CN218569684U - Electric power engineering is with maintenance device that cable laid - Google Patents

Electric power engineering is with maintenance device that cable laid Download PDF

Info

Publication number
CN218569684U
CN218569684U CN202223013522.4U CN202223013522U CN218569684U CN 218569684 U CN218569684 U CN 218569684U CN 202223013522 U CN202223013522 U CN 202223013522U CN 218569684 U CN218569684 U CN 218569684U
Authority
CN
China
Prior art keywords
fixed
driving motor
screw
drive
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223013522.4U
Other languages
Chinese (zh)
Inventor
高震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Tangyi Energy Technology Development Co ltd
Original Assignee
Xi'an Tangyi Energy Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Tangyi Energy Technology Development Co ltd filed Critical Xi'an Tangyi Energy Technology Development Co ltd
Priority to CN202223013522.4U priority Critical patent/CN218569684U/en
Application granted granted Critical
Publication of CN218569684U publication Critical patent/CN218569684U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an electric power engineering is with maintenance device that cable laid relates to electric power engineering technical field, including PMKD, PMKD's top is fixed with the fixed plate, and spacing curb plate is installed to the both sides of fixed plate, and second driving motor is installed to one side of spacing curb plate, and second drive lead screw is installed to one side of second driving motor, and second screw-nut has been cup jointed to the outer wall of second drive lead screw. The utility model is provided with the second driving motor, the second transmission screw rod, the second screw rod nut and the movable slider, thereby driving the fixed hook to move left and right, and facilitating the maintenance of a user; the fixed hook is driven to move up and down by arranging a first driving motor, a first transmission screw rod, a first screw rod nut and a movable slide block; through setting up drive hydraulic cylinder, pneumatic cylinder drive shaft and fixed couple, convenient to use person adjusts the front and back position of cable, conveniently overhauls.

Description

Electric power engineering is with maintenance device that cable laid
Technical Field
The utility model relates to an electric power engineering technical field, in particular to electric power engineering is with maintenance device that cable laid.
Background
Such as the patent: an overhaul device (application number: CN 202220129801.8) for laying cables for power engineering comprises a supporting cylinder, wherein a fixed ejector block is arranged above the inside of the supporting cylinder, the top of the fixed ejector block is fixedly connected with a limiting frame, a supporting rod is arranged inside the limiting frame, and a cable supporting block is fixedly connected to the upper end face of the supporting rod. Through setting up the cable supporting shoe and installing the screw thread bracing piece at a supporting cylinder, when overhauing the cable, place the below of cable with a supporting cylinder, with the cable supporting shoe card at the surface of cable, later rotate the cable supporting shoe, go into spacing frame with the bracing piece card of cable supporting shoe below, spacing frame plays for the spacing effect of bracing piece, the screw thread bracing piece rotates upward movement, drive fixed kicking block, bracing piece and cable supporting shoe simultaneous rebound, until with cable jack-up can, make things convenient for maintenance personal to maintain.
However, the cable to be overhauled can only be jacked up by the cable to be overhauled, the cable to be overhauled cannot be driven to move left and right and back and forth, the overhauling position of a user is limited, the applicability of the device is greatly reduced, and the device is inconvenient for the user to use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering is with overhaul device of cable laying to the cable that can not drive that proposes in solving above-mentioned background art is waited to overhaul and is controlled and the back-and-forth movement, makes user's maintenance position obtain the restriction, thereby makes the device's suitability greatly reduced's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electric power engineering is with cable laying's maintenance device, includes PMKD, PMKD's top is fixed with the fixed plate, spacing curb plate is installed to the both sides of fixed plate, second driving motor is installed to one side of spacing curb plate, second transmission lead screw is installed to one side of second driving motor, second screw-nut has been cup jointed to the outer wall of second transmission lead screw, second screw-nut's outer wall connection has movable slider, through opening second driving motor for second driving motor drives second transmission lead screw and rotates, and then drives under the effect of second transmission lead screw that second screw-nut removes along the outer wall of second transmission lead screw, and second screw-nut drives movable slider and removes simultaneously, thereby drives fixed hook and removes about, is convenient for adjust the left and right positions of waiting to overhaul the cable, and the person of facilitating the use overhauls, the both sides of second transmission lead screw are fixed with the spacing axle, one side of movable slider is connected with the drive case, the inside of drive case is provided with the drive hydraulic cylinder.
Preferably, the top of PMKD is fixed with spacing fixed axle, the installation roof is installed at the top of spacing fixed axle, the installation roof passes through spacing fixed axle to be fixed at the PMKD top, wherein will install the roof at PMKD's top through spacing fixed axle, makes the installation roof more stable through two sets of spacing fixed axles.
Preferably, the top of installation roof is fixed with first driving motor, the mounting groove is installed at the top of installation roof, first driving motor's external diameter size is the same with the internal diameter size of mounting groove, first driving motor pegs graft with the mounting groove, wherein through inserting first driving motor in the mounting groove for first driving motor is stable all the time when the operation, can not rock.
Preferably, the bottom of the first driving motor is connected with a first transmission screw rod, a first screw rod nut is sleeved on the outer wall of the first transmission screw rod, the outer wall of the first screw rod nut is connected with a movable sliding block, the first driving motor and the first transmission screw rod drive the first screw rod nut and the movable sliding block to move up and down along the outer wall of the first transmission screw rod in a straight line mode, the first driving screw rod is driven to rotate by opening the first driving motor, and then the first screw rod nut is driven to move up and down along the outer wall of the first transmission screw rod in a straight line mode under the effect of the first transmission screw rod, so that the movable sliding block is driven to move up and down.
Preferably, the second driving motor and the second transmission screw rod drive the second screw rod nut and the movable sliding block to move left and right along the straight line of the outer wall of the second transmission screw rod, wherein the second driving motor is started to drive the second transmission screw rod to rotate, so that the second screw rod nut is driven to move left and right along the straight line of the outer wall of the second transmission screw rod under the action of the second transmission screw rod, and the second screw rod nut drives the movable sliding block to move left and right along the straight line of the outer wall of the second transmission screw rod.
Preferably, a mounting bolt is installed on one side, close to the movable sliding block, of the driving box, the driving box is fixedly connected with the movable sliding block through the mounting bolt, the driving box is fixed with the movable sliding block through the mounting bolt, and then the driving box can be driven to move left and right through the movable sliding block.
Preferably, the pneumatic cylinder drive shaft is installed to one side of drive pneumatic cylinder, the one end of pneumatic cylinder drive shaft is connected with fixed couple, drive pneumatic cylinder and pneumatic cylinder drive shaft drive fixed couple front and back horizontal migration, wherein through opening drive pneumatic cylinder for the pneumatic cylinder drive shaft drives fixed couple front and back horizontal migration, and then can adjust fixed couple front and back horizontal distance, and convenient to use person adjusts the front and back position of cable, conveniently overhauls.
The utility model discloses a technological effect and advantage:
1. through the arrangement of the second driving motor, the second transmission screw rod, the second screw rod nut and the movable sliding block, the second driving motor is started to drive the second transmission screw rod to rotate, so that the second screw rod nut is driven to move left and right along the outer wall of the second transmission screw rod under the action of the second transmission screw rod, and meanwhile, the second screw rod nut drives the movable sliding block to move left and right, so that the fixed hook is driven to move left and right, the left and right positions of a cable to be overhauled are convenient to adjust, and a user can conveniently overhaul;
2. by arranging the first driving motor, the first transmission screw rod, the first screw rod nut and the movable sliding block, the first driving motor is turned on to drive the first transmission screw rod to rotate, so that the first screw rod nut is driven to move up and down along the outer wall of the first transmission screw rod under the action of the first transmission screw rod, the movable sliding block is driven to move up and down simultaneously, the fixed hook is driven to move up and down, and a user can conveniently hang cables to be overhauled at different heights;
3. through setting up drive hydraulic cylinder, pneumatic cylinder drive shaft and fixed couple, thereby drive the flexible removal of pneumatic cylinder drive shaft through opening drive hydraulic cylinder, and then can adjust the horizontal distance around fixed couple, convenient to use person adjusts the front and back position of cable, conveniently overhauls.
Drawings
Fig. 1 is the utility model relates to an electric power engineering is with cable laying's maintenance device's overall structure schematic diagram.
Fig. 2 is the utility model discloses an enlarged schematic diagram of a department's structure in fig. 1 of the maintenance device that power engineering used cable laying.
Fig. 3 is a schematic view of the overhead structure of the maintenance device for laying cables in power engineering.
Fig. 4 is the utility model relates to a power engineering is with maintenance device's of cable laying overlook structure schematic diagram.
Fig. 5 is the utility model relates to an electric power engineering is with the explosion structure schematic diagram of the maintenance device that cable laid.
In the figure: 1. fixing a bottom plate; 2. a limiting fixed shaft; 3. installing a top plate; 4. a first drive motor; 5. mounting grooves; 6. a first drive screw; 7. a first lead screw nut; 8. moving the slide block; 9. a fixing plate; 10. a limiting side plate; 11. a second drive motor; 12. a second drive screw; 13. a second feed screw nut; 14. a movable slide block; 15. a limiting shaft; 16. a drive box; 17. installing a bolt; 18. driving the hydraulic cylinder; 19. a hydraulic cylinder drive shaft; 20. and (5) fixing the hook.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a maintenance device that cable laid for power engineering as shown in fig. 1-5, including PMKD 1, PMKD 1's top is fixed with fixed plate 9, spacing curb plate 10 is installed to the both sides of fixed plate 9, second driving motor 11 is installed to one side of spacing curb plate 10, second transmission lead screw 12 is installed to one side of second driving motor 11, second screw-nut 13 has been cup jointed to the outer wall of second transmission lead screw 12, the outer wall connection of second screw-nut 13 has movable slider 14, through opening second driving motor 11, make second driving motor 11 drive second transmission lead screw 12 and rotate, and then drive second screw-nut 13 and control along the outer wall of second transmission lead screw 12 under the effect of second transmission lead screw 12, second screw-nut 13 drives movable slider 14 and controls the removal simultaneously, thereby drive fixed hook 20 and control the removal, be convenient for the adjustment and wait to overhaul the left right side position of cable, the person of facilitating the use overhauls, the both sides of second transmission lead screw 12 are fixed with spacing axle 15, one side drive box 16 of slider 14 is connected with, the inside of drive box 16 is provided with the drive hydraulic cylinder 18.
The top of PMKD 1 is fixed with spacing fixed axle 2, and installation roof 3 is installed at the top of spacing fixed axle 2, and installation roof 3 is fixed at PMKD 1 top through spacing fixed axle 2, wherein will install roof 3 through spacing fixed axle 2 and install at PMKD 1's top, makes installation roof 3 more stable through two sets of spacing fixed axles 2.
The top of installation roof 3 is fixed with first driving motor 4, and mounting groove 5 is installed at the top of installation roof 3, and the external diameter of first driving motor 4 is the same with the internal diameter of mounting groove 5 size, and first driving motor 4 pegs graft with mounting groove 5, wherein through inserting first driving motor 4 in mounting groove 5 for first driving motor 4 is stable all the time when the operation, can not rock.
The bottom of first driving motor 4 is connected with first transmission lead screw 6, first lead screw nut 7 has been cup jointed to the outer wall of first transmission lead screw 6, the outer wall connection of first lead screw nut 7 has removal slider 8, first driving motor 4 drives first lead screw nut 7 and removes slider 8 and reciprocates along the outer wall straight line of first transmission lead screw 6 with first transmission lead screw 6, wherein through opening first driving motor 4, drive first transmission lead screw 6 and rotate, and then make first lead screw nut 7 under the effect of first transmission lead screw 6, linear motion about the outer wall of first transmission lead screw 6, thereby it reciprocates to drive removal slider 8.
The second driving motor 11 and the second transmission screw rod 12 drive the second screw nut 13 and the movable slider 14 to move left and right along the straight line of the outer wall of the second transmission screw rod 12, wherein the second driving motor 11 is opened to drive the second driving motor 11 to drive the second transmission screw rod 12 to rotate, so that the second screw nut 13 is driven to move left and right along the straight line of the outer wall of the second transmission screw rod 12 under the action of the second transmission screw rod 12, and the second screw nut 13 is driven to move the movable slider 14 to move left and right along the straight line.
The driving box 16 is provided with a mounting bolt 17 at one side close to the movable sliding block 14, the driving box 16 is fixedly connected with the movable sliding block 14 through the mounting bolt 17, wherein the driving box 16 is fixed with the movable sliding block 14 through the mounting bolt 17, and further the driving box 16 can be driven to move left and right through the movable sliding block 14.
Pneumatic cylinder drive shaft 19 is installed to one side of drive pneumatic cylinder 18, the one end of pneumatic cylinder drive shaft 19 is connected with fixed couple 20, drive pneumatic cylinder 18 and pneumatic cylinder drive shaft 19 drive fixed couple 20 front and back horizontal migration, wherein through opening drive pneumatic cylinder 18 for pneumatic cylinder drive shaft 19 drives fixed couple 20 front and back horizontal migration, and then can adjust fixed couple 20 front and back horizontal distance, convenient to use person adjusts the front and back position of cable, conveniently overhauls.
The working principle is as follows: this a during maintenance device that power engineering used cable laid uses, the user is through opening a driving motor 4, thereby drive first transmission lead screw 6 and rotate, and then drive first screw-nut 7 along the outer wall up-and-down motion of first transmission lead screw 6 under the effect of first transmission lead screw 6, thereby it reciprocates to drive removal slider 8 simultaneously, and then drive fixed couple 20 and reciprocate, make things convenient for fixed couple 20 can hang the cable of waiting to overhaul of co-altitude not, after fixed couple 20 will wait to overhaul the cable and hang, can be according to user's maintenance environment, adjust fixed couple 20 around the position: through opening second driving motor 11, make second driving motor 11 drive second transmission lead screw 12 and rotate, and then drive second screw-nut 13 and control along the outer wall of second transmission lead screw 12 under the effect of second transmission lead screw 12, second screw-nut 13 drives movable slide 14 and controls simultaneously, thereby drive fixed couple 20 and control, thereby drive pneumatic cylinder drive shaft 19 telescopic movement through opening drive pneumatic cylinder 18, and then can adjust the horizontal distance around fixed couple 20, the person of facilitating the use adjusts the fore-and-aft position of cable, conveniently overhaul, the regulatory function of this maintenance device that electric power engineering used cable to lay has been realized.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides an electric power engineering is with overhaul device that cable laying, includes PMKD (1), its characterized in that: the top of PMKD (1) is fixed with fixed plate (9), spacing curb plate (10) are installed to the both sides of fixed plate (9), second driving motor (11) are installed to one side of spacing curb plate (10), second transmission lead screw (12) are installed to one side of second driving motor (11), second screw-nut (13) have been cup jointed to the outer wall of second transmission lead screw (12), the outer wall connection of second screw-nut (13) has movable slider (14), the both sides of second transmission lead screw (12) are fixed with spacing axle (15), one side of movable slider (14) is connected with drive case (16), the inside of drive case (16) is provided with drive hydraulic cylinder (18).
2. An inspection device for cabling in power engineering according to claim 1, wherein: the top of PMKD (1) is fixed with spacing fixed axle (2), installation roof (3) are installed at the top of spacing fixed axle (2), installation roof (3) are fixed at PMKD (1) top through spacing fixed axle (2).
3. An inspection device for cabling in power engineering according to claim 2, wherein: the top of erection roof (3) is fixed with first driving motor (4), mounting groove (5) are installed at the top of erection roof (3), the external diameter size of first driving motor (4) is the same with the internal diameter size of mounting groove (5), first driving motor (4) are pegged graft with mounting groove (5).
4. An inspection device for cabling in power engineering according to claim 3, wherein: the bottom of first driving motor (4) is connected with first transmission lead screw (6), first screw-nut (7) have been cup jointed to the outer wall of first transmission lead screw (6), the outer wall connection of first screw-nut (7) has removal slider (8), first driving motor (4) and first transmission lead screw (6) drive first screw-nut (7) and remove slider (8) and reciprocate along the outer wall straight line of first transmission lead screw (6).
5. The overhaul device for laying cables for power engineering according to claim 1, wherein: the second driving motor (11) and the second transmission screw rod (12) drive the second screw rod nut (13) and the movable sliding block (14) to move left and right along the straight line of the outer wall of the second transmission screw rod (12).
6. An inspection device for cabling in power engineering according to claim 1, wherein: and a mounting bolt (17) is installed on one side of the driving box (16) close to the movable sliding block (14), and the driving box (16) is fixedly connected with the movable sliding block (14) through the mounting bolt (17).
7. An inspection device for cabling in power engineering according to claim 1, wherein: a hydraulic cylinder driving shaft (19) is installed on one side of the driving hydraulic cylinder (18), one end of the hydraulic cylinder driving shaft (19) is connected with a fixed hook (20), and the driving hydraulic cylinder (18) and the hydraulic cylinder driving shaft (19) drive the fixed hook (20) to horizontally move front and back.
CN202223013522.4U 2022-11-11 2022-11-11 Electric power engineering is with maintenance device that cable laid Active CN218569684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223013522.4U CN218569684U (en) 2022-11-11 2022-11-11 Electric power engineering is with maintenance device that cable laid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223013522.4U CN218569684U (en) 2022-11-11 2022-11-11 Electric power engineering is with maintenance device that cable laid

Publications (1)

Publication Number Publication Date
CN218569684U true CN218569684U (en) 2023-03-03

Family

ID=85324395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223013522.4U Active CN218569684U (en) 2022-11-11 2022-11-11 Electric power engineering is with maintenance device that cable laid

Country Status (1)

Country Link
CN (1) CN218569684U (en)

Similar Documents

Publication Publication Date Title
CN205489296U (en) Swift pay off rack of secondary cable
CN218569684U (en) Electric power engineering is with maintenance device that cable laid
CN110295762A (en) Construction walling robot
CN200949308Y (en) Wall plastering machine
CN212176505U (en) Novel adjustable safety fixing type hanging basket for construction
CN2641206Y (en) Plastering machine for whitewashing wall
CN211123295U (en) Underwater acoustic detection regulation and control device
CN211681829U (en) Crane part installation auxiliary device convenient to accurate butt joint
CN209275621U (en) A kind of high quick change case equipment
CN100526580C (en) Wall plastering machine
CN212982304U (en) Adjustable base support mechanism for tower crane
CN212278051U (en) Lifting base for pumping unit motor
CN201065635Y (en) Simple wall surface plastering machine
CN218320156U (en) Support frame for building erection engineering
CN218643789U (en) External wall insulation decorates intergral template construction erection equipment
CN216472910U (en) Glass surface etching device
CN2099154U (en) Wall rendering machine
CN219079029U (en) Automatic lifting platform device for maintaining power transmission line
CN218472622U (en) Pulley for overhauling high-voltage transmission line
CN216665062U (en) Intelligent beam plate tensioning machine
CN219259501U (en) Large-scale electromechanical device maintenance and overhaul device
CN219263607U (en) Equipment shock attenuation installation base
CN211597583U (en) Plastering device applied to building decoration
CN219652590U (en) Ceiling hoisting device
CN212558390U (en) Servo control module device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A maintenance device for cable laying in power engineering

Effective date of registration: 20230605

Granted publication date: 20230303

Pledgee: Xi'an Lianhu Credit Financing Guarantee Co.,Ltd.

Pledgor: Xi'an Tangyi Energy Technology Development Co.,Ltd.

Registration number: Y2023980042939

PE01 Entry into force of the registration of the contract for pledge of patent right