CN218521628U - Detachable arm brace of suspension cable stretch-draw - Google Patents

Detachable arm brace of suspension cable stretch-draw Download PDF

Info

Publication number
CN218521628U
CN218521628U CN202222371125.8U CN202222371125U CN218521628U CN 218521628 U CN218521628 U CN 218521628U CN 202222371125 U CN202222371125 U CN 202222371125U CN 218521628 U CN218521628 U CN 218521628U
Authority
CN
China
Prior art keywords
roof
fixedly connected
plate
rod
detachable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222371125.8U
Other languages
Chinese (zh)
Inventor
刘永亮
焦林洋
蒙龙祥
何文忠
王根生
杨远林
班道菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN202222371125.8U priority Critical patent/CN218521628U/en
Application granted granted Critical
Publication of CN218521628U publication Critical patent/CN218521628U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge construction technical field just discloses detachable spike of suspension cable stretch-draw, including bottom plate, roof and jack, internal thread blind hole, every have all been seted up to four corners of the upper surface of bottom plate the equal screw thread in inside of internal thread blind hole has cup jointed the bolt, every the upper end of bolt is all through the first inserted bar of bracing piece fixedly connected with, first slot has all been seted up to four corners in the bottom of roof, every first inserted bar is pegged graft with the first slot activity that corresponds respectively, the jack sets up in the upside of roof, the through-hole has been seted up to the inside of roof, be provided with auxiliary stay mechanism between roof and the bottom plate. The utility model discloses greatly reduced the problem of difficulty is transported to the interior heel brace of tower, improved the efficiency of construction.

Description

Detachable arm brace of suspension cable stretch-draw
Technical Field
The utility model relates to a bridge construction technical field especially relates to detachable spike of suspension cable stretch-draw.
Background
The full length of the flower grand bridge is 1260m, wherein the main bridge is a steel-concrete superposed beam cable-stayed bridge, the main tower is a diamond type bridge tower, the height reaches 265m, and the total bridge length is 24nm +528+ 24nm =1018m. The full bridge counts 168 stay cables, the stay cables are firstly installed at the tower end (the stay cables are not installed in place at the moment), then the beam end is installed, and finally the stay cables are tensioned in place at the tower end.
This project suspension cable maximum tension is 473t, chooses 650t jack for use during on-the-spot tower end stretch-draw, because of the connecting rod that needs during stretch-draw, has the existence of anchor cup in addition, can't directly adopt the jack to stretch-draw, consequently need adopt the spike to prop up the jack and put up and stretch-draw when stretch-draw, traditional spike is whole casting, can't disassemble, the spike need be installed with the help of special hoisting equipment, the space in the tower is less, the installation is difficult, the turnover is very inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem of difficulty in transferring the stay foot in the tower in the prior art, and the detachable stay foot of stay cable stretch-draw provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
detachable spike of suspension cable stretch-draw, including bottom plate, roof and jack, internal thread blind hole, every have all been seted up to four corners of upper surface of bottom plate the equal screw thread in inside of internal thread blind hole has cup jointed the bolt, every the upper end of bolt all is through the first inserted bar of bracing piece fixedly connected with, first slot, every have all been seted up to four corners in bottom of roof first inserted bar is pegged graft with the activity of the first slot that corresponds respectively, the jack sets up in the upside of roof, the through-hole has been seted up to the inside of roof, be provided with supplementary supporting mechanism between roof and the bottom plate.
Preferably, the auxiliary supporting mechanism includes the backup pad, the upside of backup pad is rotated and is connected with the dead lever, the box is placed to the upper end fixedly connected with of dead lever, the inside of placing the box is rotated and is connected with a plurality of bull sticks, every the pole wall of bull stick all fixed the cup joint has the backing roll, the bottom of backup pad is connected with elevating system.
Preferably, elevating system is including placing board, lead screw and internal thread pipe, the lead screw rotates to be connected in the upside of placing the board, internal thread pipe fixed connection in the bottom of backup pad and cup joint with the pole wall screw thread of lead screw, two actuating levers of the pole wall symmetry fixedly connected with of lead screw.
Preferably, the four corners of the bottom of the placing plate are fixedly connected with second insertion rods, the upper surface of the bottom plate is provided with four second slots, and each second insertion rod is movably inserted into the corresponding second slot.
Preferably, the upper surface of the placing plate is symmetrically and fixedly connected with two telescopic rods fixedly connected with the supporting plate.
Preferably, the bottom of the placing box is symmetrically and fixedly connected with two universal wheels, and the two universal wheels are rotatably connected with the surface of the supporting plate.
Compared with the prior art, the utility model provides a detachable spike of suspension cable stretch-draw possesses following beneficial effect:
1. this detachable spike of suspension cable stretch-draw can independently transport its each part through carrying out detachable design with whole device to the problem of the difficulty is transported to spike in can the greatly reduced tower, has improved the efficiency of construction.
2. This detachable spike of suspension cable stretch-draw through the supporting mechanism and the elevating system who sets up, can utilize a plurality of backing rolls to reduce the frictional force of jack bottom placing the in-process of jack to be convenient for remove the jack to the upside central point of roof and put.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses greatly reduced the problem of difficulty is transported to the inner supporting leg of tower, improved the efficiency of construction.
Drawings
Fig. 1 is a schematic structural view of a detachable brace for tensioning a stay cable according to the present invention;
fig. 2 is an enlarged view of a portion a of fig. 1.
In the figure: the device comprises a base plate 1, a top plate 2, a jack 3, a bolt 4, a support rod 5, a first insertion rod 6, a support plate 7, a fixing rod 8, a box for placing 9, a rotating rod 10, a support roller 11, a placing plate 12, a screw rod 13, a threaded pipe 14, a driving rod 15, a second insertion rod 16, a telescopic rod 17 and a universal wheel 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, detachable spike of suspension cable stretch-draw, comprising a base plate 1, roof 2 and jack 3, internal thread blind hole has all been seted up to four corners of the upper surface of bottom plate 1, the equal screw thread in inside of every internal thread blind hole has cup jointed bolt 4, the first inserted bar 6 of 5 fixedly connected with of bracing piece is all passed through to the upper end of every bolt 4, first slot has all been seted up to four corners in bottom of roof 2, every first inserted bar 6 is pegged graft with the first slot activity that corresponds respectively, jack 3 sets up in the upside of roof 2, the through-hole has been seted up to the inside of roof 2
Referring to fig. 1-2, be provided with auxiliary stay mechanism between roof 2 and bottom plate 1, auxiliary stay mechanism includes backup pad 7, the upside of backup pad 7 is rotated and is connected with dead lever 8, the upper end fixedly connected with of dead lever 8 places box 9, the inside of placing box 9 is rotated and is connected with a plurality of bull sticks 10, the pole wall of every bull stick 10 has all fixedly cup jointed backing roll 11, utilize a plurality of backing rolls 11 that set up, can effectively reduce the frictional force of jack 3 bottom, be convenient for adjust the position of jack 3.
Referring to fig. 1, the bottom of backup pad 7 is connected with elevating system, elevating system is including placing board 12, lead screw 13 and internal thread pipe 14, lead screw 13 rotates to be connected in the upside of placing board 12, internal thread pipe 14 fixed connection in the bottom of backup pad 7 and cup joint with the pole wall screw of lead screw 13, two actuating levers 15 of the pole wall symmetry fixedly connected with of lead screw 13, utilize two actuating levers 15 that set up, can be convenient for drive lead screw 13, thereby realize the operation to elevating system.
Referring to fig. 1, four corners of the bottom of board 12 are fixedly connected with second insertion rods 16, four second slots are formed in the upper surface of bottom plate 1, each second insertion rod 16 is movably inserted into the corresponding second slot, the position of board 12 is fixed by inserting each second insertion rod 16 into the corresponding second slot, and the position of board 12 is prevented from being shifted.
Referring to fig. 1, the upper surface of the placing plate 12 is symmetrically and fixedly connected with two telescopic rods 17 fixedly connected with the supporting plate 7, the supporting plate 7 can be limited by the aid of the arranged telescopic rods 17, and the lead screw 13 is prevented from rotating in the process of driving the internal thread pipe 14 to rotate.
Referring to fig. 1, the bottom of the placing box 9 is symmetrically and fixedly connected with two universal wheels 18, the two universal wheels 18 are both connected with the surface of the supporting plate 7 in a rotating mode, the placing box 9 can be supported in an auxiliary mode by the aid of the two universal wheels 18, and friction between the placing box 9 and the supporting plate 7 is reduced.
The utility model discloses in, during the use, insert the inside of corresponding internal thread blind hole respectively with the screw rod of every bracing piece 5 bottom after fixed bottom plate 1, peg graft roof 2 and four bracing pieces 5 after 5 installations to four bracing pieces, peg graft after will placing four second inserted bars 16 and the second slot that corresponds of board 12 bottom, rotate two actuating levers 15, two actuating levers 15 drive lead screw 13 and rotate, lead screw 13 pivoted while is through the spacing drive backup pad 7 upward movement of two telescopic links 17, backup pad 7 drives and places box 9 upward movement, make and place box 9 and remove the top to roof 2, place jack 3 in the surface of placing a plurality of backing rolls 11 of box 9 inside and adjust the position of jack 3 to the central point of roof 2 and put, two actuating levers 15 of reverse rotation, make and place box 9 and remove the below to roof 2, thereby can place jack 3 in the upper surface of roof 2, guarantee jack 3's normal use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. Detachable spike of suspension cable stretch-draw, including bottom plate (1), roof (2) and jack (3), its characterized in that, internal thread blind hole, every have all been seted up to four corners of the upper surface of bottom plate (1) the equal screw thread in inside of internal thread blind hole has cup jointed bolt (4), every the upper end of bolt (4) all is through the first inserted bar (6) of bracing piece (5) fixedly connected with, first slot has all been seted up to four corners in bottom of roof (2), every first inserted bar (6) are pegged graft with the activity of the first slot that corresponds respectively, jack (3) set up in the upside of roof (2), the through-hole has been seted up to the inside of roof (2), be provided with supplementary supporting mechanism between roof (2) and bottom plate (1).
2. The detachable stay cable tensioning brace according to claim 1, wherein the auxiliary supporting mechanism comprises a supporting plate (7), a fixing rod (8) is rotatably connected to the upper side of the supporting plate (7), a placing box (9) is fixedly connected to the upper end of the fixing rod (8), a plurality of rotating rods (10) are rotatably connected to the inside of the placing box (9), a supporting roller (11) is fixedly sleeved on the rod wall of each rotating rod (10), and a lifting mechanism is connected to the bottom of the supporting plate (7).
3. The detachable stay cable tensioning brace according to claim 2, wherein the lifting mechanism comprises a placing plate (12), a screw rod (13) and an internal thread tube (14), the screw rod (13) is rotatably connected to the upper side of the placing plate (12), the internal thread tube (14) is fixedly connected to the bottom of the supporting plate (7) and is in threaded socket connection with the rod wall of the screw rod (13), and the rod wall of the screw rod (13) is symmetrically and fixedly connected with two driving rods (15).
4. The detachable stay cable tensioning supporting foot according to claim 3, wherein the bottom four corners of the placing plate (12) are fixedly connected with second insertion rods (16), the upper surface of the bottom plate (1) is provided with four second insertion slots, and each second insertion rod (16) is movably inserted into the corresponding second insertion slot.
5. A stay cable tension detachable brace according to claim 3, wherein the upper surface of the placing plate (12) is symmetrically and fixedly connected with two telescopic rods (17) fixedly connected with the supporting plate (7).
6. The detachable stay for stayed cables according to claim 2, characterized in that the bottom of said placing box (9) is symmetrically and fixedly connected with two universal wheels (18), and both of said universal wheels (18) are rotatably connected with the surface of the supporting plate (7).
CN202222371125.8U 2022-09-07 2022-09-07 Detachable arm brace of suspension cable stretch-draw Active CN218521628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222371125.8U CN218521628U (en) 2022-09-07 2022-09-07 Detachable arm brace of suspension cable stretch-draw

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222371125.8U CN218521628U (en) 2022-09-07 2022-09-07 Detachable arm brace of suspension cable stretch-draw

Publications (1)

Publication Number Publication Date
CN218521628U true CN218521628U (en) 2023-02-24

Family

ID=85244570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222371125.8U Active CN218521628U (en) 2022-09-07 2022-09-07 Detachable arm brace of suspension cable stretch-draw

Country Status (1)

Country Link
CN (1) CN218521628U (en)

Similar Documents

Publication Publication Date Title
CN218521628U (en) Detachable arm brace of suspension cable stretch-draw
CN206844643U (en) Post-cast strip independence braced wing support combination unit
CN215168026U (en) Template supporting structure of post-cast suspended beam plate
CN215924286U (en) Warm construction hoisting device that leads to
CN214464175U (en) Assembled shield constructs empty counterforce device that pushes away of TBM complete machine
CN213927650U (en) Strutting arrangement is used in building engineering construction
CN217175913U (en) House water leakage repairing structure
CN215889293U (en) High-stability construction support frame for building technology
CN200964696Y (en) Steel structure slippage tree-shape support
CN215670100U (en) Prefabricated assembled steel structure house
CN217268824U (en) Shear wall template fixing device is built in room
CN217175895U (en) Floor spandrel girder mounting bracket
CN221298633U (en) Temporary supporting device for beam reinforcement installation and binding process
CN219864255U (en) Precast beam support frame
CN213038898U (en) Building platform for civil engineering
CN215212524U (en) Formwork support device for building construction
CN220014595U (en) Assembled steel support
CN220100807U (en) Supporting device convenient to detach for installing prefabricated stairway
CN218843847U (en) Post-cast strip end constructional column supporting structure
CN215331492U (en) Building engineering template strutting arrangement
CN217758683U (en) Building foundation stabilization pillar
CN220226284U (en) Auxiliary installation device for welding ball net rack
CN216380502U (en) Scaffold frame for assembly type building that firmness is high
CN221422681U (en) Building support frame
CN208616485U (en) Precast wall body piling bin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant