium alloy board is pegged graft on one side of backup pad, and second aluminium alloy board is pegged graft on the opposite side of backup pad, in the second fixing bolt connecting groove, first aluminium alloy board of second fixing bolt connection and second aluminium alloy board, second aluminium alloy board fixed connection interval adjustment mechanism and guiding mechanism. The utility model discloses a first aluminium alloy board is pegged graft on the bottom plate, fixes through first fixing bolt, and first aluminium alloy plate and the face contact of pouring take off second fixing bolt after first aluminium alloy plate damages, take off first aluminium alloy plate from the backup pad and change, can take off first aluminium alloy plate and change.

Description

Construction template
Technical Field
The utility model relates to a construction technical field especially relates to a construction template.
Background
Shear force wall is also known as anti-wind wall, antidetonation wall or structural wall, the horizontal load that mainly bears wind load or earthquake action in house or the structure and the wall body of vertical load that arouses prevent structure shear failure, when the shear force wall construction is pour, need adopt the construction template to block the pouring material, among the prior art, after blockking the pouring material through the construction template, the pouring material causes the damage to the template surface easily, the unable change restoration in destroyed template surface to lead to whole template can't use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the damaged template surface can not be replaced and repaired in the prior art, and providing a construction template.
In order to realize the purpose, the utility model adopts the following technical scheme:
the design is a construction template, including base, interval adjustment mechanism, template mechanism and guiding mechanism, wherein:
the base is connected with the template mechanism through the guide mechanism, and the base is connected with the interval adjusting mechanism for adjusting the distance between the base and the template mechanism;
template mechanism includes backup pad, recess, first aluminium alloy board, second aluminium alloy board and second fixing bolt, the recess is seted up extremely the upper end of backup pad, first aluminium alloy board plug-in connect to on one side of backup pad, second aluminium alloy board plug-in connect to on the opposite side of backup pad, second fixing bolt connects in the recess, second fixing bolt connects first aluminium alloy board with second aluminium alloy board, second aluminium alloy board fixed connection interval adjustment mechanism with guiding mechanism.
Preferably, the base comprises a bottom plate, a fixing plate and a first fixing bolt, the fixing plate is fixedly connected to the bottom plate, the first fixing bolt is fixedly connected to the bottom plate, and the fixing plate is connected with the interval adjusting mechanism and the guiding mechanism.
Preferably, the bottom end of the bottom plate is fixedly connected with an anti-abrasion pad.
Preferably, the interval adjustment mechanism includes screwed pipe, threaded rod and handle, the rotatable being connected to of screwed pipe on the base, the one end fixed connection of threaded rod to on the second aluminum-clad plate, the other end of threaded rod is connected the screwed pipe, handle fixed connection to on the screwed pipe.
Preferably, the handle is sleeved with an anti-slip sleeve.
Preferably, guiding mechanism includes fixed pipe and guide bar, fixed pipe fixed connection to on the second aluminum laminate plate, the one end fixed connection of guide bar to on the base, the other end slidable of guide bar peg graft extremely on the fixed pipe.
The utility model provides a construction formwork, beneficial effect lies in:
through first aluminum alloy plate and second fixing bolt structure, first aluminum alloy plate is pegged graft on the bottom plate, fixes through first fixing bolt, and first aluminum alloy plate contacts with the face of pouring, takes off second fixing bolt after first aluminum alloy plate damages, takes off first aluminum alloy plate from the backup pad and changes, can take off first aluminum alloy plate and change.
Drawings
Fig. 1 is the utility model provides a construction formwork's schematic structure diagram.
Fig. 2 is the utility model provides a construction template intermediate distance adjustment mechanism's schematic structure diagram.
Fig. 3 is the utility model provides a sectional structure schematic diagram of template mechanism in construction template.
In the figure: the template mechanism comprises a base 1, a spacing adjusting mechanism 2, a template mechanism 3, a guide mechanism 4, a bottom plate 11, a fixing plate 12, a first fixing bolt 13, a threaded pipe 21, a threaded rod 22, a handle 23, a supporting plate 31, a groove 32, a first aluminum plate 33, a second aluminum plate 34, a second fixing bolt 35, a fixing pipe 41 and a guide rod 42.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-3, a construction formwork includes a base 1, an interval adjusting mechanism 2, a formwork mechanism 3 and a guiding mechanism 4, wherein:
the base 1 is connected with the template mechanism 3 through the guide mechanism 4, and the base 1 is connected with the spacing adjusting mechanism 2 for adjusting the distance between the base 1 and the template mechanism 3;
the base 1 comprises a bottom plate 11, a fixing plate 12 and a first fixing bolt 13, wherein the fixing plate 12 is fixedly connected to the bottom plate 11, the bottom plate 11 is used for installing the fixing plate 12, the first fixing bolt 13 is fixedly connected to the bottom plate 11, the bottom plate 11 is fixed after the first fixing bolt 13 is connected to the ground, so that the fixing plate 12 is fixed, the fixing plate 12 is connected with an interval adjusting mechanism 2 and a guide mechanism 4, the bottom end of the bottom plate 11 is fixedly connected with an anti-abrasion pad, the anti-abrasion pad is used for protecting the bottom end of the bottom plate 11, and the anti-abrasion pad is a rubber pad;
template mechanism 3 includes backup pad 31, recess 32, first aluminum plate 33, second aluminum plate 34 and second fixing bolt 35, recess 32 is seted up to backup pad 31's upper end, first aluminum plate 33 pegs graft to on one side of backup pad 31, first aluminum plate 33 is used for protecting backup pad 31, second aluminum plate 34 pegs graft to on the opposite side of backup pad 31, in second fixing bolt 35 connecting groove 32, second fixing bolt 35 is used for fixed first aluminum plate 33 and second aluminum plate 34, first aluminum plate 33 and second aluminum plate 34 are connected to second fixing bolt 35, second aluminum plate 34 fixed connection interval adjustment mechanism 2 and guiding mechanism 4.
The working process comprises the following steps: after the first fixing bolt 13 is connected to the ground, the bottom plate 11 is fixed, so that the fixing plate 12 is fixed, the distance adjusting mechanism 2 is rotated, the distance between the base 1 and the template mechanism 3 is changed, the first aluminum plywood 33 is in contact with a pouring surface, the second fixing bolt 35 is taken down after the first aluminum plywood 33 is damaged, and the first aluminum plywood 33 is taken down from the support plate 31 for replacement.
Example 2
Referring to fig. 1-3, as another preferred embodiment of the present invention, the difference with embodiment 1 lies in that the distance adjustment mechanism 2 includes a threaded pipe 21, a threaded rod 22 and a handle 23, the threaded pipe 21 is rotatably connected to the base 1, one end fixed connection of the threaded rod 22 is on the second aluminum plywood 34, the threaded pipe 21 is connected to the other end of the threaded rod 22, the handle 23 is fixedly connected to the threaded pipe 21, an anti-slip cover is sleeved on the handle 23, the handle 23 drives the threaded pipe 21 to rotate, the threaded rod 22 moves in the horizontal direction after the threaded pipe 21 rotates, and the threaded rod 22 drives the template mechanism 3 to move.
Example 3
Referring to fig. 1-3, as another preferred embodiment of the present invention, the difference from embodiment 1 is that the guiding mechanism 4 includes a fixing tube 41 and a guiding rod 42, the fixing tube 41 is fixedly connected to the second aluminum plate 34, one end of the guiding rod 42 is fixedly connected to the base 1, the other end of the guiding rod 42 is slidably inserted into the fixing tube 41, the template mechanism 3 moves to drive the fixing tube 41 to move, and the template mechanism 3 is stably moved under the guidance of the guiding rod 42.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction formwork, its characterized in that includes base (1), interval adjustment mechanism (2), template mechanism (3) and guiding mechanism (4), wherein:
the base (1) is connected with the template mechanism (3) through the guide mechanism (4), and the distance adjusting mechanism (2) for adjusting the distance between the base (1) and the template mechanism (3) is connected on the base (1);
template mechanism (3) are including backup pad (31), recess (32), first aluminum laminate board (33), second aluminum laminate board (34) and second fixing bolt (35), recess (32) set up extremely the upper end of backup pad (31), first aluminum laminate board (33) peg graft extremely on one side of backup pad (31), second aluminum laminate board (34) peg graft extremely on the opposite side of backup pad (31), second fixing bolt (35) are connected in recess (32), second fixing bolt (35) are connected first aluminum laminate board (33) with second aluminum laminate board (34), second aluminum laminate board (34) fixed connection interval adjustment mechanism (2) with guiding mechanism (4).
2. The construction template according to claim 1, wherein the base (1) comprises a bottom plate (11), a fixing plate (12) and a first fixing bolt (13), the fixing plate (12) is fixedly connected to the bottom plate (11), the first fixing bolt (13) is fixedly connected to the bottom plate (11), and the fixing plate (12) connects the spacing adjustment mechanism (2) and the guide mechanism (4).
3. A construction formwork according to claim 2, wherein an anti-wear pad is fixedly connected to the bottom end of the bottom plate (11).
4. The construction formwork according to claim 1, wherein the distance adjusting mechanism (2) comprises a threaded pipe (21), a threaded rod (22) and a handle (23), the threaded pipe (21) is rotatably connected to the base (1), one end of the threaded rod (22) is fixedly connected to the second aluminum plywood (34), the other end of the threaded rod (22) is connected to the threaded pipe (21), and the handle (23) is fixedly connected to the threaded pipe (21).
5. A construction formwork according to claim 4, wherein a slip-proof sleeve is sleeved on the handle (23).
6. The construction formwork according to claim 1, wherein the guide mechanism (4) comprises a fixing pipe (41) and a guide rod (42), the fixing pipe (41) is fixedly connected to the second aluminum laminate plate (34), one end of the guide rod (42) is fixedly connected to the base (1), and the other end of the guide rod (42) is slidably inserted onto the fixing pipe (41).
CN202223223110.3U 2022-12-01 2022-12-01 Construction template Active CN218597740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223223110.3U CN218597740U (en) 2022-12-01 2022-12-01 Construction template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223223110.3U CN218597740U (en) 2022-12-01 2022-12-01 Construction template

Publications (1)

Publication Number Publication Date
CN218597740U true CN218597740U (en) 2023-03-10

Family

ID=85408516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223223110.3U Active CN218597740U (en) 2022-12-01 2022-12-01 Construction template

Country Status (1)

Country Link
CN (1) CN218597740U (en)

Similar Documents

Publication Publication Date Title
CN218597740U (en) Construction template
CN206091503U (en) Frame construction takes precautions against earthquakes
CN211621236U (en) Bridge steel case roof beam hoist device
CN218176767U (en) Reinforced supporting structure for constructional engineering
CN211949482U (en) Adjustable supporting vehicle for construction engineering construction
CN115045289A (en) Supporting pile foundation pit supporting device for engineering and using method thereof
CN211691596U (en) Building changes inclined to one side reinforced structure for building engineering
CN207700030U (en) Lifting moving combined movable steel bridge
CN217516565U (en) Flexible attachment device of tower crane
CN220353461U (en) Adjustable diagonal bracing structure for building engineering design
CN214696088U (en) Adopt building house of concrete steel construction stand
CN215889452U (en) Beam pre-support structure for building structure design
CN219386297U (en) Construction engineering pile driving device
CN213683159U (en) Guide unloading device of attached scaffold
CN212836845U (en) Novel supporting structure for garden ancient architecture restoration
CN210113319U (en) Construction platform for pile foundation
CN210508191U (en) Floor support with middle support for floor
CN217539885U (en) Pipeline department of bending connection supporting mechanism for building plumbing
CN214170154U (en) Warning rail for hydraulic engineering safety
CN216075091U (en) Peripheral structure of underground building engineering construction inversion construction structures
CN220117504U (en) Anti-seismic metal support with good corrosion resistance effect
CN212002456U (en) A consolidate bearing structure for building engineering
CN213418439U (en) Safety inclination protection device for attached scaffold
CN219712542U (en) Water conservancy pipeline strutting arrangement
CN218644945U (en) Anti-blocking water supply and drainage pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant