CN218522388U - 一种电力工程用电杆矫正装置 - Google Patents
一种电力工程用电杆矫正装置 Download PDFInfo
- Publication number
- CN218522388U CN218522388U CN202221736811.4U CN202221736811U CN218522388U CN 218522388 U CN218522388 U CN 218522388U CN 202221736811 U CN202221736811 U CN 202221736811U CN 218522388 U CN218522388 U CN 218522388U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- fixed
- pole
- plate
- correction device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims abstract description 3
- 230000005540 biological transmission Effects 0.000 claims description 13
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 230000009471 action Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 241000220317 Rosa Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Handcart (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221736811.4U CN218522388U (zh) | 2022-07-07 | 2022-07-07 | 一种电力工程用电杆矫正装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221736811.4U CN218522388U (zh) | 2022-07-07 | 2022-07-07 | 一种电力工程用电杆矫正装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218522388U true CN218522388U (zh) | 2023-02-24 |
Family
ID=85236812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221736811.4U Active CN218522388U (zh) | 2022-07-07 | 2022-07-07 | 一种电力工程用电杆矫正装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218522388U (zh) |
-
2022
- 2022-07-07 CN CN202221736811.4U patent/CN218522388U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111438236B (zh) | 智能受电弓碳滑板用两端同步折弯机及其操作方法 | |
CN218522388U (zh) | 一种电力工程用电杆矫正装置 | |
CN216581961U (zh) | 一种石油化工工程建设用管道运输装置 | |
CN209793702U (zh) | 一种汽车维修用躺板装置 | |
CN109612622B (zh) | 一种第三轨受电靴接触压力检测装置及其方法 | |
CN212676771U (zh) | 一种改进结构的四分裂导线提线器 | |
CN214535361U (zh) | 一种新一代信息技术远程教学设备 | |
CN211931092U (zh) | 一种电气柜底座 | |
CN220643737U (zh) | 具有导向结构的夯实装置 | |
CN218064016U (zh) | 一种线扫相机使用的往复运动平台 | |
CN212371388U (zh) | 一种无动力自行式螺旋环缝轨迹跟踪装置 | |
CN220625687U (zh) | 一种建筑楼体震动检测装置 | |
CN217803189U (zh) | 一种电缆挤塑偏心控制装置 | |
CN217975564U (zh) | 一种建筑工程用装配式建筑支撑设备 | |
CN115712040A (zh) | 一种冲击电压发生装置及其使用方法 | |
CN219327360U (zh) | 一种钢结构支撑架 | |
CN217325528U (zh) | 一种建筑工程地基基础检测装置 | |
CN213360019U (zh) | 一种可调节的打井施工用的设备 | |
CN211539051U (zh) | 一种机械加工用碾压装置 | |
CN219468399U (zh) | 一种不锈钢制品插板架 | |
CN221194447U (zh) | 一种可移动式集装箱房屋 | |
CN214532908U (zh) | 一种基于油田采油抽油机用高强度支撑结构 | |
CN220621207U (zh) | 一种可拆卸钢结构支撑装置 | |
CN213783181U (zh) | 一种太阳能光伏板固定支架 | |
CN213839065U (zh) | 一种性能稳定的水喷射真空泵 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230426 Address after: 325600 Qian Yao village, Liushi Town, Yueqing City, Wenzhou, Zhejiang Patentee after: Huang Longcheng Address before: 332005 no.1188, Shili Avenue, Lianxi District, Jiujiang City, Jiangxi Province Patentee before: Liu Runyun |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231116 Address after: 830026 Room 1001, Aidi Building, No. 2 Tian'ehu Road, Urumqi Economic and Technological Development Zone (Toutunhe District), Xinjiang Uygur Autonomous Region Patentee after: Xinjiang Zhongdian Power Engineering Co.,Ltd. Address before: 325600 Qian Yao village, Liushi Town, Yueqing City, Wenzhou, Zhejiang Patentee before: Huang Longcheng |
|
TR01 | Transfer of patent right |