CN218581342U - Civil engineering construction is with guardrail of spraying dust fall - Google Patents

Civil engineering construction is with guardrail of spraying dust fall Download PDF

Info

Publication number
CN218581342U
CN218581342U CN202222606205.7U CN202222606205U CN218581342U CN 218581342 U CN218581342 U CN 218581342U CN 202222606205 U CN202222606205 U CN 202222606205U CN 218581342 U CN218581342 U CN 218581342U
Authority
CN
China
Prior art keywords
water
base
guardrail
pipe
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222606205.7U
Other languages
Chinese (zh)
Inventor
赵磊建
刘桂芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222606205.7U priority Critical patent/CN218581342U/en
Application granted granted Critical
Publication of CN218581342U publication Critical patent/CN218581342U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a civil engineering construction is with spraying dust fall's guardrail, the on-line screen storage device comprises a base, base top both sides are passed the connection respectively and are equipped with the support stake, the base downside is equipped with the arc wall, it is equipped with the spray tube to connect between the one side that two sets of support stake upper portions are close to mutually, the inboard middle part of arc wall is connected and is equipped with the water pump package, the water pump package front side income water end connection is equipped with into the water hose, both ends are and connect respectively for going out the water end about the water pump package and be equipped with flow pipe one, support stake inside flow pipe two that are equipped with, two sets of flow pipe one other ends are connected with two lower extremes of flow pipe respectively, the connection of two upper ends of flow pipe is equipped with the intubate, inside two sets of intubate insert the spray tube other end respectively, spray tube upside even connection is equipped with multiunit atomizer. Compared with the prior art, the utility model the advantage lies in: install on ground through the base with the whole firm of guardrail, played fine guard action to oral siphon and water pump assembly, the guardrail of spraying dust fall is applicable to different construction environment.

Description

Civil engineering construction is with guardrail of spraying dust fall
Technical Field
The utility model relates to a civil engineering construction technical field, in particular to civil engineering construction is with guardrail of spraying dust fall.
Background
The guardrail is a facility mainly used for protecting and protecting civil engineering facilities; at present, in the aspect of guardrails, other beneficial effects can be provided well; especially to present air pollution is more and more serious, and some guardrails have had the effect that the spraying dust fall purified now. However, most of the guardrails are installed in places with more people and vehicles, so the guardrails are easy to collide by a locomotive, the connection between the spraying dust-settling guardrail and a water supply pipeline is easy to loosen, water leakage or water spraying occurs, and a large amount of water resources are wasted; in addition, because the water supply modes of different construction environments are different, underground water supply and overground water supply exist, and a single water pipe connection mode cannot be suitable for different construction environments, so that the use of the guardrail is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides an it is not enough to be directed against among the prior art, the utility model provides a civil engineering construction is with spraying dust fall's guardrail, the on-line screen storage device comprises a base, base top both sides are passed the connection respectively and are equipped with the support stake, the base downside is equipped with the arc wall, and is two sets of support stake lower extreme inserts inside the arc wall respectively, and is two sets of connect between one side that support stake upper portion is close to mutually and be equipped with the spray tube, the inboard middle part of arc wall is connected and is equipped with the water pump package, the water pump package front side income water end is connected and is equipped with into the hose, both ends are connected respectively for going out the water end and are equipped with flow pipe one about the water pump package, it is two sets of to support the inside flow pipe that is equipped with of stake, and is two sets of flow pipe one other end penetrate two sets of support stake respectively and be connected with two lower extremes of flow pipe, it is two sets of two upper ends of flow pipe are close to connect and are equipped with the intubate the spray tube, and two sets of intubate other ends are inserted inside the spray tube inserts the spray tube respectively, spray tube upside even connection is equipped with multiunit atomizer.
As an improvement: the base upside is the arc structure, base front and back side outer wall downside edge connects respectively and is equipped with the multiunit installation piece, pass the connection on the installation piece and be equipped with ground and insert.
As an improvement: the supporting pile is characterized in that the outer side of the lower portion of the supporting pile is located on the upper side of the base and is connected with an installation frame, and four corners of the installation frame are connected with the upper side of the base through bolts respectively.
As an improvement: the upper side of the middle part of the base is communicated with a frame body, a water inlet hard pipe is connected to the upper end of the water pump set, and the other end of the water inlet hard pipe penetrates out of the side wall of the frame body.
As an improvement: the spraying pipe is characterized in that a first railing is arranged between the lower side of the spraying pipe and the upper side of the base in a matched threaded connection mode, and a second railing is arranged between the lower side of the spraying pipe and the upper side of the frame in a matched threaded connection mode.
As an improvement: the other end of the water inlet hose is connected with a first water control valve, and the other end of the water inlet hard pipe is connected with a second water control valve.
As an improvement: the spray pipe is characterized in that sealing rings are connected to the inner portions of the two ends of the spray pipe, and the insertion pipe is inserted into the sealing rings.
As an improvement: and a plurality of groups of stiffening beams are uniformly arranged on the inner wall of the arc-shaped groove.
Compared with the prior art, the utility model the advantage lies in:
the guardrail is integrally and stably installed on the ground through the base, and parts such as the water inlet pipe, the water pump set and the like are respectively stored in the supporting piles, the arc-shaped groove and the frame body, so that the guardrail is prevented from being impacted by a locomotive or being trampled by workers, the water inlet pipe and the water pump set are well protected, and the connection part between the spraying dust-settling guardrail and a water supply pipeline is prevented from being loosened, water leakage or water spraying is prevented, and waste of water resources is avoided;
the water inlet hose inside the arc-shaped groove and the water inlet hard pipe penetrating through the side wall of the frame body are used for providing two connection modes for the spraying dust-settling guardrail so as to correspond to underground water supply and ground water supply, so that the spraying dust-settling guardrail is suitable for different construction environments;
support stake and railing and install at base and framework upside through installing frame and screw thread respectively, can dismantle and assemble, convenient transportation and accomodate.
Drawings
Fig. 1 is a schematic view of the structure of the spray dust-settling guardrail for civil engineering construction;
fig. 2 is a schematic view of the structure of the spraying dust-settling guardrail for civil engineering construction;
reference numerals comparison table:
1. a base; 2. mounting blocks; 3. inserting the ground; 4. supporting piles; 5. installing a frame; 6. an arc-shaped slot; 7. a nozzle; 8. a railing I; 9. a frame body; 10. a second railing; 11. a water pump group; 12. a water inlet hose; 13. a first water control valve; 14. a first water supply pipe; 15. a water supply pipe II; 16. inserting a tube; 17. a seal ring; 18. an atomizing spray head; 19. a water inlet hard pipe; 20. a second water control valve; 21. and reinforcing the beam.
Detailed Description
The following describes the present invention with reference to the accompanying drawings.
As shown in fig. 1-2, a spraying and dust-settling guardrail for civil engineering construction comprises a base 1, wherein two sides above the base 1 are respectively connected with supporting piles 4 through a penetrating way, the lower side of the base 1 is provided with an arc-shaped groove 6, the lower ends of the supporting piles 4 are respectively inserted into the arc-shaped groove 6, the supporting piles 4 are connected with spray pipes 7 between the sides close to the upper portions of the supporting piles, the middle portions of the inner sides of the arc-shaped grooves 6 are connected with water pump sets 11, the water inlet ends of the front sides of the water pump sets 11 are connected with water inlet hoses 12, the left ends and the right ends of the water pump sets 11 are respectively connected with water outlet ends and provided with water supply pipes 14, the supporting piles 4 are internally provided with water supply pipes two 15, the other ends of the water supply pipes 14 respectively penetrate into the supporting piles 4 and are connected with the lower ends of the water supply pipes two 15, the upper ends of the water supply pipes two 15 are connected with one side close to the spray pipes 7 through inserting pipes 16, the other ends of the inserting pipes are respectively inserted into the spray pipes 7, the spray pipes 7 are uniformly connected with multiple groups of atomizing nozzles 18 at the upper sides of the spray pipes 7, the supporting piles 4 are connected with the upper sides and are provided with installation frames 5 at the upper sides of the base 1, and the upper sides of the installation frames 5 through bolts respectively.
The utility model discloses when concrete implementation, insert spray tube 7 respectively with intubate 16 inside, connect spray tube 7 between two sets of support stake 4 upper portions, it inserts arc 6 inboardly to pass 1 side walls on the base with two sets of support stakes 4, it fixes support stake 4 to be connected with base 1 through installing frame 5, rotate the earlier one end of a water supply pipe and insert support stake 4 inside and be connected with two 15 of water supply pipe, it is connected with water pump set 11 outlet ends to go out the water end with the other end again, accomplish the equipment back, if underground water supply, to go into water hose 12 and water piping connection, with base 1 fixed connection on ground, start water pump set 11, it passes through water supply pipe 14 with water through water pump set 11, in two 15 of water supply pipe and intubate 16 deliver to spray tube 7, will be defeated through 18 blowout atomizing nozzle and carry out the spraying dust fall through water pressure.
1 upside of base is the arc structure, side outer wall downside edge connects respectively around base 1 is equipped with multiunit installation piece 2, pass on the installation piece 2 to connect and be equipped with and insert 3, insert 3 through the ground that passes on the installation piece 2 and insert ground, realize the fixed connection on base 1 and ground.
The upper side intercommunication in the middle part of base 1 is equipped with framework 9, 11 upper ends water inlets of water pump package are connected and are equipped with into water hard tube 19, the 19 other ends of income water hard tube are worn out framework 9 lateral wall, as the improvement: the other end of the water inlet hose 12 is connected with a first water control valve 13, the other end of the water inlet hard pipe 19 is connected with a second water control valve 20, when underground water is supplied, the second water control valve 20 connected with the other end of the water inlet hard pipe 19 is closed, the first water control valve 13 at the other end of the water inlet hose 12 is opened and connected with an underground water supply pipe, and water supply is achieved; when ground water is supplied, the first water control valve 13 at the other end of the water inlet hose 12 is closed, and the second water control valve 20 connected with the other end of the water inlet hard pipe 19 is opened and is externally connected with a water supply pipe, so that water supply is realized.
Cooperation threaded connection is equipped with railing one 8 between 7 subs of spray tube and the 1 upside of base, cooperation threaded connection is equipped with railing two 10 between 7 subs of spray tube and the 9 upss of framework, installs 7 subs of spray tube with railing two 10 railing one 8 earlier, will support stake 4 and base 1 upside again and be connected, twists railing two 10 railing one 8 again and pass through the screw thread respectively with base 1 upside, framework 9 upside and be connected.
Spray tube 7 both ends internal connection is equipped with sealing washer 17, inside intubate 16 inserted sealing washer 17, through sealing washer 17's extrusion deformation characteristics, can make sealing connection between intubate 16 and the spray tube 7, convenient grafting, and can not cause and leak.
The inner wall of the arc-shaped groove 6 is uniformly provided with a plurality of groups of stiffening beams 21, so that the pressure resistance of the base 1 is enhanced, and the damage to the water pipe and the water pump set 11 caused by the base 1 being crushed by a locomotive is prevented.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not intended to limit the present invention, and all modifications, equivalents, improvements and the like that are made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides a civil engineering construction is with guardrail of spraying dust fall, includes base (1), base (1) top both sides are passed the connection respectively and are equipped with support stake (4), its characterized in that: base (1) downside is equipped with arc wall (6), and is two sets of it inserts arc wall (6) respectively to support stake (4) lower extreme inside, two sets of it connects between the one side that support stake (4) upper portion is close to mutually and is equipped with spray tube (7), arc wall (6) inboard middle part is connected and is equipped with water pump package (11), water pump package (11) front side income water end is connected and is equipped with into water hose (12), both ends are connected for going out the water end and are equipped with feed pipe one (14) respectively about water pump package (11), it is two sets of to support stake (4) inside water pipe two (15), two sets of the water pipe one (14) other end penetrates two sets of support stake (4) respectively and is connected with two (15) lower extremes of water pipe, the one side that two (15) upper ends are close to spray tube (7) is connected and is equipped with intubate (16), and is two sets of intubate (16) other end is inserted respectively inside spray tube (7), spray tube (7) upside evenly is connected and is equipped with multiunit atomizer (18).
2. The spraying and dust falling guardrail for civil engineering construction according to claim 1, characterized in that: the base (1) upside is the arc structure, base (1) front and back side outer wall downside edge connects respectively and is equipped with multiunit installation piece (2), pass on installation piece (2) and connect to be equipped with ground and insert (3).
3. The spraying and dust falling guardrail for civil engineering construction according to claim 1, characterized in that: support stake (4) lower part outside and be located base (1) upside connection and be equipped with installing frame (5), installing frame (5) four corners department is connected with base (1) upside through the bolt respectively.
4. The spraying and dust falling guardrail for civil engineering construction according to claim 1, characterized in that: the water pump is characterized in that a frame body (9) is communicated with the upper side of the middle of the base (1), a water inlet hard pipe (19) is connected to the water inlet at the upper end of the water pump set (11), and the other end of the water inlet hard pipe (19) penetrates out of the side wall of the frame body (9).
5. The spraying and dust falling guardrail for civil engineering construction according to claim 4, characterized in that: and a first railing (8) is arranged between the lower side of the spray pipe (7) and the upper side of the base (1) in a matching threaded connection mode, and a second railing (10) is arranged between the lower side of the spray pipe (7) and the upper side of the frame body (9) in a matching threaded connection mode.
6. The spraying and dust-settling guardrail for civil engineering construction according to claim 4, characterized in that: the other end of the water inlet hose (12) is connected with a first water control valve (13), and the other end of the water inlet hard pipe (19) is connected with a second water control valve (20).
7. The spraying and dust falling guardrail for civil engineering construction according to claim 1, characterized in that: and sealing rings (17) are connected to the inner parts of the two ends of the spray pipe (7), and the insertion pipe (16) is inserted into the sealing rings (17).
8. The spraying and dust falling guardrail for civil engineering construction according to claim 1, characterized in that: and a plurality of groups of stiffening beams (21) are uniformly arranged on the inner wall of the arc-shaped groove (6).
CN202222606205.7U 2022-09-30 2022-09-30 Civil engineering construction is with guardrail of spraying dust fall Active CN218581342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222606205.7U CN218581342U (en) 2022-09-30 2022-09-30 Civil engineering construction is with guardrail of spraying dust fall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222606205.7U CN218581342U (en) 2022-09-30 2022-09-30 Civil engineering construction is with guardrail of spraying dust fall

Publications (1)

Publication Number Publication Date
CN218581342U true CN218581342U (en) 2023-03-07

Family

ID=85367248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222606205.7U Active CN218581342U (en) 2022-09-30 2022-09-30 Civil engineering construction is with guardrail of spraying dust fall

Country Status (1)

Country Link
CN (1) CN218581342U (en)

Similar Documents

Publication Publication Date Title
CN218581342U (en) Civil engineering construction is with guardrail of spraying dust fall
CN107218615A (en) It is a kind of to improve the soot blower of SCR inlet flow field uniformity
CN216811761U (en) Tower mountain coal mine working face mixing stirrer spraying dust suppression device
CN216935275U (en) Dust device for construction site
CN109763471A (en) A kind of high-low pressure is two-sided to rush shoe manifold apparatus
CN219754237U (en) Spray fence device for construction site
KR100641264B1 (en) Radiation type pipe conduit cleaning equipment
CN211330600U (en) Pipeline repairing device
CN218716956U (en) Tunnel dust removal integrated system
CN205954550U (en) A spraying dedusting device for improving underground cavern air quality
CN221664710U (en) Dust suppression spraying device of mining coal mining machine
CN213359552U (en) Dust fall formula stores up coal canopy
CN216677509U (en) Defroster wash pipe to pneumatic valve
CN220470007U (en) Adjustable dust suppression device
CN206706959U (en) A kind of integrated prefabricated valve well
CN219262432U (en) Arc watering dust device of open-type TBM
CN216341450U (en) Device is used in municipal administration highway construction
CN220955019U (en) Shaping enclosure device shared by water supply and dust fall
CN213478384U (en) Tunnel full-section atomizer
CN220487278U (en) Dust fall encloses fender
CN221483770U (en) Fire engineering smoke exhaust system
CN220899856U (en) Underground tubular gas-water separation device
CN218554436U (en) High-efficient deamination spray gun of oblique nozzle
JPH0211514Y2 (en)
CN216825424U (en) Pure 304 stainless steel micro-fog box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant