CN200964696Y - Steel structure slippage tree-shape support - Google Patents

Steel structure slippage tree-shape support Download PDF

Info

Publication number
CN200964696Y
CN200964696Y CN 200620200881 CN200620200881U CN200964696Y CN 200964696 Y CN200964696 Y CN 200964696Y CN 200620200881 CN200620200881 CN 200620200881 CN 200620200881 U CN200620200881 U CN 200620200881U CN 200964696 Y CN200964696 Y CN 200964696Y
Authority
CN
China
Prior art keywords
quadrilateral frame
steel
tree
truss
piston shoes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620200881
Other languages
Chinese (zh)
Inventor
肖专文
王念念
周辉
李旻
罗华丽
阎彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN 200620200881 priority Critical patent/CN200964696Y/en
Application granted granted Critical
Publication of CN200964696Y publication Critical patent/CN200964696Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A steel structured sliding tree like support. The body of a sliding shoe takes the shape of a regular four edges pyramid, the prisms of which are four steel bars, the upper ends of which gather around the central steel bar and the four lower ends of which are connected with the upper parts of four supporting legs under the quadrilateral frame. The lower end of the long side of the quadrilateral frame is fixed and connected with a top plate of a hydraulic jack; the outer side face of the short side is fixed and connected with a pulling bar; and the front of the quadrilateral frame is articulated with a supporting bar, the upper end of which is connected with the extension board of a top supporting board which is the body of the sliding shoe. The utility model enhances the stability and stiffness of the structure, which makes the truss sliding system more stable and better load transferring stress. The main load transfers from the sliding system to the sliding shoe, and the stress of a roof truss structure reduces. The number of welds that are connected with the down chord of the truss greatly reduces, which is favorable for the recover of the structure appearance and the structure welding operation. Placing the pulling bar between every group of sliding shoes of a treelike supporting reduces the load transfer height, moment and the stress of the truss chord bars.

Description

The tree-shaped support of steel work slippage
(1) technical field
The utility model relates to a kind of construction steel structure supporting member, and particularly steel work supports.
(2) background technology
In the steel building work progress, steel roof truss can adopt high-altitude accumulation slippage method to install.When truss span is big, need set up together interim slideway and support thereof at span centre, this slideway generally is a level.When the lower edge of steel roof truss is not level, need between steel roof truss and interim slideway, the support piston shoes be set, with the levelling absolute altitude.The main body of the general support piston shoes of using always is the vertebral body shape, this support piston shoes are for the slippage of large-scale degree of uprising bidirectional stress steel roofing truss, because it is highly bigger, the distortion of propeller root structure is relatively large, the stationarity that is unfavorable for slippage, also have Load Transfer stressed also not good enough, the defective that the weld seam quantity that is connected with the truss lower edge is too many, welding capacity is quite big, be unfavorable for structure recovery.For example, in the engineering of the Wukesong Indoor Stadium of one of main venue of Beijing Olympic Games, the steel roofing truss is two-way quadrature truss stress system, and two-way span is 120 meters, and truss space is 12 meters, has 26 Pin.This truss cross section is fish-bellied type degree of uprising a bidirectional stress truss, and the truss cross section has seven kinds of forms, and bearing place height is 6.3m, and the span centre height does not wait from 6.3m~9.3m.For realizing the installation of Wu Ke Song steel roof system, adopted three slideway high-altitude accumulation slippage methods, transmeridional span centre sets up the interim slideway support system of being made up of 11 lattice columns and intercolumniation truss to need in the sports palace for this reason.Because steel roofing truss lower edge is the fish belly shape, height changes to 9.3 meters by 6.3 meters, and sliding rail must be a level, thus need between steel roofing and interim slideway, the support piston shoes be set, with the levelling absolute altitude.As adopt the tree-shaped support piston shoes of the back taper bodily form, then the normal pressure in preceding two groups of tree-shaped supports is not enough to tree-shaped support is pushed down in progradation, may be that hinge rotates with the tie point of top and truss.Therefore, the tree-shaped interim support piston shoes of the back taper bodily form can not be fit to needs.
(3) utility model content
The purpose of this utility model provides the tree-shaped support of a kind of steel work slippage, solves the problem that structural stability is not enough, the stressed weld seam quantity not good enough, that be connected with the truss lower edge of Load Transfer too many, welding is inconvenient.
The technical solution of the utility model: the tree-shaped support of this steel work slippage, be welded into the piston shoes main body by steel rod elements, top bracing plate| is arranged at piston shoes main body top, the piston shoes lower body part has leg, it is characterized in that: the piston shoes main body be shaped as positive four rib centrums, constitute four prisms of positive four rib centrums by four steel poles, the upper end of four prisms comes together in around the center steel column at top, four lower ends of four prisms are connected to four leg tops of quadrilateral frame bottom, be fixed with the hydraulic jack top board below the long limit of quadrilateral frame, the minor face lateral surface of the quadrilateral frame pull bar that is connected, the hinged supporting rod of the front end of quadrilateral frame, the upper end of supporting rod is connected with the extension plate of piston shoes main body top bracing plate|.
Be connected backing plate between four lower ends of above-mentioned four prisms and four legs of quadrilateral frame, between backing plate and the leg, be connected with stiffener between backing plate and the prism.
Be connected by riser between the long limit of above-mentioned hydraulic jack top board and quadrilateral frame.
Be connected floor between the top bracing plate| at above-mentioned center steel column and top.
The utility model is compared the beneficial effect that has with existing conventional art: structural stability strengthens, and the rigidity of structure increases, and steel roofing truss slippage system is more tended towards stability; Load Transfer is stressed better, and primary load is by slippage measure system-piston shoes transmission, and roof truss structure is stressed to be reduced; The weld seam quantity that is connected with the truss lower edge reduces significantly, both has been convenient to the recovery of structure outward appearance, also makes things convenient for the structure welding operation.Cylinder lever connecting rod between every group of tree-shaped support piston shoes has reduced the Load Transfer height, has reduced moment, and it is stressed to have reduced chord member of truss.The hydraulic jack top board that is connected below the long limit of quadrilateral frame is convenient to support as interim with hydraulic jack when the steel roofing unloads.In addition, the front end increase supporting rod every group of tree-shaped support rotates to prevent tree-shaped support.
(4) description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model;
Fig. 2 is a perspective view of the present utility model.
Among the figure: the extension plate of the hinge hole of 1-top bracing plate|, 2-leg, 3-prism, 4-center steel column, 5-quadrilateral frame, 6-hydraulic jack top board, 7-pull bar, 8-backing plate, 9-stiffener, 10-riser, 11-floor, 12-quadrilateral frame front end, 13-supporting rod, 14-top bracing plate|.
(5) specific embodiment
Referring to Fig. 1-2, the tree-shaped support of steel work slippage of the present utility model, be welded into the piston shoes main body by steel, top bracing plate| 1 is arranged at piston shoes main body top, the piston shoes lower body part has leg 2, it is characterized in that: the piston shoes main body be shaped as positive four rib centrums, constitute four prisms 3 of positive four rib centrums by four steel poles, the upper end of four prisms comes together in around the center steel column 4 at top, four lower ends of four prisms are connected to four leg tops of quadrilateral frame 5 bottoms, be fixed with hydraulic jack top board 6 below the long limit of quadrilateral frame, the minor face lateral surface of the quadrilateral frame pull bar 7 that is connected.The hinge hole 12 of quadrilateral frame front end is hinged with supporting rod 13, and the upper end of supporting rod 13 is connected with the extension plate 14 of piston shoes main body top bracing plate|.
For making welding convenient, make structure more firm, be connected backing plate 8 between four lower ends of above-mentioned four prisms and four legs of quadrilateral frame, between backing plate and the leg, be connected with stiffener 9 between backing plate and the prism.Be connected by riser 10 between the long limit of above-mentioned hydraulic jack top board 6 and quadrilateral frame.Be connected floor 11 between the top bracing plate| at above-mentioned center steel column and top.

Claims (4)

1. tree-shaped support of steel work slippage, be welded into the piston shoes main body by steel rod elements, top bracing plate| is arranged at piston shoes main body top, the piston shoes lower body part has leg, it is characterized in that: the piston shoes main body be shaped as positive four rib centrums, constitute four prisms of positive four rib centrums by four steel poles, the upper end of four prisms comes together in around the center steel column at top, four lower ends of four prisms are connected to four leg tops of quadrilateral frame bottom, be fixed with the hydraulic jack top board below the long limit of quadrilateral frame, the minor face lateral surface of the quadrilateral frame pull bar that is connected, the hinged supporting rod of the front end of quadrilateral frame, the upper end of supporting rod is connected with the extension plate of piston shoes main body top bracing plate|.
2. the tree-shaped support of steel work slippage according to claim 1 is characterized in that: be connected backing plate between four lower ends of above-mentioned four prisms and four legs of quadrilateral frame, between backing plate and the leg, be connected with stiffener between backing plate and the prism.
3. the tree-shaped support of steel work slippage according to claim 1 is characterized in that: be connected by riser between the long limit of above-mentioned hydraulic jack top board and quadrilateral frame.
4. the tree-shaped support of steel work slippage according to claim 1 is characterized in that: be connected floor between the fagging at above-mentioned center steel column and top.
CN 200620200881 2006-11-01 2006-11-01 Steel structure slippage tree-shape support Expired - Fee Related CN200964696Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620200881 CN200964696Y (en) 2006-11-01 2006-11-01 Steel structure slippage tree-shape support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620200881 CN200964696Y (en) 2006-11-01 2006-11-01 Steel structure slippage tree-shape support

Publications (1)

Publication Number Publication Date
CN200964696Y true CN200964696Y (en) 2007-10-24

Family

ID=38868709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620200881 Expired - Fee Related CN200964696Y (en) 2006-11-01 2006-11-01 Steel structure slippage tree-shape support

Country Status (1)

Country Link
CN (1) CN200964696Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487792A (en) * 2018-10-19 2019-03-19 中建华东投资有限公司 The interim stress system conversion method and mating adjustable device that lattice column underpins
CN111379424A (en) * 2020-03-05 2020-07-07 广州建筑股份有限公司 Anti-overturning device and method for planar structure sliding construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487792A (en) * 2018-10-19 2019-03-19 中建华东投资有限公司 The interim stress system conversion method and mating adjustable device that lattice column underpins
CN109487792B (en) * 2018-10-19 2024-01-09 中建华东投资有限公司 Temporary stress system conversion method for lattice column underpinning and matched adjustable device
CN111379424A (en) * 2020-03-05 2020-07-07 广州建筑股份有限公司 Anti-overturning device and method for planar structure sliding construction

Similar Documents

Publication Publication Date Title
CN207260338U (en) Pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body frame connecting structure
CN202280024U (en) No.0 block bracket for continuous rigid frame bridge with two-thin-wall piers
CN200964696Y (en) Steel structure slippage tree-shape support
CN210316454U (en) Large-span roof overhanging support system
CN205907812U (en) Take steel frame structure that encorbelments greatly of pull rod
CN203846791U (en) Beam-column joint reinforcing pipa bracket system used for archaistic buildings or historic building restoration
CN107419806A (en) A kind of grid solid beam-string structure system across X-type greatly and its construction method
CN211353299U (en) Novel drought-resisting shed device
CN214464175U (en) Assembled shield constructs empty counterforce device that pushes away of TBM complete machine
CN211523532U (en) Steel structure with reinforcing mechanism for factory building
CN202108055U (en) Reinforcement cantilever type retaining wall structure
CN205777716U (en) A kind of coal-burning power plant indoor coal storage yard structure
CN114352059A (en) Building structure design roof beam reinforced structure
CN204876067U (en) Fall three cornue trusss
CN211396542U (en) Cantilever scaffold puts up back support system
CN205116776U (en) Support access structure
CN201602026U (en) Non-support wintry warm type greenhouse
CN207079941U (en) A kind of Prefabricated slope roof surface board support system
CN112252478A (en) Take Y shape center pillar to be applicable to dual prestressed pipe truss structure of super large span
CN200964695Y (en) Load conversion bracket
CN101709565A (en) Double-deck continuous steel girder bridge for rigid suspended cable stiffening
CN216973706U (en) Civil engineering bearing structure for building construction
CN220538890U (en) Purline connection structure of double-slope roof
CN206071128U (en) A kind of high intensity L-type swimming pool fringe truss
CN210975463U (en) Auxiliary supporting structure for urban construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071024

Termination date: 20141101

EXPY Termination of patent right or utility model