CN218522166U - High-stability building scaffold - Google Patents
High-stability building scaffold Download PDFInfo
- Publication number
- CN218522166U CN218522166U CN202222508442.XU CN202222508442U CN218522166U CN 218522166 U CN218522166 U CN 218522166U CN 202222508442 U CN202222508442 U CN 202222508442U CN 218522166 U CN218522166 U CN 218522166U
- Authority
- CN
- China
- Prior art keywords
- stand
- fixedly connected
- stabilising arrangement
- column
- upright
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Special Chairs (AREA)
Abstract
The utility model belongs to the technical field of scaffold technique and specifically relates to a building scaffold frame that stability is high, including first stand and stabilising arrangement, one side of first stand is provided with the second stand, first stand with two crossbars of the equal fixedly connected with in second stand one side, stabilising arrangement swing joint be in first stand with the lower extreme of second stand, stabilising arrangement's lower extreme fixedly connected with adjusts the seat, first stand the second stand with the spacing seat of one side fixedly connected with that the crossbars is close to, first stand with the corresponding one side of second stand is provided with the vaulting pole, the corresponding one side fixedly connected with stand of two crossbars promotes holistic stability, reaches operating personnel's stability at the climbing in-process, and the device of being convenient for is used in different places through stabilising arrangement and thread groove screw thread regulation, promotes application range, increases the flexibility of this device.
Description
Technical Field
The utility model relates to a scaffold technical field especially relates to a high construction scaffolding of stability.
Background
The scaffold is in order to guarantee that each work progress goes on smoothly and the work platform who sets up, divide into outer scaffold according to the position of setting up, interior scaffold, can divide into wood scaffold according to the material difference, bamboo scaffold, steel pipe scaffold, divide into pole setting formula scaffold according to the structural style, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging type scaffold, choose formula scaffold, climb formula scaffold, but current scaffold is in the use, the unable regulation in scaffold bottom, the unstable condition appears in the scaffold in the use has been led to appearing easily, operating personnel leads to the fact easily at the climbing in-process and rocks, reduce the stability of scaffold, harm operating personnel personal safety, make the scaffold can't use in the environment of difference simultaneously, and then the little problem appearance of scaffold application range has been led to.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned problem that exists among the prior art, the building scaffold that provides a stability is high now.
The specific technical scheme is as follows:
the design is a high-stability building scaffold, which comprises a first stand column and a stabilizing device, wherein one side of the first stand column is provided with a second stand column, the first stand column is provided with two cross columns which are fixedly connected with the equal parts of one side of the second stand column, the two cross columns are symmetrically arranged, the stabilizing device is movably connected with the lower end of the first stand column and the lower end of the second stand column, the lower end of the stabilizing device is fixedly connected with a regulating seat, the first stand column is provided with a limiting seat fixedly connected with one side, close to the cross columns, of the second stand column, the first stand column is provided with a supporting rod corresponding to the second stand column, the two cross columns are fixedly connected with the corresponding stand columns, the first stand column is provided with a pedal corresponding to one side of the second stand column, and the pedal is located above the supporting rod.
Preferably, the thread groove has all been seted up to first stand with the lower extreme of second stand, stabilising arrangement keeps away from the one end threaded connection of adjusting the seat is in the inner wall of thread groove, it keeps away from to adjust the seat stabilising arrangement's a plurality of connector of one end fixedly connected with, just a plurality of connector equidistance sets up.
Preferably, the two cross columns are divided into two parts by the upright column, the two ends of the pedal are fixedly connected with connecting claws, one end of each connecting claw, which is far away from the pedal, is embedded and connected to the outer wall of the corresponding cross column, and one side of each connecting claw is close to the upright column.
Preferably, the stand with one side fixedly connected with climbing column that first stand is corresponding, the circular arc groove has been seted up to the outer wall of climbing column, the stand passes through climbing column fixed connection be in position between the spreader.
Preferably, the support rod is movably connected to one side of the first upright column corresponding to the second upright column, and two ends of the support rod are fixedly connected to the inner wall of the limiting seat.
Preferably, the first upright post and the second upright post are integrated through the support rod, and the support rod is positioned between the first upright post and the second upright post and has a cross-shaped staggered structure.
Preferably, the upper ends of the first upright post and the second upright post are both connected with movable posts in a threaded manner.
The technical scheme has the following advantages or beneficial effects:
1. through setting up stabilising arrangement cooperation regulation seat and connector, pass through bolt fixed connection via to vaulting pole and spacing seat, and the crisscross triangle-shaped that is of vaulting pole cross, promote stability between first stand and the second stand, be located ground when the one end of first stand and second stand, through the axial displacement between stabilising arrangement and the thread groove inner wall screw thread, be close to the friction surface that increases with ground to the regulation seat to ground, ground is pricked to the connector point this moment, form first stand and second stand and keep unified height when fixed, play the supporting role to first stand and second stand, promote holistic stability, reach operating personnel at the stability of climbing in-process, be convenient for this device to use in different places through stabilising arrangement and thread groove screw thread regulation, promote application range, increase the flexibility of this device.
2. Divide into the spreader through setting up the stand, the footboard passes through the outer wall of connecting the claw lock at the spreader and the position of fixed connection between first stand and second stand, promote the stability between first stand and the second stand, and the distance that the spreader was cut apart to the stand equals with the footboard width, closely laminate near one side to connecting claw and stand, it scrambles and is difficult for rocking to be located the climbing post top through operating personnel, promote the stability that operating personnel scrambleed, operating personnel stands in the top of footboard, by the stability of connecting the claw and closely laminating the promotion footboard, the footboard caused the condition of rocking when the walking of operating personnel has been avoided, promote operating personnel's personal safety, increase the security performance of this device.
Drawings
Embodiments of the present invention will now be described more fully hereinafter with reference to the accompanying drawings. The drawings, however, are for illustration and description only and are not intended to limit the scope of the present invention.
Fig. 1 is a schematic perspective view of a high-stability scaffold for construction according to the present invention;
fig. 2 is a schematic structural view of a climbing column of a high-stability building scaffold provided by the present invention;
fig. 3 is a schematic view of a thread groove structure of a high-stability building scaffold provided by the present invention;
fig. 4 is the utility model provides a high stability building scaffold's a local enlarged structure schematic diagram in fig. 1.
The above reference numerals denote: the device comprises a first upright post 1, a second upright post 12, a cross post 13, a stabilizing device 2, a thread groove 21, an adjusting seat 22, a connecting head 23, a limiting seat 24, a supporting rod 25, an upright post 26, a pedal 3, a connecting claw 31, a climbing post 32, an arc groove 33 and a movable post 34.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that, in the case of no conflict, the embodiments and features of the embodiments of the present invention may be combined with each other.
The present invention will be further described with reference to the accompanying drawings and specific embodiments, which are not intended to limit the present invention.
Referring to fig. 1-4, a high-stability building scaffold comprises a first upright post 1 and a stabilizing device 2, a second upright post 12 is arranged on one side of the first upright post 1, two cross posts 13 are fixedly connected to one sides of the first upright post 1 and the second upright post 12, the two cross posts 13 are symmetrically arranged, the stabilizing device 2 is movably connected to the lower ends of the first upright post 1 and the second upright post 12, a regulating seat 22 is fixedly connected to the lower end of the stabilizing device 2, a limiting seat 24 is fixedly connected to one side, close to the first upright post 1 and the cross posts 13, of the second upright post 12, a supporting rod 25 is arranged on one side, corresponding to the first upright post 1 and the second upright post 12, an upright post 26 is fixedly connected to one side, corresponding to the first upright post 1 and the second upright post 12, a pedal 3 is installed on one side, and the pedal 3 is located above the supporting rod 25.
Through setting up 2 cooperation regulation seats 22 and connector 23 of stabilising arrangement, pass through bolt fixed connection through vaulting pole 25 and spacing seat 24, and the crisscross triangle-shaped form that is of vaulting pole 25 cross, promote the stability between first stand 1 and the second stand 12, be located ground when the one end of first stand 1 and second stand 12, through the axial motion between stabilising arrangement 2 and the 21 inner wall screw threads of thread groove, be close to the friction surface that increases with ground to regulation seat 22, ground is pricked to connector 23 pointed end this moment, form first stand 1 and second stand 12 and keep unified height when fixed, play the supporting role to first stand 1 and second stand 12, promote holistic stability, reach operating personnel's stability at the climbing in-process, be convenient for this device and use in different places through stabilising arrangement 2 and 21 screw thread adjustment of thread groove, promote application range, increase the flexibility of this device.
Further, thread groove 21 has all been seted up to the lower extreme of first stand 1 and second stand 12, and the one end threaded connection that stabilizing device 2 kept away from regulation seat 22 is at the inner wall of thread groove 21, and the one end fixedly connected with a plurality of connector 23 that stabilizing device 2 was kept away from to regulation seat 22, and a plurality of connector 23 equidistance sets up.
