CN218562970U - Construction is with scaffold frame of encorbelmenting - Google Patents

Construction is with scaffold frame of encorbelmenting Download PDF

Info

Publication number
CN218562970U
CN218562970U CN202222838766.XU CN202222838766U CN218562970U CN 218562970 U CN218562970 U CN 218562970U CN 202222838766 U CN202222838766 U CN 202222838766U CN 218562970 U CN218562970 U CN 218562970U
Authority
CN
China
Prior art keywords
round hole
connecting rod
guidance tape
scaffold
picture peg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222838766.XU
Other languages
Chinese (zh)
Inventor
伍建飞
李姗珊
卢向学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongye Construction Engineering Co ltd
Original Assignee
Hunan Haoyu Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Haoyu Construction Co ltd filed Critical Hunan Haoyu Construction Co ltd
Priority to CN202222838766.XU priority Critical patent/CN218562970U/en
Application granted granted Critical
Publication of CN218562970U publication Critical patent/CN218562970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a scaffold frame of encorbelmenting for construction relates to construction scaffold technical field, include building wall and walk the guidance tape, building wall's inside is connected with the one end of crossbeam, the lug is installed in the upper surface integration of crossbeam, first round hole has been seted up on the surface of lug, the picture peg has been inlayed to the inside of spacing groove, the connecting rod has been run through to the inside of second round hole, the cap has been connect soon in the outside of screw thread, it is located the upper end of picture peg to walk the guidance tape, the internally mounted of standing groove has the sucking disc. The utility model discloses be provided with lug, spacing groove, first round hole, picture peg, second round hole, connecting rod, screw thread and cap, pass the connecting rod from first round hole and second round hole are inside for the connecting rod runs through a plurality of lugs and picture peg, and both ends around the connecting rod are screwed up to the cap, makes to walk the guidance tape and fixes on the crossbeam, and this item sets up the use that can reduce the screw, reduces the installation degree of difficulty of guidance tape, makes to walk the guidance tape installation more convenient.

Description

Construction is with scaffold frame of encorbelmenting
Technical Field
The utility model relates to a construction scaffolding technical field specifically is a scaffold frame of encorbelmenting for construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging scaffold, the formula scaffold of encorbelmenting, climb formula scaffold, the scaffold of encorbelmenting etc. the formula scaffold of encorbelmenting utilizes the structure of encorbelmenting that the building structure edge outwards stretches out to support outer scaffold, transmits the whole or part of load of scaffold for building structure. The cantilevered support structure of the cantilevered scaffold must have sufficient strength, stability and rigidity to transfer the load of the scaffold to the building structure.
Walk guidance tape and support as primary structure in the scaffold frame of encorbelmenting now, it needs to use a large amount of bolts usually to assemble between guidance tape and the support, every tie point all uses the bolt fastening, the use of a large amount of bolts leads to walking guidance tape and support assembling process loaded down with trivial details, it is simple and efficient not enough, secondly when the staff moves on walking guidance tape, skid easily, even directly lay the slipmat on the guidance tape is walked to the part, but the slipmat is unset the bottom and walks the guidance tape and skid easily or corrugate, lead to the staff to fall down, for this, the scaffold frame of encorbelmenting for construction is urgently needed.
SUMMERY OF THE UTILITY MODEL
Based on this, the utility model aims at providing a scaffold frame of encorbelmenting for construction, walk guidance tape and support as primary structure in solving the present scaffold frame of encorbelmenting, it needs to use a large amount of bolts usually to walk the equipment between guidance tape and the support, every tie point all uses the bolt fastening, the use of a large amount of bolts leads to walking guidance tape and support equipment process loaded down with trivial details, it is simple and efficient not enough, secondly the staff when moving on walking guidance tape, skid easily, even directly lay the slipmat on the part walks guidance tape, but the unfixed bottom of slipmat skids or corrugates with walking guidance tape easily, lead to the problem that the staff falls down.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a scaffold frame of encorbelmenting for construction, includes building wall and walks the guidance tape, building wall's inside is connected with the one end of crossbeam, and the welding of crossbeam other end below has the down tube, the lug is installed to the upper surface integration of crossbeam, and the inside of lug has seted up the spacing groove, first round hole has been seted up on the surface of lug, the picture peg has been inlayed to the inside of spacing groove, and the inside of picture peg has seted up the second round hole, the connecting rod has been run through to the inside of second round hole, and both ends all are equipped with the screw thread around the connecting rod, the cap has been connect soon in the outside of screw thread.
Walk the upper end that the guidance tape is located the picture peg, and walk the upper surface inside of guidance tape and seted up the standing groove, the internally mounted of standing groove has the sucking disc, and is connected with the slipmat on the sucking disc.
Preferably, the left ends of the inclined rods and the left end of the cross beam extend into the building wall, and the inclined rods are parallel to each other.
Preferably, the outer surface of the inserting plate is attached to the inner surface of the limiting groove, and the number of the inserting plates is equal to that of the lugs.
Preferably, the connecting rod penetrates through the protruding block and the inserting plate through the first round hole and the second round hole, and the connecting rod is in threaded connection with the cap.
Preferably, the lower surface of walking the guidance tape sets up to the welding with the picture peg, and walks the upper surface of guidance tape and the upper surface of slipmat and laminate mutually to the upper surface of slipmat is provided with anti-skidding line.
Preferably, the walkway plate is connected with the non-slip mat through the suckers, and the suckers are symmetrical about the central axis of the walkway plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model is provided with a lug, a limiting groove, a first round hole, a plug board, a second round hole, a connecting rod, a thread and a cap, the connecting rod is passed through the first round hole and the second round hole, so that the connecting rod runs through a plurality of lugs and plug boards, and the cap is screwed at the front end and the rear end of the connecting rod, so that the walkway plate is fixed on the crossbeam;
2. the utility model discloses in walk the guidance tape and be connected with the slipmat through the sucking disc, the slipmat has improved the non slipping nature of walking the guidance tape, makes the slipmat adsorbed at walking the guidance tape upper surface through setting up of sucking disc, and the slipmat is difficult for dropping also can not corrugate, avoids the staff to stumble by the slipmat, and secondly when the anti-skidding line on slipmat surface is worn out, when leading to anti-skidding effect to reduce, can in time change the slipmat.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic sectional structure of the present invention;
FIG. 3 is a schematic side view of the cross beam of the present invention;
fig. 4 is an enlarged schematic structural diagram of a point a in fig. 2 of the present invention.
In the figure: 1. building a wall body; 2. a cross beam; 3. a diagonal bar; 4. a bump; 5. a limiting groove; 6. a first circular hole; 7. inserting plates; 8. a second circular hole; 9. a connecting rod; 10. a thread; 11. a cap; 12. a walkway plate; 13. a placement groove; 14. a suction cup; 15. a non-slip mat.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
The following describes an embodiment of the present invention according to its overall structure.
Referring to fig. 1 to 4, a cantilever scaffold for building construction includes a building wall 1 and a walkway plate 12, the interior of the building wall 1 is connected to one end of a beam 2, and the lower part of the other end of the cross beam 2 is welded with an inclined rod 3, the left end of the inclined rod 3 and the left end of the cross beam 2 both extend into the building wall 1, the inclined rods 3 are parallel to each other, the inclined rods 3 and the cross beam 2 form a triangular structure, the fixing mode is favorable for enhancing the stability of the cross beam 2 and improving the bearing capacity of the cross beam 2, the convex block 4 is integrally arranged on the upper surface of the cross beam 2, a limit groove 5 is arranged inside the convex block 4, a first round hole 6 is arranged on the surface of the convex block 4, an inserting plate 7 is embedded inside the limit groove 5, and the inner part of the inserting plate 7 is provided with a second round hole 8, the outer surface of the inserting plate 7 is jointed with the inner surface of the limiting groove 5, and the number of the inserting plates 7 is equal to that of the convex blocks 4, the inserting plates 7 are inserted in alignment with the limiting grooves 5, the arrangement is convenient for aligning the first round hole 6 and the second round hole 8, the connecting rod 9 penetrates through the inner part of the second round hole 8, and the front and back ends of the connecting rod 9 are provided with threads 10, the outer side of the threads 10 is screwed with a cap 11, the connecting rod 9 penetrates through the convex block 4 and the inserting plate 7 through the first round hole 6 and the second round hole 8, and the connecting rod 9 is in threaded connection with the cap 11, the connecting rod 9 penetrates through the first round hole 6 and the second round hole 8, the plurality of projections 4 and the insert plate 7 are penetrated through by the connecting rod 9, and then caps 11 are clockwise screwed to both front and rear ends of the connecting rod 9 by means of the screw threads 10, the inserting plate 7 and the convex block 4 can be completely fixed, so that the walkway plate 12 is fixed on the cross beam 2, the arrangement can reduce the use of screws, reduce the installation difficulty of the walkway plate 12 and ensure that the walkway plate 12 is more convenient to install;
walkway plate 12 is located the upper end of picture peg 7, and the inside of the upper surface of walkway plate 12 has seted up standing groove 13, the internally mounted of standing groove 13 has sucking disc 14, and sucking disc 14 upper end is connected with slipmat 15, the lower surface of walkway plate 12 sets up to the welding with picture peg 7, and the upper surface of walkway plate 12 laminates with the upper surface of slipmat 15 mutually, and the upper surface of slipmat 15 is provided with anti-skidding line, walkway plate 12 is used for making things convenient for the staff to walk, slipmat 15 is used for having improved the antiskid nature of walkway plate 12, reduce the probability that the staff fell, walkway plate 12 is connected with slipmat 15 through sucking disc 14, and the axis symmetry about walkway plate 12 between the sucking disc 14, make slipmat 15 adsorbed on the upper surface of walkway plate 12 through the setting up of sucking disc 14, be difficult for dropping, also can not corrugate, avoid the staff to be stumbled by slipmat 15, secondly, when the antiskid effect reduces as the antiskid line on slipmat 15 surface is worn flat, can in time change.
The working principle is as follows: during the use, provide the holding power for the device through crossbeam 2 and down tube 3, guidance tape 12 is walked in the installation afterwards, the picture peg 7 that will walk the lower extreme of guidance tape 12 aims at the inside spacing groove 5 of lug 4 and inserts, make the alignment of first round hole 6 and second round hole 8, pass connecting rod 9 from first round hole 6 and second round hole 8 inside again, run through a plurality of lugs 4 and picture peg 7 through connecting rod 9, screw up cap 11 clockwise at both ends around connecting rod 9 through screw thread 10, can fix picture peg 7 and lug 4 completely, thereby make guidance tape 12 fixed on crossbeam 2, process convenient and fast, for the antiskid nature that has improved guidance tape 12, insert the sucking disc 14 alignment standing groove 13 of non slipping mat 15 lower surface, make non slipping mat 15 adsorbed in guidance tape 12 upper surface through sucking disc 14, this item sets up and makes non slipping mat 15 be difficult to remove and corrugate, the antiskid nature of this scaffold has greatly increased.
Those not described in detail in this specification are within the skill of the art.
The terms "central," "longitudinal," "lateral," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientation or positional relationship indicated in the drawings for ease of description, but are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the scope of the invention.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a scaffold frame of encorbelmenting for construction, includes building wall (1) and guidance tape (12), its characterized in that: the building wall comprises a building wall body (1), a cross beam (2), an inclined rod (3) welded below the other end of the cross beam (2), a convex block (4) integrally installed on the upper surface of the cross beam (2), a limiting groove (5) formed in the convex block (4), a first round hole (6) formed in the surface of the convex block (4), an inserting plate (7) embedded in the limiting groove (5), a second round hole (8) formed in the inserting plate (7), a connecting rod (9) penetrating through the second round hole (8), threads (10) arranged at the front end and the rear end of the connecting rod (9), and a cap (11) screwed on the outer side of the threads (10);
walk guidance tape (12) and be located the upper end of picture peg (7), and walk guidance tape's (12) upper surface inside and seted up standing groove (13), the internally mounted of standing groove (13) has sucking disc (14), and sucking disc (14) upper end is connected with slipmat (15).
2. The overhanging scaffold for building construction according to claim 1, wherein: the left ends of the inclined rods (3) and the left end of the cross beam (2) extend into the building wall body (1), and the inclined rods (3) are parallel to each other.
3. The overhanging scaffold for building construction according to claim 1, wherein: the outer surface of the inserting plate (7) is attached to the inner surface of the limiting groove (5), and the number of the inserting plates (7) is equal to that of the lugs (4).
4. The overhanging scaffold for building construction according to claim 1, wherein: connecting rod (9) run through lug (4) and picture peg (7) through first round hole (6) and second round hole (8), and connecting rod (9) and cap (11) threaded connection.
5. The overhanging scaffold for building construction according to claim 1, wherein: the lower surface of the walkway plate (12) and the inserting plate (7) are welded, the upper surface of the walkway plate (12) is attached to the upper surface of the non-slip mat (15), and anti-slip lines are arranged on the upper surface of the non-slip mat (15).
6. The overhanging scaffold for building construction according to claim 1, wherein: the walkway plate (12) is connected with the non-slip mat (15) through the suckers (14), and the suckers (14) are symmetrical about the central axis of the walkway plate (12).
CN202222838766.XU 2022-10-27 2022-10-27 Construction is with scaffold frame of encorbelmenting Active CN218562970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222838766.XU CN218562970U (en) 2022-10-27 2022-10-27 Construction is with scaffold frame of encorbelmenting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222838766.XU CN218562970U (en) 2022-10-27 2022-10-27 Construction is with scaffold frame of encorbelmenting

Publications (1)

Publication Number Publication Date
CN218562970U true CN218562970U (en) 2023-03-03

Family

ID=85319933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222838766.XU Active CN218562970U (en) 2022-10-27 2022-10-27 Construction is with scaffold frame of encorbelmenting

Country Status (1)

Country Link
CN (1) CN218562970U (en)

Similar Documents

Publication Publication Date Title
CN203531344U (en) Tool type scaffold
CN105888230A (en) Lifting device for building curtain wall construction and construction method thereof
CN211286562U (en) Climbing frame mounting bracket suitable for bay window
CN218562970U (en) Construction is with scaffold frame of encorbelmenting
CN211257740U (en) Small-span operation platform suitable for high-altitude construction
CN207620384U (en) Jack device for discharging
CN211873780U (en) Attached safety operation protection platform for building construction
CN215407320U (en) Aluminum alloy climbing frame guide rail
CN212453580U (en) Novel safe cat ladder of dish mouth formula scaffold frame
CN203977833U (en) A kind of wall-attached builder's jack
CN211736107U (en) Integration steel stair
CN220487053U (en) Portable photovoltaic panel installation operation platform
CN212773380U (en) Lower hanger structure for scaffold
CN205908001U (en) Operation platform standard module and operation platform
CN212836653U (en) Step ladder for climbing frame
CN215167921U (en) I-shaped steel beam supporting device
CN213927416U (en) Attached lifting scaffold
CN218843732U (en) Suspension device and creeping formwork
CN213898076U (en) Bent rod type connecting structure of walkway plate and connecting plate
CN216428982U (en) Spliced building external construction platform
CN214034644U (en) Scaffold convenient to instrument is put and is passed thing convenience
CN215631447U (en) Insulating scaffold with rest platform
CN215254375U (en) Fire retardant coating construction movable cantilever frame
CN212478514U (en) Building outer frame plate
CN211397658U (en) Pedestrian passageway for shield tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240423

Address after: 246700 Factory Building 2, Zongtong Road, Xinlou Development Zone, Zongyang County, Tongling City, Anhui Province

Patentee after: Anhui Hongye Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 415000 No. 660, Sanxing Road, Wuling District, Changde City, Hunan Province

Patentee before: Hunan Haoyu Construction Co.,Ltd.

Country or region before: China