CN218520209U - Steel pipe material cage structure of steel pipe for scaffold built in maritime work site - Google Patents

Steel pipe material cage structure of steel pipe for scaffold built in maritime work site Download PDF

Info

Publication number
CN218520209U
CN218520209U CN202220371970.2U CN202220371970U CN218520209U CN 218520209 U CN218520209 U CN 218520209U CN 202220371970 U CN202220371970 U CN 202220371970U CN 218520209 U CN218520209 U CN 218520209U
Authority
CN
China
Prior art keywords
steel pipe
material cage
steel
scaffold
meters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220371970.2U
Other languages
Chinese (zh)
Inventor
常宝琛
刘立范
姚大伟
余明淦
孙彭涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN202220371970.2U priority Critical patent/CN218520209U/en
Application granted granted Critical
Publication of CN218520209U publication Critical patent/CN218520209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pallets (AREA)

Abstract

The utility model belongs to the technical field of the steel pipe material cage structural device of the used steel pipe of scaffold is built in the maritime work place, especially for a steel pipe material cage structure of the used steel pipe of scaffold is built in maritime work place, including the steel pipe bed frame, the top fixed mounting of steel pipe bed frame has the combination of fixed pipe fastener. The utility model discloses a material cage body size is about 6.05 x 1.6 x 0.85m, and weight is about 0.54 ton, and the steel pipe quantity of adorning is 20x7+19x6=254, and steel pipe weight is about 6 tons, and bottom steel pipe is with baffle fixed position, guarantees the steel pipe stack rule; the top is fixed by a steel pipe fastener; the bottom of the steel tube material cage is provided with a forklift hole, the upright column at the top of the steel tube material cage is provided with a lifting lug, so that the steel tube material cage can be conveniently conveyed by a forklift or a crane, and the number of the conveyed material cages can be increased by the stacked structure of the upright columns, so that the engineering requirements are greatly met; can be transported for 6 meters; 4 m +2 m; 3 m +3 m; four kinds of steel pipe combinations of 2 meters +2 meters increase the quantity and the position of adjusting fixed pipe according to the combination form, guarantee the fastening nature and the security of steel pipe.

Description

Steel pipe material cage structure of steel pipe for scaffold built in maritime work site
Technical Field
The utility model relates to a marine worker place builds steel pipe material cage structural facilities technical field of the used steel pipe of scaffold frame specifically is a marine worker place builds steel pipe material cage structure of the used steel pipe of scaffold frame.
Background
In high-level construction work of a marine site, the height of which is less than 1.8 meters, a steel pipe cage for transporting and storing steel pipes is temporarily manufactured according to actual construction requirements of site construction.
The prior art has the following problems: most of the existing material cages have the problems of poor applicability, indefinite number of installed steel pipes, unreasonable steel pipe placing space, easiness in extrusion deformation and mutual collision during transportation, easiness in steel pipe scattering during strength-free checking, great potential safety hazards, incapability of effectively managing, placing and transporting and the like, engineering material waste, low construction efficiency, poor safety, incapability of meeting the satisfaction of owners and the like.
SUMMERY OF THE UTILITY MODEL
The not enough to prior art, the utility model provides a marine site builds steel pipe material cage structure of used steel pipe of scaffold, and the material cage of having solved existence now has mostly that the suitability is poor, the steel pipe quantity of adorning is undefined, and the steel pipe is put the space unreasonablely and is transported and take place extrusion deformation easily, collide each other, do not have intensity check and easily take place the scattered phenomenon of steel pipe and have very big potential safety hazard problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel pipe material cage structure of used steel pipe of scaffold is built in maritime work place, includes the steel pipe bed frame, the top fixed mounting of steel pipe bed frame has fixed pipe fastener combination.
As an optimal technical scheme of the utility model, the positive fixedly connected with stack structure of steel pipe bed frame.
As an optimal technical scheme of the utility model, the bottom fixed mounting of steel pipe bed frame has the fork truck hole.
As a preferred technical scheme of the utility model, the top fixedly connected with lug of stack structure.
As an optimal technical scheme of the utility model, the positive fixed mounting in fork truck hole has bottom steel pipe baffle.
As a preferred technical solution of the present invention, the size of the steel tube base frame is about 6.05 × 1.6 × 0.85 m.
Compared with the prior art, the utility model provides a marine worker place builds steel pipe material cage structure of the used steel pipe of scaffold frame possesses following beneficial effect:
1. the steel pipe cage structure of the steel pipes for the scaffold built in the maritime work site is fixed in number and orderly and structurally, the steel pipes are arranged regularly and are convenient to transport and manage by a forklift and a crane, the safety is greatly improved, the steel pipe cage structure can be used in a superposed mode to meet the use amount requirement of the engineering, the effective length of the steel pipes stored in the cage is 6 meters, the steel pipe cage structure can meet the storage and transportation requirements of common steel pipes of different engineering such as 2 meters, 3 meters, 4 meters and 6 meters, the engineering requirements are met, the steel pipe cage structure can be made into the steel pipe cage requirements of adaptive steel pipe lengths such as 2 meters, 3 meters, 4 meters and 6 meters according to the same thought, and the operation and engineering requirements are met; calculating through structure optimization design and strength check; the conveying requirements of a forklift or a crane are met, and the multilayer stacking can be combined, so that the construction efficiency is effectively improved; the patent meets the site construction requirement through strength check, and improves the construction safety; and the standardized design is adopted, so that the storage and management are convenient.
Drawings
Fig. 1 is a front view of the present invention;
in the figure: 1. a steel pipe base frame; 2. fixing the pipe fastener assembly; 3. a stacked structure; 4. a forklift hole; 5. lifting lugs; 6. bottom steel pipe baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, in the present embodiment: the utility model provides a steel pipe material cage structure of used steel pipe of scaffold is built in maritime work place, including steel pipe bed frame 1, the top fixed mounting of steel pipe bed frame 1 has fixed pipe fastener combination 2, through steel pipe bed frame 1, fixed pipe fastener combination 2, bottom steel pipe baffle 6, fork truck hole 4, the combination of superposed structure 3 and lug 5, the quantity that can realize that the steel pipe transports and adorn to deposit is fixed, the range is regular, the structure is firm, conveniently move and manage, space place rational utilization, the security improves, the operation demand that eminence scaffold platform was built has been satisfied, and the number of piles that can increase steel pipe material cage and the quantity of carrying steel pipe according to the demand of construction height and work load, satisfy complicated place construction environment better.
In this embodiment, steel pipe bed frame 1's positive fixedly connected with stack structure 3, the foundation structure of steel pipe material cage is the steel pipe bed frame, the utility model discloses a material cage body size is about 6.05X 1.6X 0.85 meter, and its structure is firm, checks through the intensity and calculates and satisfy the designing requirement, and the steel pipe bed frame also can be based on the length needs that the dress deposits and transport the steel pipe and design into 2 meters, 3 meters, 4 meters etc. and satisfy the steel pipe length size and carry out exclusive use and paste more the satisfying engineering demand that is tangent. The bottom of the steel pipe base frame 1 is fixedly provided with a forklift hole 4. The top fixedly connected with lug 5 of stack structure 3, fixed pipe fastener integrated configuration can install wantonly and bind and dismantle, satisfies the fixed and locking needs of the steel pipe of shipment on different positions, and its fastening nature is good, calculates through the intensity check and satisfies the designing requirement, ensures the whole safety of transporting of steel pipe material cage. The front fixed mounting of fork truck hole 4 has bottom steel pipe baffle 6, and equidistant bottom steel pipe baffle 6 has satisfied the reasonable of steel pipe material cage shipment steel pipe on spatial position and has put, reduces friction and collision each other, and spatial distribution is reasonable firm, the safety of guarantee overall structure's stability and transportation. The size of the steel pipe base frame 1 is about 6.05 × 1.6 × 0.85m, and the forklift holes designed below the steel pipe material cage can meet the requirement that a field forklift is convenient to convey and move the steel pipe material cage, so that the safety and the rapidness are greatly improved, the working hours are saved, and the construction efficiency is improved; the stacking structure is designed on the four upright columns in the middle, so that the stacking and conveying of the steel pipe material cage are facilitated, the number of conveying steel pipes can be increased, and the engineering requirements of engineering and sites are met; the 5 designs of lug are by four middle part stands, and convenient crane satisfies the engineering needs to the work of transporting of steel pipe material cage when the aerial work, improves engineering efficiency.
The utility model discloses a theory of operation and use flow: an operator fixes the position of the steel pipe base frame 1 through leveling and placing; arranging the steel pipes at intervals according to the number of the first layer of 20 steel pipes and the second layer of 19 steel pipes in the space of the bottom steel pipe partition 6; after the steel pipe is placed, fixing and locking the steel pipe fastener combined structure; according to construction site engineering and operation requirements, a forklift or a crane is selected to carry the steel pipe suspension cage to an operation site; when the demand of steel pipe quantity increases, can superpose steel pipe material cage and use fork truck to carry.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The utility model provides a steel pipe material cage structure of used steel pipe of scaffold is built on marine site, includes steel pipe bed frame (1), its characterized in that: the top fixed mounting of steel pipe bed frame (1) has fixed pipe fastener combination (2), the size of steel pipe bed frame (1) is about 6.05 x 1.6 x 0.85 meters, the bottom fixed mounting of steel pipe bed frame (1) has fork truck hole (4), the front fixed mounting of fork truck hole (4) has bottom steel pipe baffle (6).
2. The steel pipe material cage structure of the steel pipe for the scaffold built on the maritime work site as claimed in claim 1, is characterized in that: the front side of the steel pipe base frame (1) is fixedly connected with a superposition structure (3).
3. The steel pipe material cage structure of the steel pipe for the scaffold built on the maritime work site as claimed in claim 2, wherein: the top of the stacking structure (3) is fixedly connected with a lifting lug (5).
CN202220371970.2U 2022-02-23 2022-02-23 Steel pipe material cage structure of steel pipe for scaffold built in maritime work site Active CN218520209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220371970.2U CN218520209U (en) 2022-02-23 2022-02-23 Steel pipe material cage structure of steel pipe for scaffold built in maritime work site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220371970.2U CN218520209U (en) 2022-02-23 2022-02-23 Steel pipe material cage structure of steel pipe for scaffold built in maritime work site

Publications (1)

Publication Number Publication Date
CN218520209U true CN218520209U (en) 2023-02-24

Family

ID=85237119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220371970.2U Active CN218520209U (en) 2022-02-23 2022-02-23 Steel pipe material cage structure of steel pipe for scaffold built in maritime work site

Country Status (1)

Country Link
CN (1) CN218520209U (en)

Similar Documents

Publication Publication Date Title
CN206624126U (en) Transfer car(buggy)
CN101767673B (en) Device for storing and transferring automotive body-in-white sheet metal
CN102689747A (en) Cable storage tray
CN218520209U (en) Steel pipe material cage structure of steel pipe for scaffold built in maritime work site
CN111874550B (en) Underground container logistics underground loading and unloading system and arrangement method thereof
CN202294476U (en) Self-unloading saddle for petrifaction type tower device
CN208053838U (en) A kind of storage rack of oil tank of transformer
RU95608U1 (en) TRANSPORTATION DEVICE AND CONTAINER (OPTIONS)
CN205387318U (en) Rectangular type material storage frame of layer posture
CN100554632C (en) Multifunctional logistics storage dispensing station
CN202558086U (en) Cable storage tray
CN201914225U (en) Automatic loading and unloading device of heavy type demountable tanker carrier
CN210259247U (en) Extensible tray device
CN201224482Y (en) Combined rack for transporting super-wide container
CN103434720B (en) Foldable object turnover box capable of being divided and positioned
CN207089909U (en) A kind of coil steel transportation general tray
Lizbetin et al. Significance of proper selection of handling equipment in inland intermodal transport terminals
CN209952077U (en) Loading anti-falling device
CN208439742U (en) A kind of moveable platform being layered placement and rapid transport for container cargo
CN202163675U (en) Foldable-type warehousing cage
CN201597823U (en) Storing and transfer device of automobile body-in-white panels
CN217599168U (en) Two-series high-circular-spring storage and transportation integrated station device
CN205221380U (en) Transport and fight
CN203473396U (en) Isolated positioning folding article container
CN214825051U (en) Stacking box structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant