CN218597702U - Device for controlling distance between steel pipes of scaffold - Google Patents
Device for controlling distance between steel pipes of scaffold Download PDFInfo
- Publication number
- CN218597702U CN218597702U CN202222130639.4U CN202222130639U CN218597702U CN 218597702 U CN218597702 U CN 218597702U CN 202222130639 U CN202222130639 U CN 202222130639U CN 218597702 U CN218597702 U CN 218597702U
- Authority
- CN
- China
- Prior art keywords
- scale
- scaffold
- hole
- steel pipe
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Abstract
The utility model discloses a device of control scaffold steel pipe interval relates to building engineering technical field. Including two at least sliding fastener, a scale, sliding fastener is equipped with axis mutually perpendicular's first through-hole and second through-hole, the connection is established to scale slip cap in the second through-hole, during the installation scaffold frame, the steel pipe cover of scaffold frame is established and is connected in the first through-hole, set screw will sliding fastener fixes on the scale, be carved with the length scale on the scale. The utility model discloses in the scaffold installation, the steel pipe interval of control scaffold that can be very convenient ensures that the steel pipe interval is unanimous.
Description
Technical Field
The utility model belongs to the technical field of building engineering, more specifically say, relate to a device of control scaffold steel pipe interval.
Background
At present, most of external scaffolds for building construction are still erected by adopting steel pipe scaffolds, the step pitch and the span are controlled by operators according to own erection experience in the erection process, and the intervals among the steel pipes are uneven, so that the overall attractiveness is influenced. The distance is set up by the operating personnel through the tape measure control, the operation is troublesome, and the consistency of the distance is not easy to ensure. If the steel pipe interval of having the scaffold has exceeded the allowable value, later stage acceptance inspection is not passed, is difficult to carry out the rectification after setting up the completion. In view of the above, it is necessary to provide a device for controlling the distance between steel pipes of a scaffold, which can solve the above problems by strictly controlling the step and span during the erection of the outer scaffold.
Disclosure of Invention
The utility model aims to solve the technical problem that a device of control scaffold steel pipe interval is provided, in the scaffold installation, the steel pipe interval of control scaffold that can be very convenient ensures that the steel pipe interval is unanimous.
In order to solve the technical problem, the utility model discloses the technical scheme who takes is:
the utility model provides a device of control scaffold steel pipe interval, includes two at least sliding fastener, a scale, sliding fastener is equipped with axis mutually perpendicular's first through-hole and second through-hole, the scale slip cap is established connect in the second through-hole, during the installation scaffold, the steel pipe cover of scaffold is established and is connected in the first through-hole, holding screw will sliding fastener fixes on the scale, be carved with the length scale on the scale.
Preferably, a sliding groove is formed in the scale along the length direction, the top of the set screw slides in the sliding groove, and when the scale is fixed, the top end of the set screw abuts against the bottom surface of the sliding groove.
Preferably, the chute is C-shaped.
Preferably, the diameter of the first through hole is adapted to the diameter of the steel pipe of the scaffold.
Preferably, the scale and the sliding fastener are both made of aluminum alloy materials.
Adopt the produced beneficial effect of above-mentioned technical scheme to lie in: the utility model discloses in, the distance between two slip fasteners of slip fastener can be adjusted to suitable position with the distance between two first through-holes earlier in the use, and the distance between two first through-holes is adjacent steel pipe distance promptly, and a first through-hole cover is established on the steel pipe that has installed, and the steel pipe that will install is established to another first through-hole cover, uses convenience very and steel pipe interval unanimous.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic top view of the present invention;
in the figure: 1. a slide fastener; 101. a first through hole; 102. a second through hole; 2. tightening the screw; 3. and (4) a scale.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without making any creative effort belong to the protection scope of the present application.
As shown in fig. 1-2, the device for controlling the distance between the steel pipes of the scaffold comprises two sliding fasteners 1 and a scale 3. The sliding fastener 1 is provided with a first through hole 101 and a second through hole 102, the axes of which are perpendicular to each other, and the scale 3 is connected in the second through hole 102 in a sliding sleeved manner. The diameter of first through-hole 101 and the diameter looks adaptation of the steel pipe of scaffold, when installing the scaffold, the steel pipe cover of scaffold is established and is connected in first through-hole 101. The set screw 2 fixes the slide fastener 1 to the scale 3. The scale 3 is marked with length scales. A C-shaped sliding groove is formed in the scale 3 along the length direction and is equivalent to a sliding track, and the top of the set screw 2 slides in the sliding groove. The set screw 2 is screwed down, and the top end of the set screw 2 pushes against the bottom surface of the sliding chute to fix the sliding fastener 1 on the scale 3. The scale 3 and the sliding fastener 1 are both made of aluminum alloy materials, so that the use is light.
When setting up the horizontal pole, according to construction scheme design requirement, adjust the distance between two slide fastener 1 on the scale 3 well earlier. After the first horizontal rod is erected, the scale 3 is erected to coincide with the vertical rod, the first through hole 101 in the lower sliding fastener 1 is sleeved on the first horizontal rod, the first through hole 101 in the upper sliding fastener 1 is sleeved with the second horizontal rod, the second horizontal rod and the vertical rod are fixed through the pipe fastener, and the second horizontal rod is erected in a positioning mode.
When setting up the pole setting, the back is adjusted to sliding fastener 1's distance, places 3 levels of scale and coincides with the horizon bar, and the pole setting that sets up is established in the first through-hole 101 cover on sliding fastener 1 of 3 one ends of scale, and the pole setting that will set up is established in the first through-hole 101 cover on sliding fastener 1 of the other end of connection, fixes pole setting and horizon bar with the pipe fitting fastener, accomplishes the location of pole setting and sets up.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a device of control scaffold steel pipe interval, its characterized in that includes two at least sliding fastener (1), a scale (3), sliding fastener (1) is equipped with axis mutually perpendicular's first through-hole (101) and second through-hole (102), scale (3) slip cap establish connect in second through-hole (102), during the installation scaffold, the steel pipe cover of scaffold establishes connect in first through-hole (101), set screw (2) will sliding fastener (1) is fixed on scale (3), be carved with the length scale on scale (3).
2. The device for controlling the spacing between steel pipes of a scaffold according to claim 1, wherein a sliding slot is formed in the length direction of the scale (3), the top of the set screw (2) slides in the sliding slot, and when the scale (3) is fixed, the top of the set screw (2) abuts against the bottom surface of the sliding slot.
3. The device for controlling the distance between the steel pipes of the scaffold according to claim 2, wherein the chute is C-shaped.
4. An arrangement for controlling the spacing between steel tubes of a scaffold according to claim 1, wherein the diameter of the first through hole (101) is adapted to the diameter of the steel tubes of the scaffold.
5. The device for controlling the distance between the steel pipes of the scaffold according to claim 1, wherein the scale (3) and the slide fastener (1) are made of aluminum alloy material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222130639.4U CN218597702U (en) | 2022-08-12 | 2022-08-12 | Device for controlling distance between steel pipes of scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222130639.4U CN218597702U (en) | 2022-08-12 | 2022-08-12 | Device for controlling distance between steel pipes of scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218597702U true CN218597702U (en) | 2023-03-10 |
Family
ID=85396062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222130639.4U Active CN218597702U (en) | 2022-08-12 | 2022-08-12 | Device for controlling distance between steel pipes of scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218597702U (en) |
-
2022
- 2022-08-12 CN CN202222130639.4U patent/CN218597702U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107574958A (en) | A kind of three-dimensional adjustable type cell curtain wall mounting system | |
CN210216749U (en) | Assembled container room | |
CN218597702U (en) | Device for controlling distance between steel pipes of scaffold | |
CN201458567U (en) | Special angle square for profile steel trolley conductor bracket installation | |
CN206971701U (en) | Hanging basket support | |
CN205933000U (en) | External swing arm tower crane in superelevation layer strutting arrangement that climbs | |
CN213741969U (en) | Color steel tile roof tiling is with installation guide rail | |
CN210370448U (en) | Scaffold inclined ladder | |
CN210217137U (en) | Adjustable template support with notch lintel | |
CN207017511U (en) | A kind of ceramic plate curtain wall with splash guard installation connects system | |
CN210715465U (en) | Screw joint for anti-seismic support and hanger system | |
CN220911657U (en) | Steel structure platform for factory building | |
CN217581150U (en) | A climb a wall support backing plate that attaches for integration heat preservation outer wall | |
CN204879048U (en) | Novel pipeline support | |
CN215106409U (en) | Mounting support for unit body plate | |
CN219694101U (en) | Infrared horizontal thickness measuring device for controlling thickness of concrete pouring plate | |
CN210563347U (en) | Template supporting structure without window under outer eaves overhanging plate | |
CN220644794U (en) | Curtain wall keel | |
CN219569402U (en) | Prefabricated staircase location mounting structure | |
CN219863612U (en) | Suspended ceiling conversion layer system of truss structure building | |
CN216239831U (en) | Vertical measurement and correction device for mounting of assembled cement board | |
CN214889657U (en) | Electromechanical pipeline PVC screw rod composite module and spacing support | |
CN113756449B (en) | Large-span steel beam column structure and member thereof | |
CN216406132U (en) | Novel climbing frame machine position wall-attached support for residential building structural system | |
CN215907211U (en) | Archaize building hangs tile pitched roof built-in fitting construction structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |