CN218581321U - Building construction quick detach formula guardrail - Google Patents

Building construction quick detach formula guardrail Download PDF

Info

Publication number
CN218581321U
CN218581321U CN202222620521.XU CN202222620521U CN218581321U CN 218581321 U CN218581321 U CN 218581321U CN 202222620521 U CN202222620521 U CN 202222620521U CN 218581321 U CN218581321 U CN 218581321U
Authority
CN
China
Prior art keywords
quick
groove
stand
protection network
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222620521.XU
Other languages
Chinese (zh)
Inventor
蒋国平
陈谨
耿继芳
李林峰
刘茜茜
刘晓玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huite Metal Guardrail Co ltd
Original Assignee
Wuxi Huite Metal Guardrail Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huite Metal Guardrail Co ltd filed Critical Wuxi Huite Metal Guardrail Co ltd
Priority to CN202222620521.XU priority Critical patent/CN218581321U/en
Application granted granted Critical
Publication of CN218581321U publication Critical patent/CN218581321U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a construction quick detach formula guardrail, its technical scheme main points are: the protective net comprises two upright posts, wherein the two upright posts are arranged at intervals, and a protective net is arranged between the two upright posts; quick detach subassembly, quick detach subassembly sets up the both sides of protection network for to the stand with the protection network is dismantled fast, quick detach subassembly includes: two installation pieces, two installation piece fixed mounting respectively is in the both sides of protection network, the mounting groove has been seted up to the top surface of stand, the mounting groove with the installation piece activity is cup jointed, uses through the mutual cooperation of the protection network that sets up, installation piece, mounting groove, connecting block, gag lever post and spacing groove down, can reach the quick dismantlement effect to the protection network, uses through the mutual cooperation of base, mounting hole, ground nail, joint piece, joint groove, connecting hole and spread groove that sets up, can also dismantle first equipment board, second equipment board and guard bar, and is more practical convenient.

Description

Building construction quick detach formula guardrail
Technical Field
The utility model relates to a guardrail technical field, concretely relates to construction quick detach formula guardrail.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein a guardrail is often used for protecting a construction site in building construction.
For example, chinese patent publication No. CN211549114U, wherein an assembly type construction guardrail is proposed, the connection part between the guardrail frame and the upright post is composed of a mounting plate provided with a through groove and a guardrail frame fin plate matching lock bolt three, the connection part is the upper part and the lower part at both ends of the guardrail frame, the connection part is connected to the upright post in a symmetrical supporting manner, the connection mode of the bolt structure can be rapidly disassembled, the disassembly and recovery of the guardrail frame and the upright post after the construction is finished are convenient, and the green construction is realized.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a construction quick detach formula guardrail has solved guardrail frame and has installed through bolted connection's mode with guardrail frame fin, because construction site's guardrail is all installed outdoors, the rainwater can corrode the bolt, can lead to the bolt to rust to as for later stage guardrail is difficult to the problem of dismantling.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a quick-release type guardrail for building construction comprises two upright posts, wherein the two upright posts are arranged at intervals, and a protective net is arranged between the two upright posts; quick detach subassembly, quick detach subassembly sets up the both sides of protection network for to the stand with the protection network is dismantled fast, quick detach subassembly includes: two installation pieces, two installation piece fixed mounting respectively is in the both sides of protection network, the mounting groove has been seted up to the top surface of stand, the mounting groove with installation piece activity cup joints, two spacing grooves have been seted up to the top surface of stand, the top surface fixed mounting of installation piece has two connecting blocks, the bottom surface fixed mounting of connecting block has the gag lever post, the gag lever post with the spacing groove activity cup joints.
In order to assemble first equipment board and second equipment board and stand together, as the utility model discloses a construction quick detach formula guardrail, the preferred, two be provided with first equipment board and second equipment board between the stand, two joint grooves have been seted up to one side of stand, first equipment board with the both sides of second equipment board fixed mounting respectively has the joint piece, the joint piece with joint groove activity is cup jointed.
In order to improve the effect of protection, as the utility model discloses a construction quick detach formula guardrail, the preferred, a plurality of spread groove has been seted up to the top surface of second equipment board, a plurality of connecting hole has been seted up to the top surface of first equipment board, the fender rod has been cup jointed in the inside activity of connecting hole, the fender rod with the spread groove activity is cup jointed.
In order to prevent that constructor from strideing across the fender rod, as the utility model discloses a construction quick detach formula guardrail, the preferred, the top surface fixed mounting of fender rod has the spine.
In order to install the stand subaerial at construction site, as the utility model discloses a construction quick detach formula guardrail, the preferred, the bottom surface fixed mounting of stand has the base, a plurality of mounting hole has been seted up to the top surface of base, the ground nail has been cup jointed in the inside activity of mounting hole.
In order to warn constructor, as the utility model discloses a construction quick detach formula guardrail, the preferred, the both sides of stand fixed mounting respectively has fluorescence warning sign.
In order to strengthen the intensity of protection network, as the utility model discloses a construction quick detach formula guardrail, the preferred, the protection network is rigid wire netting.
To sum up, the utility model discloses mainly have following beneficial effect:
under the protection network, installation piece, mounting groove, connecting block, gag lever post and the spacing groove that use of mutually supporting through setting up, can reach the quick dismantlement effect to the protection network, under base, mounting hole, ground nail, joint piece, joint groove, connecting hole and the spread groove that sets up used mutually, can also dismantle first equipment board, second equipment board and fender rod, it is more practical convenient.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the column structure of the present invention;
FIG. 3 is a partial structural diagram of A in FIG. 2;
fig. 4 is a partial structural diagram of B in fig. 2.
Reference numerals: 1. a column; 2. a protective net; 3. mounting blocks; 4. mounting grooves; 5. a limiting groove; 6. connecting blocks; 7. a limiting rod; 8. a first assembly plate; 9. a clamping block; 10. a clamping groove; 11. a second assembly plate; 12. connecting grooves; 13. connecting holes; 14. a guard bar; 15. pricking with a sharp point; 16. a base; 17. mounting holes; 18. a ground nail; 19. a fluorescent warning board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, a quick-release guardrail for building construction comprises two upright posts 1, two upright posts 1 are arranged at intervals, a protective net 2 is arranged between the two upright posts 1, quick-release components are arranged on two sides of the protective net 2 and used for quickly detaching the upright posts 1 and the protective net 2, each quick-release component comprises two mounting blocks 3, each mounting block 3 is of a trapezoidal structure, the two mounting blocks 3 are respectively and fixedly mounted on two sides of the protective net 2, a mounting groove 4 is formed in the top surface of each upright post 1, each mounting groove 4 is a trapezoidal groove, the mounting groove 4 is movably sleeved with the mounting block 3, two limiting grooves 5 are formed in the top surface of each upright post 1, two connecting blocks 6 are fixedly mounted on the top surface of each mounting block 3, a limiting rod 7 is fixedly mounted on the bottom surface of each connecting block 6, and the limiting rod 7 is movably sleeved with the limiting grooves 5, through the protection network 2 that upwards stimulates the setting, installation piece 3 can follow the slip and the rebound of mounting groove 4 this moment, and then let gag lever post 7 break away from the inside of spacing groove 5, after installation piece 3 breaks away from the inside of mounting groove 4 completely, can reach the quick dismantlement effect to protection network 2, be provided with first equipment board 8 and second equipment board 11 between two stands 1, two joint grooves 10 have been seted up to one side of stand 1, first equipment board 8 and second equipment board 11's both sides fixed mounting have joint piece 9 respectively, joint piece 9 cup joints with joint groove 10 activity, a plurality of spread groove 12 has been seted up to second equipment board 11's top surface, a plurality of connecting hole 13 has been seted up to first equipment board 8's top surface, the inside activity of connecting hole 13 has cup jointed fender rod 14, fender rod 14 cup joints with spread groove 12 activity.
Referring to fig. 1, fig. 2 and fig. 4, the top surface fixed mounting of protection pole 14 has spine 15, the bottom surface fixed mounting of stand 1 has base 16, a plurality of mounting hole 17 has been seted up to the top surface of base 16, ground nail 18 has been cup jointed to the inside activity of mounting hole 17, base 16 through setting up, the staff can place base 16 subaerial at the construction site, and insert ground nail 18 ground depths through mounting hole 17, can accomplish the installation to stand 1 and protection network 2, insert the inside of joint groove 10 with joint piece 9 this moment, can install first equipment board 8 and second equipment board 11, and insert the inside of connecting hole 13 and connecting groove 12 with protection pole 14, the staff puts into the inside of mounting groove 4 with installation piece 3 again, after installation piece 3 completely enters into the inside of mounting groove 4, gag lever post 7 can enter into the inside of spacing groove 5, and then prevent that protection network 2 from rocking from the left and right, improve the stability of stand 1 and 2, through protection pole 14, spine 15, spine 2 and upright post reach the inside of protection network 4, the protection network 19 is installed respectively for the protection effect of rigid protection network when the protection network is installed.
The working principle is as follows: referring to fig. 1-4, through the protection network 2 that upwards stimulates the setting, installation piece 3 can follow the slip of mounting groove 4 and upwards move this moment, and then let gag lever post 7 break away from the inside of spacing groove 5, after installation piece 3 breaks away from the inside of mounting groove 4 completely, can reach the quick dismantlement effect to protection network 2, later stage staff can be pulled out right ground nail 18 from ground depths, and then pull down right stand 1, thereby can also dismantle first equipment board 8, second equipment board 11 and fender rod 14, and is more practical convenient.
Through the base 16 that sets up, the staff can place base 16 subaerial at construction site, and insert ground nail 18 ground depths through mounting hole 17, can accomplish the installation to stand 1 and protection network 2, insert the inside in joint groove 10 with joint piece 9 this moment, can install first equipment board 8 and second equipment board 11, and insert the inside of connecting hole 13 and spread groove 12 with fender rod 14, the staff is with installing piece 3 the inside of putting into mounting groove 4 again, after installing piece 3 enters into the inside of mounting groove 4 completely, gag lever post 7 can enter into the inside of spacing groove 5, and prevent that protection network 2 from taking place rocking from side to side, improve stand 1 and protection network 2's stability, through fender rod 14, spine 15, under protection network 2 and stand 1's the mutually supporting use, reach the effect of protection when the construction.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction quick detach formula guardrail which characterized in that includes:
the device comprises two upright posts (1), wherein the two upright posts (1) are arranged at intervals, and a protective net (2) is arranged between the two upright posts (1);
quick detach subassembly, quick detach subassembly sets up the both sides of protection network (2) for to stand (1) with protection network (2) carry out quick dismantlement, quick detach subassembly includes: two installation piece (3), two installation piece (3) fixed mounting respectively are in the both sides of protection network (2), mounting groove (4) have been seted up to the top surface of stand (1), mounting groove (4) with installation piece (3) activity is cup jointed, two spacing groove (5) have been seted up to the top surface of stand (1), the top surface fixed mounting of installation piece (3) has two connecting blocks (6), the bottom surface fixed mounting of connecting block (6) has gag lever post (7), gag lever post (7) with spacing groove (5) activity is cup jointed.
2. The quick-release guardrail for building construction according to claim 1, which is characterized in that: two be provided with first equipment board (8) and second equipment board (11) between stand (1), two joint grooves (10) have been seted up to one side of stand (1), first equipment board (8) with the both sides of second equipment board (11) fixed mounting respectively has joint piece (9), joint piece (9) with joint groove (10) activity is cup jointed.
3. The quick-release guardrail for building construction according to claim 2, characterized in that: a plurality of connecting groove (12) have been seted up to the top surface of second equipment board (11), a plurality of connecting hole (13) have been seted up to the top surface of first equipment board (8), guard bar (14) have been cup jointed in the inside activity of connecting hole (13), guard bar (14) with connecting groove (12) activity is cup jointed.
4. The quick-release guardrail for building construction according to claim 3, wherein: and the top surface of the protective rod (14) is fixedly provided with a spike (15).
5. The quick-release guardrail for building construction according to claim 1, characterized in that: the bottom surface fixed mounting of stand (1) has base (16), a plurality of mounting hole (17) have been seted up to the top surface of base (16), ground nail (18) have been cup jointed in the inside activity of mounting hole (17).
6. The quick-release guardrail for building construction according to claim 1, which is characterized in that: and fluorescent warning boards (19) are respectively and fixedly arranged on two sides of the upright post (1).
7. The quick-release guardrail for building construction according to claim 1, which is characterized in that: the protective net (2) is a hard iron wire net.
CN202222620521.XU 2022-09-30 2022-09-30 Building construction quick detach formula guardrail Active CN218581321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222620521.XU CN218581321U (en) 2022-09-30 2022-09-30 Building construction quick detach formula guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222620521.XU CN218581321U (en) 2022-09-30 2022-09-30 Building construction quick detach formula guardrail

Publications (1)

Publication Number Publication Date
CN218581321U true CN218581321U (en) 2023-03-07

Family

ID=85367772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222620521.XU Active CN218581321U (en) 2022-09-30 2022-09-30 Building construction quick detach formula guardrail

Country Status (1)

Country Link
CN (1) CN218581321U (en)

Similar Documents

Publication Publication Date Title
CN212656515U (en) Adjustable movable scaffold
CN218581321U (en) Building construction quick detach formula guardrail
CN210195199U (en) Assembled climbing frame for building
CN105484570B (en) A kind of hexagonal fence
CN216428959U (en) Assembled building construction platform of conveniently buildding
CN209780174U (en) Scaffold for building construction
CN109853993A (en) A kind of adjustable foundation pit construction stair of regularization
CN220645154U (en) Socket type disc buckle type shaping tripod outer protection frame
CN210217349U (en) Detachable building guardrail
CN214886145U (en) Construction protection device for safety engineering
CN214170161U (en) Fence for construction convenient to dismantle
CN113931354B (en) Cantilever scaffold and curtain wall integrated structure and construction method
CN214463176U (en) Building construction environmental protection foundation ditch guardrail
CN218467311U (en) Simple bare-handed assembled guardrail
CN213063020U (en) Edge protection device is faced in underground continuous wall regularization
CN219386180U (en) Slope protection net for water conservancy
CN212359331U (en) Movable protective fence for building construction
CN217782775U (en) Scaffold for civil engineering construction
CN220849101U (en) Safety guard rail for engineering management
CN216379165U (en) Assembled adjustable support base stone construction protector
CN215564254U (en) Scaffold frame that construction was used
CN210530500U (en) Non-fixed enclosure
CN213626670U (en) Building construction formwork support
CN214943090U (en) Road pit fence protection device
CN219281424U (en) Metal guardrail convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant