CN205489296U - Swift pay off rack of secondary cable - Google Patents

Swift pay off rack of secondary cable Download PDF

Info

Publication number
CN205489296U
CN205489296U CN201620199424.XU CN201620199424U CN205489296U CN 205489296 U CN205489296 U CN 205489296U CN 201620199424 U CN201620199424 U CN 201620199424U CN 205489296 U CN205489296 U CN 205489296U
Authority
CN
China
Prior art keywords
pulley
side plate
cable
horizontal
shaped card
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620199424.XU
Other languages
Chinese (zh)
Inventor
戴鹏
刘宏伟
王健
刘扬
姚小平
孙涛
晁欣
许文峰
过强
李小洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Liaoning Electric Power Co Ltd
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Mengcheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Liaoning Electric Power Co Ltd
Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Mengcheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Liaoning Electric Power Co Ltd, Bozhou Power Supply Co of State Grid Anhui Electric Power Co Ltd, Mengcheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Liaoning Electric Power Co Ltd
Priority to CN201620199424.XU priority Critical patent/CN205489296U/en
Application granted granted Critical
Publication of CN205489296U publication Critical patent/CN205489296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pulleys (AREA)

Abstract

本实用新型公开了二次电缆快捷放线架,其特征是设置呈直立的、开口朝上的“U”型滑轮支架,在“U”型滑轮支架上利用一上一下呈水平设置的两根轮轴一一对应安装上滑轮和下滑轮,上滑轮和下滑轮分别在各自的轮轴上可以转动,电缆在由上滑轮和下滑轮构成的线槽中走线;设置一开口朝向一侧的卧式“U”形卡,以卧式“U”形卡将放线架卡固在电缆支架上,并由螺栓固定。本实用新型能有效地保护电缆不受损,使放线过程快捷简便,提高工效。

The utility model discloses a quick pay-off frame for secondary cables, which is characterized in that an upright "U"-shaped pulley bracket with an upward opening is arranged, and two horizontally arranged upper and lower pulley brackets are used on the "U"-shaped pulley bracket. The upper pulley and the lower pulley are installed on the axles one by one. The upper pulley and the lower pulley can rotate on their respective axles, and the cables are routed in the wire groove formed by the upper pulley and the lower pulley; set a horizontal pulley with an opening facing one side "U"-shaped card, the pay-off frame is fixed on the cable support with a horizontal "U"-shaped card, and fixed by bolts. The utility model can effectively protect the cable from being damaged, makes the process of setting out the wire quick and easy, and improves work efficiency.

Description

二次电缆快捷放线架Secondary cable fast release rack

技术领域 technical field

本实用新型涉及电缆放线架,更具体地说尤其是应用在二次电缆敷设作业中的电缆放线架。 The utility model relates to a cable pay-off stand, more specifically a cable pay-off stand used in secondary cable laying operations.

背景技术 Background technique

在电力检修和维护过程,常常涉及到二次电缆的敷设。二次电缆敷设作业要求很高,实际作业存在着各种问题:包括电缆沟或电缆通道转角多、作业位置狭窄不便操作、电缆数量多整理困难、电缆困扎难度大,同时由于电缆拉伸强度低、其外部保护薄弱,很容易在敷设中受外力损坏,由此造成二次电缆敷设工作量很大。 In the process of power overhaul and maintenance, the laying of secondary cables is often involved. The secondary cable laying operation is very demanding, and there are various problems in the actual operation: including many cable trenches or cable channel corners, narrow working position and inconvenient operation, difficulty in arranging a large number of cables, and difficulty in cable entrapment. Low, its external protection is weak, and it is easy to be damaged by external force during laying, which results in a heavy workload for secondary cable laying.

目前,实际施工中,对于二次电缆敷设多采用N+2的模式,也就是在电缆沟的每个转角需要安排一名操作人员,并在首尾两端各安排一名操作人员,这使得二次电缆敷设的过程所需大量的操作人员,对于常规的变电布置方式,完成一次二次电缆敷设往往需要5-6人,并且需要两天以上的工作时间。 At present, in the actual construction, the N+2 mode is mostly used for the secondary cable laying, that is, one operator needs to be arranged at each corner of the cable trench, and one operator is arranged at each end of the cable trench, which makes the two The process of secondary cable laying requires a large number of operators. For the conventional substation arrangement, it often takes 5-6 people to complete a secondary cable laying, and it takes more than two days of working time.

实用新型内容 Utility model content

本实用新型是为避免上述现有技术所存在的不足之处,提供一种二次电缆快捷放线架,使得在二次电缆的敷设过程中,既能有效地保护电缆不受损,又能使放线过程快捷简便,减少人员配备,提高工作效率。 The utility model is to avoid the disadvantages of the above-mentioned prior art, and provides a secondary cable quick pay-off frame, so that during the laying process of the secondary cable, the cable can be effectively protected from damage, and the Make the pay-off process quick and easy, reduce staffing and improve work efficiency.

本实用新型为解决技术问题采用如下技术方案: The utility model adopts following technical scheme for solving technical problems:

本实用新型二次电缆快捷放线架的结构特点是:设置一呈直立的、开口朝上的“U”型滑轮支架,在所述“U”型滑轮支架上利用一上一下呈水平设置的两根轮轴,在所述两根轮轴上一一对应安装有上滑轮和下滑轮,所述上滑轮和下滑轮分别在各自的轮轴上可以转动,电缆在由所述上滑轮和下滑轮构成的线槽中走线;设置一开口朝向一侧的卧式“U”形卡,在所述卧式“U”形卡的底板上贯穿设置有螺栓,以所述卧式“U”形卡卡固在电缆支架上,并由所述螺栓将所述卧式“U”形卡可拆式固定在电缆支架上;在所述卧式“U”形卡的顶板上设置有轴承,所述“U”型滑轮支架支撑在所述轴承上,并可在所述轴承上转动。 The structural features of the utility model secondary cable fast pay-off rack are as follows: set up an upright "U" type pulley bracket with the opening facing upwards, and use one up and one down horizontally set up on the "U" type pulley bracket. Two axles, upper pulleys and lower pulleys are installed correspondingly on the two axles, and the upper pulleys and lower pulleys are respectively rotatable on their respective axles. Wires are routed in the wire groove; a horizontal "U"-shaped card with an opening facing one side is provided, and bolts are installed through the bottom plate of the horizontal "U"-shaped card, so that the horizontal "U"-shaped card can It is fixed on the cable bracket, and the horizontal "U"-shaped card is detachably fixed on the cable bracket by the bolt; a bearing is arranged on the top plate of the horizontal "U"-shaped card, and the " The U" type pulley support is supported on the bearing and can rotate on the bearing.

本实用新型二次电缆快捷放线架的结构特点也在于:所述“U”型滑轮支架中构成支架的两侧板中的任意一侧板是由分体设置的上侧板和下侧板,并在所述上侧板和下侧板之间以铰链相连接,使所述上侧板能够在所述铰链上向外侧翻转,所述上滑轮的轮轴支承在所述上侧板上,所述下滑轮的轴轮支承在所述下侧板上。 The structural feature of the secondary cable quick pay-off frame of the utility model is also that: any side plate in the two side plates constituting the support in the "U" type pulley bracket is an upper side plate and a lower side plate arranged separately. , and are connected by a hinge between the upper side plate and the lower side plate, so that the upper side plate can turn outward on the hinge, and the axle of the upper pulley is supported on the upper side plate, The shaft wheel of the lower pulley is supported on the lower side plate.

与已有技术相比,本实用新型有益效果体现在: Compared with the prior art, the beneficial effects of the utility model are reflected in:

1、本实用新型利用双滑轮使得在二次电缆放线作业中对于电缆有很好的保护,避免放线 过程电缆受损; 1. The utility model uses double pulleys to protect the cables well during the secondary cable pay-off operation, avoiding damage to the cables during the pay-out process;

2、本实用新型中双滑轮以及轴承的设置能满足电缆上向、下向以及各角度上的走向要求。 2. The arrangement of double pulleys and bearings in the utility model can meet the requirements of the upward, downward and various angles of the cables.

3、本实用新型中利用双滑轮对缆线进行限位,使缆线在敷设过程中同时得到整理,捆扎过程也更加快捷方便。 3. In the utility model, double pulleys are used to limit the position of the cables, so that the cables can be tidied up during the laying process, and the bundling process is also faster and more convenient.

4、本实用新型使用可以极大地减少人力,提高工效。 4. The utility model can greatly reduce manpower and improve work efficiency.

附图说明 Description of drawings

图1为本实用新型结构示意图; Fig. 1 is the structural representation of the utility model;

具体实施方式 detailed description

参见图1,本实施例中二次电缆快捷放线架的结构形式是: Referring to Fig. 1, the structural form of the secondary cable quick pay-off rack in the present embodiment is:

设置一呈直立的、开口朝上的“U”型滑轮支架1,在“U”型滑轮支架1上利用一上一下呈水平设置的两根轮轴,在两根轮轴上一一对应安装有上滑轮2和下滑轮3,上滑轮2和下滑轮3分别在各自的轮轴上可以转动,电缆是在由上滑轮2和下滑轮3构成的封闭的轮槽中走线,以封闭的轮槽为线槽4,保证了电缆不会自线槽4中滑脱。采用开口朝上的“U”型滑轮支架,其能承受侧向力、开合操作方便、紧固性好;双滑轮结构使缆线在上向和下向均能使到保护和导向,减小摩擦力。 An upright "U" type pulley support 1 with an opening facing upwards is set. On the "U" type pulley support 1, two wheel shafts that are horizontally arranged one above the other are utilized, and upper and lower shafts are installed on the two wheel shafts in one-to-one correspondence. The pulley 2 and the lower pulley 3, the upper pulley 2 and the lower pulley 3 can rotate on their respective axles respectively, and the cable is routed in the closed wheel groove formed by the upper pulley 2 and the lower pulley 3, with the closed wheel groove as the The wire slot 4 ensures that the cables will not slip off from the wire slot 4. The "U" pulley bracket with the opening facing upwards is adopted, which can withstand lateral force, is convenient to open and close, and has good fastening performance; the double pulley structure enables the cables to be protected and guided in both upward and downward directions, reducing little friction.

设置一开口朝向一侧的卧式“U”形卡,在卧式“U”形卡的底板5a上贯穿设置有螺栓6;使用时,以卧式“U”形卡的“U”形口卡固在电缆支架上,并由螺栓6将卧式“U”形卡可拆式固定在电缆支架上,这一在电缆支架上进行固定的结构形式使得在完成布线后,即可直接将电缆捆扎在电缆支架上,布线与捆扎同步完成;在卧式“U”形卡的顶板5b上设置有轴承7,“U”型滑轮支架1支撑在轴承7上,并可在轴承7上转动,以使由上滑轮2和下滑轮3构成的双滑轮线槽能够随着缆线的走向随意转动,轴承结构不仅保证其在水平方向上转动灵活,并且稳固性好。 Set a horizontal "U"-shaped card with an opening facing one side, and a bolt 6 is installed on the bottom plate 5a of the horizontal "U"-shaped card; It is clamped on the cable bracket, and the horizontal "U"-shaped card is detachably fixed on the cable bracket by the bolt 6. This structural form of fixing on the cable bracket allows the cable to be directly connected after the wiring is completed. Bundled on the cable bracket, the wiring and bundling are completed synchronously; a bearing 7 is set on the top plate 5b of the horizontal "U"-shaped card, and the "U"-shaped pulley bracket 1 is supported on the bearing 7 and can rotate on the bearing 7. So that the double pulley slot formed by the upper pulley 2 and the lower pulley 3 can freely rotate along with the direction of the cable, and the bearing structure not only ensures that it can rotate flexibly in the horizontal direction, but also has good stability.

为了便于滑轮在“U”型滑轮支架上的装配,将“U”型滑轮支架1中构成支架的两侧板中的任意一侧板是由分体设置的上侧板1a和下侧板1b,并在上侧板1a和下侧板1b之间以铰链1c相连接,使上侧板1a能够在铰链1c上向外侧翻转,上滑轮2的轮轴支承在上侧板1a上,下滑轮3的轴轮支承在下侧板1b上。 In order to facilitate the assembly of the pulley on the "U" type pulley bracket, any one side plate in the two side plates constituting the bracket in the "U" type pulley bracket 1 is an upper side plate 1a and a lower side plate 1b which are separately provided. , and between the upper side plate 1a and the lower side plate 1b are connected with a hinge 1c, so that the upper side plate 1a can turn outward on the hinge 1c, the axle of the upper pulley 2 is supported on the upper side plate 1a, and the lower pulley 3 The shaft wheel is supported on the lower side plate 1b.

在安装上滑轮2时,首先将上侧板1a向外侧翻转,使“U”型滑轮支架1的“U”形口打开得更大,随后再安装上滑轮2,这一过程操作极为方便且快捷。 When installing the upper pulley 2, first turn the upper side plate 1a to the outside, so that the "U" opening of the "U" type pulley bracket 1 is opened larger, and then the upper pulley 2 is installed. This process is very convenient to operate and fast.

具体实施中,上滑轮2和下滑轮3是采用尼龙材质,利用尼龙棒加工而成,其质轻、强度高、耐磨、摩擦阻力小,不易损伤电缆。 In specific implementation, the upper pulley 2 and the lower pulley 3 are made of nylon material and processed from nylon rods, which are light in weight, high in strength, wear-resistant and small in frictional resistance, and are not easy to damage cables.

Claims (2)

1.二次电缆快捷放线架,其特征是:设置一呈直立的、开口朝上的“U”型滑轮支架(1),在所述“U”型滑轮支架(1)上利用一上一下呈水平设置的两根轮轴,在所述两根轮轴上一一对应安装有上滑轮(2)和下滑轮(3),所述上滑轮(2)和下滑轮(3)分别在各自的轮轴上可以转动,电缆在由所述上滑轮(2)和下滑轮(3)构成的线槽(4)中走线;设置一开口朝向一侧的卧式“U”形卡,在所述卧式“U”形卡的底板(5a)上贯穿设置有螺栓(6),以所述卧式“U”形卡卡固在电缆支架上,并由所述螺栓(6)将所述卧式“U”形卡可拆式固定在电缆支架上;在所述卧式“U”形卡的顶板(5b)上设置有轴承(7),所述“U”型滑轮支架(1)支撑在所述轴承(7)上,并可在所述轴承(7)上转动。 1. Secondary cable fast pay-off rack, it is characterized in that: set up an upright "U" type pulley support (1) with the opening facing upwards, use a top on the "U" type pulley support (1) The following are two wheel shafts that are horizontally arranged, and an upper pulley (2) and a lower pulley (3) are installed in one-to-one correspondence on the two wheel shafts, and the upper pulley (2) and the lower pulley (3) are respectively on the respective The axle can be rotated, and the cable is routed in the wire groove (4) formed by the upper pulley (2) and the lower pulley (3); a horizontal "U" shaped card with an opening facing one side is set, and the Bolts (6) are provided through the bottom plate (5a) of the horizontal "U"-shaped card, and the horizontal "U"-shaped card is fixed on the cable support, and the horizontal "U"-shaped The "U"-shaped card is detachably fixed on the cable bracket; a bearing (7) is arranged on the top plate (5b) of the horizontal "U"-shaped card, and the "U"-shaped pulley bracket (1) supports on the bearing (7) and can rotate on the bearing (7). 2.根据权利要求1所述的二次电缆快捷放线架,其特征是:所述“U”型滑轮支架(1)中构成支架的两侧板中的任意一侧板是由分体设置的上侧板(1a)和下侧板(1b),并在所述上侧板(1a)和下侧板(1b)之间以铰链(1c)相连接,使所述上侧板(1a)能够在所述铰链(1c)上向外侧翻转,所述上滑轮(2)的轮轴支承在所述上侧板(1a)上,所述下滑轮(3)的轴轮支承在所述下侧板(1b)上。 2. The quick pay-off rack for secondary cables according to claim 1, characterized in that: any side plate in the two side plates constituting the support in the "U" type pulley bracket (1) is provided by a split The upper side plate (1a) and the lower side plate (1b) are connected with the hinge (1c) between the upper side plate (1a) and the lower side plate (1b), so that the upper side plate (1a ) can turn outward on the hinge (1c), the axle of the upper pulley (2) is supported on the upper side plate (1a), and the axle wheel of the lower pulley (3) is supported on the lower on the side panel (1b).
CN201620199424.XU 2016-03-14 2016-03-14 Swift pay off rack of secondary cable Expired - Fee Related CN205489296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620199424.XU CN205489296U (en) 2016-03-14 2016-03-14 Swift pay off rack of secondary cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620199424.XU CN205489296U (en) 2016-03-14 2016-03-14 Swift pay off rack of secondary cable

Publications (1)

Publication Number Publication Date
CN205489296U true CN205489296U (en) 2016-08-17

Family

ID=56656628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620199424.XU Expired - Fee Related CN205489296U (en) 2016-03-14 2016-03-14 Swift pay off rack of secondary cable

Country Status (1)

Country Link
CN (1) CN205489296U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105790164A (en) * 2016-03-14 2016-07-20 国网安徽省电力公司亳州供电公司 Quick pay-off rack of secondary cable
CN106410728A (en) * 2016-10-25 2017-02-15 国网山东省电力公司莱芜供电公司 Cable duct well and method for laying cables by using the same
CN106655010A (en) * 2017-03-14 2017-05-10 荆门创佳机械科技有限公司 Improved cable laying device
CN106711868A (en) * 2017-03-13 2017-05-24 荆门创佳机械科技有限公司 Cable laying device
CN107959262A (en) * 2017-12-26 2018-04-24 国网山东省电力公司蓬莱市供电公司 A kind of power scheduling power grid construction stretching machine
CN108092189A (en) * 2017-12-26 2018-05-29 柳州高新区欧亚自动化设备有限责任公司 Curved line frame
CN109052071A (en) * 2018-07-02 2018-12-21 合肥瀚翔智能科技有限公司 It is a kind of for being tethered at the bus cable device of unmanned plane hawser folding and unfolding
CN111872952A (en) * 2020-07-17 2020-11-03 国网山东省电力公司栖霞市供电公司 High tension transmission line walks line robot
CN119000893A (en) * 2024-10-23 2024-11-22 上海同济检测技术有限公司 Closed rail type pulley device for detecting pile body integrity by ultrasonic method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105790164A (en) * 2016-03-14 2016-07-20 国网安徽省电力公司亳州供电公司 Quick pay-off rack of secondary cable
CN106410728A (en) * 2016-10-25 2017-02-15 国网山东省电力公司莱芜供电公司 Cable duct well and method for laying cables by using the same
CN106711868A (en) * 2017-03-13 2017-05-24 荆门创佳机械科技有限公司 Cable laying device
CN106655010A (en) * 2017-03-14 2017-05-10 荆门创佳机械科技有限公司 Improved cable laying device
CN107959262A (en) * 2017-12-26 2018-04-24 国网山东省电力公司蓬莱市供电公司 A kind of power scheduling power grid construction stretching machine
CN108092189A (en) * 2017-12-26 2018-05-29 柳州高新区欧亚自动化设备有限责任公司 Curved line frame
CN109052071A (en) * 2018-07-02 2018-12-21 合肥瀚翔智能科技有限公司 It is a kind of for being tethered at the bus cable device of unmanned plane hawser folding and unfolding
CN111872952A (en) * 2020-07-17 2020-11-03 国网山东省电力公司栖霞市供电公司 High tension transmission line walks line robot
CN119000893A (en) * 2024-10-23 2024-11-22 上海同济检测技术有限公司 Closed rail type pulley device for detecting pile body integrity by ultrasonic method

Similar Documents

Publication Publication Date Title
CN205489296U (en) Swift pay off rack of secondary cable
CN202423974U (en) Crossing support for overhead lines
CN203942204U (en) The live line working of a kind of 35kV supply line is carried line apparatus with insulation
CN206820364U (en) Special tools for power distribution lines
CN203312712U (en) Secondary cable laying corner support
CN105790164A (en) Quick pay-off rack of secondary cable
CN204205436U (en) Horizontal crane span structure inner cable laying apparatu
CN210825253U (en) A material hoist for construction engineering
CN208964436U (en) A kind of small members promotion lifting apparatus
CN204002494U (en) The groove separation preventing device of flexible gate lifting wire rope
CN103398221B (en) Parallel bundled cable normalizer
CN105811301B (en) The insulation of the 35kV supply lines livewire work of low cost carries line apparatus
CN215516109U (en) Multifunctional cable laying device
CN205791248U (en) A kind of power construction cable traction device
CN104377603A (en) Device for laying cables in horizontal cable trays and application method of device
CN214046942U (en) Portable tree inversion control tool
CN208890224U (en) A kind of electric hoist for the walking of single transmission pressure
CN202488076U (en) Two-way cable pulley
CN202897913U (en) Vertically craning device capable enabling lifting lug to move in horizontal direction
CN208142715U (en) A kind of cable pay-off rack
CN206023034U (en) A kind of collection bunch side of returning device
CN213602378U (en) Novel electric power fitting strain clamp
CN205491501U (en) Device convenient to regulator cubicle removes
CN202949198U (en) Paying-off pulley for cable overhead installation
CN217444933U (en) Auxiliary trolley for laying horizontal bridge cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817