Through the axle between stabilising arrangement 2 and the 21 inner wall screw threads of thread groove, be close to the friction surface that increases with ground to adjusting seat 22, 23 pointed ends of connector prick ground this moment, form first stand 1 and second stand 12 and keep unified height when fixed, play the supporting role to first stand 1 and second stand 12, promote holistic stability, be convenient for this device to use in different places by stabilising arrangement 2 and 21 screw thread adjustments of thread groove, promote application range, increase the flexibility of this device.
Further, two spreader 13 divide into two through stand 26, the equal fixedly connected with in both ends of footboard 3 connects claw 31, connect claw 31 and keep away from the one end gomphosis of footboard 3 and connect the outer wall at spreader 13, and connect claw 31 one side and stand 26 and be close to mutually, divide into spreader 13 through setting up stand 26, footboard 3 is through connecting claw 31 lock at the outer wall of spreader 13 and the position of fixed connection between first stand 1 and second stand 12, promote the stability between first stand 1 and the second stand 12, and the distance that spreader 13 was cut apart to stand 26 equals with footboard 3 width, be close to one side closely laminating to connecting claw 31 and stand 26, lie in climbing column 32 top through operating personnel and scramble and be difficult for rocking.
Further, stand 26 and the corresponding one side fixedly connected with climbing post 32 of first stand 1, arc groove 33 has been seted up to the outer wall of climbing post 32, and stand 26 increases frictional force through climbing post 32 fixed connection in the position between spreader 13 between arc groove 33 and the operating personnel palm when holding, promotes operating personnel and snatchs firmly in the climbing process, the climbing of being convenient for.
Further, vaulting pole 25 swing joint is in the corresponding one side of first stand 1 and second stand 12, and the equal fixed connection in the inner wall of spacing seat 24 in the both ends of vaulting pole 25 carries on spacingly to spacing seat 24 range of opening, and the vaulting pole 25 of being convenient for opens and supports first stand 1 and second stand 12.
Further, the first upright column 1 and the second upright column 12 are integrated through the support rod 25, and the support rod 25 is located between the first upright column 1 and the second upright column 12 and has a cross-shaped staggered structure.
Further, the upper ends of the first stand column 1 and the second stand column 12 are respectively connected with a movable column 34 in a threaded manner, splicing is facilitated through the movable columns 34, and flexible use of the device is improved.
The working principle is as follows: when using this device, adjust seat 22 and connector 23 through setting up the cooperation of stabilising arrangement 2, pass through bolt fixed connection through vaulting pole 25 and spacing seat 24, and the crisscross triangle-shaped form that is of vaulting pole 25 cross, promote the stability between first stand 1 and the second stand 12, one end when first stand 1 and second stand 12 is located ground, through the axial motion between stabilising arrangement 2 and the screw thread of thread groove 21 inner wall, adjust seat 22 to be close to ground and increase the friction surface with ground, connector 23 pointed end pricks ground this moment, form first stand 1 and second stand 12 and keep unified height when fixed, play the supporting role to first stand 1 and second stand 12, promote holistic stability, reach operating personnel's stability in the climbing process, it uses in different places to be convenient for this device through stabilising arrangement 2 and the screw thread adjustment of thread groove 21, promote application range, increase the flexibility of this device.
Divide into through setting up stand 26 to spreader 13 one, footboard 3 is through connecting the position of claw 31 lock at the outer wall of spreader 13 and fixed connection between first stand 1 and second stand 12, promote the stability between first stand 1 and the second stand 12, and the distance that spreader 13 was cut apart to stand 26 equals with footboard 3 width, closely laminate near one side to connecting claw 31 and stand 26, it scrambles and is difficult for rocking to be located climbing post 32 top through operating personnel, promote the stability of operating personnel climbing, operating personnel stands in the top of footboard 3, promote the stability of footboard 3 by connecting claw 31 closely laminating, the condition that footboard 3 caused the rocking when having avoided operating personnel to walk, promote operating personnel's personal safety, increase the security performance of this device.
The above description is only an example of the preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and those skilled in the art should be able to realize the equivalent alternatives and obvious variations of the present invention.
Claims (7)
1. The utility model provides a high building scaffold of stability which characterized in that: including first stand (1) and stabilising arrangement (2), one side of first stand (1) is provided with second stand (12), first stand (1) with two spreader (13) of the equal fixedly connected with in second stand (12) one side, two spreader (13) symmetry set up, stabilising arrangement (2) swing joint be in first stand (1) with the lower extreme of second stand (12), the lower extreme fixedly connected with of stabilising arrangement (2) adjusts seat (22), first stand (1) second stand (12) with one side fixedly connected with spacing seat (24) that spreader (13) are close to, first stand (1) with one side corresponding of second stand (12) is provided with vaulting pole (25), one side fixedly connected with stand (26) corresponding of two spreader (13), first stand (1) with footboard (3) are installed to one side corresponding of second stand (12), just footboard (3) are located the top of vaulting pole (25).
2. A high stability construction scaffolding according to claim 1, wherein: first stand (1) with thread groove (21) have all been seted up to the lower extreme of second stand (12), stabilising arrangement (2) are kept away from the one end threaded connection who adjusts seat (22) is in the inner wall of thread groove (21), adjust seat (22) and keep away from stabilising arrangement's (2) one end fixedly connected with a plurality of connector (23), just a plurality of connector (23) equidistance sets up.
3. A high stability construction scaffold according to claim 1 wherein: the two cross columns (13) are divided into two parts through the upright columns (26), connecting claws (31) are fixedly connected to two ends of the pedal (3), one ends, far away from the pedal (3), of the connecting claws (31) are connected to the outer walls of the cross columns (13) in an embedded mode, and one sides of the connecting claws (31) are close to the upright columns (26).
4. A high stability construction scaffold according to claim 1 wherein: stand (26) with one side fixedly connected with climbing column (32) that first stand (1) is corresponding, circular arc groove (33) have been seted up to the outer wall of climbing column (32), stand (26) pass through climbing column (32) fixed connection be in position between spreader (13).
5. A high stability construction scaffolding according to claim 1, wherein: the stay bar (25) is movably connected to one side of the first upright post (1) corresponding to the second upright post (12), and two ends of the stay bar (25) are fixedly connected to the inner wall of the limiting seat (24).
6. A high stability construction scaffolding according to claim 1, wherein: the first upright column (1) and the second upright column (12) are integrated through the support rods (25), and the support rods (25) are located between the first upright column (1) and the second upright column (12) and are in a cross-shaped staggered structure.
7. A high stability construction scaffold according to claim 1 wherein: the upper ends of the first upright post (1) and the second upright post (12) are both in threaded connection with a movable post (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222508442.XU CN218522166U (en) | 2022-09-21 | 2022-09-21 | High-stability building scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222508442.XU CN218522166U (en) | 2022-09-21 | 2022-09-21 | High-stability building scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218522166U true CN218522166U (en) | 2023-02-24 |
Family
ID=85245748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222508442.XU Active CN218522166U (en) | 2022-09-21 | 2022-09-21 | High-stability building scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218522166U (en) |
-
2022
- 2022-09-21 CN CN202222508442.XU patent/CN218522166U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102022083B1 (en) | Complex double supported cable suspension bridge | |
CN218522166U (en) | High-stability building scaffold | |
CN214658685U (en) | Combined anti-skidding climbing frame for constructional engineering | |
CN212773366U (en) | Door type scaffold | |
CN105275377A (en) | Herringbone ladder | |
CN211383614U (en) | Expansion training frame with liftable track | |
CN205742939U (en) | A kind of Anti-inclining scaffold | |
CN209742777U (en) | House building is with ladder convenient to remove walking | |
CN211923486U (en) | Cantilever structure part climbing frame support heightening part | |
CN219548303U (en) | Scaffold for civil engineering construction | |
CN109019420B (en) | Multi-functional cat ladder is used in architectural decoration | |
CN203097694U (en) | All-directional fixed connection ladder | |
CN207499383U (en) | Height-adjustable hoistway operation platform | |
CN216766720U (en) | Safety protection device for power transmission and transformation engineering construction | |
CN218091926U (en) | Building engineering building climbing frame | |
CN207863449U (en) | Disk buckle type scaffold new type of safe cat ladder | |
CN211572642U (en) | Be used for construction steel bar ligature operation platform | |
JP2006194061A (en) | Tree-climbing machine | |
CN218970575U (en) | Novel building scaffold with it is multi-functional | |
CN215565682U (en) | Use convenient cat ladder | |
CN210918152U (en) | Civil engineering safety scaffold | |
CN216277231U (en) | Construction site faces limit protector | |
CN213016149U (en) | Gardens are with multi-functional gardens ladder | |
CN220451359U (en) | Security protection device for construction | |
CN216042488U (en) | Novel scaffold for multi-use architecture construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |