CN218581332U - Temporary protective guard for building engineering quality detection - Google Patents

Temporary protective guard for building engineering quality detection Download PDF

Info

Publication number
CN218581332U
CN218581332U CN202223198746.7U CN202223198746U CN218581332U CN 218581332 U CN218581332 U CN 218581332U CN 202223198746 U CN202223198746 U CN 202223198746U CN 218581332 U CN218581332 U CN 218581332U
Authority
CN
China
Prior art keywords
baffle
base
engineering quality
guard rail
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223198746.7U
Other languages
Chinese (zh)
Inventor
张懿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223198746.7U priority Critical patent/CN218581332U/en
Application granted granted Critical
Publication of CN218581332U publication Critical patent/CN218581332U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model relates to a construction guardrail technical field discloses interim rail guard of building engineering quality testing, including baffle one and baffle two, be connected through the hinge between baffle one and the baffle two, baffle one all is provided with the bayonet socket with two bottoms of baffle, the bayonet socket periphery is provided with the base, the base middle part is provided with the draw-in groove, bayonet socket sliding connection is at the draw-in groove middle part, the inside cavity of base, just base upper portion is provided with the opening, the base bottom is provided with a plurality of through-holes, base bottom sliding connection has the picture peg. The utility model discloses in, through mutually supporting of baffle one, baffle two, base, can accomplish the quick installation of rail guard, and when dismantling, can fold baffle one and baffle two, the transportation of being convenient for through the water tank, water pump, communicating pipe and shower nozzle with the water atomization blowout in the water tank, adsorbs the dust of building site periphery, increases the function of rail guard, and it is more convenient to use.

Description

Temporary protective guard for building engineering quality detection
Technical Field
The utility model relates to a construction guardrail technical field especially relates to building engineering quality detects interim rail guard.
Background
The building engineering is an engineering entity which performs various technical works and completions such as planning, surveying, designing, constructing, completing and the like for newly building, reconstructing or extending building buildings and affiliated structures and installation engineering of lines, pipelines and equipment matched with the engineering entity. Also refers to the construction of various houses and buildings, also known as the construction workload. With the development of economy, the country vigorously builds cities to accelerate urbanization construction, so that high-rise buildings can be found in most regions in China, a large number of employment opportunities are provided, meanwhile, people can conveniently concentrate in the future, businesses are developed, the quality of construction projects needs to be detected to ensure the construction safety, and temporary protective guards need to be installed on the periphery of the buildings due to the consideration of safety factors during the quality detection of the construction projects.
Most of the existing temporary protective guards for construction sites use color steel tile barriers for plugging, when the temporary protective guards need to be installed, expansion screws and the like are installed on the ground for fixing, then the barriers can be installed, the installation is very inconvenient, the size of the barriers of a single color steel tile is large, the color steel tile is very inconvenient when being transported, when the barriers after the installation are dismantled again, the expansion screws on the ground need to be cleaned, the flow is loaded down with trivial details, it is very inconvenient to use, when building site construction, can produce more dust, and these dusts can float building site periphery to cause the pollution to the environment, and the interim rail guard of using now most can not adsorb to these dusts and remove dust, leads to the rail guard only to possess the effect of enclosing the fender, and the function is less, and it is very inconvenient to use, provides the interim rail guard of building engineering quality detection for this reason and solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the temporary protective guard of building engineering quality testing who proposes.
In order to realize the purpose, the utility model adopts the following technical scheme: temporary protective guard for building engineering quality detection comprises a first baffle and a second baffle, the first baffle and the second baffle are connected through a hinge, bayonets are arranged at the bottoms of the first baffle and the second baffle, the periphery of the bayonets is provided with a base, a clamping groove is formed in the middle of the base, the bayonets are connected to the middle of the clamping groove in a sliding mode, the base is hollow inside, the upper portion of the base is provided with an opening, a plurality of through holes are formed in the bottom of the base, and a plugboard is connected to the bottom of the base in a sliding mode.
As a further description of the above technical solution:
the hanging rod is fixedly connected to one side of the rear sides of the first baffle and the second baffle, the hook is rotatably connected to the other side of the rear sides of the first baffle and the second baffle, and the other side of the hook is arranged on the periphery of the adjacent hanging rod.
As a further description of the above technical solution:
one side of the first baffle far away from the hinge is fixedly connected with a convex block, one side of the second baffle far away from the hinge is provided with a notch, and the convex block is arranged in the middle of the adjacent notches.
As a further description of the above technical solution:
the water tank is characterized in that communicating pipes are arranged on the upper portions of the first baffle and the second baffle, a plurality of spray heads are arranged on the upper portion of the communicating pipes, a water tank is arranged on the rear side of the first baffle, a water pump is fixedly connected inside the water tank, the water outlet end of the water pump is connected with the communicating pipes through connecting pipes, and a water inlet pipe is arranged on one side of the upper portion of the water tank.
As a further description of the above technical solution:
the picture peg outside is provided with the hole, just picture peg bottom and through-hole upper portion contact.
As a further description of the above technical solution:
the first baffle and the second baffle are in a group, and the guard rail is formed by mutually splicing a plurality of groups of the first baffles and the second baffles.
As a further description of the above technical solution:
the base is preferably arranged at the bottom of the joint of the first baffle plate and the second baffle plate.
The utility model discloses following beneficial effect has:
1. the utility model discloses in, through mutually supporting of baffle one, baffle two, base, can accomplish the quick installation of rail guard, need not use tools, it is very convenient to install, and when dismantling, can fold baffle one and baffle two to reduce the space of rail guard, the transportation of being convenient for, it is very convenient to use.
2. The utility model discloses in, through water tank, water pump, communicating pipe and shower nozzle with the water atomization blowout in the water tank, adsorb the dust of building site periphery, increase the function of rail guard, it is more convenient to use.
Drawings
Fig. 1 is a schematic perspective view of a temporary guard rail for quality inspection of construction engineering according to the present invention;
fig. 2 is a schematic perspective view of another viewing angle of the temporary guard rail for building engineering quality inspection according to the present invention;
fig. 3 is a schematic structural view of a water tank of the temporary guard rail for building engineering quality inspection according to the present invention;
fig. 4 is the utility model provides a construction engineering quality detects the structural schematic diagram of the base of interim rail guard.
Illustration of the drawings:
1. a first baffle plate; 2. a second baffle plate; 3. a bayonet; 4. a base; 5. a notch; 6. a bump; 7. a communicating pipe; 8. a spray head; 9. a connecting pipe; 10. a water tank; 11. a water pump; 12. a water inlet pipe; 13. a hanging rod; 14. hooking; 15. a card slot; 16. a through hole; 17. and (4) inserting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: temporary protective guard for building engineering quality detection, which comprises a first baffle 1 and a second baffle 2, wherein the first baffle 1 and the second baffle 2 are connected through a hinge, the first baffle 1 and the second baffle 2 can rotate and fold along the hinge, the size of the whole protective guard is reduced, and the protective guard is convenient to transport and is more convenient to use, bayonets 3 are arranged at the bottoms of the first baffle 1 and the second baffle 2, a base 4 is arranged at the periphery of each bayonet 3, a clamping groove 15 is arranged at the middle part of the base 4, the bayonets 3 are slidably connected at the middle part of the clamping grooves 15, the bayonets 3 at the bottoms of the first baffle 1 and the second baffle 2 are aligned with the clamping grooves 15 on the base 4 and then inserted, the installation of a single protective guard is completed, the base 4 is hollow, an opening is formed in the upper part of the base 4, sand, and other materials in a building site are more, when the temporary protective guard is installed, the sand and other materials can be loaded into the base 4 from the opening in the upper part of the base 4, the counter weight of the base 4 is increased, the base 4 is stable in installation, a plurality of through holes 16 are formed in the bottom of the base 4, the base 4 is slidably connected with a plug board 17, when the temporary protective guard is needed to be disassembled, the plug board, the base 4 is convenient to be moved, and the base 4, and the base can be moved from the bottom of the plug board, and the plug board can be conveniently.
A hanging rod 13 is fixedly connected to one side of the rear sides of a first baffle 1 and a second baffle 2, a hook 14 is rotatably connected to the other side of the rear sides of the first baffle 1 and the second baffle 2, the other side of the hook 14 is arranged on the periphery of the adjacent hanging rod 13, the first baffle 1 and the second baffle 2 are unfolded along a hinge and connected through the hanging rod 13 and the hook 14, a lug 6 is fixedly connected to one side of the first baffle 1 away from the hinge, a notch 5 is arranged on one side of the second baffle 2 away from the hinge, the lug 6 is arranged in the middle of the adjacent notch 5, the notches 5 and the lugs 6 of the two adjacent guardrails are connected to complete the splicing between the guardrails, thereby completing the integral installation of the guardrails, tools are not needed in the installation process, the installation is very convenient, a communicating pipe 7 is arranged on the upper portions of the first baffle 1 and the second baffle 2, a plurality of spray heads 8 are arranged on the upper portion of the communicating pipe 7, a water tank 10 is arranged on the rear side of the first baffle 1, and a water pump 11 is fixedly connected to the interior of the water tank 10, the water outlet end of the water pump 11 is connected with the communicating pipe 7 through the connecting pipe 9, when the guard rail is used, the communicating pipe 7 can be arranged above the first baffle 1 and the second baffle 2, then water is added into the water tank 10, the water is conveyed into the communicating pipe 7 through the connecting pipe 9 under the action of the water pump 11 and then is sprayed out through the spray head 8 to adsorb dust flying out of a building site, so that the function of the guard rail is increased, the use is more convenient, one side of the upper part of the water tank 10 is provided with the water inlet pipe 12, the water can be added into the water tank 10 through the water inlet pipe 12, the outer side of the inserting plate 17 is provided with holes, so that the inserting plate 17 can be conveniently pulled, the bottom of the inserting plate 17 is contacted with the upper part of the through hole 16 to prevent sand and stones from flowing out of the gap of the through hole 16 of the inserting plate 17, the first baffle 1 and the second baffle 2 are in a group, and the guard rail is formed by mutually splicing a plurality of groups of the first baffle 1 and the second baffle 2, the multiple groups of guard railings are connected through the grooves and the projections 6, the hooks 14 and the hanging rods 13, and the base 4 is preferably arranged at the bottom of the joint of the first baffle 1 and the second baffle 2, so that the joint between the first baffle 1 and the second baffle 2 can be supported by one base 4, and the stability of connection of the first baffle 1 and the second baffle 2 is improved while the support is ensured.
The working principle is as follows: when the temporary protective fence is needed, only the first baffle 1 and the second baffle 2 need to be pulled out of the base 4, then the inserting plate 17 at the bottom of the base 4 is pulled out of the base 4, the materials such as sand and stones in the base 4 can be discharged from the through hole 16, so that the weight of the base 4 is reduced, then the hooks 14 at the rear side of the first baffle 1 and the second baffle 2 are pulled out of the hanging rod 13, the first baffle 2 and the second baffle 2 are further convenient to be transported into a water tank, and the water tank can be conveniently transported to the water tank by using the water pump 7, so that the water tank can conveniently absorb water, the first baffle 7 and the second baffle 7, and the water tank can conveniently transport the water tank to the water tank by using the water pump 7, thereby reducing the size of the water tank, and facilitating the use of the first baffle 7 and the water tank, and the water tank to be conveniently transported by using the water pump 7, and the water tank to transport the water tank, and the water tank.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. Temporary guard rail of building engineering quality testing, including baffle one (1) and baffle two (2), its characterized in that: be connected through the hinge between baffle one (1) and baffle two (2), baffle one (1) and baffle two (2) bottom all are provided with bayonet socket (3), bayonet socket (3) periphery is provided with base (4), base (4) middle part is provided with draw-in groove (15), bayonet socket (3) sliding connection is at draw-in groove (15) middle part, the inside cavity of base (4), just base (4) upper portion is provided with the opening, base (4) bottom is provided with a plurality of through-holes (16), base (4) bottom sliding connection has picture peg (17).
2. The construction engineering quality detection temporary guard rail according to claim 1, characterized in that: the utility model discloses a wall hanging device, including baffle one (1) and two (2) rear sides, the equal fixedly connected with peg (13) in baffle one (1) and two (2) rear sides one side, baffle one (1) and two (2) rear sides opposite side rotate and are connected with couple (14), couple (14) opposite side sets up the periphery at adjacent peg (13).
3. The construction engineering quality detection temporary guard rail of claim 1, wherein: one side fixedly connected with lug (6) of hinge is kept away from in baffle one (1), one side that the hinge was kept away from in baffle two (2) is provided with breach (5), lug (6) set up the middle part in adjacent breach (5).
4. The construction engineering quality detection temporary guard rail of claim 1, wherein: baffle one (1) and baffle two (2) upper portion all are provided with communicating pipe (7), communicating pipe (7) upper portion is provided with a plurality of shower nozzles (8), baffle one (1) rear side is provided with water tank (10), the inside fixedly connected with water pump (11) of water tank (10), the play water end of water pump (11) is connected with communicating pipe (7) through connecting pipe (9), water tank (10) upper portion one side is provided with inlet tube (12).
5. The construction engineering quality detection temporary guard rail of claim 1, wherein: the outer side of the inserting plate (17) is provided with a hole, and the bottom of the inserting plate (17) is in contact with the upper part of the through hole (16).
6. The construction engineering quality detection temporary guard rail according to claim 1, characterized in that: the first baffle (1) and the second baffle (2) form a group, and the guard rail is formed by mutually splicing a plurality of groups of the first baffles (1) and the second baffles (2).
7. The construction engineering quality detection temporary guard rail of claim 1, wherein: the base (4) is arranged at the bottom of the joint of the first baffle plate (1) and the second baffle plate (2).
CN202223198746.7U 2022-11-30 2022-11-30 Temporary protective guard for building engineering quality detection Active CN218581332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223198746.7U CN218581332U (en) 2022-11-30 2022-11-30 Temporary protective guard for building engineering quality detection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223198746.7U CN218581332U (en) 2022-11-30 2022-11-30 Temporary protective guard for building engineering quality detection

Publications (1)

Publication Number Publication Date
CN218581332U true CN218581332U (en) 2023-03-07

Family

ID=85380557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223198746.7U Active CN218581332U (en) 2022-11-30 2022-11-30 Temporary protective guard for building engineering quality detection

Country Status (1)

Country Link
CN (1) CN218581332U (en)

Similar Documents

Publication Publication Date Title
CN218581332U (en) Temporary protective guard for building engineering quality detection
CN113323134A (en) One-time pouring construction method for waterproof reversed ridge and main building of toilet
CN217353855U (en) Barrier wallboard with dust fall function for construction
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN215632171U (en) Construction is with enclosing fender
CN212254486U (en) Engineering is managed with building outer wall infiltration testing arrangement
CN211340602U (en) Road and bridge guardrail washs curing means
CN210699300U (en) Dust collector for building site
CN112900822A (en) Aluminum assembled high-altitude operating platform
CN210086993U (en) Protection plate for building construction
CN214463261U (en) Dustproof equipment for building construction
CN214739771U (en) Aluminum assembled high-altitude operating platform
CN218541800U (en) Safety fence for construction engineering management construction
CN219951688U (en) Hanging basket device for bridge auxiliary engineering construction
CN217205144U (en) Indoor spraying device of green building construction
CN220226187U (en) Protection structure of scaffold fixing assembly for municipal house building
CN219241552U (en) Portable shaping rail guard that can install and remove fast
CN216767001U (en) Energy-saving protective fence for building
CN218989906U (en) General type assembled pier steel form construction operation platform and rail
CN214885363U (en) Building construction operation platform
CN221000576U (en) Construction site cross-communication channel
CN215285930U (en) Pipe fitting placing device for civil engineering construction site
CN218249285U (en) Energy-saving environment-friendly multi-unit configurable dust removing mechanism in building construction
CN212715844U (en) Construction frame
CN219840005U (en) Municipal administration watering dust device